Progress version

Hi,
I created a Progress version for my company code.
In WBS, Progress Tab --> Progress version field my progress version  is missing.
Where should i assign my progress version so as to appear in WBS progress tab

Hi Thanks,
Yes i didn't created for a project.
Can you please give the path how i can manually assign my progress version to WBS and activity ?

Similar Messages

  • Migration from Progress (version 8.36 - 9.1) to Oracle 8i or 9i

    Hi all, I am trying to migrate data from Progress version 8.36 above to Oracle 8i and possibly 9i in the future. Has any of you implemented this before or know where I can get valuable hands on information or link on how to do this, especially the obstacles and issues involving this migration.
    Thanks

    Phil,
    There is an informix 7 oracle migration workbench plugin and related documentation for informix 7 to oracle8i and oracle9i. In the oracle workbench download area.
    Regards,
    Turloch
    Oracle Migration Workbench Team

  • Two - Progress Versions in One Project

    Dear Experts,
    I need to setup two progress versions for one project.
    Progress Version 1 - for monitoring project progress and preparing S curve., measurement method is time propotional.
    Progress Version 2 - for Result Analysis, measurement method is Estimation.
    Please advise on the following....
    a) Is it necessary to enter both plan and actual for RA POC (for Progress Version 2), or can I enter only the actual progress.
    b) Can I maintain the POC only on the Billing Element (WBS Element) where the RA will be calculated (RA key attached WBS Element).
    c) Can I use two different POC  weighting for the two different progress version.
    Looking forward to hearing from you.
    Thanking you.
    Best Regards,
    Abdul.

    Hi Jon,
    I know I can right click and pulldown to "locate referenced files" and in both cases it says there are no referenced files which means that neither of these is in an Album or whatever.
    Sorry, no, that means something completely different. It means that your master images are managed, they  are imported into your Aperture Library and not stored outside your library. Perhaps you mixed this up with "Show in project", that you can use to find out the home project of an image in an album.
    But is there a way to know what the Master is for these two?
    No, both images are versions, referencing the same master. What you can find out, however, is which of the two is the most recent version.
    To see this, you need to define a Meta Data preset in the Inspector Window. Open "Meta Data" in the Inspector Window. Select "Edit" in the selector. In the right panel navigate to Aperture -> Last Modified Date and check this item.
    Now you will see the date when your your version was last modified. So you will be able to which of these two is the original version.
    I know these sound confused and I am even after having pored over the full extent of the documentation.
    Good for you! Keep it up, and do not only read but experiment with this information - try it out with a small experimental library.
    Regards
    Léonie

  • Enter progress version once only-7A304

    HI Gurus
    We are upgrading system from ECC5 to ECC6.0 and we are getting error like "Enter progress version once only-7A304".  Can anyprovide some pointers to resolve the issue.
    Thanks and regards
    Ramarao

    HI Drik,
    Thanks for your reply
    He is getting that error message when he is trying upload values through his custom defined program
    Actully our issue is Ecc6.0,  progress version values are getting populated automatically in WBS in progress tab but not in case of ECC5.0. Our client requires restore the same functionality in ECC6.0.  Could you please provide info on this why it is behaving in that manner and what is the resolution
    Thanks and regards
    Ramarao

  • Default Progress Method and Progress Version

    Hello all,
    Could someone explain me why are Plan or Actual POC not shown in CNE5 when no progress version is set in progress tab of any WBS element or activity? According to squence of consideration of progress method if system couldnt find any method set by manually then go next step and check consistence of opposite POC method. (plan POC consider actual POC method if not manually set, actual POC method consider plan POC method if not manually set.) If also opposite POC method is not assigned then go next step and check default measurement methods defined in IMG. If also not assigned then the system goes through SAP 0-100 method.
    But, when I check my reports in CNE5 when I didnt assign any progress version in progress tab none of date comes screen. I dont get it.

    Hello,
    it is mandatory to enter a Progress Version for the objects relevant for the Progress Analysis. This is needed as the settings concerning the default measurement methods are depending on the Progress Versions.
    If you don't like to maintain a Progress Version for each object note 549097 might be useful for you.
    Kind regards,
    Dirk

  • Default progress version in project objects

    hi all,
    is it possible to have a default progress version in projects.. note, i am referring to progress version, not measurement method...
    my main requirement is to have progress values but no need to maintain progress version in progress tab of WBS and activities...
    is this possible using substitution or user exit or is it possible no need to maintain prog version in wbs but still have poc values..
    thanks.

    no replies..

  • Error in Project Progress Config and process steps

    Hi experts,
    I am implementing PS for Asset procurement, in this i will procure material against material component which is added in Internal activity. I am using scheduling also. Now My client requirement is that he want project progress report on cost basic.
    I am using CJ40, CJ30 and CJ32.
    IN IMG i have configured like given below
    1. I have created Progress version 100
        EV base - Cost Plan ( active Proejct, Annual Value)
        POC weighting - Weight
        Planning type - Basic dates
        Early/Late - Earliest Possible
        Actual method and Ref plan method tick.
    2. Measurement method -
       for cost based report i have selected - Cost proportional
    3. Default value for measuremnt method -
        100 -WBS element - Plan - Cost proportional
        100 - WBS element - Actual - Cost proportional
        100 - Acitvity ( int)- Actual - Cost proportional 
        100 - Acitvity ( int)- Actual - Cost proportional 
    I have put this in CJ20N. I followed following steps
    1. CNE1
    2. CNE5
    but it is showing 0 value in all tabs such as Aggregate planned percentage of completion, Non-aggregated planned percentage of completion
    can anyone tell me the total process to get this report perfectly. It is very urgent need so please help me guys.
    Thanks,

    Hi,
    1) in wbs goto progress tab for enter version plan ,give ur method and actual also give your method  poc weightage give 1
    2) in activity go to progress tab enter your version, give your method for plan and actual give the work measurement method and weightage give 1
    3) now confirm the activities if partial confirmation enter the degree of processing (%).
    4) goto progress calculation screen and give your project number and select with hierachy and with orders. enter the month and year.
    5) excute,
    6) goto the report and check the report.
    if still not working send screen shot of the report.
    Thanking you
    Vengaiah Chowdary

  • Problem in Project progress

    Hi,
    I am facing problem in Project progress report CNE5.
    System is calculated 300 % poc in Adjusted aggregated actual POC & Aggregated actual POC field only after full confirmed the activity (Degree of Processing is showing in report as 100%).
    If I confirmed 50 % then system is showing above value 0% .
    Also while CNE1 system is taking default method as :SAP 0-100, so i changed it into activity by 00006 (Work) then system calculate the Progress but only after full confirmation, but again it is 300%. which should not.
    The configuration settings are as
    1. Progress Version: -
    Progress Version : 100
    Plan Version          : 0
    EV Basis                 : 1 ( Cost Plan)
    POC weighting      : 4 Work, Basic ( Active Project)
    2. Group of Progress version:-
    Controlling Area & 1
    3. Assign Progress Versions to Group Progress Versions:-
    Controlling Area, 100 & 1
    4. Define Statistical Key Figure for Percentage of Completion:-
                                                     Usage               SKF (with unit of measurement= %)
           Controlling area                   1 10
           Controlling area                    2 20
           Controlling area                    3 30
    5. Define Measurement Methods:-
    Measurement method :0000000006 (Work)
    Meas. technique  : E ( Degree of Processing)
    Max POC                : 100
    6. Define Measurement Method as Default Value
    Progress version(100),  Object Type (2:Activity, Internal Processing), Plan/ Actual( 1 &2 :both), Method (00000006 :Work)
    7.Maintain Assignment of Cost Element Group
    Cost element (PS) , Default selection( Yes) & cost element group(PS_PROP)
    I hope above information is sufficient.
    My problem is system is calculating poc only after full confirmation but i want at partial confirmation. Also after full confirmation poc is showing 300% which i want 100%.
    Regards,
    AVI

    Hi Experts,
    I am waiting for your valuable inputs.
    Regards,
    AVI

  • Define Measurement Method as Default in Progress Analysis

    Hi All,
    I have defined Measurement Method 0000000003(Milestone) in progress analysis for my company code.
    But while running CNE1 for my project it is not picking the measurement method i have defined for my company code but it is picking the 0-100 Method .
    Please advice.
    Muzamil

    Hello All,
    I have read all the posts on the subject, we are facing the same problem as reported by Muzamil. I have done the follwing
    1. Creat Progress Version
    2. Define Measurement Method as Default Values
         2.1. Define measurement methods for WEBE
         2.2. Ddfine measurement methods for all activity types
    3. Assign progress versions to the WBS Elements and Activities in their progress tabs.
    But, wen I run CNE1, SAP does not pic the default methods while analyzing progress. SAP uses 0-100 method, which is not right.
    Please propose some solution
    Regards,
    Murtaza

  • Reg:BAPI for updation of Progress parameter and status profile

    Hi,
    Can anybody suggest name of BAPI used for updating "progress parameter" & "Status Profile" in actvity.
    With Regards
    Rohit Prakash

    Hi Ammar,
    I have checked both BAPI but BAPI are not working as per our requirement.
    Firstly we wanted to update progress parameter like measurement method(progress version,method plan,method actual) & POC weight into activity but as per BAPI given by you there is no any field available related to measurement method(progress version,method plan,method actual).
    And secondly we wanted to update status profile residing in Activity tab not in network header or WBS.
    Waiting for some more input related to  query.
    With Regards
    Rohit Prakash

  • PropertyChange progress value

    Hello,
    I'm trying to create a progress bar in my program when a user uploads a File.
    I've created a class that extends SwingWorker to upload a file using FTP. I'm creating an instance of the class and adding a propertychange listener to it. But when I run it the only calls im getting from the propertyChange method are two states that tell me when the file upload has started and when its finished. The file upload works fine. I've been reading this tutorial http://java.sun.com/docs/books/tutorial/uiswing/components/progress.html and it looks like I should be getting the progress aswell, so I can use it in a progress bar.
    Any pointers greatly appreciated.

    Hi Benny,
    it depends on the setting for the EV basis, which is done in the customizing for the Progress Version. There you can choose between:
    - cost plan (annual values, per periods) e.g. via transaction CJR2
    - cost plan (overall values) e.g. via transaction CJ40
    - budget (annual values)
    - budget (overall values)
    The calculation of the BCWS and BCWP is done for each object. This means that the budget/planned costs from the relevant object are used for the calculation of the Earned Value. So if there is a POC for this object, but no budget or planned costs, then the EVs will be zero.
    Besides this you should check whether this is just a reporting problem. Therefore you should check whether there are entries in table COSB with value type 'P1' and/or 'P2' for the relevant objects. If there are entries then check whether there are corresponding entries in table RPSCO (Project Info Database) with the same value types.
    If these entries are missing, check the assignment to value categories of the cost elements that you have maintained for the Progress Analysis (cost elements can be found in IMG Project System -> Progress -> Progress Analysis -> Maintain Assignment Of Cost Element Group).
    The assignment of cost elements to value categories can be done via transaction OPI2.
    I hope that these informations will help you.
    Kind regards,
    Dirk

  • Progress Tab fields as required field

    Hello PS Experts,
    We do Progress analysis and update the Progress Tab of activity in
    CJ20N. One of our business requirement is to make one of the fields in
    Progress Tab as required field.Eg. Progress Version.
    Is there any way to make this field as required ?
    Thanks in advance
    pscosnultant

    Hi Varshal,
    Thanks for your input. Does this applicable to only one project or whole CJ20N?
    As I mentioned ,my requirement is to make one of the fields in Progress Tab in Activity or Activity Element as required field .
    Also I do have different projects. I would like to restrict it for some projects only based on Project profile or network profile
    Thanks Again
    psconsultant
    Edited by: psconsultant on Sep 16, 2009 1:42 PM

  • Version in BPS

    Hello Gurus.
    There is a concept of version in BPS.
    Q1. What is the purpose of having version?
    Q2. Where do we define version? For ex: i want to plan on version 001,002,003 for different levels. Do i need to upload the version data from flat file or do we need to punch in transactional cube manully..
    i am not very much clear regarding version...I would appreciate if someone thro some light on this..
    regards
    Ram

    Hi Praveen
    Thanks for the reply. We didnt started BPS till now..and next week we are going to start. In 0version infoobject i can already see few version like:
    000     D     Plan/Ist - Version              
    000     E     Plan/actual version             
    001     D     Planversion Änderung 1          
    001     E     Plan Version: Change 1          
    002     D     Planversion Änderung 2          
    002     E     Plan Version: Change 2          
    003     D     Istkosten vs. Sollkalkulation   
    003     E     Actual Costs vs. Target Costs   
    100     D     PS: Fortschrittsversion         
    100     E     PS: Progress Version            
    110     D     PS: Prognoseversion             
    110     E     PS: Forecast Version
    I think these are readly given by SAP. If i want to create new version..can i upload the versions directly from flat file or after entering the planning data that version will come at sit in 0version object.
    REgards
    Ram

  • PROJECT PROGRESS ANALYSIS FOR NETWORK HEADER

    < MODERATOR:  Message locked.  Please read the [Rules of Engagement|https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/rulesofEngagement] before posting next time. >
    Dear all,
    We can get the progress analysis data (tcode CNE5) for a network activity and also for WBS element. However data is not cumulated at the network header. Need your urgent help for getting this at the network header level. Is there a workaround like user exit for doing this?
    Also let me know available user exists for PS. Please guide me how to find an user exit for PS in particular.
    Regards,
    Prakash.

    arenk03 wrote:
    > Is there any possibility to assign progress versions to network activitys automatically when creating a new network activity?
    No , it is not possible.
    Please search the forum for further details, as it discussed many times earlier.

  • Importing and handling progressive (non-interlaced) video...

    Hi, have searched around and can't quite find the answer to my problem so I hope somebody can help...
    Ive recently aquired a Sony TRV 900 (3ccd) which has a progressive shooting option. Apart from a strange semi-strobing effect on that sometimes occurson fast moving objects this option generally seems fine in good light.
    I can import into Final Cut Express (v1) ok, and when I view the clip frame by frame (with the arrow keys) every single frame is clear, crisp, free of jaggies etc.
    As soon as I play it back (either as a clip or in a sequence) it appears to be lower quality somehow and there is lots of nasty aliasing or jaggies. Pausing restores the image quality back to normal.
    Ive messed with various options available when putting the browser into list view. (PAL or square ratios etc). Even tried exporting a final cut express movie, to view in Quicktime but the quality never matches that of a frame by frame playback in FCE. The exported versions if viewed frame by frame lack also lack the higher quality.
    I cannot find any sort of interlace or field options during the import stage but as my 'stills' are great I assume it's either the preview playback or the rendered export at fault,but it's driving me pretty crazy! lol
    Even though footage may end up on a dvd at some point (ie. interlaced, right?), I would still like progressive versions to create web versions etc.
    Am I completely missing the point here or something?
    Hope somebody is able to shed a little light here for me?!
    Thanks in advance...

    As far as i know, Final Cut Express (at least the version i've used which is version 2) assumes you are working with interlaced video and that is that. In Final Cut Pro there is the option to work with progressive footage, but i think FCE just assumes you are using interlaced, and doesn't allow you to change that.
    The way you are describing it, it does sound like it is playing progressive footage when in an interlaced mode. A similar thing happens when you play interlaced footage in a progressive mode. It looks absolutely fine when you look at a single frame, but once playing it has lines and artifacts around edges.
    I'm not sure if there's anything you can do about that. I'd like to be wrong though.

Maybe you are looking for

  • HP pavilion keyboard malfunctio​ning

    Hey! I have a problem with one of my HP's that I cant seam to figure out. Some keys are "dead" or coming out as the wrong letter. Like for example: the "caps lock" key comes out "a", the "v" button comes out "5v", the "o" button (letter) seams dead u

  • If i have Dns Client service running, is it necessary to enable dns prefetch in the about:config section?

    I've been wondering this for a while and can't seem to find the answer. Whenever i set network.dns.disablePrefetch to true, the browser seems to load a bit more smoothly and even with the pref. disabled, the dns client service seems to still cache dn

  • How do I save only part of a PDF file?

    I have a PDF of a book layout, which is 176 pages. It's one big file. How can I save only selected pages as a separate PDF? Thanks David Heim

  • Vendor Evalution - Vendor Class

    Hi 1. What is the exact purpose of Vendor class ? How it can be used in Vendor Evaluation and other areas ? 2. Can we group some Vendors in to a Vendor class so that we can assign the Weighting key to the Vendor Class instead of Vendor by Vendor in V

  • FCE issues: editing audio, displaying video frames

    Hello friend. How do I display the video frame in the timeline? I have selected it but all it shows are a bunch of boxes with Xs in them. Why? Also, I want to manipulate the audio in this clip but I don't see where you do that. I see the waveforms an