Project POC to determine actual cost and actual revenue

Dear all experts,
please help me on the following issue.
i am working on a project for sales.
the project actual cost and actual revenue will be determined by the project POC.
i have read the SAP help about project progress.
but it confused me.
my first question is how can i caculated the actual POC?
is there a standard predefined way to solve it?
please give me some hints or suggestions.
thanks a lot.
Judy

Hi,
Can anyone detail the steps involved in carrying out RA with Valuation Method 7 with progressive value analysis. Here, we can give a percentage of POC into the system as certified by the Engineers unlike Valuation method 3 where the POC is calculated on the basis of actual costs incurred.
In the case of valuation method 3, only revenue is analysed by the system with reference to the POC and necessary entries are posted as Revenue surplus or Revenue in excess of billings. Whereas in the case of valuation method 7, both the revenue and costs are analysed and necessary provisions are made both for revenue and costs.
Regards,
Judy

Similar Messages

  • PLM table for Internal Order budget, Actual Cost and Actual Hrs

    Dear all
    In cProjects version 4.0, we have integration with existing ECC 6.0. We create Internal Order manually and assign it to cProjects.
    One cProject  having one Internal Order.
    Resource Planning part is managed in cProjects while Actual Time keeping(CATS with reference to Internal Order), budgeting of Internal Order, Material and Service Procurement which is done against Internal Order is managed in ECC. ECC and PLM are separate systems.
    We have RFCs established to transfer actual hrs, budget and actual cost data from ECC to PLM.
    Which is the ABAP table in PLM where we get linking of cProject with Internal Order and also actual hrs, budget and actual cost data in PLM system?
    Thanks & Regards
    Ashish

    actual hrs, budget and actual cost data in PLM system?
    Its not there, actual hours can be found in DPR_Task but it needs to be transferred by running a report.
    The planned cost etc is also calculated at runtime and passed on to Costing object in ECC (Int order/PS)
    Actual hours will be in CATSDB in ECC
    needless to say actual cost will also be there in ECC and not in PLM, PLM only displays at runtime based on RFC.
    If you want to try, Break the RFC and try to check the Evaluation..
    Niranjan

  • Re-allocating Actual Costs and Actual Work from one project to multiple projects

    My company would like to track costs in one project and then re-allocate those costs to multiple projects.  Example: An end user would submit a timesheet against a task named 'Analysis' for Project A.  Once accepted and published, the
    costs for those hours would be subtracted from Project A and 60% of those costs would be transferred to the 'Analysis' task for Project X and 40% of the costs for those hours would be transferred to Project Y. 
    We believe we can accomplish this through reporting, but before we go this route, we wanted to make sure there was not a logical, supported way in MS Project Server to complete these actions.  Could a script be developed to accomplish this?
    Thank you!
    Tasha

    Out of the box Project and Project Server do not support this. However with VBA anything is possible. You could also use PSI to work directly with project data in teh Server db but that would take much longer to develop. Check you can do what you want
    in VBA then you can use the result to spec the server version afterwards.
    Rod Gill
    Author of the one and only Project VBA Book
    www.project-systems.co.nz

  • WBS Element Actual Cost and 'Detailing the  Value Type ' issue

    Hello BW Experts ,
    I want to extract the WBS Element Actual Cost and Revenue.
    I have selected the data source 0CO_OM_WBS_6 .
    In this data source there is a field  Detailing the value type ' 0VTDETAIL.
    As per SAP BI Help if the value of this field exists between 1 to 4 then it is actual cost of WBS ( also Key figure Category 0METYPE should be 1000 for actual cost and for revenue it is 1001).
    value 4 of 0VTDETAIL means CO Activity Allocations.
    When I see  the data from this data source in RSA3 , I could not get any WBS whose 0VTDETAIL is 1 to 4 and Key Firgure Category as 1000, value type = 10.
    Is there any other data source I should select in order to get actual cost for WBS ?
    I can see the settelment cost whose 0VTDETAIL = 5 through this data source in RSA3.
    But I want to see the data for the Actual Cost whose 0VTDETAIL = 4 .
    What could be the reason ?
    Thanks in advance .
    Amol.

    Dear Oscar,
    Thanks for your response,
    The Actual Cost posted by our Functional Consultant is USD 250, but i am getting the Total Actual cost is ZERO (Sum of -250 +250) as i shown above.
    the posted  actual cost is +250, finally we need this figure only,
    if i do restriction on Sender receiver Indicater field with S than i will get Actual Cost 250, but in SAP standard RKF for Actual Cost there is no restriction on Sender receiver Indicater field (S & H)
    I hope you got my point now.
    Thanks
    Amar Reddy

  • Dashboard content is not populated with Planned Cost and Actual Cost

    Hi
    We are working in cProjects 4.0 + ECC 6.0 implementation. I could not get the data for columns in Planned Cost and Actual Cost in cProjects Project Dashboard. I have properly mapped the config settings and created and assigned a Project in PS
    Has anybody got this data in the Dashboard?
    Kindly suggest the solution
    with regards,
    K Rama Krishna
    9394712743

    Hi Rama,
    It is difficult to say, where the problem is.
    but typically, the causes of the problem are
    customizing is  set incorrectly or the evaluation is not carried out.
    You can run the the evaluation DPR_EVE_BATCH_DPO additionally, please untick the flag 'check the last changed date'.
    Hope, it helps.
    Kind regards,
    Zhenbo

  • In which table production order planned cost and actual cost i can see?

    Dear PP Guru,s,
    from which table i can see productuion order planned and actaul cost. i checked following tables AUFK, AFVC, AFVV, CAUFV, AFRU, AFKO, AFPO. but i did not found planned cost and actual cost field. is there any other way to get this data with respect production order?
    Regards,
    sree

    Dear,
    Planned and actual costs of prod order from COEP, COSS, COSP  S027 tables
    production order shows the planned cost based on the quantity structure.
    Please refer my reply in this thread for details,
    Re: Actual Halb Material Cost
    Regards,
    R.Brahmankar

  • Target cost and actual cost not picking in production order

    Hello,
    The target cost and actual cost is not updating in production order when I display it in CO03 in cost analysis.
    Even though we have maintained planned price in KP26.
    Please suggest how it can be populated.
    Best Regards,
    Tapan

    Hi Tapan
    For Target cost
    1. Your std cost must be released before Goods Receipt
    2. There must be goods receipt posted on the prod order
    3. You must calculate variances in KKS1/2
    For Actual Cost
    1. Post Goods receipt and Goods issues
    2. See if any mat movements are pending in COGI
    3. Ensure that operation is confirmed in PP and no entry is lying in COFC
    Regards
    Ajay M

  • Function Module to find Planned Costs and Actual Costs against WBS element

    Dear All,
    We have a requirement where we need to find out the Planned Costs and Actual Costs booked against a WBS element, in a year. The costs can be against all the plan versions or on individual plan version.
    Are there any function modules to retrieve this value?
    Thanks for the help.
    Warm Regards,
    Judith

    Hi,
    The easiest way would be to get the OBJNR for all WBS elements from PRPS and look up RPSCO and summarize for Value type (RPSCO-WRTTP) 1 for planned cost and 4 for Actual cost.
    Please let me know if this helps.
    jibat

  • Estimated Cost and Actual Cost

    Hi Friends,
               Can someone tell me, which MM tables(logically database) has these fields stored?? Estimated cost and Actual cost??
    Note : Where and How can I find the logical data base??
    Thanks alot in advance,

    Yes thank so much for your quick help.
    I see here we can get 1- Plan cots , 4 Actual cost, But in PMCO, how can we get the estimated cost, I see that WRTTP = 1 also contain the value for estimated cost but not plan cost . Please help me.
    Thanks

  • IW32  needed Plan Cost and Actual Cost table name

    Hello ,
    In IW32 transaction Plan Cost and Actual cost in cost tab ---Table Name.
    Req: needed  plan cost & actual cost table names  for particular order number.( For New Report )
    Can you please let me know where Plan cost & actual cost get stored in IW32 in Cost tab ( table name / function module name ) or how its get calcualted for particular order number.
    Thanks in advance !
    Regards
    Rahul

    hi ,
    i too had same issue , i wrote following FS for that :
    Actual and planned cost  from PMCO-WRT00 to WRT12(the sum of values should be considered for actual as well as planned ) for  PMCO-OBJNR taken from CAUFV -OBJNR for order number  AFIH-AUFNR  and also currency from CAUFV-WAERS .
    Actual cost will have valuation type PMCO-WRTTP = 4 and planned cost will have valuation type  PMCO-WRTTP = 1 , which will be placed in different column
    hope this helps
    regards
    satish

  • Difference between Actual Cost and Allocable costs in splitting KSS2

    I have Cost splitting structure results with me(KSS2)
    What is the difference between Actual Costs, Control Costs, Allocable Actual, Actual cost balance and which amount will system consider for calculating the rate with dividing the activity rates.

    Hi,
    In Splitting Structure KSS2 There are two Costs One is Target Cost (Planned) and Control Cost (Actual Cost)
    In Variance Calculation U will See Target Cost (Planned), Actual Cost, Allocated Actual Costs.
    Target Cost = Planned Cost
    Control Cost = Actual Cost
    Actual Cost = Actual Cost
    Allocated Actual Cost = Actual Cost of the Output Qty. This is Actual Credits from Activity allocation. This is Actual Credits from delivery of Stock.
    Hope you are Clear.

  • Huge Variance between Target cost and Actual Cost

    Hi,
    In Product Costing,I am getting Huge variance between Target cost and Actual Cost.It is showing the Target Cost as ZERO.Why i am getting this target cost as Zero? what could be the reason? Kindly help me in fix this issue.
    Thanks
    Supriya

    Dear,
    First do the GR final DEV for Production order
    You need to do the variance calculation in KKS2, then when you save the variance, the target cost is calculated.
    Target cost appear after GR.  And you will get the Variance also right.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Target Cost and Actual Cost

    Hi All,
    When is the target cost and actual cost gets populated and from where does the data comes from liek labour,machine,overhead cost comes?
    Thanks in advance

    Dear Friend,
    speaking from controlling point of view, target and actual costs will be flown from "costing variant planned" and "costing variant actual" respectively.In above mentioned varinats, whats the process has to be followed to calculate  material costs,activty costs,overhead costs etc will be defined. These variants will be assigned in order type dependent parameters OPL8.
    Target Costs - In standard cost estimate(ck11n),target cost will be calculated  in the following way
                              -material cost from material master and BOM
                              - activity costs from routing( for this u need to plan the activity costs in KP26)
                              - other costs from the definitions of planned costing variant.
                       - after running the standard cost estimate,u need to mark n release(ck24).
    Actual Costs - material costs frm goods issues (via goods mvmts thru MBIA,MB1B etc) against
                          production/process order.
                              - activity costs(as per the price u plannned in KP26)through  operation confirmation in
                                COR6N/CO11N.
                              - any other costs like overheads,cost center issues etc as per the process defined
                                in 'actual costing variant'.
    Hope this will clear your doubt.
    Rams.

  • Actual costs and Planned Costs

    HI Friends
      I want to know the Main Tables from which i can get the <b>Actual costs and Planned    Costs</b>     for the given Cost element or object number
         I tried with table COEP and i got actual costs up to all cost elements in the given controlling area and in given cost center , but for some cost elements, this tables does not have any entries...
    So is there any other way to get these Actual costs and
    from where i can find the Planned Costs
    Reagrds Rk

    Hi
      I already checked these tables but i didn't get the exact data
      for actual costs i checked COEP but some costs are missing there
      and i could n't find the field BENKZ in coep table
         I am comparing these values with the standard transaction <b>S_ALR_87013611 </b>
      but not getting exact details  in my program
    can you please help me in this regard..
    Does anybody worked on this transaction <b>S_ALR_87013611 </b>, then please explain me the logic how it is getting the actual and planned costs
    Regards Rk
    Message was edited by:
            Rk Pasupuleti

  • In IW32 no Planned Cost and Actual is showing Zero

    hi,
    In IW32 no Planned Cost and Actual is showing Zero,since activity type is mentioned.
    how it could be displayed.
    Thanks

    Dear Sharma,
    1. This is regarding Maintenance order, frist you confirm by clicking on the operations tab-> double clicking on the work center->click on costing tab, check here activity type, activity unit is maintained.
    2. then in in KP26 check the activity price in the current period.if it is zero u will get zero
    3 then in the order click on components, if components are consumed  also check the component price in material master.
    this will resolve your issue
    sree

Maybe you are looking for

  • How to get USERID system parameter in the report

    I can pass the user id, password and connect string through the USERID parameter, but how do I get it in the report? (I need to pass the USERID to a different report, I got a error when I use :USERID). Thanks. WJ

  • Index Entries in 9i

    Hi, In older versions of designer 1.3.2 Index entries are available for foreign keys. We have migrated the repository from 1.3.2 to 9i and Index entries are not available in the design editor for foreign keys.When we generate a table in 9i we get err

  • IPod Classic to iMac photo transfer

    Laptop died, lost everything. However, my old iPod Classic (click wheel 120GB) still had all of my old photos on it. I have an iMac now and am trying to transfer the photos over. Any good (hopefully free, although not opposed to buying) transfer soft

  • Iphoto won't import photos from my camera

    My hard drive crashed about 2 months ago and I had a new one installed. It worked great for the first month but then began importing my photos very slowly and now has stopped. It will still import/snyc from my iphone but has since, stopped importing

  • Can I use a 1 3T base station as a router/backup and a second 3T as a backup only without comflict?

    Can I use a 1 3T base station Time Capsule as a router/backup and a second 3T base station as a Time Machine backup router without conflict?