Project Professional 2013

I am preparing for 74-343. following is the drag and drop question. Please help me. I would like to post more Drag and Drop questions as soon as find more. Does anybody have a summary of Drag and Drop questions and answers ready? If I get them, that would
be great help. Thanks in advance to all Project Professional 2013 gurus
which 4 steps from following , in sequence , required to find and install an app from the office store ? all
a) Add an app to your account
b) Access the office store and log in by using a valid account
c) Request the app at your local Microsoft Office store
d) Search for an specific app
e) Execute the installation app file to inst
f) Download and save the app file on your local computer
g) Receive an email with instruction on how to download and install the app
h) Go to My Apps in Microsoft Project and then Select and Insert the app

Hi Mayur,
I'd say B, D, E, H.
However this forum is not intended to train users for certifications exams, but to help users about specific issues using, implementing, administering the solution.
Anyway I got some documentation about the certification that I'll be pleased to send you. Contact me at : guilluameDOTrouyreATgcosiDOTcom (replace caps letters).
Cheers.
Guillaume Rouyre - MBA, MCP, MCTS

Similar Messages

  • Can't open Project Professional 2013 projects in SharePoint 2013

    I can't open Project 2013 documents from SharePoint2013. 
    My environment is: 
    Project Professional 2013 32 bit
    Office Professional 2013 32 bit
    IE 9 32 bit
    Windows 7 Enterprise 64 bit
    All other documents (Word, Excel) can be checked out and edited from SharePoint.
    When I check out and edit a Project document I get the following error:
         Project cannot open the file.
    check that the file name a path are correct.
    check that the file format is recognized by Project.
    Also, I get the same error when trying to open a project document from a mapped SharePoint drive.
    Note:  This was working on a fresh install of Office 2013 and Project Professional 2013 UNTIL a windows update (Office 2013 SP 1 and other updates)
    Am I missing an update? 
    Thanks!
    Ken

    Hi Ken,
    I would try first to repair MS Project from the control panel to see if it fixes your issue.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Publication of the big-sized Enterprise projects from Project Professional 2013 to Project Server 2013 takes about 60+ minutes.

    Dear Sirs,
    I need your support over the following MS EPM 2013 issue:
    Publication of the big-sized Enterprise projects from Project Professional 2013 to Project Server 2013 takes about 30+ minutes. We
    need to reduce this total publication time down to acceptable working values 10+- minutes.
    Environment information:
    Single App Server (Virtual): 16 Gb RAM, x64 4xCPU, HDD > 50 GB free disk space, OS Windows Server 2012 Standard Edition x64 Service
    Pack 1, MS SharePoint Server 2013 and MS Project Server 2013 with CU December 2013 (KB 2850024) applied.
    Single RDBMS MS SQL Server (Virtual): 8 Gb RAM, x64 4xCPU, HDD > 200 GB free space, OS Windows Server 2012 Standard Edition x64 Service
    Pack 1, MS SQL Server 2012 x64 SP 1 Enterprise Edition.
    We have 1Gbit LAN between APP, DB server and 1Gbit LAN between APP and Proj Prof Client.
    Yes, we are on the way of migrating to the Prod environment
    with 3-tiered architecture (with SP1 slipstream and CU December 2014 applied), but this issue also
    presents there.
    Project’s file information:
    Tasks in the file: [~4900], resources in the file [~396] enterprise task’s custom fields used in the file [~23].
    Project save procedure for this new project would last about 7 minutes. Project publication would last about 47 minutes. We noticed that
    tasks synchronization process took about 1 second for each ~2,5 tasks, to add them to the sharepoint tasks list. So for all 5148 tasks it took about 5148/3/60 =  34 minutes. Other 13 min was used for reporting database publication and other tasks relevant
    for new sharepoint site creation.
    Case 1: Issue description:
    During the Enterprise project’s file save and publication we have the following sharepoint 2013 log messages:
    07.31.2014 12:43:17.22 Microsoft.Office.Project.Server (0x0358) 0x3D5C SharePoint Foundation Monitoring b4ly High Leaving Monitored Scope
    (Persisting list changes). performing time =376.068676326181 22dca99c-4696-70f1-e9e2-06851d0bcffd
    07.31.2014 12:43:17.69 Microsoft.Office.Project.Server (0x0358) 0x3D5C SharePoint Foundation Monitoring b4ly High Leaving Monitored Scope
    (Persisting list changes). performing time =361.652807828928 22dca99c-4696-70f1-e9e2-06851d0bcffd
    It shows that sharepoint spend at least ~350 milliseconds (or 0,35 sec*4900 tasks = 1715 sec, or 28,5 min) for each task update during
    project publication. And we also have another log file that shows that about 0,7 sec (or 0,7 sec*4900 tasks = 3430 sec, or 57 min) sharepoint spend for save each task in project file to project server. So total save and publication time more then 60+ minutes
    for that project file. The same result we have even if user didn’t do any changes at the project file.
    We use only enterprise projects (dbo.MSP_EpmProject_UserView.projectvisibilitymode = «False»), and do not use sharepoint tasks lists,
    but the synchronization between MSP Plan and SharePoint tasks list works at any case.
    Case 2: Issue description:
    - For the second test we created a new project with new sharepoint project’s site on basis of our «issue» project, with total amount
    of tasks in it of 5148 (yes, we increased the tasks list default limit at the sharepoint site up to 6000 items in it – standard limits for sharepoint view list – 5000 items).
    - Project save procedure for this new project would last about 7 minutes. Project publication would last about 47 minutes. We noticed
    that tasks synchronization process took about 1 second for each ~2,5 tasks, to add them to the sharepoint tasks list. So for all 5148 tasks it took about 5148/3/60 =  34 minutes. Other 13 min was used for reporting database publication and other tasks
    relevant for new sharepoint site creation.
    -Then we deleted the
    tasks list for that new test project from the sharepoint site and republish the project plan one more time. This time project save procedure took about 7 minutes, project publication about 2 minutes and 3 minutes for other relevant queue jobs. So total time
    is 12 minutes.
    As a conclusion: yes, we have determined
    the exact problem - during synchronization process (from Project Server to SharePoint) it perform copying all tasks and related data from Project to SharePoint in spite of fact that you changed only ONE task or ALL of them. At any case, synchronization will
    copy ALL of them from Project Server to SharePOint task’s list.
    Our workaround is to disable the task’s synchronization for such big-sized project plans:
    – to delete the SharePoint «tasks» list at the SharePoint site tied with project plan.
    - or deattach the SharePoint site from the project plan.
    Thank you for reading this topic, please if you also forced with such issue provide us any known workaround or maybe any official response
    \ feedback from MS about it.
    Thank you in advance,
    Best Regards, Andrey

    Regarding my topic, I also said that every time when sync works it updates All items from project’s plan at Project Server to corresponded task’s list at SharePOint server. Inspire of the fact that you changed only One task or group /
    all of them at your project’s plan.
    And it seems to me and my colleagues that it’s probably (maybe) a “bug” at the product. Here is what we have if looked a little bit closer to the code:
    Share Point determines what task to sync from Project’s plan to sharepoint list. To do that sharepoint needs to know was that task changed or not, based on the following fileds (check SQL stored procedure “[MSP_READ_TASKS_FOR_SYNCRONIZATION]”):
    TASK_UID    TASK_NAME    TASK_START_DATE    TASK_FINISH_DATE    TASK_PCT_COMP    TASK_PARENT_UID    TASK_OUTLINE_NUM   
    WSS_LISTITEM_UID   TASK_ID    TASK_IS_ACTIVE
    We noticed that at any case synchronization performs for all tasks, EXCEPT the ROOT one. Then we looked at the comparison of TASK_PARENT_UID field. So sharepoint compares TASK_PARENT_UID with ParentID (this is internal name for lookup
    field “Tasks” at the Sharepoint, and it stores their values at the format "ID;#Title").
    And comparison performs like following:
    SharePoint looks for Task at the Tasks’s list corresponded to Project’s plan with ID represented at the TASK_PARENT_UID field. Then it takes SharePoint ListItem ID (“int” type) and store it to the “num” parameter;
    num = this.GetCachedListItemByUniqueId(listItem.ParentList, nullable.Value).ID;
       2.Then it compares “num” with task’s “ParentID” at SharePOint as follow with operator “!=”:
    ((SPItem) listItem)["ParentID"] != (System.ValueType) num
       3. If comparison was success (true) – then it tell us that values (at the Project’s plan for tasks) was changed, then it need to be synchronized. Corresponded Method setup “true” flag, and then returns it.
    The “bug” is that this expression at the Step 2 will always return “true”, because in fact it compares “string” (see above – that this is lookup field at SharePoint side)
    with “number”. For example if the parant task ID is “55”, then we get:
    "55;#Task 1" != 55
    And by the rules of .Net the “string” will never equal “number”
    Furthermore this is approved by the SharePoint logs:
    In that case we always get the note “Setting ParentID to” at the logs (we see it if turns on Verbose for “Project Server” -> “Sharepoint Integration” category).
    So at any case of publishing project’s plan we always get that note at the logs for tasks that have Parent task, and we have Parent for all of them EXCEPT the ROOT one, exact logs represented further:
    10/15/2014 02:37:32.26    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server    Sharepoint Integration    ado0d   
    Verbose    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.62    Microsoft.Office.Project.Server (0x07D8)    0x06E8   
    Project Server    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.63    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.67    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.69    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 5    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d
    The following is the complete Method’s code from the corresponded reflector:
    private bool UpdateParentID(DataSet taskDS, DataRow row, SPListItem listItem, Dictionary<Guid, SPListItem> redoEntries)
    bool flag = false;
    int index = taskDS.Tables[0].DefaultView.Find((object) DataRowExtensions.Field<Guid>(row, "TASK_PARENT_UID"));
    if (index >= 0)
    Guid? nullable = DataRowExtensions.Field<Guid?>(taskDS.Tables[0].DefaultView[index].Row, "WSS_LISTITEM_UID");
    int num = -1;
    if (listItem.Fields.ContainsField("ParentID"))
    if (nullable.HasValue)
    try
    // STEP 1
    num = this.GetCachedListItemByUniqueId(listItem.ParentList, nullable.Value).ID;
    catch (ArgumentException ex)
    if (redoEntries != null)
    if (!redoEntries.ContainsKey(DataRowExtensions.Field<Guid>(row, "TASK_UID")))
    redoEntries.Add(DataRowExtensions.Field<Guid>(row, "TASK_UID"), listItem);
    //STEP 2
    if (num != -1 && ((SPItem) listItem)["ParentID"] != (System.ValueType) num)
    ((SPItem) listItem)["ParentID"] = (object) num;
    ULS.SendTraceTag(845443U, (ULSCatBase) ULSCat.msoulscat_PS_ProjectSharepointIntegration, ULSTraceLevel.Verbose, "Setting ParentID to {0}", new object[1]
    ((SPItem) listItem)["ParentID"]
    //STEP 3
    flag = true;
    else if (((SPItem) listItem)["ParentID"] != null)
    ((SPItem) listItem)["ParentID"] = (object) null;
    ULS.SendTraceTag(2495056U, (ULSCatBase) ULSCat.msoulscat_PS_ProjectSharepointIntegration, ULSTraceLevel.Verbose, "Resetting ParentID to null");
    flag = true;
    return flag;
    Any thoughts about it would be much appreciated!

  • Project professional 2013 can't connect to Project online

    It's federated account where the AD is synched with Project Online.
    When i use project professional 2013 it asks me to type in the username and password. If i use Office 365 account it works fine and if i use federated account it doesn't work and prompts me that account is wrong.
    If i use the same federated account from browser i am able to login with after redirecting me to local server to authenticate.
    any pointers? 
    Satya Mantena 

    I would open a support case with Microsoft to try and resolve this.
    Ben Howard [MVP] | web |
    blog |
    book | P2O

  • Project professional 2013 can not connect to Project Online behind proxy

    Hi,
    I had problem when running application ms project professional 2013 connect to project online behind proxy,
    but we can access url PWA site in browser.
    but when we connect to pass through internet  we can connect project professional 2013 to project online.
    i get article http://technet.microsoft.com/library/hh373144.aspx to open port 443, but we already
    open port 443. 
    anybody  know how to troubleshoot this problem? or other port to open beside port 443.
    thansk for advice.
    regards
    rully

    Hi Ruly,
    Are you still having an issue? Could you share the error details, when you try to connect the MS Project to project online behind proxy?
    Cheers, Badal

  • Reports in Microsoft Project Professional 2013

    Hi,
    Is there a link which explains the reports in Project Professional 2013?
    I need the detailed description of the chart in each report.
    K.Gokulraj

    Hi K.Gokulraj
    Please find the links,
    I hope you will find those helpful.
    Pick the right report in Project 2013
    and
    What’s New in Microsoft Project 2013?
    Thanks
    Manish

  • Error occurs when I open the tasks list in MS Project Professional 2013 from SharePoint 2013

    Hi,
    I have created a SharePoint 2010 workflow for a tasks list that updates a list item column if the Date Complete <= Today's date & Percentage Complete = 100%
    I used 'Set Field in Current Item' in the workflow & the values are updated in the list for the current item.
    However, when I open the tasks list in MS Project Professional 2013 from SharePoint 2013, then I get a error "We can't write task - taskname to the SharePoint site. This is either because tasks list is in read only mode or because this task has a column
    that requires unique value."
    If I remove the 'Set Field in Current Item' in the workflow, then the error does not occur. However, the 'Set Field in Current Item' in the workflow is required.
    Please provide solution to this issue ASAP. Your reply will be greatly appreciated.
    Thanks in advance

    Hi Jack,
    A shot in the dark here.  I'm not convinced the error is from the workflow.  What is the definition of the list item column in SharePoint?  Have you set the column to requiring a unique vale?  Look at the column definition.

  • Project Professional 2013 Installations Fails with Office 2010 installed on Windows 7 x86

    When attempting to install Project Professional 2013 Pro (x86) on Windows Professional x86 PC that has Office 2010 ProSp2 installed client getting an error message at the end of the installation "Project 2013 has encountered an error during setup".
    I have gotten the installer to work on x64 PC with Office 2010 installed. (Something worth noting that even thought I set the reboot to prompt its automatically reboots without warning but, appears to be working.)  I also tried using the OTC, custom XML
    file and just running setup.exe and get the error no matter what. When looking in the logs I there are MSI installer error with an error: Product:
    Microsoft Project Professional 2013 - Update '{A6FFA77F-C1C1-43D3-A2C7-6A5B68138D9F}' could not be installed. Error code 1603. Windows Installer can create logs to help troubleshoot issues with installing software packages. Use the following link for
    instructions on turning on logging support: http://go.microsoft.com/fwlink/?LinkId=23127
    Without having to uninstall Office 2010 what do I need to modify in the installer to get it to Project 2013 Pro to install on the x86 machine?
    Thanks

    Hi,
    Your environment will support 32 bit of Project professional 2013 (x86) as you have Windows and Office of (X86).
    You try to modify registry then you wont face issue.
     The issue when you hit a "1653" is that Windows
    Installer "DisableRollback" is set. Office 2013 requires that "rollback" be enabled. If you are getting a "1653"
    error in your logs as Ken did then the solution is to delete the "DisableRollback" (or set to '0') at the following registry keys:
    HKEY_CURRENT_USER\Software\Policies\Microsoft\Windows\Installer
    HKEY_LOCAL_MACHINE\Software\Policies\Microsoft\Windows\Installer
     these are the issues I've seen:
    Scheduler service was stopped. At a cmd window typing "net start schedule" resolves the problem.
    CMD.exe was customized via the following registry key. Solution was to temporarily disable the customization by changing autorun value to autorun_old. 
    HKEY_LOCAL_MACHINE\SOFTWARE\Microsoft\Command Processor
    HKEY_LOCAL_MACHINE\SOFTWARE\Wow6432Node\Microsoft\Command Processor
    Permission issues - seems some custom permissions affected Ingram's install which he explained in his previous post.
    Environment variable "ComSpec" had been modified (semicolon added). Fix was to remove the added semicolon (there should be no semicolon).
    The way to identify you are hitting this specific issue is if in the %temp%\OfficeSetup.log there is a mention of "Office64MUI.msi" failing to install with return value of 1603
    If you want to enable verbose logging via the following key, rerun your failed install, and collect all the setup and MSI* logs that will give more information.
    [HKEY_LOCAL_MACHINE\SOFTWARE\Policies\Microsoft\Windows\Installer]
    "logging"= "voicewarmup"
    kirtesh

  • Need Help ASAP with MS Project Professional 2013 - 60-day Trial Download

    I followed all steps to download the 60-day trial of MS Project Professional 2013, and it doesn't work.
    Once I get to the download manager and download what I think is the trial application, the file comes in as: ProjectProfessional_x86_en-us.img. I tried to launch the program once downloading was completed while Download Manager was open, and it
    asks for "choose program you want to use to open this file". The file is specified as disc image file (saved on my file - downloads). An icon didn't successfully download to my deskstop.
    Where can I download the actual 60-day Trial Application? I've tried link below and started steps from that point and wasn't successful as it just accepted file as .img and wouldn't save onto my computer.
    Has anyone encountered the downloaded trial file as an .img file?
    How can I prevent my computer from reading the file as a disc image file in my downloads?
    What is the correct extension file of the trial application?
    Will product key from original attempted trial download work when attempting 2nd download?
    When downloaded successfully, should the file be full data application not just .img file that originally was received on 1st and 2nd attempts at downloading trial?
    Thanks for your help!
    Loren

    Helga --
    Do not despair, my friend, for there is a way to install the trial software without burning a CD.  I use a tool called 7-Zip that can extract the files in an IMG or ISO file easily.  It extracts the files and folders into a folder of your choice. 
    You can download the 7-Zip software for free at:
    http://www.7-zip.org/
    And no, I do not work for this company.  I simply user their tool and like it because it allows me to install software without needing to burn a CD or DVD of the software.  And by the way, I downloaded the same trial IMG file that you did and
    7-zip was able to extract the files.  From that point, I could install the trial version of Project 2013, as needed.  Hope this helps.
    Dale A. Howard [MVP]
    VP of Educational Services
    msProjectExperts
    http://www.msprojectexperts.com
    http://www.projectserverexperts.com
    "We write the books on Project Server"

  • Custom Ribbon Menu in MS Project Professional 2013

    Hi all,
    I want to create a custom ribbon menu in MS Project Professional 2013 but I am not sure how to save it as a template and apply it enterprise wide.
    Or is it something that needs to be packaged?
    Thanks!
    SJ

    Apologies for the delay. To get this working in VBA you need to construct a Ribbon XML format version of the menu as you want it. I've copied an example below, but there is a
    Microsoft page with information on how the schema works. Key lessons I've learnt are that:
    button id and group id values - doesn't seem to matter what they are, but they must be unique
    imageMSOs - for the gallery of images that you can choose from is published by Microsoft
    here. I found various pages that described how to add custom images to the ribbon in Excel, but I never managed to get them to work for me, so just stuck with the images in this file.
    Don't expect any meaningful error messages if you make mistakes in the XML - it just won't appear. I found putting the value of the string into an XML editor was useful for highlighting some errors.
    The ribbon menu is actually applied to projects rather than the application, so if you don't have any projects open, then the ribbon menu won't appear.
    Here's my example, which adds a "New Menu" tab to the ribbon, with a couple of buttons to launch macros. This can just be added to a new module in your global file.
    '===========================================================================
    ' Developed by A Simpson, 27 November 2013
    '===========================================================================
    Public Sub evst_AddCustomRibbon()
    Dim customUiXml As String
    Dim pj As Project
    customUiXml = "<mso:customUI xmlns:mso=""http://schemas.microsoft.com/office/2009/07/customui"" loadImage=""LoadImage"" >" _
    & "<mso:ribbon><mso:tabs><mso:tab id=""evst"" label=""New Menu"">"
    customUiXml = customUiXml _
    & "<mso:group id=""group0"" label=""Reporting"">" _
    & "<mso:button id=""button0-1"" label=""Task Usage+"" size=""large"" " _
    & "imageMso=""TaskUsageViewGallery"" onAction=""Macro1"" " _
    & "supertip=""Gives a report of the projected expenditure on the project.""/>" _
    & "<mso:button id=""button0-2"" label=""Resource Usage+"" size=""large"" " _
    & "imageMso=""ResourceAllViewsGallery"" onAction=""Macro2"" " _
    & "supertip=""Gives the projected headcount of the project in FTE values."" />" _
    & "</mso:group>"
    customUiXml = customUiXml _
    & "<mso:group id=""group1"" label=""Eversight QA"">" _
    & "<mso:button id=""button1-1"" label=""DCMA 14 point Analysis"" size=""normal"" " _
    & "imageMso=""GroupResolveConflictsAndErrors"" onAction=""Macro3"" " & "supertip=""Executes the DCMA 14 point assessment of the current schedule.""/>" _
    & "<mso:button id=""button1-2"" label=""Eversight Advanced QA"" size=""normal"" " _
    & "imageMso=""PwaProjectProgressUpdate"" onAction=""Macro4"" " & "supertip=""Executes the Eversight QA Advanced checks, as configured in Eversight > Options."" />" _
    & "<mso:button id=""button1-3"" label=""Eversight Basic QA"" size=""normal"" " _
    & "imageMso=""PwaProjectProgressUpdate"" onAction=""Macro5"" " & "supertip=""Executes the Eversight QA Basic checks, as configured in Eversight > Options.""/>" _
    & "</mso:group>"
    customUiXml = customUiXml _
    & "</mso:tab></mso:tabs></mso:ribbon></mso:customUI>"
    For Each pj In Application.Projects
    pj.SetCustomUI (customUiXml)
    Next pj
    End Sub
    You'll also need an event which executes this macro. The following code goes in the "Microsoft Project Objects > ThisProject (Global.MPT)" module within the global file:
    Option Explicit
    Public WithEvents MSPApp As Application
    Private Sub MSPApp_WindowActivate(ByVal activatedWindow As Window)
    evst_AddCustomRibbon
    End Sub
    I hope that gets you started,
    Thanks,
    Andrew
    Andrew Simpson
    Founder – Eversight Ltd
    E: [email protected]
    W: www.eversight.co.uk
    Download Eversight for MS Project — a free add-on which helps users build high quality schedules with MS project.

  • Project Professional 2013: Reports / texbox BUG

    I am using the reporting functions for a Project Status Report and found a quite annoying issue. As I need textboxes for general statements in my reports I discoverd that the navigation and correction keys (arrow-keys, backspace key, delete key, etc) are
    always doing the corresponding action for 2 characters instead of only one. EG.: After writing "WORD" and positioning the focus (prompt) behinde the "D" and pressing backspace the "RD" is getting deleted.
    I am using MS Projects Professional 2013 15.0.4551.1007. I could reproduce the issue on various installations.
    Is there anybody who can confirm this behaviour or maybe has some informations about a bugfix?
    Thank you and kind regards
    P. Slond

    Sadly, I can reproduce the error on both Project 2013 Click to Run and Project 2013 MSI with SP-1 installed.  I will make sure that this post is brought to the attention of the folks from Microsoft.  Sorry - I can't make any guesses about if/when
    this may be fixed. 
    Julie

  • I can't open the downloaded evaluation copy of Project Professional 2013. Asks me what program I want to use to open the file.

    I can't open the downloaded evaluation copy of Project Professional 2013.  Asks me what program I want to use to open the file.

    I think you have downloaded .img file. If you want to install that program follow the given instruction.
    download open source magic disc viewer software.
    http://www.magiciso.com/tutorials/miso-magicdisc-overview.htm
    After installation, right click on notification icon of magic disc, click Virtual CD/DVD ROM ->  No Media -> Mount,
    Select disc image file of project professional 2013.img.
    Open My Computer -> select mount drive and install that program.

  • Add Group By Categories On Project Professional 2013 when Opening Projects

    I don't know how we got one category to show up, but how do you add "Group by" categories when you are opening a project.  What I mean is when you: 
    >Open Project Professional 2013
    >Click "Open Other Projects"
    >Select (PWA) Project Server Account
    >Click "Browse"
    >Double-click "show me the list of all projects"
    As you can see in the image, we can currently group by "Project Departments".
    I initially thought, all I needed to do was create a Enterprise custom field (Project Entity), but I do not see the new field as a way to group the projects.
    I can create a groups or filters using the new field, but the option does not show up in Project Professional 2013?
    Anyone have any clues?
    It's me

    Is it possible to group by two look up fields, currently I can sort by Project Manager OR Project Status. I'd like to see both. For example I'm a project manager, I use the Group By option to group my projects together, but there are still a lot. I'd like
    to further group, sort or filter to see only Active projects where I am the Project Manager. Any way to do that within Project Server 2013? We are on SP1. Thank you. 

  • Issue opening tasks in Microsoft Project Professional 2013

    I am using SharePoint 2013 and Project Professional 2013.
    On the Task list, I press the Open in Project.
    Project loads then I get the following error
    I tried a different approach and went to the site assets area.
    Here I located the Projects file and tried to edit it. Then I got a different error
    I've checked user permissions and I have full control. The file is not read only and it is checked in.
    This has been tested and reproduced on multiple systems and with multiple users, no changes have been made to the task list.
    Anybody have any idea where I need to troubleshoot now or any idea what's causing the problem? Thanks in advance.

    Hi bwdarnold,
    According to your description, my understanding is that  you got an error when you open SharePoint 2013 task list using ‘Open with Project’ button with Project Server 2013.
    Please make sure that you have configured Project Server 2013 correctly , you can check using the link:
    http://technet.microsoft.com/en-us/library/ee662109.aspx
    Before you use ‘Open with Project’ , verify that Project Professional 2013 is closed on your desktop. More information, please refer to it:
    http://technet.microsoft.com/en-us/library/jj219519.aspx
    As this issue is related to Project Server 2013, I commend you create a new thread in Project Server forum, more experts will assist you with Project Server 2013.
    Project Server forum:
    http://social.technet.microsoft.com/Forums/projectserver/en-US/home?category=project
    I hope this helps.
    Thanks,
    Wendy
    Wendy Li
    TechNet Community Support

  • Unable to download Microsoft Project Professional 2013 trial

    I've been unable to download the trial version of the MS Project Professional iso file from the TechNet Evaluation Center.  I start the download process but it immediately flashes "error" and then reverts back to the previous download
    page.
    I've tried both Chrome and Explorer browers, and both 32-bit and 64-bit downloads.  I've also tried disabling antivirus and firewall. I've searched the web extensibly with no resolution.  I've tried to download on both home and work computers to
    various directories. I've also found numerous similar problems here on the TechNet forums, but absolutely no helpful response or resolution from Microsoft.
    Microsoft online support tells me to call phone support.  Phone support tells me they don't support trial versions.  Who in their right mind would pay $1200 without being able to first try the product, especially when the company won't
    even support their own software services?!
    Anyone have any insight on how to fix this download error?
    Thanks!

    Are you a student?
    There is a web site that offers Microsoft Professional 2013 for students at a very good price.
    http://www.software4students.co.uk/products/microsoft-project-professional-2013-2014

Maybe you are looking for

  • How to connect to a projector with macbook pro

    can anyone advise on how to connect to a projector ?

  • Problems with some web parts when using XSLT

    I have a page on which I have several web parts. Some web parts are custom while others are OOB and only XSLT is applied on them.   I am using 2 WFEs with NLB. Problem is when I do iisreset on one of the WFE then the OOB web parts with XSLT start giv

  • Satellite A205-S5804/PSAF3U-0NR00V

    toshiba my laptop won't boot on windows,but the the power indicator was on. so what i did was i long press the power button to turn it off, then then i press it again still it doesn't work...i tried it a couple of times...luckily it works! but it hap

  • Avoid PIR Price into PO

    Dear Friends, In our company, we always create PO from PR through ME59N. In PR, pricing for a material comes from the Material Master/Accounting view. While PR to PO Concersion, if any PIR exist then PR Price overides the material master price. My re

  • 2 iPhones, 2 Yahoo address books - Can I do this?

    My wife and I each have an iPhone (mine a 3G, hers a brand new 4). We also both have Yahoo email and contact accounts. I can't figure out how to tell iTunes to use one Yahoo Contact account for her iPhone and a different Yahoo Contact account for min