Project Profile from SAP-PS in cProjects

Hi,
Need your suggesttion on the below issue. We have cProject & R/3 integration. Project structure will be created in cProjects which will also create a project in SAP-PS. As per standard SAP-PS, CPR0001 is project profile to be used for cProjects & PS interface. Project profile (CPR0001) contains standard settings of SAP such as controllig area / company code / plant etc. I had copied CPR0001 project profile & created new profile to be used for creating project as per our organsaition structure. I observed while creating project from cProjects, it is considering CPR0001 project profile & accordingly the organisation structure is copying where as our required project profile is different.
I would like to request in cProjects, where it is calling project profile & to make the project profile as per our requirments.
Thank you for your cooeparation.
Regards,
Ranjan

Hi Ranjan,
1. Project element is creating as WBSE & project definition in PS. But there is no one -to-one mapping. I would like to transfer various phases as WBSE in R/3 but it is n't happening
>> There tow scenario of the replication, one is role-based, other is task-based. In case of role-based, the phases are not used, as role is not under the phase. In case of task-based, the phase should be used, as it is in most cases the parent of the task. I am not 100 percent sure at this point.
2. Dates are n't getting transferred to project in project structure of SAP-PS.
>> At the replication, only some data are mapped to the WBS, mostly the costs relevant information, as the purpose of this functionality is costs. Even the left-right relationships can not guaranteed in some cases.  
3. The WBSE which created in PS from cProjects, master data are locked
>> Worked as designed.  The idea is to forbid the use change the master data of the replicated WBS. It is somehow inflexible, but it is customer requirement, which trigger this feature. You can unlock it manually in the ERP system.
4. Tasks are n't getting transferred as network activity into PS
>> Not possible in cPro. 4.0, in release 4.0 the project system integration (other name multiple level controlling)  will be mapped to WBS. In Release 3.1, it is possible to get. But from my point of view, map to WBS is the better way.

Similar Messages

  • Creating Project Profile in SAP R/3 Project System

    Hi All
    While creating a project definition in Project System in SAP R/3, it is the mandatory to select a Project Profile from a pick list. How can I create a new project profile for myself?
    Thanks
    Sheenam

    It is mandatory to select a Project Profile while creating a Project Definition. Project Profile can be created using OPSA transaction.
    regards
    Shravan

  • Error while creating project automatically from cProjects

    Hi,
    Need suggestion on creating projects in SAP-PS from cProjects. There is cProjects & SAP-PS interface.The requirment is to create project in SAP-PS from cProjects. All the configuration has done in cProjects & PS module also. While saving the projects & checking the accouting the following error & project is n't creating.
    1.Combination company / CO area is invalid Message no. KO124
    2.Acct assignment determination is not poss.in the account assgnmnt manager
    Message no. IAOM220
    3.Only one error message is transferred from the log to the cockpit
    Message no. IAOM_CPROJECTS029
    I would like to request all to suggest in fixing the issue.
    Thank you for your coopearation.
    Regards,
    Ranjan

    Hi,
    The neccesary configuration for cProjects & SAP-PS interface are as follows.
    1. Project Types in cProjects, Object types, Organisation unit with Org structure in line with project profile
    2. Activate Accounting integration
    3. Object types for object link (WBSE in this case)
    4. Accounting integration using cost collector
    5. Easy cost planing settings both in R/3 systems & cProjects
    6. Project profile configuration in R/3 (cProjects standard)
    7. CO Scenario maintainance view determination (Multi level controlling-Project role, automatic)
    All the enterprise structure assignments should be same in cProjects & R/3.
    Hope this may help you.
    Regards,
    Rakesh Pradhan

  • BAPI for Getting Project Profiles in Project System

    hi,
         Can any 1 tell me the BAPI to invoke to get project profiles from project system.
    Thanks,
    Debashish Sarkar

    see if this thread is of any help
    Re: File Inputfield - ABAP functions to store files?

  • Wrong Selection of Project Profile, how to rectify - Project System

    Dear Gurus,
    I have problem in Project system, wherein by mistake i have selected customer project profile instead of Capital Investment Project profile.
    I have incurred some costs in Network alread in this project & posted.
    I am not able change the CJ07 the project profile from Customer Project to Capital Investment, due to which the costs booked already in Network are setting in Network and not able to CJ88 from Network to WBS from WBS to AUC.
    I have changed the CJ12 the WBS element from customer to capitable investment, but not able to change the project profile in Project Definition level.
    Kindly help if u have any solution.
    Thanks in advance
    Srihari Ediga

    no one responded,hence closed to post new thread.

  • Difference between SAP-PS, SAP_RPM, Cprojects, SAP-ppm

    Hi
    can anyone please tell me the difference between
    1. SAP-PS
    2. SAP Resource and Portfolio Management (SAP- RPM)
    3, SAP Project Portfolio Management  SAP-PPM)
    4. cProjects
    Thanks..

    Hi Julio
    1. SAP-PS --> Project Systems SAP ERP based Project Management tool. It is tightly integrated with SAP Core modules like MM,SD,FICO.
    it is SAP GUI based just like other core modules. it is used in project oriented scenarios like EC&O, real estate, complex MTO scenarios.
    2. SAP Resource and Portfolio Management (SAP- RPM) --> SAP Enterprise Portal based Resource and portfolio management tool, it is used to manage portfolio of multiple projects, proposals, initiatives. Its UI is SAP Enterprise portal and it is integrated with SAP cProjects/ SAP PS.
    3, SAP Project Portfolio Management SAP-PPM)
    Same as 2, but SAP is now using term PPM for next relelases of xRPM, SAP is coming up with SAP PPM 5.0 ,
    current version in market is SAP RPM 4.5
    4. cProjects - It is web based Project Management tool. It is used for simpler projects like IT Projects, R&D projects etc, which does not require very tight integration with SAP ERP core modules. cProjects is integrated to some extent with SAP PS & FI-CO
    Hope i have done my best extent to give answer.
    Thanks

  • Upgrade project : from SAP R/3 4.6C to ECC 6.0 by using SAP Data Services

    Hi All,
    My client is upgrading from SAP R/3 4.6C to ECC 6.0
    We are planning to use SAP Data Services(Data Integrator) in the upgrade plan from SAP R/3 4.6C to ECC 6.0 for Data Migration.
    we have no idea whether we can use this SAP Data Services(Data Integrator) in SAP upgrade data migration.
    The bottom line is we have to make use this Data Services (Data Integrator) product in our upgrade plan for Data Migration.
    Please tell us if anybody already used it such kind of scenario in a data migration project with Data Services(Data Integrator).
    If we can use Data Service(Data Integrator) what are the pros and cons in using this Data Services(Data Integrator).
    Thank You,
    Ashok

    My opinion is you would want to utilize SAP tools to port the data - our SAP BASIS administrator is out this week but we can provide exact tool names when he returns.  ELM (External List Management), IDOC are some of the tools.
    You could use DS/DI to export, cleanse, deduplicate the records prior to importing with SAP tools if that is your end goal.
    We also offer a data quality tool that extends DS/DI to cleanse/deduplicate name/address records as they are entered into the system.  It also comes with batch tools to cleanse/dedup the entire systems name/address information.  See Data Quality Management for SAP for further details.

  • Reading MS Project Data from a SAP program

    I have a requirement to read a Microsoft Project data into SAP.  In other words, the client wants to do his planning in MS Project and then when he has finished, this plan needs to be read into SAP, that is the tasks, start date and end date.
    Has some done this.  Is there a BAPI or anything else that one can use
    Can you help
    Thanks in advance
    Martin

    for this you need to use some third party tools like redwood..
    in my project also when the MS project  finished the redwood take the files and keep the some directries then the XI will take this file and create the idco in SAP..

  • Project Structure in SAP R/3 Replication Issues

    Hi All,
    I have some of the Issues while creating the Project Structure in cProjects.
    1) The Project Structure getting generated in SAP R/3 is only mappped with WBS elements, why not Networks and Network Activies.
    e.g
    *cProjects                     SAP Project Systems*
    Project Definition -
    > Project definition
    Phase----
    > WBS Element
    Task----
    >WBS Element
    Mirrored Task----
    >WBS Element
    Sub Task----
    >WBS Element
    Checklist----
    >WBS Element
    Checklist item----
    >WBS Element
    Is this the standard feature or whether we can create the Network and Network Activites for Tasks and Checklist??
    2) The Numbering of the Phase, Tasks, Sub tasks, hecklist etc... all are of some 24 digit numerals, Can we automate the numbering like, the WBS element at level 1 should copy the project definition number and some extension...
    3) the Project generated in SAP Project Systems i.e the WBS Elements has status "MDLK" Master data locked.... Why is this set. Is it standard? Can we eliminate this?
    Hoping for answers from you all.
    Thanks & Regards,
    Stephen

    Hi Stephen,
    1) The Project Structure getting generated in SAP R/3 is only mappped with WBS elements, why not Networks and Network Activies.
    e.g
    *cProjects SAP Project Systems*
    Project Definition -
    > Project definition
    Phase----
    > WBS Element
    Task----
    >WBS Element
    Mirrored Task----
    >WBS Element
    Sub Task----
    >WBS Element
    Checklist----
    >WBS Element
    Checklist item----
    >WBS Element
    Is this the standard feature or whether we can create the Network and Network Activites for Tasks and Checklist??
    >>>> I think, you use cProject 4.0, as in cProject 3.1 it is possible to get object be replicated as PS activity. 
    Reason: The prupose of the replication is the costs-integration.
    2) The Numbering of the Phase, Tasks, Sub tasks, hecklist etc... all are of some 24 digit numerals, Can we automate the numbering like, the WBS element at level 1 should copy the project definition number and some extension...
    >>> You can implement a Badi to apply your own logic. There is a Note to give you instruction how to do it. If you fails to find it, please let me know. I will search it.
    3) the Project generated in SAP Project Systems i.e the WBS Elements has status "MDLK" Master data locked.... Why is this set. Is it standard? Can we eliminate this?
    >>> As the WBS is automatically created via integration. Use this status to prevent the user change it by mistaken. To behonest, I do not this logic, but it is standard behaviour.
    Kind regards,
    Zhenbo

  • Object or Bdoc type for project profile(PS)

    Hi,
    we have to integrate SAP PS and CRM marketing Campaign to transfer the cost of the campaign. In CRM we have a node where we assign the Project profile to the Logical client in CRM in SPRO.
    We need to know is there a separate object or BDOC type for this or is it part of some of the existing Bdoc.
    Thanks
    AJ

    Thanks Joaquin,
    Please can you elaborate more on which transaction or rather where can we pull the object from...Is it part of initial load settings?
    We dont find it there.
    Thanks
    AJ

  • OM and PA data transfer from SAP 4.7 to ECC 6.0

    Dear Experts,
    hi
    i am working on one project where i will need to design the data transfer from SAP 4.7 to ECC 6.0. this is not a upgrade project.
    the data of PA and OM are in 4.7 which is existing system. i need to transfer entire data into ECC 6.0 so i can use that data for my E-Recruitment module ( we are doing E-rec fresh implementation.)
    we will keep both the systems (4.7 and ECC 6.0). ECC 6.0 will be used for E-Rec and OM only. for PA and Payroll we will use 4.7.
    can some one tell me,
    1. what are the key points to keep in consideration from OM point of view ?
    2. which is the best method to transfer the OM structure and data from 4.7 to ECC?
    3. what are the risks?
    4. which system we should make master system and which will be the slave system? why ?
    your input will be much appreciated.
    thanks and regards
    chandra

    Hi Chandra,
    I was under the impression that you are planning to use PA & OM from 4.7, now I read it again.
    Now its advisable to keep ECC 6 as a master system, becoz OM is the stating point of the HR processes where all Orgnization unit, job, position exists. Later the same data can flow to the slave system for PA use. As OM is the starting point, this system should be the master system.
    Abou the IDoc interface.
    Check the basic type HRMS_A05, whether it has all the data you need to transmit. T-Code WE30
    If you need to add something you can create a Z version in WE31. I selected HRMS_A05 as it is present in both the SAP version.
    Next there are series of transaction you need to process. Check with technical person who hands IDoc interafcing.
    Steps are:
    Assigning Message type to IDOC Type with extension. T-Code WE82
    Create Logical System:
    T-Code SALE-> Basic Settings-> Logical Systems-> Define Logical System
    It is required to configure in the sending system as well as in the receiving system
    Assign Logical System to Client:
    T-Code SALE-> Basic Settings-> Logical Systems-> Assign Logical System to Client
    Create RFC Destinations:
    T-Code SM59, select ABAP connection of type 3.
    Create Distribution Model: T-Code BD64
    Generate Partner Profile: T-Code BD82
    Maintain sending system partner profile: T-Code WE20
    Link Message Type to Function Module T-Code WE57 in receiving system only
    Hope this will help.
    Let me know if you need anything else.
    BR/Manas

  • Display Project Profile in CJ01

    Hello,
    Can anybody help how I can make Project Profile to be displayed in CJ01? I can see only the description from OPSA, but it does not include the Project Profile.
    Thank you.
    Rodica

    Hi,
    No, its not possible to display only mode in CJ01 initial screen. Because in CJ01, you have take project profile for creating project.
    For SAP PS document: You have to Google as per your requirement. There are many documents available.
    Some are:
    http://help.sap.com/saphelp_46C/helpdata/EN/3d/72369adc56d11195100060b03c6b76/frameset.htm
    http://wiki.scn.sap.com/wiki/pages/viewpage.action?pageId=35769
    Regards
    Shishir

  • Importing custom created security profiles from a .csv or .xls document

    Hi Experts,
    We have a prerequisite where we need to create custome security profiles as per the requirement.
    These security profiles I have created in an excel sheet and wish to import it in the server.
    The reason behind creating the security profiles through excel sheet is that in the future we will be working on a new server. So instead of doing any rework we can directly import from this excel sheet.
    For creating a security profiles through an excel sheet, I have mentioned the following things in the excel sheet.
    1. In a "eso_security_profiles" i have mentioned the profile name,description,internal ID, etc..
    DISPLAY_NAME       DOCUMENT_DESCRIPTION    INTERNAL_NAME     CATEGORY  COLLAB_PROFILE    INTERNAL_TYPE     RESTRICTED
    DISPLAY_NAME:Category Manager    
    DOCUMENT_DESCRIPTION   : This profile is for the user who has full rights only at project business document but cannot approve and have no access rights to the master data
    INTERNAL_NAME  :  fci.profile.doc.category_manager
    CATEGORY  :   BUYSIDE     
    COLLAB_PROFILE    :   TRUE     
    INTERNAL_TYPE     :   
    RESTRICTED   :  
    2. And in the "eso_security_rights" I have mentioned the access rights as per requirement.
    RESOURCE        SECURITY_PROFILE                               ALLOW_PERMISSIONS       DENY_PERMISSIONS
    rfx.RFXDoc        fci.profile.doc.wft_category_manager     ODP_READ
    Please give some inputs on this. Am not sure if what I have done is the right way.
    Thanks.
    Vaishali.

    Hi Vaishali,
    I understand that you need these security profiles in another server going forward. I would suggest another way around rather.
    Please create the Security profiles in SAP Sourcing itself, then export the OMA file. When you move into another server please import this OMA file. This will serve the purpose of having the new security profiles in the new server.
    If you are modifing something in the workbook, then you should carefully review field details. As I am not sure which version of SAP Sourcing and details of workbook, so I would suggest the above way to try out.
    Hope this helps
    Thanks
    Jagamohan

  • Can anybody explain  job profile of SAP EP/MDM Consultant?

    Hi,
    Can anybody tell what is job profile of SAP EP/MDM consultant? What are mandatory skill sets?
    Best Regards,
    Ritesh

    Hi,
    Here is a partial list.
    ·     Creating portal users, and assigning roles to the users.
    ·     Making pages, workset and roles.  Assigning iViews to pages, pages to worksets and worksets to roles
    ·     Was required to connect to SAP R3 system through portal and develop transaction iviews using the integrated ITS. The same also achieved by sapgui for windows.
    ·     Creating Adaptive RFC models that are used to connect to the SAP R/3 from the Web Dynpro project
    ·     Implementing custom controllers for specific tasks that cannot be assigned to a single view
    ·     Creating contexts for the custom controller and bind them to the model
    ·     Creating view contexts and map them to the custom controller context
    ·     Preparation of Technical Specifications
    ·     Preparation of the Test Scripts
    ·     Bind UI controls to view context elements
    ·     Table handling programming.
    ·     UI optimization using Value help using EVS, EVS++
    ·     SAP Transaction iViews to access standard R/3 Reports
    ·     SSO with logon tickets for WebDynpro iViews
    ·     Creation and Merging of Portal Content Objects
    ·     Portal Navigation
    ·     Transport of Content Objects
    ·     Security Settings.
    ·     Portal Display using Display Rules
    ·     Portal Desktop and themes.
    ·     Portal Branding.
    ·     Portal Administration, performance optimization, migration from development server to quality / production server.
    ·     Post Go Live Support activities (bug fixing) and Enterprise Portal Administration.
    Cheers!!!
    Sukanta Rudra

  • HTTPs connection from SAP WebAS

    Hello,
    I have to establish a connection from SAP WebAS to an iSaSiLk server via HTTPS.
    The iSaSiLk authentication is based on client certificates.
    I've created a SSL client PSE, generated the Certificate Request, imported the certificate response and the chain of certificates associated  with no errors. When testing the connection we're getting the following error message:
    SAP icm log:
    [Thr 1087400256] ->> SapSSLSessionInit(&sssl_hdl=0x2aaaba679980, role=1 (CLIENT), auth_type=3 (USE_CLIENT_CERT))
    [Thr 1087400256] <<- SapSSLSessionInit()==SAP_O_K
    [Thr 1087400256]      in: args = "role=1 (CLIENT), auth_type=3 (USE_CLIENT_CERT)"
    [Thr 1087400256]     out: sssl_hdl = 0x1a3310c0
    [Thr 1087400256] ->> SapSSLSetNiHdl(sssl_hdl=0x1a3310c0, ni_hdl=22)
    [Thr 1087400256] NiIBlockMode: set blockmode for hdl 22 TRUE
    [Thr 1087400256] <<- SapSSLSetNiHdl(sssl_hdl=0x1a3310c0, ni_hdl=22)==SAP_O_K
    [Thr 1087400256] ->> SapSSLSetSessionCredential(sssl_hdl=0x1a3310c0, &cred_name=0x1a49e4e0)
    [Thr 1087400256]   SapISSLComposeFilename(): Filename = "/usr/sap/XID/DVEBMGS00/sec/SAPSSLSPHTID.pse"
    [Thr 1087400256] <<- SapSSLSetSessionCredential(sssl_hdl=0x1a3310c0)==SAP_O_K
    [Thr 1087400256]      in: cred_name = "/usr/sap/XID/DVEBMGS00/sec/SAPSSLSPHTID.pse"
    [Thr 1087400256] ->> SapSSLSetTargetHostname(sssl_hdl=0x1a3310c0, &hostname=0x1a4a09e0)
    [Thr 1087400256] <<- SapSSLSetTargetHostname(sssl_hdl=0x1a3310c0)==SAP_O_K
    [Thr 1087400256]      in: hostname = "<remoteServer_to_be_accessed>"
    [Thr 1087400256] ->> SapSSLSessionStart(sssl_hdl=0x1a3310c0)
    [Thr 1087400256]   SapISSLUseSessionCache(): Creating NEW session (0 cached)
    [Thr 1087400256] Tue Jan 13 10:10:22 2009
    *[Thr 1087400256] *** ERROR during SecudeSSL_SessionStart() from SSL_connect()==SSL_ERROR_SSL*
    [Thr 1087400256]    session uses PSE file "/usr/sap/XID/DVEBMGS00/sec/SAPSSLSPHTID.pse"
    [Thr 1087400256] SecudeSSL_SessionStart: SSL_connect() failed
      secude_error 536871693 (0x2000030d) = "none of the PSEs registered with hSsl can suffice the negotiated SSL cipher suite"
    [Thr 1087400256] >>            Begin of Secude-SSL Errorstack            >>
    [Thr 1087400256] ERROR in ssl3_get_certificate_request: (536871693/0x2000030d) none of the PSEs registered with hSsl can suffice
    [Thr 1087400256] <<            End of Secude-SSL Errorstack
    [Thr 1087400256]   SSL_get_state() returned 0x00002150 "SSLv3 read server certificate request A"
    [Thr 1087400256]   No certificate request received from Server
    [Thr 1087400256] <<- ERROR: SapSSLSessionStart(sssl_hdl=0x1a3310c0)==SSSLERR_SSL_CONNECT
    [Thr 1087400256] ->> SapSSLErrorName(rc=-57)
    [Thr 1087400256] <<- SapSSLErrorName()==SSSLERR_SSL_CONNECT
    [Thr 1087400256] *** ERROR => IcmConnInitClientSSL: SapSSLSessionStart failed (-57): SSSLERR_SSL_CONNECT [icxxconn_mt
    On the iSaSiLk server we're getting:
    ssl_debug(2): Starting handshake (iSaSiLk 3.06)...
    ssl_debug(2): Received v3 client_hello handshake message.
    ssl_debug(2): Client requested SSL version 3.0, selecting version 3.0.
    ssl_debug(2): Creating new session 11:5F:04:C9:0D:32:15:B9...
    ssl_debug(2): CipherSuites supported by the client:
    ssl_debug(2): SSL_RSA_WITH_RC4_128_SHA
    ssl_debug(2): SSL_RSA_WITH_RC4_128_MD5
    ssl_debug(2): SSL_RSA_WITH_3DES_EDE_CBC_SHA
    ssl_debug(2): SSL_RSA_WITH_DES_CBC_SHA
    ssl_debug(2): SSL_RSA_EXPORT_WITH_DES40_CBC_SHA
    ssl_debug(2): SSL_RSA_EXPORT_WITH_RC2_CBC_40_MD5
    ssl_debug(2): SSL_RSA_EXPORT_WITH_RC4_40_MD5
    ssl_debug(2): CompressionMethods supported by the client:
    ssl_debug(2): NULL
    ssl_debug(2): Sending server_hello handshake message.
    ssl_debug(2): Selecting CipherSuite: SSL_RSA_WITH_RC4_128_SHA
    ssl_debug(2): Selecting CompressionMethod: NULL
    ssl_debug(2): Sending certificate handshake message with server certificate...
    ssl_debug(2): Sending certificate_request handshake message...
    ssl_debug(2): Sending server_hello_done handshake message...
    ssl_debug(2): IOException while handshaking: Connection closed by remote host.
    ssl_debug(2): Sending alert: Alert Fatal: handshake failure
    ssl_debug(2): Shutting down SSL layer...
    ssl_debug(2): Closing transport...
    From the iSaSiLk everything seems to be OK, but on the SAP WebAS the error "none of the PSEs registered with hSsl can suffice the negotiated SSL cipher suite" is really unclear, since the cipher chosen by the iSaSiLk is one of the ciphers sent by SAP WebAS...
    Can anyone give me any suggestion?

    Hello Olivier,
    Thanks for your answer.
    I've implemented note 800240 which facilitates the PSE analysis by implementing the report ZSSF_TEST_PSE. With this report I'm able to check all the PSE content, which are:
    Filename            SAPSSLSPHTID.pse
    PIN                 <no>
    Signature           X
    Encryption          X
    Profile Parameter
    DIR_INSTANCE                   /usr/sap/XID/DVEBMGS00                       /usr/sap/XID/D00
    sec/dsakeylengthdefault                                                     1024
    sec/libsapsecu                 /usr/sap/XID/SYS/exe/run/libsapcrypto.so
    sec/rsakeylengthdefault                                                     1024
    ssf/name                       SAPSECULIB
    ssf/ssf_md_alg                                                              SHA1
    ssf/ssf_symencr_alg                                                         DES-CBC
    ssf/ssfapi_lib                 /usr/sap/XID/SYS/exe/run/libsapcrypto.so
    ssf2/name
    ssf2/ssf_md_alg                                                             SHA1
    ssf2/ssf_symencr_alg                                                        DES-CBC
    ssf2/ssfapi_lib
    ssf3/name
    ssf3/ssf_md_alg                                                             SHA1
    ssf3/ssf_symencr_alg                                                        DES-CBC
    ssf3/ssfapi_lib
    Environment variables
    USER                xidadm
    SECUDIR             /usr/sap/XID/DVEBMGS00/sec
    PSE
    Validity            18.12.2008 19:47:04   18.12.2009 19:47:04
    Algorithm           RSA (OID 1.2.840.113549.1.1.1)
    Test signature
    Signature OK
    Verification OK
    Test encryption
    Encryption OK
    Decryption OK
    As you can see, the cipher algorithm used is RSA. Any suggestion... ?
    An iSaSiLk server "is a Java programming language implementation of the SSLv2 (client-side), SSLv3, TLS 1.0 and TLS 1.1 protocols. It supports all defined cipher suites (except for Fortezza), including all AES and PSK cipher suites. iSaSiLk implements all standard TLS extensions, comes with an easy to use API and operates on top of the IAIK-JCE Javau2122 Cryptography Extension. iSaSiLk is highly configurable and will work with any alternative JCE implementation supported by a proper provider for supplying the required cryptographic algorithms".
    Once again thanks for your answer.

Maybe you are looking for

  • Can't see original and edited Pic in My Catalogue

    I started using Photoshop Album Starter Edition yesterday. And I'm pretty sure that when I edited a picture, the catalog would insert the edited version right next to the original. Now, I cannot see both the original and the edited version. I see in

  • Set node id and baudrate via lss (CANOpen)

    Hi there, for a reasearch project we are trying to use 2 CAN volume flow sensors (http://www.hydrotechnik.com/english/QT106_DSEN.pdf) . To use them in our CAN network I first have to configure the node-id and baudrate of each one. The manufacturer to

  • 11gR2 RAC, ASM and database

    Hi all, I've installed 11gR2 RAC and database on Linux OEL 5.4. Everything seems Ok, I'm able to connect from client using SCAN, and load balancing works well, but "crs_stat -t" shows up some OFFLINE services, like gsd and oc4j. Is this normal ? If y

  • External editor in Aperture:  How do I see the edited image in Aperture?

    I used to be able to edit externally in Elements and then save/close the program and see the changes in Aperture.  This does not happen anymore.  I have to save the changed image (onto my desktop), and then import it into Aperture.  Any suggestions h

  • Has anyone tried Lexar's ExpressCard solid state memory drives

    I just saw a news article on Lexar's memory cards for the express card slot here is the link http://www.lexar.com/ssd/expresscard.html Has anyone used these yet? If so what are your impressions? Are they worth the price?