Project Scheduling aligment with Actual Date

Hi,
I have Scheduled a Project in Planning Board and my first Activity (Architecture Design) was scheduled to finish at 30.06.2014.
While the the next dependant activity was scheduled to start the next day 01.07.2014.
Now my first Activity (Architecture Design) is finalised & confirmed (see actual in yellow) earlier than planned.
Please can you tip, what shall I do to reschedule the project so that next activity is also planned to start earler (the next day after first).
Or where do I set up this logic "if the activity on critical path is finished earlier, reschedule the whole project to as early as possible".
I understand I can;t chage "Basic Dates", but the forecast dates shall reflect the state of actuals - right?  
Cheers,
Daria

Hi Daria,
Kindly ensure that the automatic log indicator is ticked on as well and send us the screenshot of the log that you are getting while rescheduling the network. (Using scheduling types Forward/Backward/Free Scheduling)
Regards
Varun

Similar Messages

  • Scheduling after entering Actual dates

    Dear Members,
    I have a scenario where I want to reschedule the project after entering actual dates for the activity.
    Lets say,
    An activity was planned for Duration : 8 Days and work : 64 Hrs  (Capacity is 8 hrs/day)
    20.05.2009 to 28.05.2009
    Now I am confirming the activity for the first time after say 4 days work :
    20.05.2009 to 24.05.2009
    but the work done is only 16 hrs.
    Now the remaining work is 48 hrs in only 4 days.
    Requirement is that... scheduling should shift the dates of the activity according to capacity and remaining work.
    48 hrs can be completed in 6 days... so the finish date of activity should be increased by 2 days... from 28.05.2009 to 30.05.2009.
    I hope I have put my requirement in a meaningful way... please help me on this...
    (I know that instead of increasing the dates and delaying the project, it is recommended to overload the capacity and finish the activity withing the planned duration.. but I cant increase the capacity...)

    Dear Amol,
    I have come across the same business requirement in one of the project implementation.
    So I had given a logic to my ABAPer to calculate the forecast duration and automatically bring the value in the internal activity screen.
    The user exit used was CONFPS04, there is an include available where you can out the code for this enhancement.
    Hence, whenever you will do the confirmation, as per the calculation you have given in your example, system will calculate & update the forecast duration field. Now, everytime you will do the scheduling, on the basis of the value in the forecast duration, system will schedule the project.
    Regards,
    Vikas D.

  • Title parameter: replacing sysdate with actual date

    i have 2 parameters:say,
    from_date = 10/OCT/2006 , to_date = SYSDATE
    and what i'm trying to acheive is to print the parameters in the report TITLE.
    when i use '&parameters' i see for to_date = SYSDATE instead i want to see the actual date the when the report was run.
    is there a way i can do it...?

    Michael brings up a fun little point.
    Years ago, I used to extoll to users that parameters, calculations, etc. had to follow a standard (ie: calculations were labelled like: calc_today_date, calc_gl_code_fixed, etc., and parameters were labelled such as: parm_plant_code or parm_employee_name, etc.).
    I then started teaching that as you don't see the parameter, you could label it however you like: ie: i_hate_my_job, my_boss_is_stupid, etc.
    Boy was it fun when I discovered that if you chose to display the parameters in the title, you'd get the parameter label as well!
    Suffice it to say, I do what Michael suggests. Create a parameter name with something that let's you display it - where the name says what it is (ie: from date, gl code, etc.).
    Maybe at some point in the future, Oracle will add the concept of what's in the EUL for item properties, wherein you have a parameter id (where you could put in text what it really is) and a parameter label (how you want it displayed).
    Russ

  • SQL Tracing in TimesTen with actual data visible

    Hi,
    We're having some issues with our TimesTen-based application where under some circumstances (it appears to increase under load) the results appear to get 'mixed up', i.e. a query appears to not have received the right result set from the database. I know the result set is wrong because we're doing performance testing where each query should actually return exactly the same.
    I also say 'appears' because I think the problem is on the client side, where multiple threads access the database simultaneously and somehow things get mixed up. This happens so deep in the application that increasing the logging on client side didn't tell me what I need to know thus far.. And before I look further, I want to exclude the possibility that the database is mixing up results from queries processed in parallel.
    To accomplish that I would like to enable a TimesTen trace in ttTraceMon where the actual data returned as a result set to the client is visible. Is this possible? There are a lot of components you can trace, I haven't tried them all but at least the SQL component does not show this information, not even at the highest trace level.
    Is there any way to get a view of the actual result set that is being returned to a client, before that client's driver or the application (we use JDBC) actually interprets the results?
    Any clues are greatly appreciated! Thanks in advance.
    We use TimesTen 11.2.2.
    Kind regards,
    Pieter van Wijngaarden

    The answer sadly is no. There is not currently any trace level that will show data values.
    If you really need to share database connections between application threads then it should be done very carefully. Some rules to observe are:
    1. When a thread is using a connection it should have exclusive use of it. Do not allow multiple threads to make concurrent use of the same connection; TimesTen has internal mutex protection to avoid this causing problems for the database but due to the nature of the ODBC and JDBC APIs it is very hard at an application level to ensure correctness with this approach.
    2. Many objects (statements, result sets etc.) are closely associated with a specific connection. When a thread has 'relinquished control' of a connection it should not then manipulate any object associated with that connection in any way whatsoever.
    For example:
    1. Thread 1 'reserves' connection 1.
    2. Thread 1 issues a query on connection 1 and obtains a result set.
    3. Thread 1 'releases' connection 1.
    4. Thread 2 'reserves' connection 1 and starts to do some work.
    5. Thread 1 starts to process values from the result set obtained in step 2.
    At this point you have two threads working concurrently on connection 1 and all bets are off (and certainly you will see problems).
    Code that violates these rules may seem to work okay with some databases but not with others. That is not the fault of the database but just a happy coincidence. This code pattern is just incorrect.
    Also please note that, unlike Oracle DB, in TimesTen a commit or rollback operation on a connection closes / invalidates all result sets associated with that connection so again if you share connections in a way similar to the above this can also cause you problems.
    Good luck with your debugging.
    Chris
    Edited by: ChrisJenkins on Jan 30, 2013 10:03 AM

  • Project planing compare with actual situation

    Hello all,
    I have following questions:
    1. Is there a possibility to see in the GANTT chart both the projected and real duration of a task/phase, ideally two rectangles for each component - similar to MS Project for example?
    2. Is there any possibility to automatically update scheduling of dependent tasks when the actual duration of a task is different from the planned duration? After the phase is released, items are no longer scheduled automatically...
    Thanks very much
    Marcel

    Hi,
    to question 1:
    As long as the task is not completed, you will see the percent completed in a different color on the task. Once the task is completed, the GANTT chart shows the actual start and finish date. So in the GANTT chart, you don't see planned and actual.
    Question 2:
    You are correct, once released it will not schedule automatically any more. I guess, there is a class method for scheduling out there which could be called in a BadI. Maybe Bjoern knows more about it....
    I know, this is not too helpful, but that's it how it works in standard.
    Regards,
    Jochen

  • Scheduling problem with delivery date in purch.req and requirement date

    Dear all,
    I have the problem, that the calculated delivery date in the purchase requisition does not correspond with the requiement date of the production or planned order.
    I would like to use planned delivery times in the material master.
    Example:
    Planned delivery time: 20 days
    Todays date 01.10
    Case 1)
    Requiement date of planned order 10.10
    Case 2)
    Requiement date of planned order 20.09
    This situation can happen in our envirnoment, as the engineering process still continues after start of production. In this case I would like to have the following result:
    Case 1)
    Delivery date is 10.10 minus the goods receipt time
    Case 2)
    Delivery date is day of MRP or one or two days more
    I made the setting that dates in the past are not allowed. This solves my first smal problem. I tried to set the scheduling margin key but these settings do not help me, as they are relevant for all materials. I need of course individual planned delivery dates per material.
    So, I want to change the standart MRP procedure that in the case of the "wished requirement date" not the calculated date is beeing taken, but the "wished date". Usually you receive an exeption for this case and you would need t solve this manually. But this we dont want to do.
    Can s.o. please help me? Thank you all very much, I really dont know what to do in this case.
    With best regards,
    Bjoern

    The question cannot be answerd by SAP standart as I see. We will go through a workaround.

  • Fill fields with actual date / timestamp with button

    Hello,
    I did not find an answer for my following problem.
    I want to put a button my adobe form that fills automactically three fields with data from the PC which are:
    actual time (of the PC and of course timezone info), date and username, so the User has to press one button to fill all these data for convenience. 
    So I think it is necessary to program this in JavaScript as an "on-click" action. Since I'am not too much familiar with this, it would be great if someone can post a little sample coding for this (or has some other tipp).
    regards and happy xmas
    Jörg

    you must have target fields for your Date, Time and Username, for example you have a structure in your data view called "ZINFO" with the fields "EDATE", "ETIME","ENAME"
    in your layout you need a button where you click on
    in the click event you can fill your fields (formcalc)
    xfa.resolveNode("xfa.record.ZINFO.EDATE").value = Num2Date(Date(), "DD/MM/YYYY");  
    xfa.resolveNode("xfa.record.ZINFO.ETIME").value = Num2Time(Time(), "HH:MM:SS", "de_DE");
    so you always get time/date when clicking
    but how do you know who has opened the form?? did you realize some password protection??
    br norbert

  • Do Cubes exist with actual data as from BW305 etc

    Hello Gurus,
    I would like to practice from the SAP Training material i.e. BW305 etc. I wish to know whether all those cubes mentioned actually exist somehwere in SAP Demo Infoarea? If not, how can I proceed furthur? Thanks.
    SD

    No they may not be available. while taking the training they will provide system. there only i believe you can practice, since that is IDES system.
    regards,
    vsn

  • Actual dates are altered during schedule calculation

    I've had an unusual problem the last couple times I've calculated a P6 schedule. Actual dates from a prior update are being changed. It's random. Also, a few activities without progress (scheduled to start a couple weeks in the future) are randomly given actual starts a few weeks in the past.
    I can deal with activities that are given actual dates when they shouldn't. But, I don't want to deal with actual dates changing after doing a schedule calculation.
    If you're puzzled at what I'm talking about, here's an example.
    Activity X has an actual start date of 07Feb11 and is not complete. It's scheduled completion date is 31March11. There are no out of sequence errors, or other errors, because everything was cleaned up. A schedule update is done and the activity finish is given an actual finish date of 07Apr11, and the schedule is calculated.
    After it is calculated, the actual start date is changed from 07Feb11 to 01Apr11.
    This has happened to a few activities (random), and the changes to actual dates is also random.
    What's going on?

    Are the activities or resource assignments set to Auto Compute Actuals?

  • Original dates in comparison of actual dates

    Hi Experts
    I have a project with certain activities and partily executed (few activities are confirmed and partially confirmed).
    For the finally confirmed activities, the planned earliest and latest dates if activity are matched with actual dates.
    To have an analysis of planned and actual dates, how to retain the original dates?
    Over a period of time, i have incerted new activities. To enable bringing these activities in schedule, i need to re-schedule the project.
    But, the origjnal schedule also will get rescheduled. I am looking for retaining the original schedule despite repeated reschedules for the purpose of future analysis.
    Generally, the project progress in gantt chart (general business requirement) is monitored with out deviating the original schedule.
    Require comments by experts.
    warm regards
    ramSiva

    Hi Mahendra
    My scheduling scenario is bottom up, because the individual activities and procurement lead times will decide the actual planning for each WBS.
    So, as you suggested, once after complete structuring and initial scheduling, i will transfer the basic dates to forecast dates.
    Then onwards i will keep reschedule after confirmation / partial confimation  / addition of new activities.  Is this method keeps the forecast dates unchanged forever and gives information on iniital schedule?
    During intermittent rescheduling, will the forecast dates get affected as like basic dates (due to my scenario bottom-up)?
    warm regards
    ramSiva

  • How to get  the actual data in ALV report

    I am doing some upgradation work   in that i am using Submit  & And return and  also i am using some function modules like LIST FROM MEMORY , LIST TO TXT wnd WRITE LIST , it gives output in normal list format , But i need to print in ALV report .
    With the use of set table for 1st display i got the  ALV report   but not with actual data, (some junk value is showing) , So can any 1 suggest me how to get  the  actual data in ALV report, With the use of  Any Function Module or with Coding,
    with regards,

    Hi Saravana
    I am sure you must be getting the values in tables of table parameters from every FM.
    consolidate the values from tables of all FMs in one table and built ALV for that table only.
    I hope this way you can show the actual data in ALV.
    thanks
    Lalit

  • Delivery from sales scheduling agreement with one item per schedule line

    Hi all,
    I have a sales scheduling agreement where the same part number has 3 different JIT schedule lines and I need to create a delivery with 3 item lines: every item line of the delivery has to be referred to one schedule line of the scheduling agreement.
    When I create the delivery with transaction VL10E it has only one item line and its quantity is the sum of the 3 schedule lines of the sales scheduling agreement.
    I've tried to change the customizing of the User Role, choosing the Split Schedule Line = 2 ("One item per schedule line") but the delivery is created again with only one item line.
    How can I solve this issue?
    Thanks in advance for reply

    Dear Alex
    The SAP standard behaviour is that all schedule items with delivery date in the past have to be rescheduled anyway to one date and are combined therefore.
    Partially this behaviour can be influenced in VL10* by 2 parameters in
    the user role : Split per sched.line and Rule (delivery qty).
    Please find below informations about these different parameters
    "Split per sched.line propose you 3 Rule for creating one delivery item
    per schedule line. In a delivery list in item view with multiple
    schedule lines, you can decide for the same document item whether you
    want to generate one delivery item per schedule line or whether you want
    to deliver the cumulated quantity of the last schedule lines selected.
    About rule for delivery quantity, the following rules are currently
    implemented:
    1. No cumulation
    The open schedule line quantity to be delivered is the quantity at which
    the list line is delivered.
    2. Sum of all open schedule line quantities to be delivered that fall
    before the chronologically latest date in the to field (following the
    Deliv. creation date field) of the selection criteria.
    3. Sum of all open schedule line quantities to be delivered whose
    delivery creation date falls within the selection time frame (between
    the dates in the Deliv. creation date and to fields, respectively),
    making the calculation of the quantity to be delivered consistent with
    selection criteria. However, calculationof the quantities delivered with
    the order's schedule line quantities is not affected."
    Hope this helps.
    Regards
    Tonia

  • Auto release of Invoicing plan item when milestone actual date is entered

    Hi all,
    I wonder if anyone can help me on this.  I have configured the system to automatically release an invoicing plan in a PO once the milestone attached to that invoicing plan is confirmed in the project by entering the actual date.  For some reason though, when trying to enter the invoice for this item in MIRO, the amount from the invoicing plan is not copied.  The amount only gets copied if you enter the PO in change mode after confirmation of milestone, display the invoice plan for each item then save before exitting.  It is only after this that the block on the item is removed.  Is this supposed to be so?  I would have thought immediately after confirmation of milestone by indication of actual date, the block on the invoicing plan will be immediately be removed so the invoice can immediately copy the amounts from the PO?  Any ideas how to achieve this?  (GR is not a part of the process).

    Hi,
    Go through this link. Might be helpful.
    http://wiki.sdn.sap.com/wiki/display/HOME/InvoicingPlanin+SAP
    You can also search for related content in the forum. You will find a lot of threads related to this.
    Regards,
    Gokul

  • PR date in MD04 to be displayed with past date. Even if req. is in past?

    Hi All,
    I have scenario where the raw material "X" has Order reservations in past let us assume month as May'11.  The Procurement time is 10 days and GR time is 2 days and the Lot Size is EX. When we run the MRP in month of June the PR which will be created for Order reaservations will have the "Purchase Requisition" scheduled Forward with release date maintained as the current date and the delivery date as 10 Working days ahead of release date and Requirment date will add 2 more days. And This Requirment date will be displayed in MD04 in Date column. let us assume that we have excuted MRP on 17-June, then for all Past requirments the release date willl be 17-june and Delivery date will be 01-July and Requirment date will be 05-July based on setting said above (Rem: - Saturday and Sunday is holiday). 
    Client does not want to see the requirment date planned this way. He wants the date in MD04 for PR to be maintained in Past only.
    is there any way to make this happen?
    Edited by: ANIMESH KUMAR on Jun 17, 2011 7:45 AM

    Hi Vivek,
    But won't this Setting effect the Production order planning. I mean to say that Only PR should be planned this way, But Planned order must not be affected at all.

  • Scheduling with Forecast Dates

    Dear Experts,
    I want to know whether following is possible.
    When creating a project initial schedule dates based on Activity Duration and Activity Relationships should reflect as Basic Dates. After project creation, when ever the Project Manager reschedule the project, those reschedule dates should be reflect as Forecasted dates.
    By doing this the Project Manager will be able to identify Initial Plan as Basic Dates, Reschedule Plan as Forecasted Dates and Actual as Actual Dates.
    Very Much Appreciate your Support,
    Dileepa.

    Dear All,
    I did reschedule Forecasting Dates using CN24 (Overall Network Scheduling) transaction. But after doing this, overall Project and WBS Elements dates does not changes based on the reschedule Network Time lines.
    Further I have define "Network determines dates" as the Scheduling method in WBS Schedule Profile.
    Very much appreciate your guidance,
    Dileepa.

Maybe you are looking for

  • Error while deploying OIA in domain same as OIM

    HI, I have installed and configured IDM and IAM in one domain. Every thing is working fine. Later i tried to deploy OIA in same domain. I followed OIA install guide. I configured OIA. Copied few Jars from OIM home to lib in OIA as per few forum threa

  • DS 6.0 passthrough to ADC

    Can someone please point to intructions/tips on getting DS 6.0 to passthrough authenticate with Active Directory? For a variety of reasons, we cannot use the Windows Sync stuff. At the end of the day, we want to be able to use DS 6.0 to authenticate

  • A valid installer could not be found.

    I followed the instructions for using Adobe Application Manager to create an install package for Macintosh computers very carefully.  I cannot get it to accept that the Install.app is in the product install folder I created by copying contents of the

  • Is this how to treat your loyal customers !? (Massive increase in monthly charges!)

    So I've been with Verizon for 2 years now and my services are up for renewal. I decided to go to the Verizon website to check out what renewal / upgrade options were available to me. The usual prompt to talk to a CSR came up and thought what the hell

  • Bluetooth Headset does not play sound from ipad touch 4th gen. ipod touch 4th gen. although it does pair ok! Please help!

    HM1200, BH99b, JabraBT2045 bluetooth headsets do not play music from ipad, ipod touch 4th generation, although it does pair ok. Why is that if it is compatable, why it does not play any music or sound via bluetooth headsets.  When I pair the headsets