Project Server 2010 SP2 Timesheet Errors

Hi,
We use Project Server 2010, SP2 in SEM mode. Users use IE9. Some of our users complaining that while entering timesheet, sometimes "h" for hours is auto populated next to the hours entered in the cell... and sometimes dont appear and then timesheet
freezes. Anyone have any suggestions when would this happen and any resolutions?
And some users also get the following error...
An error occurred when communicating with the server. Check connectivity with your administrator to determine whether further action is necessary", then attempt to approve TimeSheet"
Please suggest.
Kishore Dodda

Let us know what turns up. It certainly looks like you are losing connectivity. The other possibility is that your databases are in need of attention. Ask your SQL DBAs whether they are following best practices for Database management and have a SQL maintenance
plan running on the Project Server databases.
Gary Chefetz, MCITP, MCP, MVP msProjectExperts
Project and Project ServerFAQs
Project Server Help BLOG

Similar Messages

  • Project Server 2010 (PWA Timesheet) Error

    Hello,
    I am an administrator for Project Server and had a resource submit a timesheet in error. The timesheet was approved at the time and recalled by the resource at the same time. When the resource had tried to recall, they received back an error. I delegated
    as the resource and tried to recall it as the user but it gets stuck with the green loading picture and never moves past that. It seems the status update was accepted when it got approved and now the timesheet is "stuck". From the user's standpoint,
    it shows only as "Submitted" in their Timesheet status, but somehow it does not let me delete the timesheet. The error received is saying Invalid object, timesheet failed/blocking correlation. Anyone have any idea how to resolve this? Can't seem
    to fix this error.
    This is the error i get in return:
    Timesheet:
    GeneralInvalidObject (20009). Details: id='20009' name='GeneralInvalidObject' uid='fc00fed3-1cb1-48b2-83b6-800b03b33f1d' parameter='nextApproverUID'.
    Queue:
    GeneralQueueJobFailed (26000) - TimesheetReview.ReviewTimesheetMessage. Details: id='26000' name='GeneralQueueJobFailed' uid='fbebdb81-29b5-416b-818d-a085a4f1d808' JobUID='e9104f34-f416-4b89-9d3e-8574a868e065' ComputerName='WEGSFES29090'
    GroupType='TimesheetReview' MessageType='ReviewTimesheetMessage' MessageId='1' Stage=''. For more details, check the ULS logs on machine
    WEGSFES29090 for entries with JobUID e9104f34-f416-4b89-9d3e-8574a868e065. 
    Thanks!

    Is the Test and Production in the same domain. If they are not, then the SIDs associated with the SQL accounts may look the same but they are not.  At times, I have had to recreated accounts when in different domains.
    I would also use PowerShell cmdlets and see if it finds any issues, such as Test-SPContentDatase.. Validate the SharePoint content databases, because if not setup properly the Provisioning will fail.
    Also check these properties.
    $web=get-spweb http://prodproj01/pwa
    $Web.AllProperties[“PWAURL”] ### see what the value is.. you may have to blank it out, specially if it is pointing to a different URL
    Here is how to fix.
    $Web.AllProperties[“PWAURL”]=””
    $web.Update()
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • Do I *really* need a Service Connection Point in AD to complete a Project Server 2010 SP2 installation?

    Hi all,
    I have installed Project Server 2010 SP2 and run psconfig.exe
    PSCONFIG is failing because it cannot set up a Service Connection Point in AD. I've checked in AD and the contains 'Microsoft SharePoint Products' does not exist. All the resolutions I can find suggest adding the container into AD.
    The issue I have is that I have no control of the AD, and adding containers will take lengthily negotiation.
    Is there any way of completing the installation and getting my site back without adding the container into AD?
    Thanks in advance.

    other solutions
    1) check timer service see if it is running
    http://www.jonthenerd.com/2011/06/30/sharepoint-2010-sp1-upgrade-error-unable-to-create-a-service-connection-point-in-the-current-active-directory-domain/
    2) check UAC (and the rest of the technet answers - some are listed below)
    http://social.technet.microsoft.com/Forums/en-US/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/psconfig-fails-failed-to-upgrade-sharepoint-products
    3) My workaround:I
    run once again the command „PSConfig.exe -cmd upgrade -inplace b2b -force -cmd applicationcontent -install -cmd installfeatures“  in
    the “Bin” Folder as an administrator console session.In the moment I saw the staus “Configurationtask 5 of 6 is executed”
    I start to run the command “net start SPTraceV4 & net start SPWriterV4 & net start SPAdminV4 & net start SPSearch4 & net start SPTimerV4” in a parallel administrator console session and after that the configuration task finished successfully.
    http://social.technet.microsoft.com/Forums/en-US/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/psconfig-fails-failed-to-upgrade-sharepoint-products
    4) Try running the psconfig.exe command a second time
    5) had the same issue and called Microsoft support.  Here is the fix:
    Stop the "SharePoint 2010 Timer" service
    Delete ONLY the xml files from C:\ProgramData\Microsoft\SharePoint\Config\216f8013-b78b-4e5b-8631-3a5f4c7277e8
    Note: Do NOT delete the cache.ini file in this folder
    Edit cache.ini and change to "1"
    Start "SharePoint
    2010 Timer" service
    Run psconfig again:  PSConfig.exe -cmd upgrade -inplace b2b -wait -force
    6) Initially I tried http://support.microsoft.com/kb/2009272 but
    it did not help (I re-implemented later).
    I re-registered the DLL’s as perhttp://social.technet.microsoft.com/Forums/da/winservergen/thread/b4bd0deb-45d0-4661-8c50-a2b45db41103 from
    NareshD.  I do not believe this is necessary unless there is a corruption in the system but I am noting here just
    in case.
    I tried to run The PSConfig but it was failing:  I
    had to do the following in order to make it finish successfully:
    (from same page at http://social.technet.microsoft.com/Forums/en-US/smallbusinessserver/thread/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/)
    On the migrated SBS2011 PSCDiagnostic Log I found no entry to detect or start the services SPWriterServiceInstance and SPTimerServiceInstance.
    I run once again the command „PSConfig.exe -cmd upgrade -inplace b2b -force -cmd applicationcontent
    -install -cmd installfeatures“ in the “Bin” Folder as an administrator console session.
    In
    the moment I saw the status “Configuration task 5 of 6 is executed” I
    start to run the command “net start SPTraceV4 & net start SPWriterV4 & net start SPAdminV4 & net start SPSearch4 & net start SPTimerV4” in a
    parallel administrator console session and after that, the configuration task finished successfully.  (I
    just opened another cmd window and copy/paste the sequence below when I saw the status “Configuration Task x of y” on the screen:
    net start SPTraceV4 
    net start SPWriterV4 
    net start SPAdminV4 
    net start SPSearch4 
    net start SPTimerV4
    -Note SPSearch4 is disabled in our system…
    Very awkward but it worked…
    I implemented http://support.microsoft.com/kb/2009272 again.
    Backup started working with no errors.

  • Project Server 2010 PWA Provisioning Error - System.UnauthorizedAccessException: Access is denied.

    Hi,
    When migrating from a Prod Environment to a Test Environment using the Project Server 2010 5 Database backup and restore process (actually 6 DB's with the Project Sites DB), upon encountering a failure during provisioning the PWA Instance, we get the errors listed
    at the base of this posting in our Event Logs.
    To clarify what we have done already, we have:
    1. Backed up the 6 databases from the Source Environment.
    2. Removed the existing PWA_Content and PWS_Content (Project Sites) databases from the Target Environment Farm.
    3. Restored the 6 databases in the Target Environment.
    4. Given the SP Farm Service Account 'db_owner' rights to each of the 6 restored databases.
    5. Added the PWA_Content and PWS_Content databases  (exact same names) to the Target Environment.
    6. Locked down (offline/stopped), all of the SharePoint Content databases in the Farm except for the PWA_Content database.
    7. Run the PWA Provisioning process from the 'Project Server' SharePoint Service in Central Admin.
    It is during the PWA provisioning that we encounter these errors.
    As the Target Environment is for Test/Dev purposes, the SP Farm Service Account is setup to support all of the SharePoint Farm Services, is in the Local Admin Group of each of the Servers (App, WFE and DB), and is actually in the sysadmin
    role on the DB Server.
    Any suggestions on what is causing this denied access situation would be most appreciated.
    Cheers,
    Wayne
    Event Log Entries:
    ============================================
    Log Name:      Application
    Source:        Microsoft-SharePoint Products-Project Server
    Date:          1/22/2014 2:47:34 PM
    Event ID:      6971
    Task Category: Provisioning
    Level:         Error
    Keywords:     
    User:          ACCOUNTS\svc_psfarm
    Computer:      SERVER.accounts.domain.com
    Description:
    Failed to provision site PWA with error: Microsoft.Office.Project.Server.Administration.ProvisionException: Membership synchronization failed. ---> System.UnauthorizedAccessException: Access is denied. (Exception from HRESULT: 0x80070005 (E_ACCESSDENIED))
       at Microsoft.SharePoint.Library.SPRequest.AddRoleDef(String bstrUrl, String bstrName, String bstrDescription, Boolean bHidden, Int32 lRoleOrder, UInt64 iPermMask, Byte iType, Int32 lRoleDefID)
       at Microsoft.SharePoint.SPRoleDefinitionCollection.AddCore(SPRoleDefinition role)
    etc....
    Failed to create the Report Center web (Exception: PSI Entry Point:
    Project User: DOMAIN\svc_psfarm Correlation Id: c0a30b18-46e4-4447-b469-f8fd3bb1490a
    PWA Site URL: http://pstest2010/PWA
    SSP Name: Project Server
    PSError: NoError (0))
    Failed to grant 'DOMAIN\svc_psfarm' access to web application 'SPWebApplication Name=Portal'.
    Error: System.Security.SecurityException: Access denied.  Only machine administrators are allowed to create administration service job definitions of type: Microsoft.SharePoint.Administration.SPUpdateWorkerProcessGroup, Microsoft.SharePoint, Version=14.0.0.0,
    Culture=neutral, PublicKeyToken=71e9bce111e9429c.
       at Microsoft.SharePoint.Administration.SPAdministrationServiceJobDefinition..ctor(String name, SPService service, SPServer server, SPJobLockType lockType)
       at Microsoft.SharePoint.Administration.SPUpdateWorkerProcessGroup..ctor(SPTimerService timerService, String[] loginsToAdd, String[] loginsToRemove)
       at Microsoft.SharePoint.Administration.SPWebApplication.GrantAccessToProcessIdentity(String username, SPPolicyRoleType policyRole)
       at Microsoft.Office.Project.Server.Administration.PsiServiceApplication.GrantAccessToWebApp(List`1 webApps, String userName) The Zone of the assembly that failed was: MyComputer

    Is the Test and Production in the same domain. If they are not, then the SIDs associated with the SQL accounts may look the same but they are not.  At times, I have had to recreated accounts when in different domains.
    I would also use PowerShell cmdlets and see if it finds any issues, such as Test-SPContentDatase.. Validate the SharePoint content databases, because if not setup properly the Provisioning will fail.
    Also check these properties.
    $web=get-spweb http://prodproj01/pwa
    $Web.AllProperties[“PWAURL”] ### see what the value is.. you may have to blank it out, specially if it is pointing to a different URL
    Here is how to fix.
    $Web.AllProperties[“PWAURL”]=””
    $web.Update()
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • Project Server 2010 SP2 - Use with IE11, Firefox and Safari

    More groups in my company are being onboarded to start reporting time and managing projects out of Project Server /PWA 2010.  We found that one of the groups have MACs and use either Safari or Firefox.  There are some members of that
    same team who are using an HP machine but are using IE 11. 
    From what I am reading and what I am seeing it appears that with Firefox and Safari you cannot access Manage Timesheets or Project Center.  Has anyone found a work-around for this?
    The work-around we are using for IE11 is to add Project Serrver to the Compatability View.  Does anyone know of a problem with this approach?
    Thank you

    Look into using the 'IE tab' for Chrome/Firefox as a work-around. I had a similar scenario with Mac users and installed IE tab in their Chrome/Firefox browsers for them and worked pretty good for the most part. Hope this helps.

  • Project Server 2010 - Error 20010 with a master project and 3 sub-projects during publication

    Hi,
    Here is the situation :
    One master project with three sub projects.
    Sub projects are really similar (Same ressources and nearly same tasks but only the first contain real work for now).
    Sub projects got no sub projects nor links between projects.
    The owner of the master project got read rights through projects permissions on sub projects.
    Sub projects are link in "read only".
    We applied Project Server 2010 SP2 last week end and the issue appeared monday.
    Here are the symptoms :
    When we link only one sub project (Doesn't matter which one), the owner can publish, no problems.
    With 2 sub projects, the error may occur.
    With 3 sub projects, the error always occurs.
    With admin rights, the error doesn't occur.
    Here is the error :
    ID : 20010 (0x4E2A)
    Description : You don't have required permissions to perform the action (Average traduction)
    Detail : <detail><errinfo><general><class name="Project"><error id="20010" name="GeneralSecurityAccessDenied" uid="19515c1d-2624-466f-953a-b7fc67337b81"/></class></general></errinfo></detail>
    I'm unable to determine which sub project is the culprit, if there is one, as it's working when I link only one of them.
    Thanks for your time !

    Fylim --
    If the project manager in question does not need to edit any of the three projects, the PM does not need to have Read/Write access to any of the three projects.  Because you said that the PM needs to set links in all three projects, this means that
    the PM will be editing all three projects.  In order to edit the three projects, the PM must have Read/Write access to all three.  Setting cross-project links constitutes editing of the projects, which is why the PM must have Read/Write permission. 
    Make sense?
    Regarding SP2, I am not aware that this would change anything, but I could be wrong.  The reality is that regardless of which SP you have applied to Microsoft Project and Project Server 2010, the PM in this situation MUST have Read/Write access to the
    projects that he/she needs to edit with cross-project links.  Hope this helps.
    Dale A. Howard [MVP]

  • Project Server 2010 - Import Project Wizard - Local Resource Import Error

    Using Project Server 2010 SP2 with admin rights when I encountered the following error:
    Steps:
    Upon importing a local mpp file with Import Projects Wizard
    Mapped Resources.  Some were mapped to enterprise resources and others were left as local.
    Following completion of import process (mapped task fields, and save), the resources that were marked as "keep as local" were imported to the server as enterprise resources.
    I have never encountered this issue with previous versions of project server and am wondering if anyone else has run into the same issue and if there is a patch?  The error is consistently repeatable and I will check utilizing the account
    of someone without admin rights to see if it happens there as well. 
    It appears that in proceeding to validation step, the import field is automatically defaulted to Yes when proceeding to step 2.  If the user doesn't manually flag this back to No, then the resource is imported to project server.

    Hi Luis,
    I just ran a quick test and I couldn't reproduce your issue with PS2010 SP2. My local resources have been kept as local resources after the import process whereas the resources with a similar name than enterprise resources have been mapped with enterprise
    resources.
    Not sure which CU I have but I'd suggest you to upgrade to the
    latest CU.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Playbook Restore error project server 2010

    HI,
    I am getting error when trying to restore Server settings using play book, my backup and restore server versions are same project server 2010 sp2.
    below is the error i am getting 
    Creating lookup table Project Work Category...
    08:16:25 :       SoapException: ProjectServerError(s) LastError=LookupTableSortOrderMustComeBeforeParentNextSiblingSortOrder Instructions: Pass this into PSClientError constructor to access all error information
    08:16:25 :       ERROR: Project Server Error: LookupTableSortOrderMustComeAfterParentSortOrder Context: Updating lookup table 
    08:16:25 :       ERROR: Project Server Error: LookupTableSortOrderMustComeBeforeParentNextSiblingSortOrder Context: Updating lookup table 
    08:16:26 :    Updating Custom Fields...
    08:16:29 :       Updating custom field Sample Compliance Proposal...
    08:16:29 :       Updating custom field Sample Approved Start Date...
    08:16:29 :       Updating custom field Sample Proposal Cost...
    08:16:30 :       Updating custom field C_Project Name - English...
    08:16:30 :       Updating custom field B_Project Name – Arabic...
    08:16:30 :       Updating custom field F_Date Requested...
    08:16:31 :       Updating custom field Cost Type...
    08:16:31 :       Creating custom field P_Service Name...
    08:16:31 :       SoapException: ProjectServerError(s) LastError=CustomFieldInvalidLookupTableUID Instructions: Pass this into PSClientError constructor to access all error information
    08:16:31 :       ERROR: Project Server Error: CustomFieldInvalidLookupTableUID Context: Updating custom field P_Service Name.
    08:16:31 :       Creating custom field H_Project Work Category...
    08:16:31 :       SoapException: ProjectServerError(s) LastError=CustomFieldInvalidLookupTableUID Instructions: Pass this into PSClientError constructor to access all error information
    08:16:31 :       ERROR: Project Server Error: CustomFieldInvalidLookupTableUID Context: Updating custom field H_Project Work Category.
    08:16:31 :       Updating custom field Project Departments...
    vijay kommireddi

    Hello Vijay,
    From error it seems to be the issue with the Project Work Category lookup table sorting. Could you please share what sorting option is selected for this Lookup table?
    Please refer to
    http://social.msdn.microsoft.com/Forums/en-US/aee17d2b-5171-40f6-88aa-d4d15472c1d7/firm-with-complex-and-frequently-changing-org-chart-wants-to-have-its-ps2010s-rbs-lut-refreshed?forum=project2010custprog
    You may run into this issue if sort order for the lookup table is not set to sort By Ascending or Descending.
    If it set to "BY Row Number" then try to set to "By Ascending or Descending" and they try backup and restore again.
    Thank you,
    Kiran K.

  • Error Project Server 2010, % Complete, Work and Actual Work

    Hi Everyone
    I have a Project Server 2010 SP2 Environment, The farm contains 3 Servers.
    1 WFE, 1WebApp, 1 BD. All servers in the farm are Windows Server 2008 R2 and the Data Base Server is SQL Server 2008 R2
    The Context:
    The Project Managers create the Project in Project Professional 2010 SP2 for support Annual Maintenance about a software, then the team members go to my tasks in PWA to create the task inside the stage in the project, then they put the actual work, then they
    send the progress to his project manager.
    So, the project manager goes to the approval page to approve two times, one, the task creation and two, the progress.
    So far all ok but when the project manager open the Gantt in Project Professional 2010 SP2 , the task that the team member has sent appear with a 100 percent complete, but the work with 0 hours and the actual work with 0 hours too, being that should appear
    with the hours the team member has sent, that is my problem.
    This occur only with this project manger and his team member, all of others project managers in the platform don't report this issue.
    I already have  re open the project and re publish too
    So , let me know if you have some idea about this issue.
    Erick Gutiérrez PMI Membership #ID 2089740 MTCS - Microsoft Project Server Managing Projects

    Only other ideas is to make sure the duration isn't 0, which would make it a milestone.
    Have the resources, recall the timesheets and resubmit.  Run it thru cycle again and see if they actual show up.
    Finally, you can run SQL query and see where the data may be. 
    1) Check if status manager is who you think it is
    2) Check if project shows actuals in sql.  Doesn't explain why not showing in schedule.
    cheers!
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • An Unknown Error Has Occurred - Project Server 2010 - Tasks Page

    Greetings!   Some of my resources are recieving the error "An Unknown Error has occurred" (in red)  when trying to access their TASKS Page in Project Server 2010.  
    I've researched this error quite a bit and am finding suggestions and answers pretty much all over the board.    Before I have my server people start installing a slew of hot fixes - I want to know if anyone has an idea of the underlying cause
    for this error.    Since this issue doesn't affect everyone (i.e. I can access my task page), is it possibly related to the actual schedule in which they have assignments?    
    Any help is appreciated.
    Thanks!
    ~Randy 

    i have found the solution for this issue, you need to do this:
    in the logs you must search the "exception" and the logs give you a ID, this ID is about the task assignment in the specific resource , so this assignment is corrupt.
    this ID, you need to merge in the SQL server in the project server database, you need to merge ID task with ID Project with ID Resource, so when you identify the ID project and ID resource you can
    DELETE this assignment in the project from project profesional, because this task has a corrupt assignment, you must delete
    ONLY FROM project professional.
    This solutión solve this specific problem for this assignment  that
    IS DIFERENT TO THIS SOLUTION  post of Brian Smith:
    http://blogs.msdn.com/b/brismith/archive/2010/07/02/project-server-2010-an-unknown-error-has-occurred-in-project-center-resource-center-or-tasks.aspx?Redirected=true
    Erick Gutiérrez PMI Membership #ID 2089740 MTCS - Microsoft Project Server Managing Projects

  • Understanding Project Server 2010 Error ID 12015

    Are there any known bugs with Project Server 2010 producing the error ID 12015.
    I have a user who has the most up to date version of Project Pro 2010 who cannot open projects from Project Server 2010.
    Below is there screenshot showing their Project Pro version:
    We have the oldest version of Project Pro in Project Server set to 14.0.6134.5000
    Below is a screenshot of the Error ID they are receiving with a completely new version I have never seen before:
    I have been researching for days trying to figure out where the 14.0.4751.1000 version number is coming from. We have all our users on the same versions that are displayed in the first screenshot. 
    Has anyone ran into this issue before?
    Thanks,
    Brent

    14.0.4751.1000 is of that users MPP. 
    and minimum 14.0.6134.5000
    version is specified in project server instance. But your user is having 14.0.4751.1000
    version 
    So resolution is either user update mpp with latest Cu or you specified 14.0.4751.1000
    version in project server .
    As every after Cu update version is getting changed of MPP
    kirtesh

  • Project Server 2010 Active Directory Synchronization - duplicate Windows Name - Event ID 7734

    Environment: SharePoint Server 2010, Project Server 2010, SP2, DEC 2013 CU (Farm Build number: 14.0.7113.5001)
    Scenario: 
    Domain user has been added to the Active Directory group being synchronized with Project Server for the Team Members group.
    That user has participated as a team member in numerous projects, added documents, been assigned tasks, typical project stuff...
    Employee quits.
    AD account is deleted. (NOT deactivated or moved into another OU)
    Time passes...
    Employee gets rehired.  NEW AD account is set up: same display name, SamAccountName, email address, different GUID of course.
    Daily Active Directory job runs again and throws event ID 7734 and the sync ends with a partial fail.
    I understand why this is happening.  Solutions I've found point me to deleting the Enterprise Object resource in Project Server and then rerunning the sync.  Sure, this works BUT won't all of the previous documents, tasks,
    etc. be disassociated from that user?  If so, this is not ideal.
    2 questions:
    Is there a better way to deal with the fixing of the resource in Project Server to somehow link the old resource to the new resource allowing the sync to run successfully while still leaving the association to all old content intact?
    How are other organizations dealing with rehires when they have been added as resources in Project Server?  What is the best practice guidance from Microsoft on this?  Are other companies not actually deleting AD accounts when users leave organizations
    or are they putting them into a "ARCHIVE" OU or something like that? This happens at least half a dozen times a year at my company. We would like to keep our AD as clean as possible, but this appears to change our approach.
    Any suggestion/guidance is appreciated.

    For the question to relink the new account to the account which is already available in Project Server. You will have to update the WRES_AD_GUID to Null for the the Resource in MSP_RESOURCES table in the published database.
    Whenever a users gets synchronized to the PWA his ADGUID, SAMAccountName, Display Name, Email Address and DepartmentName is Synchronized from AD to Project Server. When the user was deleted and recreated the ADGUID got changed. During the next sync, project
    found the user with similar properties but different ADGUID which was updated in WRES_AD_GUID column in MSP_RESOURCES table. Hence it says that there is a duplicate account in the table with the same properties but a different ADGUID
    Nullifying the WRES_AD_GUID column value in MSP_RESOURCES table should get the user synchronized to Project server in the next sync.
    Cheers! Happy troubleshooting !!! Dinesh S. Rai - MSFT Enterprise Project Management Please click Mark As Answer; if a post solves your problem or Vote As Helpful if a post has been useful to you. This can be beneficial to other community members reading
    the thread.

  • How to find Project Level Text Custom Fields in Project Server 2010 databases?

    Hello,
    We are using Project Server 2010 SP2 in SEM Mode. We are planning to use Project Level Local Custom fields and we want to pull them in reports using SSRS, so I am wondering which table these "Local" (non enterprise) custom fields are stored in
    database.
    Any suggestions?
    Regards,
    Kishore Dodda
    Kishore Dodda

    Hi,
    Please see this
    similar thread about reading local custom fields though the PSI.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Delete Enterprise Custom Fields in Project Server 2010

    Hello,
    We have Project Server 2010, SP2, in SEM mode. We recently removed some legacy unused Project Level enterprize custom fields from system, and observed that, the fields are not visible via PWA System Settings, but still see them in Project Pro, Project Information
    dialog and also available as a field that I can add it to a view.
    I have already tried following:
    - Clear the roaming profile (global.mpt) and exit out of Project Pro, and reconnect to Project Server... but still see those fields.
    Any ideas, why we see it, and is there any additional steps we need to perfome to remove from Project Pro?
    Please suggest.
    Regards,
    Kishore Dodda
    Kishore Dodda

    Hello,
    They should have removed automatically. I have seen this before and carried out these steps:
    http://pwmather.wordpress.com/2012/02/22/projectserver-2010-msproject-enterprise-global-custom-fields-out-of-synch-ps2010-ps2007/
    Fully backup the system before doing this and test on a DEV / Test system first.
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS

  • Project Server 2010 Task page - An unknown error has occurred

    Hi All,
    I have searched inside the forum for similar problems but i didn't find any solution.
    We have Project Server 2010 with December CU installed and
    we are
    experiencing
    a serious
    problem with two enterprise resources.
    They can login to pwa succesfully but when they enter in the Task page the following error is raised:
    An unknown error has occurred
    There are no errors reported in the event viewer while in the ULS Log I found only this entry but i don't know if it's related with this issue:
    Detected use of SPRequest for previously closed SPWeb object. Please close SPWeb objects when you are done with all objects obtained from them, but not before. Stack trace:
    at Microsoft.SharePoint.SPWeb.get_CurrentUser()
    at Microsoft.Office.Project.PWA.PJContext.get_RegionalSettings()
    at Microsoft.Office.Project.PWA.PJContext.get_LocaleCulture()
    at Microsoft.Office.Project.PWA.WCFContext.AuthenticateUser(Message message, WCFContext& wcfContext, String userName, Boolean isWindowsUser)
    at Microsoft.Office.Project.PWA.WCFContext.GetContext(Message message, String userName, Boolean isWindowsUser, Boolean newCookie, Uri originalTargetUri)
    at Microsoft.Office.Project.Server.ProjectServerRouter.Microsoft.Office.Project.Server.IProjectServerRouter.ProcessMessage(Message message)
    at SyncInvokeProcessMessage(Object , Object[] , Object[] )
    at System.ServiceModel.Dispatcher.SyncMethodInvoker.Invoke(Object instance, Object[] inputs, Object[]& outputs)
    at System.ServiceModel.Dispatcher.DispatchOperationRuntime.InvokeBegin(MessageRpc& rpc)
    at System.ServiceModel.Dispatcher.ImmutableDispatchRuntime.ProcessMessage5(MessageRpc& rpc)
    at System.ServiceModel.Dispatcher.ImmutableDispatchRuntime.ProcessMessage4(MessageRpc& rpc)
    at System.ServiceModel.Dispatcher.MessageRpc.Process(Boolean isOperationContextSet)
    at System.ServiceModel.Dispatcher.ChannelHandler.DispatchAndReleasePump(RequestContext request, Boolean cleanThread, OperationContext currentOperationContext)
    at System.ServiceModel.Dispatcher.ChannelHandler.HandleRequest(RequestContext request, OperationContext currentOperationContext)
    at System.ServiceModel.Dispatcher.ChannelHandler.AsyncMessagePump(IAsyncResult result)
    at System.ServiceModel.Diagnostics.Utility.AsyncThunk.UnhandledExceptionFrame(IAsyncResult result)
    at System.ServiceModel.AsyncResult.Complete(Boolean completedSynchronously)
    at System.ServiceModel.Channels.InputQueue`1.AsyncQueueReader.Set(Item item)
    at System.ServiceModel.Channels.InputQueue`1.EnqueueAndDispatch(Item item, Boolean canDispatchOnThisThread)
    at System.ServiceModel.Channels.InputQueue`1.EnqueueAndDispatch(T item, ItemDequeuedCallback dequeuedCallback, Boolean canDispatchOnThisThread)
    at System.ServiceModel.Channels.InputQueueChannel`1.EnqueueAndDispatch(TDisposable item, ItemDequeuedCallback dequeuedCallback, Boolean canDispatchOnThisThread)
    at System.ServiceModel.Channels.SingletonChannelAcceptor`3.Enqueue(QueueItemType item, ItemDequeuedCallback dequeuedCallback, Boolean canDispatchOnThisThread)
    at System.ServiceModel.Channels.SingletonChannelAcceptor`3.Enqueue(QueueItemType item, ItemDequeuedCallback dequeuedCallback)
    at System.ServiceModel.Channels.HttpChannelListener.HttpContextReceived(HttpRequestContext context, ItemDequeuedCallback callback)
    at System.ServiceModel.Activation.HostedHttpTransportManager.HttpContextReceived(HostedHttpRequestAsyncResult result)
    at System.ServiceModel.Activation.HostedHttpRequestAsyncResult.BeginRequest()
    at System.ServiceModel.Activation.HostedHttpRequestAsyncResult.OnBeginRequest(Object state)
    at System.ServiceModel.PartialTrustHelpers.PartialTrustInvoke(ContextCallback callback, Object state)
    at System.ServiceModel.Activation.HostedHttpRequestAsyncResult.OnBeginRequestWithFlow(Object state)
    at System.ServiceModel.Channels.IOThreadScheduler.CriticalHelper.WorkItem.Invoke2()
    at System.ServiceModel.Channels.IOThreadScheduler.CriticalHelper.WorkItem.Invoke()
    at System.ServiceModel.Channels.IOThreadScheduler.CriticalHelper.ProcessCallbacks()
    at System.ServiceModel.Channels.IOThreadScheduler.CriticalHelper.CompletionCallback(Object state)
    at System.ServiceModel.Channels.IOThreadScheduler.CriticalHelper.ScheduledOverlapped.IOCallback(UInt32 errorCode, UInt32 numBytes, NativeOverlapped* nativeOverlapped)
    at System.ServiceModel.Diagnostics.Utility.IOCompletionThunk.UnhandledExceptionFrame(UInt32 error, UInt32 bytesRead, NativeOverlapped* nativeOverlapped)
    at System.Threading._IOCompletionCallback.PerformIOCompletionCallback(UInt32 errorCode, UInt32 numBytes, NativeOverlapped* pOVERLAP)
     It's not a task related errors because i have alredy done an analysis of the resorce's assignments.
    I have also verified IIS authentication settings as described in this
    post but all had been alredy correctly configured.
    We have a farm installation with two physical server:
    Application Server with Windows 2008 R2, SharePoint 2010 Enterprise, Project Server 2010
    Database Server with Windows 2008 R2 and SQL Server 2008 SP2
    Any help would be greatly appreciated!
    Thanks in advance.
    Raffaele

    Hi,
    I faced exactly the same problem: some resources try to connect to My Tasks, and get an Unknown error. No error message in ULS or Eventlog.
    I hope I solved the problem, and want to share the experience here.
    First, by reading this article,
    http://www.projectserverexperts.com/ProjectServerFAQKnowledgeBase/Unknown%20Error%20My%20Tasks%20Page.aspx: even if the SQL Query returns me no records, it gives me the idea to delete (unpublish) some tasks (i managed to identify some tasks which raised
    the problem, by assigning a test account on them, and see that the pb happened).
    So I decided to delete my project from the Published Database (and keep it in the Draft of course). Than in Project Pro, I opened and Published: the problem seem to be solved.
    I don't know the root cause of the pb: maybe some SQL data were corrupted for an unknown reason.
    Hope it could help some one ! Don't hesitate to give feedback if you solved this pb with this solution, or workaround.
    Sylvain

Maybe you are looking for

  • AirPlay on Apple TV (2nd gen) and iPhone 4 (iOS 4.2.9).

    My iPhone 4 (Verizon) and Apple TV are up-to date on SW. When I try playing an iPod tune through AirPlay, the AirPlay icon "sees" the ATV and it's checked but no music comes out of the ATV. If I switch to my iPad on exactly the same network settings,

  • Aperture Library and iLife Media Browser - Showing Deleted MobileMe Gallery

    I'm currently using Aperture 3.1 and iLife '09 and just noticed that when I try to access the Aperture Library from say iPhoto or Keynote that the list of folders contains two MobileMe folders with my name, one of which contains dupicates of two of m

  • Authorized sold-to party and other BP to release from contract

    Normally, both sold-to party and other business partners are authorized to release from a contract. To meet this requirement, maintain configuration in sales document type Which field in the document type determine the release ? thanks,

  • Problem with cropped WPF content in an ElementHost

    I am displaying a WPF control inside an ElementHost. It works on most systems but on SOME the content gets cropped. Can anyone help me in the right direction with this?