Project server 2010. Troubles with resource availability

A problem occurred while checking resource usage using PWA. 
Using the PS 2010 
the total number of projects about 2000, about 1600 resources (for 5 years) 
We have a project - project1 and resource involved in it - res1 
In the project, each week for the resource specified work (20 - 30 hours), the project is saved and published. (When publishing a project there are no errors.) 
In MS Project and PWA in Project center values ​ per weeks are the same. Go to the resource center, choose res1 and check its work in resource availability and see that for some weeks value of work is 0, at some 1.75. some 0.462 etc. 
For other projects work of this resource displayed normally. Moreover, for all other resources is displayed correctly in this project. 
When re-saving project data and republishing it the situation is same. 
This issue takes place to be for some other projects. 
questions: 
1 - what database of PS take the data for plotting in resource availability? 
2 - than similar behavior can be caused? 
3 - how possible to solve this problem? 
Thanks for help!

Hi,
The resource availability in PWA-resource center is based on the Published DB data.
In order to trouble shoot, can you check in the data grid under the resource availability graph the capacity of the resource? Indeed the availability is calculated based on work versus capacity. The capacity might vary with calendar exceptions (holidays)
and non-working administrative time in the resource timesheet. I'd suggest that you check in detail the periods where you have this unexpected behavior and see the resource calendar and timesheets.
Also what you can do is to open a blank project plan (be sure to check the option "load summary resources assignments when starting MS Project Pro), insert the resource, go to the resource usage and add the remaining availability and work availability.
Then you could confirm if the data are correct or not.
Hope this helps,
Guillaume Rouyre, MBA, MVP, P-Seller |

Similar Messages

  • Project Server 2010 compatibility with IE11 and Windows 8.1

    Hi All!
    Maybe a silly question since compatibility is always asked about older versions, but here is my question:
    Is Project Server 2010 compatible with IE11 and Windows 8.1?
    I personnaly tested with IE11 and it seems to be ok. All views and pages can be opened with IE11.
    But what about windows 8.1? 
    Has Microsoft done any communication about this?
    Thanks in advance for your helps.
    Guillaume.
    Guillaume Rouyre - MBA, MCP, MCTS

    I am seeing a minor issue with the timesheet grid after users are upgraded from IE8 to IE11.
    We are using Project Server 2010 with SP1 and Oct 2013 CU.
    When some users (using IE11) switches between filters or views in the Timesheet page, the grid shrinks making to content un readable.  The only way to get it back is to refresh the page. After a refresh, the grid returns to normal size, but the pane
    divider is too far to the left and always must be dragged to the right in order to see the task names in the left grid. 

  • Project Server 2010 - Issue with correct recording of timesheet actual hours with decimals

    We have Project Server 2010 and are using the timesheet functionality for recording resource times/costs in the schedules.
    It has come to light only recently, that for one user, suddenly the times she is entering are not being summed up correctly. An image of her timesheet and the manage timesheet screens are shown below. Note she entered 9.5 hrs but the total that
    appears in the manage timesheet screen is 9.514hrs.
    If you look at the history of the previous weeks as well, the weird change toi the total hours has occurred in the previous 4 weeks as well.  I have no idea why this has started happening and am not aware of any change to the resource's details (apart
    from a change to her hourly rate).
    Has anyone experienced this before? 
    Thanks
    Peter

    We have this issue and are past the patch that discussed decimal rounding (April 2014, though it was more related to the application of resource rates).  This seems different from that noted rounding problem.
     We have at least three users (out of 625) that have this problem every week and it isn't always the same users.  If we re-enter the time and zero fill the cells for the problem task it will fix it. 
    It is almost like when a user deletes a value that it is leaving residual numbers in the field. 
    Our 2010 server version below which is through Sept 2014 CU:
    14.0.7132.5000 
    Any help on this would be appreciated.
    Thanks!

  • Project Server 2010 - Customizing the resource assignment workflow

    Hi,
    When you build project schedule and publish it, each resource will be able to view his assignments under Tasks then he can edit an assignment and does changes on it.
    What I need to know, is there any way to customize the workflow that controls the assignment lifecycle so that for example if the resource changed the assignment end date I need to generate approval task to his manager and when approved it will generate
    another approval task for his director and if the director approved the task then the change it get reflected on the schedule otherwise the change will be disregard and the resource will be notified by email.

    Hi,
    There is no easy way to configure the task approval chain adding approval level and notifications. By default, the status manager of the task will receive the update for approval before it gets pushed in the project plan.
    Doing some code, you might achieve something similar, like sending an email to a specific user if the assignment finish date has been changed,  but the approval will always be send to the status manager once the update is submitted.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Project Server 2010 - Import Project Wizard - Local Resource Import Error

    Using Project Server 2010 SP2 with admin rights when I encountered the following error:
    Steps:
    Upon importing a local mpp file with Import Projects Wizard
    Mapped Resources.  Some were mapped to enterprise resources and others were left as local.
    Following completion of import process (mapped task fields, and save), the resources that were marked as "keep as local" were imported to the server as enterprise resources.
    I have never encountered this issue with previous versions of project server and am wondering if anyone else has run into the same issue and if there is a patch?  The error is consistently repeatable and I will check utilizing the account
    of someone without admin rights to see if it happens there as well. 
    It appears that in proceeding to validation step, the import field is automatically defaulted to Yes when proceeding to step 2.  If the user doesn't manually flag this back to No, then the resource is imported to project server.

    Hi Luis,
    I just ran a quick test and I couldn't reproduce your issue with PS2010 SP2. My local resources have been kept as local resources after the import process whereas the resources with a similar name than enterprise resources have been mapped with enterprise
    resources.
    Not sure which CU I have but I'd suggest you to upgrade to the
    latest CU.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Is it possible to create a formula that converts a resource hours into full time units in project server 2010

    Hi
    Is it possible to create a formula that converts a resource available hours into full time equivalent units in project server 2010? Say a resource has 160 available hours for any given month this will translate into 1 FTE for this month. If it is 80 hours
    for that month then it will be 0.5 FTE and so on and so forth.
    Thanks,
    -Maurizio

    Maurizio,
    It's a bit late, but there are two OLAP cubes that can provide you with this information in a pivot table in Project Server 2010.
    "MSP_Portfolio_Analyzer" and "Resource Timephased" contains capacity measures that be used to provide calculated measures when the cube database is generated. You change OLAP cube configuration in "Server Settings -> Database Administration -> OLAP
    Database Management". In either of the aforementioned cubes, use "Calculated Measures" to create two measures:
    Member Name
    MDX Expression
    Available (FTE)
    ([capacity]-[work])/[capacity]
    Work (FTE)
    [Work]/[Capacity]
    These two fields will appear in the pivot table field list as "Values", and when combined with a "Time" column, can give you a picture of FTE usage and availability.
    I prefer the portfolio version since it contains project/assignment data and resource data, letting you see just  how resources are being utilized.
    One thing I have not been able to get around is getting ""Maximum Units" for a resource factored into the measure. A common practice is to allocate more that "100%" to generic resources to represent teams for planning purposes. The OLAP measures will show
    only 0.0 to 1.0 FTE for any resource, even if a resource represents more than one body.
    If you have an SSRS query you could share, I would appreciated it!
    Hope this helps!
    JTC
    JAckson T. Cole, PMP, MCITP

  • Project Server 2010 - Active Directory Enterprise Resource Pool Synchronization limitations

    Greetings again.
    I have a quick question about the limitations of Active Directory Enterprise Resource Pool Synchronization.  Specifically, what has your experience
    been with extremely large numbers of users (10k plus).  Is anyone aware of a
    practical limit of users in your AD group you would recommend when using the
    Schedule Synchronization feature on a nightly or weekly basis?
    There is a caveat to this question however.  The client has decided (perhaps for some misinformed reasons) to allow access for every user, to every
    project site, within their PWA environment.  They’ve selected the View Project Site option within the
    Categories for the Team Members PWA Group for which 90% of their intended users reside.  So when we ran a couple test syncs in DEV with a smaller AD group of about 8,000 users, the sync understandably
    lasted upwards of 18 hours.  Obviously unacceptable for a PROD environment on a nightly basis and not necessarily ideal for a weekly sync either.
    Experience in addition to documents like these, “Best
    practices for managing a large number of resources in Project Server 2010” tell me that we are way over the practical limit of a scheduled resource pool synchronization...IF
    the client really desires that all users access all their sites.  But before I submit my recommendations, I wanted to check with the community just in case others may have found a way to synchronize large numbers of users (10k plus) on a nightly or weekly
    basis, within a reasonable time frame AND allowed all users to access all sites within PWA.
    What do you think?
    As always, thanks for your help.
    Chris Addis - MCTS

    Hello Hrishi.
    My delayed response has been due to a large amount of testing we have been performing on this particular topic.  Here is an update, please feel free to provide feedback.
    We went back to testing and spent more time reviewing the documents: 
    Best practices for managing a large number of resources in Project Server 2010 and
    SharePoint Server 2010 capacity management: Software boundaries and limits.  Our team interpreted those documents as saying, 1,000 security
    scopes per site is a recommended limit.  It does not say it’s a hard limit, just a recommended limit.  “When the recommended unique security scope boundaries are exceeded, performance issue can occur.”
    So we decided to perform some tests (31 in total) to try and get a gage of what we are seeing.
    We needed to establish a baseline first.  So we performed a series of 23 Active Directory Resource Pool Synchronizations with various settings in a clean, Out of the Box, environment in order to see some consistent numbers.  Here is it’s summary:
    Our AD group of 8,000 users took about 32 minutes, on average, every time to sync.  The difference between the first sync and last sync differed only by 1-3 minutes.
    Adding 40 project sites increased the average sync time from 32 to 120 minutes.
    Adding 100 users to each of those 40 project sites, did not increase the sync times.
    One setting (identified at this time) reduced the synchronization time.  It was the
    Project Site Permissions check box found within the Project Web App > Server Settings > Project Site Provisioning Settings area.  By deselecting this check box we reduced or synchronization time back to the 32 minute
    average.
    The View Project Site check box within the Project Web App > Server Settings > Manage Groups > Team Members group had no apparent effect on the sync times besides what we had gleaned from the Microsoft documentation.
    Naturally, this left us with a problem.  As I’m sure you know, by deselecting the check box (Project Site Permissions), our project sites are now (figuratively speaking) orphans with no connection to the parent site.  This generates
    a new set of issues.  For example:
    Newly created project sites cannot be accessed by the owner and team members.  They will require someone like the farm admin to come in behind them and add the intended users to the project site along with their required permissions.
    All current and futures sites will no longer have users added via the standard method of building a team and publishing the project, but will have to be added manually.
    You can use the Synchronize option found within Project Web App > Server Settings > Project Sites page, but that kinda defeats the purpose.  It would require constant updating on a per site basis to keep up with
    PM changes.  Not very sensible, but it does work.
    With this baseline information, we moved our tests into our DEV environment which somewhat mimics our PROD environment.  This environment has 352 project sites and we performed 8 tests.  This is where we had some large sync time numbers. 
    Here is the DEV test summary:
    With the Project Site Permissions check box cleared, our AD group of 8,000 users took on average 30 minutes to sync.  This was in line with our baseline times.  With the exception of one test sync that took 99 minutes to complete. 
    That anomaly is acquiescent with what I’ve seen over the years.  Sometimes syncs do some unusual things.
    With the Project Site Permissions check box selected, our AD group of 8,000 users took on average 690 minutes (11.5 hours) to sync.  Unacceptable of course.
    So here’s what we’ve learned when dealing with extremely large numbers of active directory users in your Resource Pool sync:
    We did not see a decrease in subsequent sync times after the initial Active Directory Resource Pool Synchronization as some might expect.
    Our attempt to decrease sync time via the option of removing the View Project Sites was not successful.  (Unless we interpreted Microsoft's document incorrectly.)
    However, our interpretation of the recommended software boundaries and limits of SharePoint Server 2010 as it pertains to security scopes per site at 1,000, appears to be correct.
    Using the option of clearing the Project Site Permissions does produce a reduction in AD sync time, but at a cost segregating your project sites and thus the creation of new processes of maintaining them.
    I’ll remind others that these results are particular to our environments, there may still be exceptions yet to discover.  Others may see numbers contrary to ours.
    The biggest surprise to some members on our team (myself excluded) was that we did not see a reduced sync time after any of our initial syncs.  Some are under the impression that after your initial sync, you should see reduced sync times.  I haven’t
    found that to be the absolute case in all situations, just in some situations.  The reason for this still eludes me.  Any thoughts would be appreciated.
    I’ll let this sit a bit longer, but if no one disagrees with the results, I think we have our answer:
    The number of project sites directly affects your Active Directory Resource Pool Synchronizations if you are using the
    Project Site Permissions option.  If you plan on synchronizing over 1,000 users
    and you have a large number of project sites, proceed with the knowledge that you may have performance issues and long sync times.
    As always, I’d love to hear from you or others just in case I’m missing something.
    Chris Addis - MCTS

  • Project Server 2010 , Project Center, Resource Center, My Work not loading

    Hi,
    We have Project Server 2010 SP-2 env
    Yesterday one of my Project Manager told me that he is not able to access any of the following page Project Center, Resource Center, My Work in our Quality env. Issue is it shows page is loading infinitely long and on botton it shows some script error mentioned
    below
    Webpage error details
    User Agent: Mozilla/4.0 (compatible; MSIE 8.0; Windows NT 6.1; WOW64; Trident/4.0; SLCC2; .NET CLR 2.0.50727; .NET CLR 3.5.30729; .NET CLR 3.0.30729; .NET4.0C; .NET4.0E)
    Timestamp: Tue, 21 Oct 2014 13:55:19 UTC
    Message: 'null' is null or not an object
    Line: 217
    Char: 4
    Code: 0
    URI: http://XXXXXXXXXXX/_layouts/inc/pwa/library/webmethodmanager.debug.js?rev=BtnvMSOtt14tg%2FnfhDTJpA%3D%3D
    Also I have checked event logs in shows WebHost failed error with Event ID 3 , complete detail mentioned below.
    Event Log Error
    WebHost failed to process a request.
     Sender Information: System.ServiceModel.ServiceHostingEnvironment+HostingManager/45523402
     Exception: System.ServiceModel.ServiceActivationException: The service '/_vti_bin/PSI/ProjectServer.svc' cannot be activated due to an exception during compilation.  The exception message is: Could not load file or assembly 'FirePoint.SharePoint.RssViewerWebPart,
    Version=1.4.7.12, Culture=neutral, PublicKeyToken=e891f27e2edd24d0' or one of its dependencies. The system cannot find the file specified.. ---> System.IO.FileNotFoundException: Could not load file or assembly 'FirePoint.SharePoint.RssViewerWebPart, Version=1.4.7.12,
    Culture=neutral, PublicKeyToken=e891f27e2edd24d0' or one of its dependencies. The system cannot find the file specified.
    File name: 'FirePoint.SharePoint.RssViewerWebPart, Version=1.4.7.12, Culture=neutral, PublicKeyToken=e891f27e2edd24d0'
       at System.Reflection.Assembly._nLoad(AssemblyName fileName, String codeBase, Evidence assemblySecurity, Assembly locationHint, StackCrawlMark& stackMark, Boolean throwOnFileNotFound, Boolean forIntrospection)
       at System.Reflection.Assembly.InternalLoad(AssemblyName assemblyRef, Evidence assemblySecurity, StackCrawlMark& stackMark, Boolean forIntrospection)
       at System.Reflection.Assembly.InternalLoad(String assemblyString, Evidence assemblySecurity, StackCrawlMark& stackMark, Boolean forIntrospection)
       at System.Reflection.Assembly.Load(String assemblyString)
       at System.ServiceModel.Activation.ServiceHostFactory.CreateServiceHost(String constructorString, Uri[] baseAddresses)
       at System.ServiceModel.ServiceHostingEnvironment.HostingManager.CreateService(String normalizedVirtualPath)
       at System.ServiceModel.ServiceHostingEnvironment.HostingManager.ActivateService(String normalizedVirtualPath)
       at System.ServiceModel.ServiceHostingEnvironment.HostingManager.EnsureServiceAvailable(String normalizedVirtualPath)
    WRN: Assembly binding logging is turned OFF.
    To enable assembly bind failure logging, set the registry value [HKLM\Software\Microsoft\Fusion!EnableLog] (DWORD) to 1.
    Note: There is some performance penalty associated with assembly bind failure logging.
    To turn this feature off, remove the registry value [HKLM\Software\Microsoft\Fusion!EnableLog].
       --- End of inner exception stack trace ---
       at System.ServiceModel.ServiceHostingEnvironment.HostingManager.EnsureServiceAvailable(String normalizedVirtualPath)
       at System.ServiceModel.ServiceHostingEnvironment.EnsureServiceAvailableFast(String relativeVirtualPath)
     Process Name: w3wp
     Process ID: 5052
    Also I have checked Brian Smith blog to resolve WebHost error with Event ID 3, but that didn't help.
    So kindly help me to get this issue resolve and do let me know in case need further details.
    Thanks

    Hi,
    From error log it seems you have some custom or thrid party web part activated in your application and that web part is not able to load which might causing those pages to get corrupt.
    As a fix can suggest you below to two thing to check
    1) Remove that "FirePoint.SharePoint.RssViewerWebPart" from your environment and try to access those PWA pages again.
    2) Even after removing above web-part solution does not fix this issue, as it is quality env can you try to disconnect and reconnect the share-point farm . Then try to access those pages again.
    Share us the latest update and your finding on this issue.
    Regards
    Sachin Vashishth MCTS

  • Project Server 2010 Resource Assigments - Need a license for every Resource?

    I am trying to determine the requirements for Project Server 2010 licenses.
    In Project Server 2010, I need to add resources to the pool, then assign a resource to a project task.  The task will be maintained/statused through a manager, not the resource.  
    Does that resource need to have a Project Server license even if the resource never accesses Project Server even through PWA?

    Hi JenKranich,
    You need licences only for users that will access
    Project Server data by any means :
    MS Project Pro, Sharepoint sites and/or
    PWA.
    But resources not associated with users are not "real person" accessing data but just informal entity, thus no need for licences for those resources.
    It is important to note that if those resources can access the SharePoint site, since it contains Project Server data (risks, issues, deliverables), then they DO need a licence.
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Unable open Project details or a project from PWA Project server 2010 with Alias name

    Hi,
    I am unable to open the Projects from Project center with the Alias name with the server name i am able to open the projects, version is  project server 2010,
    My system is ABC.DC.IN  alias name i have given is DEF.AD.COM  
    With the system name i can able access PWA and all are working fine.
    As i have observed with alias name i can able to login to  pwa and all the server  setting approval center all are working fine but only in the project center i am not able to open the projects (http://DEF.AD.COM/pwa/ProjectDrillDown.aspx .xxxx)
    its is coming in the below of the ie. 
    But with Alias name these are the issues i am facing,
    1.when longing with alias name its asking two times for user name and password
    2.when i click on a project from project center its taking some time and asking for user name and password after i enter user name and password "PAGE cannot displayed" error i am getting.
    can any one Help me. 
    vijay kommireddi

    Hi Eric,
    Thanks for your Reply.
    As you said i have added in Manged Path as  (Testpwa/projects.aspx as <Wildcard inclusion>) But still problem is there it is asking user
    name password again if click on any project in project center and  and showing page cannot be displayed error. 
    This is url its is showing in the below of the IE ( http://def.ad.com/testpwa/projectdrilldown.aspx?ProjUid=e28c6d43-85b6-478d-9542-2961cc81a69e)
    I have observed one more thing if click on Project
    details then only this issue  is coming project schedule and project information
    is also opening with Alias name.
    My farm version is 14.0.7015.1000
    Vijay Kommireddi

  • Project Server 2010 Web services access with Client Certificate Authentication

    We switched our SharePoint/Project Server 2010 farm to use client certificate authentication with Active Directory Federation Services (AD FS) 2.0, which is working without issue. We have some administrative Project Server Interface (PSI)
    web service applications that no longer connect to server with the new authentication configuration.  Our custom applications are using the WCF interface to access the public web services.
    Please let us know if it is possible to authenticate with AD FS 2.0 and then call
    Project Server web services. Any help or coding examples would be greatly appreciated.

    what is the error occurred when the custom PSI app connects?
    can you upload the ULS logs here for research?
    What is the user account format you specified in the code for authentication?
    For proper authorization, the “user logon account” in PWA for the user needs to be changed from domain\username to the claims token (e.g.
    'I:0#.w|mybusinessdomain\ewmccarty').
    It requires you to manually call the UpnLogon method of
    “Claims to Windows Token Service”. if (Thread.CurrentPrincipal.Identity is ClaimsIdentity)  
    {  var identity = (ClaimsIdentity)Thread.CurrentPrincipal.Identity;  }  
    if (Thread.CurrentPrincipal.Identity is ClaimsIdentity)
    var identity = (ClaimsIdentity)Thread.CurrentPrincipal.Identity;
    Than you need to extract UPN-Claim from the identity.
    Upload the verbose log if possible.
    Did you see this?
    http://msdn.microsoft.com/en-us/library/ff181538(v=office.14).aspx
    Cheers. Happy troubleshooting !!! Sriram E - MSFT Enterprise Project Management

  • Project Server 2010 - Error 20010 with a master project and 3 sub-projects during publication

    Hi,
    Here is the situation :
    One master project with three sub projects.
    Sub projects are really similar (Same ressources and nearly same tasks but only the first contain real work for now).
    Sub projects got no sub projects nor links between projects.
    The owner of the master project got read rights through projects permissions on sub projects.
    Sub projects are link in "read only".
    We applied Project Server 2010 SP2 last week end and the issue appeared monday.
    Here are the symptoms :
    When we link only one sub project (Doesn't matter which one), the owner can publish, no problems.
    With 2 sub projects, the error may occur.
    With 3 sub projects, the error always occurs.
    With admin rights, the error doesn't occur.
    Here is the error :
    ID : 20010 (0x4E2A)
    Description : You don't have required permissions to perform the action (Average traduction)
    Detail : <detail><errinfo><general><class name="Project"><error id="20010" name="GeneralSecurityAccessDenied" uid="19515c1d-2624-466f-953a-b7fc67337b81"/></class></general></errinfo></detail>
    I'm unable to determine which sub project is the culprit, if there is one, as it's working when I link only one of them.
    Thanks for your time !

    Fylim --
    If the project manager in question does not need to edit any of the three projects, the PM does not need to have Read/Write access to any of the three projects.  Because you said that the PM needs to set links in all three projects, this means that
    the PM will be editing all three projects.  In order to edit the three projects, the PM must have Read/Write access to all three.  Setting cross-project links constitutes editing of the projects, which is why the PM must have Read/Write permission. 
    Make sense?
    Regarding SP2, I am not aware that this would change anything, but I could be wrong.  The reality is that regardless of which SP you have applied to Microsoft Project and Project Server 2010, the PM in this situation MUST have Read/Write access to the
    projects that he/she needs to edit with cross-project links.  Hope this helps.
    Dale A. Howard [MVP]

  • Getting the "401 : Unauthorized" exception with bulk edit tool in Project Server 2010

    Hi all,
    We are using the Bulkedit tool in our Project server 2010 environment.
    When users click the button "bulk edit projects" from the ribbon, it is giving the error with a correlation id.
    I checked the id in uls logs and find that it is giving the below message.
    Does anyone know why we are getting this error ?
     Best Regards
    Anil Kumar Alladi

    Hi Paul,
    Thanks for your reply.
    The loopbackcheck was already disabled. The users who are accessing the url from the client machines also getting this error.
    Best Regards
    Anil Kumar Alladi

  • Problem with the% deviation from Project Server 2010 field

    hello
    I have a problem with the% deviation from Project Server 2010 field.
    Within a file or project, this project contains tasks.
    Each task has completed the field% deviation.
    Within the row "Summary" in the field of% deviation does not perform the sum of all fields of tasks.
    Only occurs on certain projects, these projects have the view of PR Progress Report
    Anyone know happens?
    thank you very much

    Hi
    Sorry, I'll be more specific now.
    Within the field% deviation. Your settings in PWA is:
    The formula for field% Deviation:
    Str (IIf ([Job baseline] = 0; IIf ([Working] = 0, 0, 100); IIf ([Working] = 0; -100; Int (100 * ([Job] - [Work Online base]) / [Working baseline])))) + "%"
    Under the heading rows Calculation Summary:
    > Use formula.
    Within the field Allocation Calculation of rows:
    > It is labeled the "Apply unless you manually specify".
    The field [Job] and field [Job baseline] are fields Pack project server.
    The error is in project, in the list of tasks.
    In the top row, this row summary makes the sum of the ranks of the tasks of the file.
    But in my case only in the summary field the same value appears in the tasks.
    In all the cells in column% deviation appears the same value.
    I hope it helps.
    thank you very much

  • How to : Configure Project Server 2010 to work with Exchange Server 2013

    Hi everybody. I have a problem. I did integration success project server 2010 with exchange server 2010. But now my customer use exchange server 2013. So my question is "Have a way to integration project server 2010 with exchange server 2013 ?"

    I haven't seen any document with Project 2010 and Exchange 2013. You could still try the old document with Project 2010 and Exchange 2010.
    http://technet.microsoft.com/en-us/library/ff468700(v=office.14).aspx
    It might just work.
    Thanks Gaurav Wason MCITP, PMP

Maybe you are looking for

  • JPEG Export: I need browser-independant colors!

    Hello, Let me explain my situation: I have a website where I publish my Illustrator documents as exported JPEG files. The website has a certain RGB-color background. And my illustrations have the same RGB-color background. Those two backgrounds have

  • What is wrong with my LCD? Help!

    Hi guys, Hoping you can give me some advice on what is going on with my screen. I have attached a photo but basically anything that is usually white on the screen now shows up as vertical blue lines. It is not a software/driver problem as it occurs o

  • RAW from Sony A7

    I can't open RAW-pictures from my Sony A7 in Photoshop elements 12. Can anyone tell me how to do it?

  • External hard drive /storage for use with mini and XP (bootcamp)

    Never purchased an external hard drive (storage) before so not sure if this is possible. Basically I have an intel mini with 60gb hard drive, which I have now allocated 20 to xp via boot camp. I'm quickly using up the 20gb with a few games so I want

  • Examining individual characters of a sequence?

    i was wondering how to examine individual characeters of a sequence. I know something like charAT but im not sure how to do this. say i had a sequence mnmnm. I was wondering if i could somehow say the character one = for example 0. So how do i tell m