Project Server 2013 - Project Plan crashes frequently

Team,
We are using EPM , and everytime we update the project plan using enterprise project, the plan crashes and it does not allow me to publish the plan on the Project server.
Please suggest solution for the above
We are using Project Server 2013
Regards
Vidhya

Vidhya --
First of all, is your Project Server 2013 system updated with the latest Cumulative Updates and/or with Service Pack 1 (just released yesterday)?  If not, I would strongly suggest that you update your system and your copies of Microsoft Project 2013
with Service Pack 1 at the earliest date possible.
Second, regarding this project in particular, I would strongly suspect that this project is corrupted.  To resolve the corruption, you will need to use the Save for Sharing feature in Microsoft Project 2013.  To do this, right-click anywhere on
a ribbon tab in Microsoft Project 2013, such as the Tasks tab, and then select the Customize Quick Access Toolbar item on the shortcut menu.  In upper left corner of the Project Options dialog, click the Choose Commands From pick list and select
the All Commands item.  In the list of commands on the left side, select the Save For Sharing item and click the Add button to add it to the list on the right. Click the OK button when finished.
To use the Save for Sharing feature, do the following:
Open the enterprise project in question.
Click the Save for Sharing button in the Quick Access Toolbar.
In the Save dialog, save the MPP file to a location where you can find it easily, such as your computer Desktop, for example.
Close the MPP file.
Reopen the MPP file.
Click File > Save As and then save the project.
When the Save operation is done, try publishing the project.
Please let us know if this helps.
Dale A. Howard [MVP]

Similar Messages

  • Exchange server 2013 architecture planning

    Hi all,
    We are planning for a new Exchange 2013 installation :
    1 site
    around 2000 users
    1 domain
    I need some hints about the optimal architecture keeping in mind high availablity and future extensions.  
    examples :
    4 servers with CAS and MAILBOX roles
    2 CAS only servers + 4 mailbox only servers
    Many thx in advance

    Start with the calculator:
    http://gallery.technet.microsoft.com/office/Exchange-2013-Server-Role-f8a61780
    For info on HA:
    http://technet.microsoft.com/en-us/library/dd638137(v=exchg.150).aspx
    and use the Deployment Assistant:
    http://technet.microsoft.com/en-us/exchange/jj657516.aspx
    Twitter!: Please Note: My Posts are provided “AS IS” without warranty of any kind, either expressed or implied.

  • Project Server 2013 Tasks differ in project site and plan

    I have an Project Server 2013 enterprise plan that I created with an associated project site. The plan has tasks added to the timeline. The project site has a timeline webpart but the problem is the tasks added to the timeline differ.
    Does anyone have any ideas what could be the problem here? I checked the timeline webpart and it's correct.
    Thanks!
    [Images below].
    The following image is taken from the schedule PDP.
    This image taken from the project site depicts what is out of sync.

    Hi Guillaume,
    Yes, I've checked the queue while publishing the project. It's successful without any errors. I don't remember if I checked the ULS logs, but what I suspect is that it will say something along the lines of orphaned tasks in the project site.
    Anyways I've tried a number of things and I think the only 2 options I have are:
    Re-create the project site then sync the plan to it
    Ask MSFT for a script to resolve the orphaned tasks
    For the same of time, I'm going to assess how long it would take to re-create the project site.
    Thanks,
    Roland

  • IOPS & Lync Server 2013 - Guidance

    Is there any formula MS released for IOPS calculation for Lync Server 2013.
    Do we need to take IOPS into consideration for Lync Server 2013 while planning, how to calculate the Lync Server 2013 IOPS requirements?

    The official disk guidelines are here:
    https://technet.microsoft.com/en-us/library/gg615015(v=ocs.15).aspx but they don't mention IOPS specifically.  The front ends in 2013 can get beaten a bit due to all the presence subscriptions and related queries. 
    They also touch on it a bit when it comes to virtualization:
    https://www.microsoft.com/en-us/download/details.aspx?id=41936
    Please remember, if you see a post that helped you please click "Vote As Helpful" and if it answered your question please click "Mark As Answer".
    SWC Unified Communications
    This forum post is based upon my personal experience and does not necessarily reflect the opinion or view of Microsoft, its employees, or other MVPs.

  • Project Server 2013, cannot open project plan in pwa

    I have a clean installation of Project Server 2013 and am able to save project plans, send assignments and receive task updates.
    The one error so far i'm running into is when I try to open any project plan from PWA - I get the following error:
    "we couldn't find the project detail page for this project. see the system administrator."
    Can someone assist in resolving this issue?
    Thank you,
    Damon Curtin | New Signature

    Damon,
    Navigate to Project Web App>>PWA Settings
    Select Enterprise Project types option from "Workflow and Project Details Pages" section
    Validate "available project details page section" by default schedule and project details should be selected in right hand side column, if it is not then add these two pages and click save.
    Hrishi Deshpande – Senior Consultant DeltaBahn
    Blog | < |
    LinkedIn
    Please click Mark As Answer; if a post solves your problem or Vote As Helpful if a post has been useful to you.This can be beneficial to other community members reading the thread.

  • Project Plan/Schedule for Project Pro and Project Server 2013 Install

    Looking for a project plan/schedule for a dept. wide install of Project Pro and Project Server 2013. Anyone have one to share?

    In Project Professional 2013 there are two templates:
    Install Project Server 2013 and Upgrade to Project Server 2013.  You may search for either template.
    Here is a direct link:
    http://office.microsoft.com/en-us/templates/results.aspx?qu=project&av=zpj150&queryid=312801ca-a859-48dd-af56-714e81c97cf4#ai:TC103345703|

  • How to Remove "Project Plan Template" from Project MSP client Enterprise tab / Project Server 2013

    Hello All,
    This should be easy one.
    I have created a "Project Plan Template" and applied to the EPT. Now i open my MSP Client 2013 and go to New--> Enterprise tab and select the template i want to use to create a new project. However, there are unnecessary Plan Templates which
    i want to remove from enterprise tab.
    Please Help. 
    sandeep

    Hi Sandeep, Go to PWA,server settings, delete enterprise objects. Then select the project combo box. You will see the list of all projects of your instance, with a column named "type". In this column you will find projects, sub projects, master
    projects and templates. Just sort along this type column, look for the templates, select the template to remove and click on the "delete" button.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Project Server 2013 for Resource Planning & Project Portfolio Management

    We are looking to  use project server 2013 for resource and project portfolio management.  We are an IT department of approximately 600 growing to 1,000 within the next several years.
    We would like to us PS2013 to do the following :
    Manage Portfolio of Projects
    Manage Resources against this Portfolio
    Calculate Project Finances using resource roles and rates
    I would be grateful to have both comments on experience , both positive and negative.
    Thank You

    Many teams within organizations are turning to Project Server to help them control resources, deliverables and costs better.    It does resource management very well with work & cost resources, baseline costs, material costs, budget costs and
    out of the box earned value analysis (EV).  The Strategy (portfolio) component is very powerful and it will help you identify project that align to your objects then do what if analysis to find the right mix of projects.
    Here are a couple of things you should think about when moving to PS2013:
    1) Who will be using the tool?  If it is a mix of onsite staff, remote staff, vendors, contractors etc. you may want to think about a hosted solution.
    2) Training.  Don't assume everyone will just magically 'know' how to use the tool.  Train everyone (team members, PMs, Executives) then train them again.  It's the only way to truly get the value out of the tool.
    3) Who will manage the system?  This is not a typical application.  The right administrator needs SharePoint, Project Server, SQL Server,  MS Project, Analysis Services and SQL Report writing skills.  Please note that much of this can
    be learned by the right person but DEFINITELY find the right person.
    4) Don't start customizing right out of the box.  You will get frustrated.  Adjust your organization to the tool early on.  I know that is easier said than done but you need a realistic approach to get tool acceptance moving early.  
    5) Use workflows but don't use them right out of the gate.  Workflows are great but I suggest you wait until phase 2 or 3 to start aligning them to your business processes.  
    6) Lastly and most importantly, you must first establish your own business processes THEN  align them to the tool.  DO NOT assume the tool will create business process for you.  You must think about how you are going to initiate a project,
    how are you going to track deliverables, how will time sheets be managed, etc.  Get to a whiteboard, crack open Visio and start building and establishing your processes now.  PS 2013 is pretty flexible and usually will align well with existing business
    processes.
    And don't forget to hire a good consultant.  They can be brought in during key phases of your roll-out to add value, help you avoid risks, and provide you with best practice advice.
    Good luck.

  • Project Server 2013 reporting database change in Schema from Project Server 2010

    I have a current Project Server 2010 implementation, I am planning to migrate to Project Online.
    We have Customized Reports that consume from the PS 2010 Reporting DB.
    Are there differences in the Reporting DB schema  between PS 2010 and Project Online?
    My Question is: if we migrated to Project Online, will the reports crash?
    Another question is that, is PS 2013 Reporting DB schema the same as Project Online?

    Hi Atia,
    IN project server 2013 we have only one database instead of 4, it means draft, archive, published and reporting with in one database.Project Server 2013 reporting database schema tool that can be downloaded.
    http://blogs.msdn.com/b/project_programmability/archive/2013/01/28/project-server-2013-reporting-database-rdb-schema-reference.aspx
    There are differences in reporting of on-premises vs. Project Online
    The Project Server 2013 reporting schema includes three new tables, 27 new views, and a total of 33 tables and views that include new fields.
    Answer-1 : Yes there are some differences between PS 2010 and project Online.
    Answer-2 : Reports will crash as In Project Online you have to use ODATA to create report. You can not query project online data for reporting directly you have to have use ODATA. 
    http://msdn.microsoft.com/en-us/library/jj163015.aspx
    Answer-3 : NO, PS 2013 Schema and Project online Schema is different. 
    kirtesh

  • Project Server 2013 - This webpart was unable to load

    Hi all,
    I am getting the following error in project server 2013 project sites:
    This webpart was unable to load. For more information, please contact your server administrator.
    <Guid>
    I only get this error message on 'Project Summary Web Part'.
    Any idea what it could be?
    Thank you,
    SJ

    Hi there!
    I got similar problem in a PDP that was working perfectly even after migration to 2013. On this case, my PDP was showing the webpart that let you to choose what fields and custom fields want to show on a specific PDP.
    I created a copy of the crashed PDP and got the same error. So I bet for remove all the custom fields and add one by one to see what happens. The surprise came up when it started to work when my PDP had just pair of custom fields. With this procedure,
    I found that the problem was on some specific custom fields created that had null values to all the projects created before. Once I forced value on those fields it worked properly!!
    Sometimes EPM2013 has a very strange behavioural and in some cases just clicking on EDIT and SAVE  without any change have solved some of my problems too.
    I hope it helps this to you and feel free to contact me if I can somehow help you :)
    Diego

  • Error Message when opening Project Plan on Project Professional from PWA 2013 using either Google Chrome or Firefox

    Dears,,
    One of our clients uses Google Chrome
    as their standard navigator to open PWA 2013 that we have deployed for them.
    Every thing went fine until we tried to open a project plan using Project Professional 2013 from PWA using the Edit in Project Professional option, we had the below error:
    "Project Web App was unable to find the specified Project.
    the project was not found on Project Web App. some possible reasons include:
    The Project has not yet been saved successfully to the server.
    The Project has been deleted on the server.
    you don’t have adequate permissions to open this project.
    if the project is available in the local cache, you can click the globe in the status bar and select "Work offline", and then open the project, if the problem continues, contact
    your administrator."
    Please note that IE is working fine with this scenario,
    the belwo screenshot shows the error that appears to the users.
    Ibrahim Al-Masri Technology Manager at MethodCorp

    Hi All,
    As Gary and Guillaume suggested, have you tried to install IE tab extension for chrome?
    See the link below:
    http://www.ietab.net/
    and also im with what Dale has posted
    (why don't you just tell the PM to use Internet Explorer instead of Google Chrome? 
    I suspect that this problem reveals that PWA does not work perfectly in browsers other than the Internet
    Explorer,
    so I would simply mandate that all PMs and TMs need to use Internet Explorer for Project Server. 
    Just a thought.  Hope this helps.)
    from my side , i have tested it and it works perfect. 
    Karim El Zarka, MCTS Sharepoint 2010 , MCITP SharePoint Administrator 2010 Whenever you see a reply and if you think is helpful, click "Vote As Helpful"! And whenever you see a reply being an answer to the question of the thread, click "Mark
    As Answer

  • Publication of the big-sized Enterprise projects from Project Professional 2013 to Project Server 2013 takes about 60+ minutes.

    Dear Sirs,
    I need your support over the following MS EPM 2013 issue:
    Publication of the big-sized Enterprise projects from Project Professional 2013 to Project Server 2013 takes about 30+ minutes. We
    need to reduce this total publication time down to acceptable working values 10+- minutes.
    Environment information:
    Single App Server (Virtual): 16 Gb RAM, x64 4xCPU, HDD > 50 GB free disk space, OS Windows Server 2012 Standard Edition x64 Service
    Pack 1, MS SharePoint Server 2013 and MS Project Server 2013 with CU December 2013 (KB 2850024) applied.
    Single RDBMS MS SQL Server (Virtual): 8 Gb RAM, x64 4xCPU, HDD > 200 GB free space, OS Windows Server 2012 Standard Edition x64 Service
    Pack 1, MS SQL Server 2012 x64 SP 1 Enterprise Edition.
    We have 1Gbit LAN between APP, DB server and 1Gbit LAN between APP and Proj Prof Client.
    Yes, we are on the way of migrating to the Prod environment
    with 3-tiered architecture (with SP1 slipstream and CU December 2014 applied), but this issue also
    presents there.
    Project’s file information:
    Tasks in the file: [~4900], resources in the file [~396] enterprise task’s custom fields used in the file [~23].
    Project save procedure for this new project would last about 7 minutes. Project publication would last about 47 minutes. We noticed that
    tasks synchronization process took about 1 second for each ~2,5 tasks, to add them to the sharepoint tasks list. So for all 5148 tasks it took about 5148/3/60 =  34 minutes. Other 13 min was used for reporting database publication and other tasks relevant
    for new sharepoint site creation.
    Case 1: Issue description:
    During the Enterprise project’s file save and publication we have the following sharepoint 2013 log messages:
    07.31.2014 12:43:17.22 Microsoft.Office.Project.Server (0x0358) 0x3D5C SharePoint Foundation Monitoring b4ly High Leaving Monitored Scope
    (Persisting list changes). performing time =376.068676326181 22dca99c-4696-70f1-e9e2-06851d0bcffd
    07.31.2014 12:43:17.69 Microsoft.Office.Project.Server (0x0358) 0x3D5C SharePoint Foundation Monitoring b4ly High Leaving Monitored Scope
    (Persisting list changes). performing time =361.652807828928 22dca99c-4696-70f1-e9e2-06851d0bcffd
    It shows that sharepoint spend at least ~350 milliseconds (or 0,35 sec*4900 tasks = 1715 sec, or 28,5 min) for each task update during
    project publication. And we also have another log file that shows that about 0,7 sec (or 0,7 sec*4900 tasks = 3430 sec, or 57 min) sharepoint spend for save each task in project file to project server. So total save and publication time more then 60+ minutes
    for that project file. The same result we have even if user didn’t do any changes at the project file.
    We use only enterprise projects (dbo.MSP_EpmProject_UserView.projectvisibilitymode = «False»), and do not use sharepoint tasks lists,
    but the synchronization between MSP Plan and SharePoint tasks list works at any case.
    Case 2: Issue description:
    - For the second test we created a new project with new sharepoint project’s site on basis of our «issue» project, with total amount
    of tasks in it of 5148 (yes, we increased the tasks list default limit at the sharepoint site up to 6000 items in it – standard limits for sharepoint view list – 5000 items).
    - Project save procedure for this new project would last about 7 minutes. Project publication would last about 47 minutes. We noticed
    that tasks synchronization process took about 1 second for each ~2,5 tasks, to add them to the sharepoint tasks list. So for all 5148 tasks it took about 5148/3/60 =  34 minutes. Other 13 min was used for reporting database publication and other tasks
    relevant for new sharepoint site creation.
    -Then we deleted the
    tasks list for that new test project from the sharepoint site and republish the project plan one more time. This time project save procedure took about 7 minutes, project publication about 2 minutes and 3 minutes for other relevant queue jobs. So total time
    is 12 minutes.
    As a conclusion: yes, we have determined
    the exact problem - during synchronization process (from Project Server to SharePoint) it perform copying all tasks and related data from Project to SharePoint in spite of fact that you changed only ONE task or ALL of them. At any case, synchronization will
    copy ALL of them from Project Server to SharePOint task’s list.
    Our workaround is to disable the task’s synchronization for such big-sized project plans:
    – to delete the SharePoint «tasks» list at the SharePoint site tied with project plan.
    - or deattach the SharePoint site from the project plan.
    Thank you for reading this topic, please if you also forced with such issue provide us any known workaround or maybe any official response
    \ feedback from MS about it.
    Thank you in advance,
    Best Regards, Andrey

    Regarding my topic, I also said that every time when sync works it updates All items from project’s plan at Project Server to corresponded task’s list at SharePOint server. Inspire of the fact that you changed only One task or group /
    all of them at your project’s plan.
    And it seems to me and my colleagues that it’s probably (maybe) a “bug” at the product. Here is what we have if looked a little bit closer to the code:
    Share Point determines what task to sync from Project’s plan to sharepoint list. To do that sharepoint needs to know was that task changed or not, based on the following fileds (check SQL stored procedure “[MSP_READ_TASKS_FOR_SYNCRONIZATION]”):
    TASK_UID    TASK_NAME    TASK_START_DATE    TASK_FINISH_DATE    TASK_PCT_COMP    TASK_PARENT_UID    TASK_OUTLINE_NUM   
    WSS_LISTITEM_UID   TASK_ID    TASK_IS_ACTIVE
    We noticed that at any case synchronization performs for all tasks, EXCEPT the ROOT one. Then we looked at the comparison of TASK_PARENT_UID field. So sharepoint compares TASK_PARENT_UID with ParentID (this is internal name for lookup
    field “Tasks” at the Sharepoint, and it stores their values at the format "ID;#Title").
    And comparison performs like following:
    SharePoint looks for Task at the Tasks’s list corresponded to Project’s plan with ID represented at the TASK_PARENT_UID field. Then it takes SharePoint ListItem ID (“int” type) and store it to the “num” parameter;
    num = this.GetCachedListItemByUniqueId(listItem.ParentList, nullable.Value).ID;
       2.Then it compares “num” with task’s “ParentID” at SharePOint as follow with operator “!=”:
    ((SPItem) listItem)["ParentID"] != (System.ValueType) num
       3. If comparison was success (true) – then it tell us that values (at the Project’s plan for tasks) was changed, then it need to be synchronized. Corresponded Method setup “true” flag, and then returns it.
    The “bug” is that this expression at the Step 2 will always return “true”, because in fact it compares “string” (see above – that this is lookup field at SharePoint side)
    with “number”. For example if the parant task ID is “55”, then we get:
    "55;#Task 1" != 55
    And by the rules of .Net the “string” will never equal “number”
    Furthermore this is approved by the SharePoint logs:
    In that case we always get the note “Setting ParentID to” at the logs (we see it if turns on Verbose for “Project Server” -> “Sharepoint Integration” category).
    So at any case of publishing project’s plan we always get that note at the logs for tasks that have Parent task, and we have Parent for all of them EXCEPT the ROOT one, exact logs represented further:
    10/15/2014 02:37:32.26    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server    Sharepoint Integration    ado0d   
    Verbose    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.62    Microsoft.Office.Project.Server (0x07D8)    0x06E8   
    Project Server    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.63    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.67    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.69    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 5    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d
    The following is the complete Method’s code from the corresponded reflector:
    private bool UpdateParentID(DataSet taskDS, DataRow row, SPListItem listItem, Dictionary<Guid, SPListItem> redoEntries)
    bool flag = false;
    int index = taskDS.Tables[0].DefaultView.Find((object) DataRowExtensions.Field<Guid>(row, "TASK_PARENT_UID"));
    if (index >= 0)
    Guid? nullable = DataRowExtensions.Field<Guid?>(taskDS.Tables[0].DefaultView[index].Row, "WSS_LISTITEM_UID");
    int num = -1;
    if (listItem.Fields.ContainsField("ParentID"))
    if (nullable.HasValue)
    try
    // STEP 1
    num = this.GetCachedListItemByUniqueId(listItem.ParentList, nullable.Value).ID;
    catch (ArgumentException ex)
    if (redoEntries != null)
    if (!redoEntries.ContainsKey(DataRowExtensions.Field<Guid>(row, "TASK_UID")))
    redoEntries.Add(DataRowExtensions.Field<Guid>(row, "TASK_UID"), listItem);
    //STEP 2
    if (num != -1 && ((SPItem) listItem)["ParentID"] != (System.ValueType) num)
    ((SPItem) listItem)["ParentID"] = (object) num;
    ULS.SendTraceTag(845443U, (ULSCatBase) ULSCat.msoulscat_PS_ProjectSharepointIntegration, ULSTraceLevel.Verbose, "Setting ParentID to {0}", new object[1]
    ((SPItem) listItem)["ParentID"]
    //STEP 3
    flag = true;
    else if (((SPItem) listItem)["ParentID"] != null)
    ((SPItem) listItem)["ParentID"] = (object) null;
    ULS.SendTraceTag(2495056U, (ULSCatBase) ULSCat.msoulscat_PS_ProjectSharepointIntegration, ULSTraceLevel.Verbose, "Resetting ParentID to null");
    flag = true;
    return flag;
    Any thoughts about it would be much appreciated!

  • Project server 2013----new custom field value is not synced between my work assignment view and project professional

    Hi All,
    I would like to add a new custom enterprise field in project server to caculate the effective work. I hope it can work as the default field "work" and "overtime work". And I add my custome enterprise field to my work assignment and the
    related details view. User can update the values in "my task" but after PM accept the updates, these values are not synced to the project center as well as project professional. Any idea?
    Regards,
    Anna

    Yes, I am saying that the PM cannot see the updated values in the enterprise project in Microsoft Project 2013. It is a task custom field. No errors for it. Would you please help create a task custom field on your side to see whether you can reproduce
    this issue? After creating the field, please add it to the "My task" related views so that project members can update the value for the task when they update the task information under "my tasK" page. After that, open the project plan as
    project manager to see whether you get the updated value. Thanks a lot!
    Regards,
    Anna

  • How to make the 'Finish Date' field Editable in Project server 2013

    Hi All,
    In Project server 2013 on premises deployment, When I try to create a new enterprise project [Also in case of new custom project type], Only the 'Start Date' field is available. The 'Finish Date' field is by default taking the value of the 'start Date' itself.
    I am unable to make this 'Finish Date' field editable.
    Any pointers on this would be very helpful,
    Thanks
    Shanky

    Shanky --
    When you create a new project in either Microsoft Project Professional or Project Online, the system does not allow you to enter both a Start date and a Finish date for the project.  Here is how the software works:
    You enter the Start date of the project.
    You completely plan the project with tasks, task dependencies, task Durations, and assigning resources to tasks.
    Based on the Start date you provide, plus all of the task information, the software calculates the Finish date of the project for you.  So, you cannot provide both the Start date and the Finish date, nor is they any way to force the system to allow
    you to do this.  Hope this helps.
    Dale A. Howard [MVP]

  • How to make the entire project in the project server 2013 reschedule؟

    How to make the entire project in the project server 2013 reschedule ?
    Because item %compelet related to reschedule
    In this photo it is known there are no items update project

    Hi,
    In PWA, you do not have the feature to update the project plan in one click, meaning marking as completed the work before the status date or reschedule after the status date the remaining work. Either you have to use Project Pro, or edit individually the
    assignments with the actual work (if not comming from timesheets) and remaining work.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |