Project Server 2013 Work Flow

Hi All,
We planed to have as simple workflow for project, which will go through initiation, planning , execution and monitoring and closure. Is there any easy way to configure this or we need to develop the workflow using visual studio.
Thanks in advance, taj

Hi Taj,
With PS2013, it is now possible to build workflow using SharePoint Designer that requires less/no code than with Visual Studio with PS2010.
See some interesting links below to start over:
http://blogs.office.com/2012/09/18/demand-management-now-with-sharepoint-designer/
http://msdn.microsoft.com/en-us/library/office/ee767694(v=office.15).aspx
http://msprojectnow.com/Blog/tabid/142/entryid/617/Designing-and-Deploying-workflows-with-Project-Server-2013.aspx
Hope this helps.
Guillaume Rouyre - MBA, MCP, MCTS

Similar Messages

  • Project Server 2013 Task Reassignment Privileges Off? (Works in Timesheet)

    Version: Project Server 2013
    I'm trying to give our users access to reassign tasks.  I turned on "Reassign Task" on the Global Permissions and gave them security to "Assign Resource" on all their categories.
    I've tested this, and the "Reassign" feature is available and working then they are on the "Timesheet" page, but it is grayed out and gives the message:
    "This control is currently disabled.  You might not have the right permission level to use this, you might need to select an object or item, or the control might not work in this context."
    Again, the same task is available to be reassigned in Timesheet though.
    My guess is that this is a Security Permission issue, because my account which I am the Administrator and Owner of the project, I can reassign tasks on both pages.
    Any suggestions?
    Thanks,
    Justin
    It's me

    Hi Justin,
    Just for your information, as far as I know, the "assign resources" is not necessary for using the "reassign task" feature. The "reassign task" global permission is enough.
    To be sure to understand your issue, the "reassign task" button is available for you as admin or project owner, but not for users which you granted the "reassign task" permission to? Am I right?
    You are talking about global permissions but did you add the "reassign task" to the
    groups permission the users belong to?
    Silly question, but do the users have select a task before trying to reassign it?
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Trouble Getting OOF to work on Project Server 2013

    Hey all,
    I am working on getting OOF working on Project Server 2013. I have followed the steps on the TechNet guide.
    Once I have done this, I get an error from my manage queue jobs stating that it failed, but was not blocked for each resource. What am I missing? What would be the cause of the failure?
    Thanks in advance for the help.
    Jonathan

    Are you referring to following TechNet
    http://technet.microsoft.com/en-us/library/dn155802(v=office.15).aspx
    Hrishi Deshpande Senior Consultant

  • Which sharepoint service applications & services are required for Project server 2013 to work fine.

    HI,
    Can any one help me,
    I am planning to install project server 2013,  what are the service applications and Services ( Manage services on server in central admin ) in sharepoint  are required for project server 2013 to work fine, so that i will run only  service
    application and services to increase server performance..i don't want to configure all service applications  when i  am configuring.
    Thanks in Advance..
    vijay kommireddi

    Hi Vijay,
    If you are installing Project Server on SharePoint farm, You need to start the service Project Application Service which would be available after you install project Server 2013.
    For Project Server Reporting you need to start Excel service and Secure Store service.
    http://technet.microsoft.com/en-us/library/ee662106(v=office.15).aspx
    Thanks,
    Phani

  • PowerView In Project Server 2013 is not working

    Hi All,
    I am working on environment with Project Server 2013. In report part i am not able to see or view only power view reports.
    I am testing this with default report provided by Microsoft, where other reports (power pivot) are working fine.
    My power view report is not showing any error, it is simply gets opened as blank sheet.
    Quick replies and help will be appreciated. 
    Note: I have installed silver light latest version too.
    Thanks
    Abbas 

    I am also experiencing issues with this.  After the approval task is completed, the Workflow gets cancelled with the following message
    RequestorId: 60d96368-4cb4-b059-8086-604972a92e60. Details: System.Collections.Generic.KeyNotFoundException: The given key was not present in the dictionary. at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)
    at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
    bookmarkManager, Location resultLocation)
    All other desired workflow actions work as expected.  Emails are sent, project is moved from stage to stage, however as soon as the workflow approval task is completed, either Approved or Rejected, the Internal Status is changed to Canceled and the
    workflow fails.
    What is interesting is when the Approval task is completed, the approver will receive an email notification that the task was CANCELLED or DELETED....
    not COMPLETED, which is what would be expected.
    Has anyone seen this - any potential resolution?

  • Send email is not working in share point desinger 2013 for project server 2013 workflow

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

  • Project Server 2013 - OOB Report do not work - Overview report...

    Hi.
    I have followed all of the step to configure reporting as mentioned in text book " implementing and administering project server 2013'. However after configuring the secure store, excel services, analysis service and sql 2012 I am unable to see the
    OOB reports appear with information.
    I have built the OLAP cube in projects service application successfully, however when I try to run the report no information appears.
    What can I do to resolve?
    Thanks

    I assume that you have configured excel services,secure store and built OLAP cube correctly and you are also having data in your Project server.
    You can open cube report and excel report, then select row column or value according the need it will display data.
    If you are using report viewer and author group make sure account from which you are trying to open report will have sufficient access or you can check with service account.
    Also check when you open report, you select enable data which appears in the upper ribbon of the reports.
    If you still facing any issue please let us know,what exactly is the issue.
    kirtesh

  • Resource filter is not working on 'Timesheet Adjustment' page. in project server 2013

    Environment : Project Server 2013
    In Time-sheet approval page, Time sheet manager unable to filter the resource time-sheet.
    In time-sheet adjustment page time-sheet manager unable to filter the data as per resource.
    Please help to resolve the issue.

    Hi,
    As far as I know, this feature which exists since at least PS2007 was never reported as "buggy". Thus I think it is an issue due to which user filters on which timesheets, meaning a visibility setting. It is really hard to debug for you since I
    do not know exactly the steps you went through and your configuration. I would start by testing simple scenarios in a dev environment using delegation sessions to check from the timesheet manager point of view what he can see. It is also important to check
    the timesheet status.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Project Server 2013 - This webpart was unable to load

    Hi all,
    I am getting the following error in project server 2013 project sites:
    This webpart was unable to load. For more information, please contact your server administrator.
    <Guid>
    I only get this error message on 'Project Summary Web Part'.
    Any idea what it could be?
    Thank you,
    SJ

    Hi there!
    I got similar problem in a PDP that was working perfectly even after migration to 2013. On this case, my PDP was showing the webpart that let you to choose what fields and custom fields want to show on a specific PDP.
    I created a copy of the crashed PDP and got the same error. So I bet for remove all the custom fields and add one by one to see what happens. The surprise came up when it started to work when my PDP had just pair of custom fields. With this procedure,
    I found that the problem was on some specific custom fields created that had null values to all the projects created before. Once I forced value on those fields it worked properly!!
    Sometimes EPM2013 has a very strange behavioural and in some cases just clicking on EDIT and SAVE  without any change have solved some of my problems too.
    I hope it helps this to you and feel free to contact me if I can somehow help you :)
    Diego

  • Can't open Project Server 2013 word documents with office 2010 installed

    hello forum members,
    we having issues opening a word document in a Project Server 2013 . we have Office 2010 on our computers installed. 
    when I click on a document link, i get a message "The webpage cannot be displayed".  the only way to open a document is to right click on link and select "Open". 
    Does Project Server 2013 require Office 2013 installed? If not, is there a way to open documents in Project Server 2013 without right clicking on links?
    tatiana
    tatiana

    Hi Tatiana,
    This is the know issue. I have experienced this issue with one of our client. The cause of issue as below -
    Scenario
    You have 2007 Microsoft Office installed on a computer.
    On the same computer, you also have a Microsoft Office 2013 application installed, such as Microsoft Lync 2013 or Microsoft Word 2013.
    SOLUTION
    To work around this issue, remove the Microsoft SharePoint Foundation Support program component from the Office 2013
    installation on the affected computer or computers. To do this, follow the “Install or remove individual Office program components” section of the following Microsoft Office website:
    Install or remove individual Office
    programs and components
    (http://office.microsoft.com/redir/HA010354261.aspx)
    After you complete these steps, repair 2007 Office. For more information about how to repair the installation, click
    the following article number to go to the article in the Microsoft Knowledge Base:
    924611
    (http://support.microsoft.com/kb/924611/ )
    How to install the individual 2007 Office features or to repair the installed 2007 Office programs
    Note When
    you follow these steps, set the Microsoft SharePoint Foundation Support
    component within Office Tools to Not Available.
    This solution doesn't apply to scenarios in which SharePoint Designer 2013 is installed on the affected computer.
    You can find further details here at Microsoft support site -
    http://support.microsoft.com/kb/2888015
    Hope this helps you.
    Cheers, Badal

  • Unable to edit the Project details from PWA in Project server 2013

    I am Migrating the project from MS Project 2007 to MS Project 2013.In that i save the project as a file first in 2007 and then open that file in  MS Project 2013 And publish it.But in some Project when i am Trying to change the projects details from
    PWA in Project server 2013 and then trying to save then the projects are not saving and are generating the error as shown below
    •GeneralQueueException:◦GeneralQueueException (9131). Details: id='9131' name='GeneralQueueException' uid='f7bb5d93-20e9-e411-b302-005056ae159c' messageID='2' exception='System.TimeoutException: This request operation sent to net.pipe://localhost/pscalc_13c43af4a7d34a2c8145b776b325a865
    did not receive a reply within the configured timeout (00:05:00). The time allotted to this operation may have been a portion of a longer timeout. This may be because the service is still processing the operation or because the service was unable to send a
    reply message. Please consider increasing the operation timeout (by casting the channel/proxy to IContextChannel and setting the OperationTimeout property) and ensure that the service is able to connect to the client. Server stack trace: at System.ServiceModel.Dispatcher.DuplexChannelBinder.Request(Message
    message, TimeSpan timeout) at System.ServiceModel.Channels.ServiceChannel.Call(String action, Boolean oneway, ProxyOperationRuntime operation, Object[] ins, Object[] outs, TimeSpan timeout) at System.ServiceModel.Channels.ServiceChannelProxy.InvokeService(IMethodCallMessage
    methodCall, ProxyOperationRuntime operation) at System.ServiceModel.Channels.ServiceChannelProxy.Invoke(IMessage message) Exception rethrown at [0]: at System.Runtime.Remoting.Proxies.RealProxy.HandleReturnMessage(IMessage reqMsg, IMessage retMsg) at System.Runtime.Remoting.Proxies.RealProxy.PrivateInvoke(MessageData&
    msgData, Int32 type) at Microsoft.Office.Project.Server.Interfaces.ICalcService.OpenProjectRemappedProject(CalcServiceCallState callState, Guid realProjectGuid, Guid remappedProjectGuid, EngineSessionState& sessionState, EngineSessionType sessionType,
    PSError& psError) at Microsoft.Office.Project.Server.BusinessLayer.CalcServiceChannel.OpenProjectRemappedProject(CalcServiceCallState callState, Guid realProjectGuid, Guid remappedProjectGuid, EngineSessionState& sessionState, EngineSessionType sessionType,
    PSError& psError) at Microsoft.Office.Project.Server.BusinessLayer.CalcServiceProxy.<>c__DisplayClass2.<OpenProjectRemappedProject>b__1(ICalcServiceChannel calcServiceChannel, PSError& localPsError, EngineSessionState& localSessionState)
    at Microsoft.Office.Project.Server.BusinessLayer.CalcServiceProxy.<>c__DisplayClass6e`1.<RunCalcServiceOperation>b__6c() at Microsoft.Office.Project.Server.Base.IdentityUtilities.<>c__DisplayClass1`1.<RunWithAccessToAppTierServices>b__0()
    at Microsoft.SharePoint.SPSecurity.<>c__DisplayClass5.<RunWithElevatedPrivileges>b__3() at Microsoft.SharePoint.Utilities.SecurityContext.RunAsProcess(CodeToRunElevated secureCode) at Microsoft.SharePoint.SPSecurity.RunWithElevatedPrivileges(WaitCallback
    secureCode, Object param) at Microsoft.SharePoint.SPSecurity.RunWithElevatedPrivileges(CodeToRunElevated secureCode) at Microsoft.Office.Project.Server.Base.IdentityUtilities.RunWithAccessToAppTierServices[T](Func`1 action) at Microsoft.Office.Project.Server.BusinessLayer.CalcServiceProxy.RunCalcServiceOperation[T](CalcServiceOperation3`1
    func, EngineSessionState& sessionState, String scopeName) at Microsoft.Office.Project.Server.BusinessLayer.CalcServiceProxy.OpenProjectRemappedProject(Guid realProjectGuid, Guid remappedProjectGuid, EngineSessionState& sessionState, EngineSessionType
    sessionType) at Microsoft.Office.Project.Server.BusinessLayer.ProjectEngineUpdate.OpenProject() at Microsoft.Office.Project.Server.BusinessLayer.ProjectEngineUpdate.HandleUpdate() at Microsoft.Office.Project.Server.BusinessLayer.ProjectQueueDispatch.HandleProject2(MessageContext
    mContext, ProjectMain project, ServerEventManager sem, ProjectDataSet dataset, Guid projectUid, Guid sessionUid) at Microsoft.Office.Project.Server.BusinessLayer.ProjectQueueDispatch.InternalDispatchMessage(IPlatformContext context, Message msg, Group messageGroup,
    JobTicket jobTicket, MessageContext mContext)'. 
    •Queue:◦GeneralQueueJobFailed (26000) - ProjectUpdate.ProjectUpdate2Message. Details: id='26000' name='GeneralQueueJobFailed' uid='f8bb5d93-20e9-e411-b302-005056ae159c' JobUID='a6fa36de-1fe9-e411-b302-005056ae159c' ComputerName='1af8030b-7714-4c8f-8738-903b73e87a82'
    GroupType='ProjectUpdate' MessageType='ProjectUpdate2Message' MessageId='2' Stage='' CorrelationUID='0a4aff9c-dd6b-7015-87a8-29d876e1540c'. For more details, check the ULS logs on machine 1af8030b-7714-4c8f-8738-903b73e87a82 for entries with JobUID a6fa36de-1fe9-e411-b302-005056ae159c. 
    What will i do .Please help.

    Hi Jeremy,
    Thanks for the reply .I try the steps that is given in link above but its not working.Please suggest something.What
    should i do.

  • Help needed Regarding Project Server - 2013 Workflow

    Hi All,
    I am new to Project server 2013 Workflow, hence please help me regarding this. Pardon me if this question is too trivial. 
    I have created a project type associated with a workflow and my workflow is as follows :
    So I am not doing anything here, I am just testing the workflow as mentioned by technet site : http://technet.microsoft.com/en-us/library/dn458865(v=office.15).aspx
    But it is mentioned that, after a minute or 2, the workflow state will change, also they have mentioned to press the Submit button.
    But in my case, the workflow is not moving to next stage [It just says 'The workflow is still processing - which never changes after hours] or I am getting the submit button (Submit button is disabled on the ribbon). Below is the state of my workflow :
    PS : I have made the user added to Portfolio managers group as well. But still I am having this same issue. 
    The Workflow manager is installed properly, and it is working fine in case of List workflow. I am facing the issue only wrt Site workflow for Project server 2013.
    Please help me to solve this issue.
    Thanks,
    shanky

    Hi Kiran,
    I am now facing issue while assigning a task to a person in the workflow.
    I am having a person named say 'John' , who is included in Project Manager as well as Portfolio Manager.
    And I am using a workflow as :
    Stage : Conceptual
    Assign a task to John (Task outcome to Variable: Outcome5 | Task ID to Variable: TaskID3 )
    Transition to stage
    Go to Approval
    But this is again giving issue as :
    Workflow Internal status : Cancelled
    Details: System.ApplicationException: HTTP 401 {"error":{"code":"-2147024891, System.UnauthorizedAccessException","message":{"lang":"en-US","value":"Access denied. You do not have
    permission to perform this action or access this resource."}}}
    PS : I have used the same Sharepoint admin account for 'Account Name' in ‘User Profile Sync' , Is this causing the issue? Please let me know.
    Thanks,
    Shanky

  • How to get timesheet information in a javascript (Project Server 2013)

    Hi all,
    In Project Server 2013, I'm trying to customize the Timesheet ribbon. This far, I've been able to add a new button and tie an event to it. All is working well. This is all done using elements.xml and a javascripts.
    Now the problem is that I want to get some informations about the timesheet (the Guid for example) and, for now, I've got no success. I know that there is an object called PS.TimeSheet, but when I try to use some PS.TimeSheet's methods I get an error.
    Note that i'm in the page http://servername/pwa/timesheet.aspx (there is not Guid in the address) and all the treatments should be done in the javascript (no call to another aspx page)
    Thanks !

    Finally, I've found the solution.
    My goal was to add a button in the timesheet ribbon to launch a special report showing some data about the timesheet. The report has the timesheet Guid as parameter.
    To customize the Sharepoint ribbon, you have to do it via an xml file and a javascript (a lot of explanation is available in the internet that explains how to do it). So I had to call a function in the javascript to launch the report (which is a SSRS report).
    When you are in a javascript you have access to many global variables. When the timesheet.aspx is displayed, there is a global variable called "timesheetComponent".
    Using this variable we can call the method :
    timesheetComponent.m_consumedApi.get_Impl()
    to get an implementation of the current timesheet. This implementation has an attibute that has a lot of nice stuff about the current user and the current time sheet. This attribute is 
    _headerInfo
    _headerInfo is a structure that includes tsUid which contains the timesheet Guid I was looking for.
    Finally, the function attached to the button goes like this :
    function _LaunchReport() {
    var tsUId;
    var rptPath;
    var tsImpl = timesheetComponent.m_consumedApi.get_Impl();
    try
    if (CONST_REPORT_PATH == null || CONST_REPORT_PATH == "" ) {
    alert("Constant CONST_REPORT_PATH is not defined")
    else {
    tsUId = tsImpl._headerInfo.tsUid;
    rptPath = CONST_REPORT_PATH + 'TimesheetDetails&rs:Command=Render&rc:Parameters=false&TimesheetUID=' + tsUId;
    window.open(rptPath);
    catch (Err) {
    alert(Err)
    CONST_REPORT_PATH is the path to SSRS defined elsewhere
    I hope this will help some other poeple !

  • Error while installing MS Project Server 2013(trial) on Sharepoint 2013(CAL)

    My problem is that I get the following error:
    trial editions and licensed editions of SharePoint, Project Server, and Office Web Apps products may not be installed on the same server
    when I try to install MS Project Server 2013(180 days-evaluation) over a Sharepoint 2013(MAPS license).
    What does exactly this error say?
    Do I need to have Sharepoint and MS Project Server with same type of license?
    If so, I suppose I'll have to remove Sharepoint(MAPS) and install a 180 days-evaluation Sharepoint. Will this re-installation be acceptable or I'll get some license type incompatibility issues?

    Hello. You are correct, you will need to have the same license types either both trials or both licensed. Uninstalling/ reinstalling with trials should work fine or build another trial farm. Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS |
    MVP | Downloads

  • Project Server 2013 - External Data Refresh Failed

    Hi, 
    I have built  new Project Server 2013 in a 3 tier farm, with OWA, configured PWA site everything working fine except, Reports in BI Center, where i am getting - External Data Refresh Failed error
    http://Sp2013/PWA/ProjectBICenter/Sample%20Reports/Forms/AllItems.aspx
    i have stopped using Excel Web also to use Excel Services, get below error
    External Data Refresh Failed
    An error occurred while accessing application id ProjectServerApplication from Secure Store Service. The following connections failed to refresh:
    Project Server - Issue Data
    Project Server - Risk Data
    Learn
    more about data refresh
    Steps Tried:
    1.deleted Excel Services - recreated
    2.Deleted Secure store - recreated
    Built  test box without OWA still have the same issue
    Any suggestions/ Solutions greatly appreciated.
    Thanks 
    Aleem
    Alim

    Hi,
    If you are still facing the same issue follow the below steps:
    1) Access PWA from your server
    2) Download any built in report from Reports section (in your case
    Project Server - Issue Data Project
    Server - Risk Data) to your server.
    3) Open report in excel, go to Data->Connections in Workbook Connection dialog open "Project Server - Issue Data" go to properties.
    4) Here select tab 'Definition' under connection file remove tick for 'Always use connection file'
    5) Tweak your connection string & tick save password option 
    6) Excel Services: Authentication Settings (suit yourself)
    Now, save & publish on PWA, hope it works :)

Maybe you are looking for

  • Open asset acctng year in closed FI fiscal year - asset not totally posted

    Hello Friends, In January we have closed 2010 in finance but Asset accounting year remained open. Now I have an asset with planned depreciation in 2010 which was not posted. Now I can't close asset accounting for 2010. I have read about SAP note 2969

  • Several how-to questions...

    I'm looking for answers to the following questions with respect to Framemaker 9: 1) How do I get the Spell Checker to recognize words that abut dash ems and ellipsis?  Currently the Spell check flags such instances. 2) Is there no way to display POTE

  • How do i backup from iCloud (not the last)

    i have a new device and when i tried to backup from icloud i couldn't find the last backup.  the newest backup was blank when i plug the new device in, and i need the backup i did yesterday.  where can i find it?

  • Partially corrupt iPhoto Library

    I am using iPhoto 6.0.6 Recently, some of my older Rolls have had their photos seemingly disappear. They are actually moved under a folder ~iPhoto Library/Originals/2009/SomeNewRoll. This folder has 2400 photos in it, but the corresponding roll, Some

  • Set a FLVPlayback Object Colour

    Hello I am creating an FLV movie player using one of the FLVPlayback Skins (SkinUnderPlaySeekStop). I am trying to set the colour of the play button and the SeekBar dynamically from my player. I can assign the Skin OK using flashMovie.skin = "SkinUnd