Project stock report

hello,
we want to view the project stock report which would give sales order number and the WBS number.
In MBBS tcode the sales order number is shown but wbs no field is blank(if special stock is  E)
and in other case wbs no shown but sales order no is absent.(if special stock is  Q)
How to view both fields sales order and wbs no.
is there any method or alternative report.
thanks
shiv

Project Stock and Sales order stock are different. You cannt see WBS against sales oreder no.
Thanks,
Venkat
Edited by: VenkatSrinvas Konda on May 12, 2008 9:02 AM

Similar Messages

  • Project Stock report using QBEW and QBEWH tables

    Dear All,
    First of all Happy New Year to all of you.
    Here is my question: I want to build a ABAP report for stock situation for project stock. The report demands the stock by closing month. Suppose I run the report for month 11/2010, it should show the closing stock at the end of the month 11/2010.
    Now I am using the values from table QBEW for this purpose.But QBEW table shows only current entries. If a material stock is changed or value is changed, it goes into history table QBEWH.
    Now problem is that if I try to make sum of QBEW and QBEWH, the stock value is excessive. Now I am not sure which entries I should consider from QBEWH table for this purpose.
    Has anybody worked on similar requirement?
    Thanks in advance!
    Regards,
    Mahendra Dighe

    Hi,
    Please try the report S_P00_07000140 - Inventory and Raw material for special stock report.
    Thanks.
    abdul

  • Non-Valuated Project Stock Report

    Dear Sir,
      I am assigning some valuated and non-valuated materials to the Project. So I have selected Project Stock in Project Defination. So I can see Valuated Project Stock in MBBS but I can't see non-valuated project stock . So where should I come to know these stock also ?
    Regards
    Girish Lashkar

    Hi,
    If you check your project definition control tab you can find which type of stock you are using, whether it is valuated project stock or non-valuated project stock. Since SAP is giving a radio button to select this, it means you can not maintain both valuated and non-valuated project stock.
    In your case may be some of the material code you created as non-valuated material for the particular plant, not for project. Please check it again.
    You can also refer sap help under project system > material to know better.
    Tnx.
    Abdul

  • Korea project stock report - materials GR and GI

    Hello,
    can anyone help me to find some more information about for Korea required reports.
    Report should show open G/I items per project and after sales respective.
    Maybe there is already something prepared...
    Thank you for your help!
    Regards
    Witek

    Hello,
    Try to execute program RKANBU01 in SA38.
    Regards
    Prashant

  • Stock Report for Project related items

    Dear Sir,
    We have to generate a report showing item wise Stock quantity lying against a WBS (Project Stock) .
    We are able to get the desired data from the Table MSPR . But only problem is that we are not getting Storage BIN related information in this table .
    Kindly guide us as how can we get the Storage BIN information also against these Project (WBS) Stock Items .
    With Thanks and Regards
    Sonia

    Hi Everyone !!
    I would once again request all of you to kindly answer to my question, as I need a solution to this urgently.
    Thanx & Regards,
    Ravi Kumar

  • Report for Project Stock Balances as on a previous Date

    Hi PS Gurus !!
    We need to have a Report that gives the Project Stock Balances and Values as on a Past Date. The system gives a Current Status Report, but is there a Report that gives the Values for Past Date. This is a report for the Auditor's Interest.
    Secondly, we would also need a Report on the Movement of Project Stock in the past periods. Is this possible ??
    Thanx !!
    Ravi

    Hi Everyone !!
    I would once again request all of you to kindly answer to my question, as I need a solution to this urgently.
    Thanx & Regards,
    Ravi Kumar

  • Inventory Report For Special Stock (Project Stock)

    Dear Sir,
    We are in Make -To - Order scenario and procure the material against  the WBS element . For getting the Inventory List , we use MBBS tcode but it has following limitation :
      a) It give the Stock Status as on date basis . While we need Stock Inventory on a cut off date , say on
          31/Jan/2007 .
      b) We are not able to get the Inventory Report , Material Group wise
    I request to kindly guide me , as how to take the Inventory Report for Project Stock .
    Regards
    B Mittal

    Hi Shailesh,
    Is there any way we can include some extra fields into this MC.9 report - i tried but could not find anything.  Can you please help.
    Regards,
    Laxmi

  • Slow moving items report for project stock

    Hi ALL,
    We are using project stock to manage all of our inventory. As the standard slow moving items report (MC46) does not contain project stock (special stock Q), we would like to develop a report then. "Slow moving" should be identified by material, plant, storage location and WBS.
    Has any had this experience? What's the main data logic for this report?
    Thanks a lot!!

    Dear,
    Do One thing.. First goto MB5B - stocks on posting date and select to display only special stock indicator Q (Project). By this you can abstract all Project materials. Save the output into Excel. (The main aim is first abstract the project stock materials into a list with a suitable transactions - MB5B or MB52).
    Then run MC50 or MC46 using these materials saved in excel file.
    Try this.
    Regards,
    Syed Hussain.

  • ME2O report with special stock assignment (project stock)

    Dear Guru's
    Im tring to use ME2O report to monitor the stocks of subcontracting. In my business we have special stocks (project stocks).
    When I run the report it does not give the subcontracted stocks with project assignment.
    Am I doing something wrong or is there any otherway to achive this. I want to monitor the subcontractor stocks (with special stock assignment of project)
    Thanks in advance
    Rupesh

    can you explain this scenario a bit more
    subcontracting stock is stock type O, project stock is stock type Q
    I dont think one stock can have 2 stock types
    And ME2O is monitoring stock type O, not Q.

  • LIS Reporting of Valuated Project Stock

    We have a scenario where we have materials that are used both as valuated project stock and plant stock.  Plant stock goes to normal orders.  For the projects, the material is manufactured and goes into valuated project stock.  So the same material can be valuated as plant stock and project stock.  An example might be:
        Item A    50 in plant stock
                      10 for project A
                        5 for project B
    Some reporting works well.  MMBE for example faihfuly reports these values.  MBBS is correct.   MB5L shows good integrity between all accounts.
    The inventory LIS reports are messed up.  MC.1 reports odd values including the project valuation class which SAP says it will not report. 
    Does SAP Inventory LIS (MC.1 etc..) handle the situation where a material has multiple valuation classes and can be used in diferent way?  Is there a fix for this problem?
    The ultimate requirement is to have stock history similar to plant stock but for project stock.

    Hi,
    Please try the below report..
    S_P00_07000140
    Thanks
    abdul.

  • Projected Stock-Inventory Report for APO

    Hi All,
    I have to develop Projected Stock-Inventory Report for APO.
    I need to fetch data from APO and need to store it in BI for reporting purpose.
    Do you have any idea about how to get the required data from APO system?
    Where does stock data resides along with projected stock in any SNP aggregate or any table?
    Regards,
    Krunalkumar Rathod

    Hello,
    I suppose you mean you want to export the data "stock on hand" in SNP planning book to BW.
    This key figure is an auxiliary key figure that calculated by macro. The data is only diplayed in the planning book but not saved to any database table or liveCache.
    In order to save it, you can add your own time-series key figure to save the stock on hand. And you'll need to create your own macro to calculate or copy from the auxiliary key figure.
    A good way is you can  create a macro by copying the "stock balance" macro and just change the stock on hand key figure to your own time serires key figure. Then when you need the data, you can run the macro in background job. By doing this, the stock data will be saved to the time series key figure. Then you can extract it from liveCache as normal key figures.
    Please notice the time-series key figure must be assigned to correct aggregates in an SNP planning area.
    Best Regards,
    Ada

  • Stock Report for Variant configuration

    Hi Experts,
    Request your help to get the following information.
    We have a material which are packed in to multiple packing modes. Inorder to ease the selection of packing mode in sales order, we are thinking of introducing variant configuration. I.e all the packed materials will be created as variants in SAP and the sales order will be created for the configurable material. When the proper characteristic is selected the material will be automatically replaced by the variant.
    But the requirement is to see the stocks of all the varaints along with the configurable materials as the header. For eg. Material A is having variants A1, A2 & A3. The sales quantites are 25, 30 and 35 respectively.
    In any of the standard report, can I see the sales of these along with the total sales of config mtl A as 90
    Please guide.
    Thanks & Regards
    Prathib

    Hi Prathib,
    On my last project, we define material code with the same code at the beginning like you do A1 A2 A3 (for variants) and AC for example for configurable material. Then for stock report you can use MB52, in material field just write A* it will show you stock from material start with code A. But make sure you define material type and material group for selection wisely. It works for me. Now depends on how well you define your structure.
    Regards,
    Arman

  • Storage location wise project stock valuation

    Hi all,
       I am tying to generate a report for storage locationwise project stock valuation. MBBS is giving the data valuation type as well as WBS element wise valuation.That is fine. I want to show the data storage location wise. So, I have taken MSPR table where I am getting data storage location wise. For this stock, i am picking up unit price from QBEW table. My user says there will be cases that the material comes in with different prices in a same financial period.Here I am facing issue when there are two prices for the same material with same Val.area and same WBS element .Pls tell me how can I pick up the correct price.

    Hi,
    If stock with different price under 1 plant and 1 WBS Element put into different storage location based on the material price then in table MSPR we can have LGORT (storage location) as indicator there. Otherwise, since valuation type is not implemented, there is no other way you can differentiate stock based on price as you mentioned before.

  • T Code for Project Stock for a particular period

    I want to check my project stock for a particular period, is there any Standard T Code, if not how to find the solution. Please revert me the solution.
                                                                                    Thank you.

    Hi
    Please check the following Report
    S_P00_07000140 - Inventory and Raw Material for Special Stock Report
    To access the report, from the SAP Easy Access menu, choose Accounting >> Financial Accounting >> General Ledger >> Reporting >> Tax Reports >> Thailand >> Inventory and Raw Material for Special Stock Report
    OR
    please try to create a Query by using the following tables..
    MSPR
    MARA
    MAKT
    Tnx.
    Abdul

  • Projected Stock for a given Material and Location (System: SCM-APO)

    Hello Experts,
    Appreciate, if anybody can help me in getting a time-series key-figure data (Stock-On-Hand for a given Material and Location) for a given period.
    I am working on a report to display the projected stock (Material & Location are known) for a given period (1 month).
    I am able to view the above data in my planning book.
    Thanks in advance.
    Regards,
    Prasanna
    Edited by: Prasanna Gunji on Apr 9, 2010 3:42 PM

    Hi Prasanna,
    9ASOQMQTY - Stock in quality inspection
    9ASOTRSQTY - Stock in transit
    9AAVLSTCK - Projected Stock
    Hope this helps
    Regards
    R. Senthil Mareeswaran.

Maybe you are looking for

  • Called id after ios5 not working correctly

    I have an iPhone 4 and I have upgraded to ios5. All my contacts are saved with the country code +357 (Cyprus). When someone calls me (90% of the time) it displays the number and does not match it from the contact list. I did not have this problem wit

  • JAR file not running.

    My name is Pradipto.I make one JAR file which contains some third party classes.Actually i am using jdom classes for parsing xml.As i am running jar file it is showing error that jdom classes not found. I set classpath for jdom classes also included

  • HP Photosmart C4780 All-in-One Only Prints Half a Page

    MacBook Pro 15.4 Laptop Model A1286 Snow Leopard 10.6 HP Photosmart C4780 All-in-One Wireless Connection Airport Extreme Sim Dualband New to wireless Why does the wireless printer take several minutes before it prints? Why does it print only the top

  • USB 3.0 Bracket (Optional) Connected but not working :(

    I have connected the USB3 Bracket for the additional 2 USB3 ports, but it does not seem to be working.   I have Renesas Electronics USB 3.0 Host Controller listed twice and Renesas Electronics USB 3.0 Root Hub listed Twice in my Device Manager. The T

  • ASA 5580 with EtherChannel 20Gbs, Does the Failover link must match the same Speed?

    Hello, I have an ASA 5580, I am plannning on setting two EtherChannels (inside and outside), each channel will include two TenGigabit interfaces. My questions is that if the links that I am gonig to use for the failover and link, should also be 20Gbs