Project System Datasource for Tendering process

Hi ,
My client wants to see some reports based on contracts/tenders like when contract was floated and when it was closed .
Can you please guide me to datasource from where I can get this information.
Regards
John

Hi ,
My client wants to see some reports based on contracts/tenders like when contract was floated and when it was closed .
Can you please guide me to datasource from where I can get this information.
Regards
John

Similar Messages

  • SBIW for Porject Systems datasources for 0PS_C02

    I am looking for an explanation how to configure the objects under the following path
    SBIW
    Settings for Application-Specific DataSources (PI)
    Project System
    Project System Dates,Durations,and Floats in the BW
    Installing business content for this cube has been fairly easy up until this step and I have been unable to find clear instructions for what, when, how, or why this is done. Any assistance or identification of documentation would be greatly appreciated.  I have the D12 Project System - Dates documentation guides for all releases already.
    Thanks

    The documentation I found on BWEXPERTS online and best practices site states:
    For these extractors [0PS_DAT_*], you need to go to BW Customizing (SBIW) ...... to describe the settings, duration and buffer. This has two steps:
    1) Create new combinations of the InfoObjects Value type etc
    2) Choose which date field of an R/3 master table is built through a given characteristic vector in BW.
    I have been unable to find an explanation for these two steps which include 8 steps in config in SBIW.  I don't understand whether or not i need to perform some or all steps and would like to find something that explains in detail what is the result of performing and using this config.
    Let me add that we are on SAP 4.7 (620) with BW 3.1 currently have installed support pack stack including 19 - 23 in our dev box where I have been testing these objects.
    Thanks so much for your comments

  • Project system datasource

    Hi Experts,
    I am new to Project Systems,
    can anybody please guide me.
    I installed Standrad cubes and Queries from BI Content.
    My question is i am unable to understand the standard datasources for standard cubes.
    what are the datasources for 0ps_c41 cube.
    Thanks,
    manag1984

    Hi Saveen,
    Thanks for your response,
    here i am doing before and after flow only. i have done the 0ps_c41 cube, here i found many sources for this infocube
    see below,
    0PS_C041 0PS_CSH_NTW 0LEROHM572FH3Y3CLTBY4IDZV Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-08 11:21:10 SAP
    0PS_C041 0CO_OM_OPA_6 0RJCUTI3N1FNITD7PTZTSOV2Z Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 12:14:02 SAP
    0PS_C041 0CO_OM_NAE_2 12VKCHZ1DXAVAIP8E8A2R1ZJ3 Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-06 15:40:29 SAP
    0PS_C041 0CO_OM_NAE_1 1GA3O3H6ZD4IBJM279QBA75EN Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 07:47:46 SAP
    0PS_C041 0CO_OM_NTW_2 1TH590M1OKGSQUUY6DIKFUGBJ Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 08:15:07 SAP
    0PS_C041 0CO_OM_WBS_5 2GEJX6Y7U0MKYZ6VJ9G7RVRDN Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 11:09:20 SAP
    0PS_C041 0CO_OM_NWA_1 3N5KQ8S5C8XB9FT762M8038DB Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 08:01:37 SAP
    0PS_C041 0PS_CSH_WBS 3XR43ZC9U9XDRO879U0XNBJOB Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-08 11:18:38 SAP
    0PS_C041 0CO_OM_NTW_1 4LNA7MRY5IABHXFC6BU611OV3 Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 08:18:47 SAP
    0PS_C041 0PS_CSH_NWA 4MC5R2YIH0T2VMHJ2LJJEI4WR Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-08 11:24:13 SAP
    0PS_C041 0CO_OM_WBS_6 4XXCXKON8XFQTGKN0N1YXFF4R Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 11:16:19 SAP
    0PS_C041 0CO_OM_WBS_1 7QLS28PEUQJV4133G8EWO6SDB Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 08:23:54 SAP
    0PS_C041 80PS_C081 98K7Q55TV17EGH8YKJ6TJT1EJ Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-08 10:40:05 SAP
    0PS_C041 0CO_OM_WBS_4 AV1E5Y10TC4TK3CF72ARLUH5N Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 10:58:29 SAP
    0PS_C041 0CO_OM_OPA_1 B5PMHGKZA085WHPLCSHXDDYZF Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 12:04:11 SAP
    0PS_C041 0CO_OM_NWA_2 BILVN07LZ4RIK0BOWY32955PB Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 07:57:28 SAP
    0PS_C041 0CO_OM_WBS_2 BL4ZOU600JPGG6XLA1HXF7LSV Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 08:29:08 SAP
    0PS_C041 0CO_OM_OPA_3 CYKOKU2WESCTAX6OZS7VJCR4R Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 12:09:49 SAP
    0PS_C041 0CO_OM_WBS_3 E0IRRGKC972YC8EM01KDYGZDR Sends data to : 0PS_C041 [CUBE] 3.5/03 2004-12-07 08:32:21 SAP
    These many datasources has for this cube,
    Can you plz guide me what are the exact datasource for 0ps_c41 cube.
    Thanks,

  • Project system tables for getting baseline and forecast values

    Hi all,
    I am new to Project systems and currently i am having the PS report.
    I need to pick the following values based on project definition (proj-pspid):
    --> historical baseline values like:
    1) versions
    2) created by
    3) created on
    --> historical forecast values like:
    1) versions
    2) created by
    3) created on
    Can you please let me know the tables and fileds for fetching the above values.
    Regards,
    raviraj.

    Hi,
    IMAK Appropriation requests - general data
    IMAV Appropriation request variant
    IMPR Investment Program Positions
    IMPU Texts for cap. inv. program positions
    IMTP Investment programs
    IMZO Assignment Table- CO Object - Capital Investment Prog.Pos.
    PMCO Cost structure of maintenance order
    PRHI Work Breakdown Structure, Edges (Hierarchy Pointer)
    PROJ Project definition
    PRPS WBS (Work Breakdown Structure) Element Master Data
    Check with tables

  • B1if - #sender system in for each processing loop

    Hi all,
    I am creating a scenario where I use the for each processing loop.
    Everything works fine but when I want to use the #Sender system in various steps (call B1 atom eg), I get an error saying the #Sender system is empty.
    Do I need to do something to get it populated inside the for each loop?
    Kind regards,
    Joeri

    Hi Joeri,
    I have done a test and I have the same problem you are having the system is empty when I use the #Sender System in a B1 call inside a for each. If I use a fix system id then it works fine.
    <?xml version="1.0" encoding="utf-8" ?>
    <Msg xmlns="urn:com.sap.b1i.vplatform:entity">
      <Body>
        <Payload Role="C" id="atom3" system="empty">
          <B1CallResult status="failure" b1login="Technical User" method="Synchronous Retrieval" objectid="4" payload="" keyname="ItemCode" keyvalue="A00001" />
        </Payload>
      </Body>
    </Msg>
    Please open a message for support asking for it and share the information with us.
    Hope it helps
    Trinidad.
    Edited by: Maria Trinidad MARTINEZ GEA on Jan 6, 2012 11:00 AM
    My previous answer was not related to your question...

  • Project System Report for AP and AR

    Hi,
    Working on a process where man hour, equipment cost, AR and AP should be captured in a PS WBS element. Posting for man hrs and equipments are through service order and AP/AR are through FI posting. Throught controlling view we can see that cost is capturing and most of the standard reports are working except S_ALR_87100191, S_ALR_87013573 , S_ALR_87013575 and S_ALR_87013574 - Expenses , where Receipt and Expenses are most important. Is there seperate settings needs to be done in CO or PS area to make this report work...??. I always get error "
    No costs, revenues or finances were selected
    Message no. OK602"
    Help would be highly appreciated......
    Thanks.

    Hi,
    Can u check project cash management activated r not
    Please ref below link
    PS Cash Management
    Thanks
    Prasath n

  • I want all system status for all process orders in COR3

    Hi All,
    I have small requirement below:
    In COR3 tcode after we enter Process order as input, in that screen we can see in 3rd row, System Status and User Status,
    Where all these system status and User Status are stored,
    How we will get these msgs?
    Please help me on this....
    Sri

    Now  i have verified in productin box, i am getting more than one STATUS in JEST for OBJNR , with this value i am getting more than one values, but here i am facing again one more issue:
    in T02JT table i am getting some set of status(in table i am getting 10 values) but when i have verifed in COR3 tcode for that particuler order i am able to see only 8 system status...what about remain 2 ?
    in T02JT table i tried all options as i put X for status with out X, i tried all options..
    Please help me on this...
    One more this is i need User Status's also...? how we can will get these values also..
    Sri

  • Project System structure for Telecom domain

    Hi all of you,
    Our client is in to telecom engineering services and have number of sites to develop and support technically. Currently, they are splitting up their projects according to regions and Circles then in to number of sites. The regions and the circles are not dependent on the projects since they have unique regions and circles. They require to take reports at project: region: circle level and region, circle reporting across the projects. Do we have this facility like region/ circle assignment to the WBS elements? If yes, give me some stuff to resolve.
    Regards
    Ramki

    Hi Ramki,
    For every WBS, under Assignment TAB there are fields called Location and Functional Location. You can try using the same for Region / Circle for your projects to fetch the data and call the same in Reporting. But ensure that you don't have any actual data entry already for those fields Location & Func. location.
    Else, you can create user fields for Circle / Region and call the same in Reporting.
    Regards,
    Kabir

  • Database design for the Project System!

    Hi
    I need the database design schema for the Project System .
    For example with the transaction code CJ20N at the left side all the Project Hierarchy is tabulated.
    I want to  know the relations between tables ?
    Would you please help me ?

    look logical database PSJ with tcode SE36
    grx. A.

  • Project Systems - Inter company stock transport orders

    We are implementing SAP Project Systems module for our client as part of ECC 6.0 global roll out and we are looking for a solution to meet the with following business scenario:
    The sales company (CC : US01)  receives a purchase order for large project from an external customer. The sales company creates a sales order in SAP with delivering plant  that belongs to another legal entity ( CC : US02 and plant : USP2) that has the main engg.facility . Two projects ( WBS elements ) are created for the sales company and engg.company . WBS element 1 element is used to drive milestone billing for the external customer and WBS2 element is created to post revenues and costs for the main engg.company
    ( CC :US02). The main engg.company plant ( USP2) has to procure sub structures from another legal entity in the company ( CC :US03 and plant :USP3) . We are creating an inter company stock transport order from USP2 ( main engg.company ) on plant USP3. In standard SAP , the stock transport order carries WBS2 that belongs to purchasing plant. But the business requirement is to have their own WBS element for USP3 plant to capture costs and revenues. What's the best of way of meeting the above business requirement either through standard SAP configuraion or some user exists with manual process.
    I'd appreciate any suggestions or ideas from the experts !
    Thanks

    Hi,
    Please check if the below link helps.
    [Project with Intercompany Billing|http://help.sap.com/bp_bblibrary/500/html/D48_ProjInterBill_EN_US.htm]
    Regards,
    P Gomatheeswaran

  • Know about Project system

    Hi, I am basically HR functional consultant. I would like to know about Project systems. Is project systems is for managing the projects like what we do in Microsoft project and primavera.
    Could any one give me clear idea about project systems and guide me how the beginner can learn about project system.
    Please don't hesitate about my question. I am completely new this topic.
    I will appreciate you response.
    Many thanks
    santhi

    Hi,
    Pls check things like http://www.sap-img.com/sap-ps.htm
    Eddy
    PS. Which type of SDN Ubergeek/BPX suit are <a href="/people/eddy.declercq/blog/2007/05/14/which-type-of-sdn-ubergeekbpx-suit-are-you">you</a>?
    Deadline: June 15th

  • Is there a BADI to call custom defined fields in Project Systems (PS)

    Hi,
    Is there a BADI to call custom defined fields in Project Systems (PS)
    The business process is as under:
    SRM MDM product catalog is called from PS applcation in ECC using transaction code CJ20N.
    Standard fields like description, qty, price etc are displayed and transfered to the PS application.
    The requirement is in addition to above mentioned fields, need to display
    custom defined (CUST_FIELD1 to CUST_FIELD5) fields and subsequently to be transfered to the PS application.
    Pls provide help or inputs.
    Thanks,

    Hi,
    There is customizing in the PS side. PS -> Material-? *(OCI) -> Convert HTML to SAP Fields
    Regards,
    Masa

  • Source System Conversion in Remote Process Chain

    Hi all!
    I' working with BI7 SP12 and facing the following problem:
    <b>There is no source system conversion for Remote Process Chains, when transporting Process Chains with Remote Process Chains from DEV to QA.</b>
    First the following warning appears:
    DEV-Destination of Remote Process Chain does not exist on QA-System.
    ==> The is correct because the DEV-Destination should have been converted to QA-Destination.
    Then the following error appears:
    Process Chain with the Remote Process Chain was not succesfully checked.
    <b>All source system conversion tables are maintained correctly!</b>
    The source system conversion works for example for InfoPackages correctly.
    But for Remote Process Chain there is neither source system conversion for the Destination nor for Callback Destination. Both should be converted.
    Do I have to do it manually??
    Or do I have to create the DEV-Destination in SM59 on the QA-System??
    ==> We want to avoid this...
    Thanks for any ideas...
    kj

    Please note:
    When I create the DEV-Destination in SM59 on the QA-System,
    the transport gets no warnings and no errors...
    But there is still no conversion of the source systems for the Destination and the Callback Destination of the Remote Process Chain to QA-Destinations...
    So, i think:
    There is no automatic source system conversion of Remote Process Chains and I have to adjust it manually in the QA-System...

  • Changing the data in DataSource in R/3 System for Project System

    Can we change the data of DataSource which is extracted from R/3 sYSTEM for Project System Module?

    Hello Rajesh,
    You can modify it in PSA. Or write the routines or rules logic as per your requirement.
    Could you please elaborate more on what kind of changes you are interested for.
    San.

  • Business process of Purchasing, FI-AA, Project Systems, Invst Mgmt for BW

    Hi
    I am a BW consultant and I would like to know the business process like what-is-what regarding the modules of Purchasing, FI-AA (Asset Accounting), Project Systems, Investment Management, SRM from BW perspective like how much and what should I know.
    Help me by posting some material/documnets so that I can come to an idea regarding the business process of those modules that will help me to work in that application areas as a BW Consultant.
    Thanks in advance
    Sugandhi

    Hi Sugandhi,
    Take a look bi best practice - purchasing analysis
    http://help.sap.com/bp_biv235/BI_EN/html/bw.htm
    http://help.sap.com/bp_biv235/BI_EN/html/BW/PurchAnal.htm
    and sap help business content
    http://help.sap.com/saphelp_nw04/helpdata/en/ed/62073c44564d59e10000000a114084/frameset.htm
    (navigate left panel for infocube, query etc)
    Please go through this links:
    http://help.sap.com/saphelp_nw04/helpdata/en/e9/62073c44564d59e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_ides/helpdata/en/fd/45beec9d6411d189b60000e829fbbd/content.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/9c/df293581dc1f79e10000009b38f889/frameset.htm
    http://help.sap.com/saphelp_bw33/helpdata/en/e9/62073c44564d59e10000000a114084/frameset.htm
    http://www.sap-img.com/sap-mm.htm
    http://www.sapgenie.com/abap/tables_mm.htm
    SRM:
    This is the SAP help link:
    http://help.sap.com/saphelp_nw04/helpdata/en/3a/7aeb3cad744026e10000000a11405a/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/bb/66073c52619459e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/7a/68073c52619459e10000000a114084/frameset.htm
    Also check http://service.sap.com/bi -> business content -> supplier relationship management and http://service.sap.com/srm
    the connection/create source system should just same (for r/3, srm, scm with bi also), not sure you had this doc already
    http://help.sap.com/bp_biv335/BI_EN/BBLibrary/documentation/B84_BB_ConfigGuide_EN_DE.doc
    for portal
    https://www.sdn.sap.com/irj/sdn/developerareas/ep
    and search bi and portal integration in sdn library
    Keys for Integrating SAP BW 3.5 and SAP Enterprise Portal 6.0
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/6b1472a7-0301-0010-64bd-dc96509db6f7
    Hope these helps u...
    Regards,
    KK.

Maybe you are looking for

  • What is the problem?

    I want to deploy a CMP Entity Bean in weblogic6.1SP2,but I meet an error,what should I do to solve the problem? the error code: <2003-4-7 ~{OBNg~}02~{J1~}27~{7V~}24~{Ck~}> <Error> <J2EE> <Error deploying application SVC: Unable to deploy EJB: CMPSvc

  • Problem in installing Matlab on lion

    hi guys i want to install matlab r2011a on lion but when i click on app icon it actives  on the dock after some seconds it stops giggling and nothing happens after I click on it it disappear normally it ahould open a window to install software but th

  • Oh no- I rearranged photos in Library....

    I took a day to rearrange (by dragging) some 2500 scanned and downloaded photos into chronological order in the Library. THEN I hear I should have done this inside an Album and NOT in the iPhoto Library.... What are the consequences of my ignorance?

  • La Cie Internal DVD Burner and A Power Mac G4

    A stupid situation here..... I just bought & installed the La Cie internal Lightscribe DVD burner to replace the Pioneer DVD burner which wore out. ( Installed into a Power Mac G4 - mirror drive door version.) It works except it seems that the tray o

  • Safari Update-Privacy-Shockwave Player Error

    Did some software updates yesterday evening, one of them being a Safari update. After the updates were completed, did a "re-start" and eveything seemed fine. Noticed a few enhancements to Safari (v 5.1) but one thing I do find now is if I click on Sa