Hi,
Following is the situation in MD04:
Unrestricted Stock = 1
Safety Stock -10
Order Reservation -1
When I execute MRP, a single PR is generated for 10 ( 9 for Safety Stock and 1 for Order Reservation). But I want 2 PRs (one for 9 and another for 1) to get generated. What settings would enable this to happen ?
Thanks.
Raj
Hi,
Thanks for your response.
In case referred, Safety Stock and Ord Res fall on the same date. I tried MTO with Plng Strat 20, but it still generates a single PR.
Moreover, Safety stock is set at MRP Area (SLoc) level for a Part.
Is there any workaround to generate 2 PRs otherwise ?
Raj
Similar Messages
-
Dear all,
The MRP run creates different procurement proposals like purchase order or planned order. I am doing MRP run in plant A for a finished material with SPK 40 (procurement from plant B). The MRP run is giving me purchase requisitions in plant A. In plant B I am getting the MRP element PRqRel (Release order for a stock transfer requisition) and planned orders for the same quantity. Is the MRP element PRqRel correct? If I want the system to propose the MRP element as TrnReq (Transfer requirements WMS) instead of PRqRel what can I do?
thanks and regards,
RaghuHi Raghu,
Raghu Ram wrote:
I understand that I am getting the correct requirement in terms of quantity. My question is about MRP elements. There are a lot of MRP elements available. Why the system is chosing only PRqRel as the MRP element. If I want the system to show another MRP element TrnReq in the place of PRqRel, what can I do?
What is the use of so many MRP elements?
TIA
Raghu
I have a similar query and requirment, I wants to understand the MRP Element TrnReq Functionality and when it comes means in which scenario?
Did you got any solution then? Can you please share?
Thanks
Ashwani -
Hi All:
Need help, any idea how to map these MRP elements to standard keyfigures in Pl. area 9ASNP02.
MR Reservation
QM Inspection lot for quality management
BB Subcontractor requirements of material provided
UR Stock transfer reservation
If these MRP elements dont map to any keyfig's, what are my options.
Thank you
MonoHi Harish/ Somnath:
As per Harish words I did created a new pl. area and new KF but I am having trouble when it comes to Keyfigure function allocated to this new KF since I cant use a give keyfigure function twice, I have this MRP element QM (Insp. lot for QM) which maps to ATP category BU (Inspection lot). If I am creating a new cat. grp for BU and mapping it to cust. KF which Keyfigure function would it map to, please advice.
Thank you
Mono -
MRP element direct procurement
Hi
For the FG used strategy 10 no special procurement key..MRP type:PD
For the RM MRP type PD, MRP4 view Ind/collective indicator 2 maintained.
After running MRP for rawmaterials Purchase requisation are creating with out consideraing the stock as "Direct procurement" MRP element.
I checked in OPPQ maintained indicator as 3.
What are the possible reasons. we dont want to create PR as per direct procuremet we want collective.
Regards,
srihari.MHi,
Check the BOM for the FG material if any SPK is maintained in BOM. IN MD04 put the cursor on PR generated and click on Pegged Requiremnt Button, this will give you the osurce from where the direct requirement has been generated and analyse further from that point.
Check and Revert,
Santosh Sarda -
Sale Order # - MRP element missing in MD04
Hi,
I created an SO with a material, for which planning was not done in MRP view. Later I changed the schedule line category from CN to CP in VA02. Then MRP run is carried out for that particular plant (1001) . IN MD04, i could able to get the details of that particular SO except the MRP element Data . SO # is missing.
Regards,Hi,
Sale order no. is missing., say 3820. All the details of this SO is furnished properly in line, but the SO # column is blank. And to give you an extra detail, all other SO # for this particular material is displaying in its corresponding column.
In my observation, if some changes (like changing the schedule line category, order reason), doing such changes effects in displaying the SO # in MD04.
Pl do help me to display it and could anyone pl tell me what will be the reason for this blank column.
Regards, -
In MD05 system show message "The MRP element no longer exist".
Hi Guru,
Need some help .
In MD04 transaction contain Purchase order, when I double click purchase order,It will get open . But when I open same purchase order in MD05 system show message u201CThe MRP element no longer exist".
Please help me , if any know the solution or any input. Open purchase order in system.
Regards
PNUPNU,
I don't believe this is the same Purchase order.
Review closely order number/item number/schedule number. I believe you will see that the old entry (MD05) no longer exists, and has been replaced with a similar item.
Best Regards,
DB49 -
Change Mrp Element Data of Production Order in MD04
Dear guru ,
In the mrp element data of the stock/requirement list for the production order I see the
Production order number , the order type , and the system add /RE if production order is released or
/PD if production order is partial delivered. No other information about others production order status.
How can I change mrp element data using Customizing or ABAP in order to recognize in MD04 if production order is confirmed or partial confirmed ?
Thanks.Dear Cris ,
I am not sure if CNF/PCNF will show up in the MRP Element data in MD04.I have checked PO which are also CNF/PCNF and i looked the same order in md04.It is not showing .U may need some ABAP help .
But if you really intersted to see the list PO status together , then go to COOIS and give plant , order type .It will give you all the order under that plant irrespective of material and also Status.U ave lot of option to filter the PO status under Status Profile or System status ok.
Hope this will fullfill your requirement
Reward point if useful
Regars
Jia -
Intra company STO- MRP element reservations
Dear All'
I request your help to resolve following issue.
I have created Intra company STOs based on different plant's requirements. say PO# 1, 2, 3...100.
The system is reserving available qty based on POs in sequence. When I process PO# 56 for example, when doing PGI in VL02N, the system is throwing error saying deficit of qty in stock.
But I can see stock as available in MMBE, but in mD04, mrp elements are created based on POs created earlier.
But business needs can be, I can process any PO first for delivery and PGI based on urgency.
Request you help in this regard.
Best Regards
RahulHi Maria,
Thanks for your quick reply.
I have checked ATP, that is not activated.
Best Regards
Rahul -
Dear all,
Where can we create MRP elements for ex BH for process order, we can check in MD04 but i want to know where they are created
Regards
VenkatVenkat,
If you are talking about creating a new type of MRP element, this generally cannot be done. I believe the only way implement a new element would be to modify all existing programs that manage this field.
I have never heard of 'BH' for process order, the standard MRP element for Process order has already been assigned to 'BR'.
There is a configuration where you are permitted to assign different text elements (human-readable names) to existing MRP elements OMD5.
Best regards,
DB49 -
How to get MRP elements - quantity received/required
Hi all
I have a report and I need it to show the quantity received/required for each material in a plant due to MRP execution.
Basically something like MD04 showing each MRP element entry (Deliv., OI-SL, Order, etc) but a sum of quantity received and required
Do anyone knows a function, bapi, or other that can helps calculate this?
Thanks in advanceHi,
Sometime ago I were asked to solve a similar problem.
Just try FM 'MD_ABBL_REPORTING', see if this FM meets your requirements.
Hope it helps!
Best regards,
Carlos Constantino. -
How to delete single MRP element line item
Hi gurus,
I need to delete a SINGLE line item for an MRP list for materials. Is there a transaction to do this?
I have tried MD08, but that only deletes whole lists. I am trying to clear out old elements that are years old in my list for a material.
I will reward useful answers
Thanks!Hi,
It's very difficult to say what to do since I cannot see what you see, and I do not know anything about your system.
In MRP there are: stock, requirements (IndReq, DepReq), transactional data (PO, SO, Delivery, PurRqs, etc)
1. What you should do is to define which materials are related in this issue.
2. Which kind of MRP elements are related (you have got old requirements, transactional data, etc?).
If you have old requirements you should find the source of them. DepReq cannot be deleted > they come from higher levels > you should find where they come.
Do they derive from old transactional data?
Do they come from higher and higher level, I mean there are IndReqs, SOs for FG?
(you can use 'pegged' function if you click on the MRP element)
If you know from which kind of source they come (only they come from old transactional data or from IndReq, SO) > you should eliminate them accordingly.
A. If they come from SO, IndReq you can use the steps written by me in my previous message. (You can use MD62 to delete old IndReq).
B.
If they come from old transactional data, you have to find the way to eliminate them. Maybe you cannot eliminate them by mass processing, I do not know.
But you canmake groups / categorize the transactional data > after that maybe you can use mass change / handle them accordingly.
I mean if you have SO and Delivery, you cannot delete the SO when Delivery refering to that SO exist.
So, in case of requirements please delete the requirements (IndReq, SO) that exist at highest level and running MRP you will get rid of a lot of mess (top > down). In case of transactional data the strategy is the opposite: bottom > up.
If you get error messages > double click on it and read what SAP says > if it's not clear search for the number of the error message on the forum.
Sorrowfully, I cannot help in case of HU, I do not know them.
BR
Csaba
Edited by: Csaba Szommer on Jul 23, 2008 10:54 PM
Edited by: Csaba Szommer on Jul 23, 2008 10:56 PM -
Hi Gurus,
We see planned orders in MD04 for a material. Please explain me how and when the system will convert this planned order to PR. The material is externally procured. please exaplain me about the MRP elements and and their relationship in MD04. I 'm new to MD04
Thanks
AnsuhaDear Anusha,
Once after running MRP either at the header material level or at the material level,the system creates planned order/purchase
requisition depending upon the MRP control parameter given for create Purchase requisition at the time of MRP run.
The planned order/purchase requisition is one of the MRP element that can be seen in MD04,which is one of the important
screen for a production scheduler/purchase dept.
Converting a purchase requisition into a purchase order or else a planned order into a purchase requisition depends on the
business decision.Either you can convert the purchase req into purchase orders via MD04 or else using ME21N.
Likewise MD14,MD15,MD16 can be used for converting a planned order into purchase req.
Also a background job can be scheduled using T Code ME59N to convert the pur.req into purchase orders.
Check and revert back.
Regards
Mangalraj.S -
Hi All,
I have a lot of open MRP elements in the system. They are since from 2000. The MRP elements are IndReq, DepReq, PchOrd, PurRqs, OrdRes, SubReq, Deliv, ConRel, PlOrd, Prdord, SchLne. So please tell how to close all the open MRP elements. All the materials will not be having all these MRP elements. Please tell me which MRP elements should be closed in decending order i.e. what should be the sequence.
Regards,
RameshHi Ramesh,
You need to analyze case by case basis as to which are linked & the impact of deleting them.
But what you can do is, run MRP with Planning mode as 3, this will remove all procurement proposals (planned order / purchase rqn) which are not firmed. Now you can analyze the ones which are firmed, i.e. if it has been created manually or edited manually.
The production orders, purchase orders, scheduling agreements needs to be analyzed & based on the confirmation from both operations & finance personnel in your firm, you may proceed to delete / close the same.
It would be better if you analyze them thoroughly & if you face a specific issue then revert.
If helpful award points
Regards,
Vivek -
Hi all,
can any one know me the mrp elements in md04
As we call Value stock at vendor as Subcst
To.quality inspection as QM-Lot
In transfer ( storage location) as Sloc st
and i want to know for Returns,in transfer (plant), unrestrected consignment,
blocked consignment,Rest.Consignment,consignment in inspection.quality inspection stock at vendor.
Thanks,
Narsimha Reddyi need the mrp elements i.e.in md04 transaction we can see the stock. if we click on stock we will find all the stocks dispalyed so where can we see that all mrp list elements.
-
Automatic PR'S to be created in system with MRP element
Sir,
Ply help me out how automatic PR'S will be created with the help of MRP element
regards
ameyHi,
PLease check this link with screen shots for MRP run which will create PR:
http://www.sap123.com/showthread.php?t=89
Regards
Ram
Maybe you are looking for
-
Converting Smartform into pdf in encrypted format
Hi All, I have a requirement to download smartform into pdf format. I have done this,but this pdf is editable with pdf editor tool. is there any way to encrypt pdf data and downloading it? I find some FM's in forum but those are used to encrypt and d
-
Need a Sigma zoom profile--Sigma DG 50-500mm 4.5-6.3 APO
Does anyone have this lens profile: Sigma DG 50 - 500 mm 4.5 - 6.3 APO or can Adobe create this for me? I take photos of birds, and I use the following: Canon 7D My lenses are: Sigma DC 18 - 250 3.5-6.3 HSM---I have this lens in Camera Raw
-
I've tried lowering the quality of the video and tried using different messaging apps (stock and hangouts) but every time I try to send a video message, I get an error, "Video is too large for MMS message." I've even tried to send a 2 second video a
-
Help! Where are my contacts & text messages after syncing new iPhone!
Hi anyone who can help! I've just had to replace my iPhone 3G which was faulty, and got my new one today without any problem. I did all the right things by syncing all my iPhone content last night with iTunes so that I could reload them onto the new
-
Guys i have a problem bit strange one can someone please help me out .....i have a sites in which i have pix firewall (515E). Now i have already 3 Vpns site to site established.......(without NAT) now i want to establish fourth VPN....now th eporblem