Propose Measuring point automatically in IW42

Hi,
I have assigned a measuring point as PRT to the operation of an Order. During confirmation in IW42, after entering the order number system proposes the operation details and I need to click button meas.points Inspn planning to display the measuring point assigned to the operation. But now my requirement is, system should propose the measuring point automatically, along with operation details, when I enter the order number in IW42 as user will forget to click button meas.points Inspn planning.
Could anybody suggest how this requirement can be met?
Thanks and regards,
Basavaraj

Hi James,
Thanks for your reply.
Yes, I have configured confirmation profile and same has been selected in IW42. I can see screen area for measurement document in IW42. Now my requirement is, I want the system to display the measuring point automatically, which is assigned to operation as PRT, when I enter the order number in IW42 ans press enter.
Thanks and regards,
Basavaraj.

Similar Messages

  • Attaching measurement point in task lists

    Hi experts
    Here we decided to go to measurment points (by valuation codes) rather than tassk lists for prev. maint. As like task list each speific measurment point has to trigger in order based on frequency required. Just user capture the valuation codes at measurment docs. then we cud see the results at IK17.
    But iam not finding the way to do , linking the task lists by prev. orders. can you suggest us

    Hi,
      If you are on ECC 6.0 with EHP4, Measurement points can actually be associated to operations as a PRT on task list or directly on the order. This functionality(Inspection rounds)  has been provided as part of Enterprise asset management continuous improvement under Enterprise Business function set. The measurement points are automatically proposed during the completion confirmation of the relevant operation.
    http://wbhelp.sap.com/ERP2005_EHP_04/helpdata/EN/48/689d3dd2613c87e10000000a42189c/frameset.htm
       if you are not at this level or not plan on getting there in the near future a custom or manual solution is your only option.
    Hope this helps.
    Narasimhan

  • Auto Update of measuring point/document

    Dear all,
    I have one issue over here.Measuring point/document is not updating automatically after productiuon order confirmation . I tried with following steps
    1) Created the equipment as test equipment -->created measuring point as a counter ---> maintain the usage value formula SAPF02 in the PRT tab . Unit of measurement for the characteristics and base unit of measure of material are same
    2) Then i have assigned this eqipment as a PRT in the routing of material .
    Which steps i am missing
    Thanks

    Hi
    I had faced the same problem  when I used SAPF02 then I did following changes.
    Created formula like SAP_09 * PRTSTD / SAP_08
    SAP_09 : Operation Qty
    PRTSTD : PRT Standard Value
    SAP_08:   Base Qty.
    Also make sure the measuring point category should me T in IK02( PRT life counter)
    Regards,
    Raj

  • Copy Measuring Point from 1 FL to other FL

    Hi,
    I need to copy the Measuring Point( General Data, Counter Data & Classfication) from 1 Func Location to another Func Location.
    Please suggest me...
    regards,
    Venkatesan Anandan

    HI,
       As suggest Pete, Plese go to IL01 and enter the referece functional location, then press enter
    once you press enter pop will appear  , where you select measuringpoint, class etc as required by you
    then automatically data will transfer to new functionallocation which u creted.
    regards
    Krishna

  • Measuring Points transfer to one total measuring point

    Hi everyone,
    We would like to transfer the values of different measuring points to one global (total) measuring points. I know that it is possible to transfer one value to n measuring points but I need the opposite.
    We habe a machine with different blades (exchangebale) and would like to summarize how many time the machine cut sheets in total.
    Is there a way to do this automatically?
    Thank you for your answers.
    Regards,
    Olivier

    Hello,
    Similar request in this thread:
    Issue in Transfer Counter Reading
    You would need custom functionality to read the various source counters then transfer the total to the main counter.
    -Paul

  • Measuring Point for Tools and Die Maintenance

    Dear All,
    I am trying to map the following process:-
    My client has 10 press machines and around 250 Dies for punching. Dies are assembled to press machines and they produce jobs by punching.
    Client has an Preventive Maintenance plan for each Die in terms of number of strokes punched by an Die. for e.g PM is done after every 300000, 600000, 900000, 1200000 strokes. Estimated life is 1200000.
    What they want is when production person confirms the production order say for 10000 jobs the counter of the die should increase by 10000.......and so on. When the counter reaches 300000 preventive maintenance call should be scheduled.
    What i have done is created an Die as an Equipment with PRT as equipment category. Created an measuring point for that Die, assined Usage formula etc.
    I have created an Maintenance plan for that die in which i have assigned the strategy (IP11) which contains the stroke cycles 300000, 600000.........etc.
    Assigned the Die as a PRT to the material which is to be produced in the Routing.
    When i confirm the production order the counter of the PRT increases which i can check IK13.
    What i am expecting is that in IP10 system should update the counter automatically so that when the counter reaches to 300000 maintenance call wil be scheduled and order will be generated.
    I would request you to please give me some input on this.
    Thanks and Regards,
    Rashmi

    Hello Rashmi;
    I have seen the screen shots & there are problems with the following:
    1) Counter overflow reading
    You have entered 130;  keep it as- 999999 (it is the reading after which system starts counting from 0 value)
    2) Formula that you have used;
    You have used the formula- SAPF02; do not use this. Create you own formula with following details: SAPF99 (new formula)  = SAP_20 * SAP_09
    3) You have manually entered the reading for the measuring point; do not use it. System will calculate the measurement reading from PRT usage value.
    CREATE a single measuring document with reading as '0'.
    4) Also in CA01; you need to assign this PRT in routing with "EQUIPMENT" & not material. Also make sure that in the same screen (assignment of PRT- basic data) maintain usage value as 1 (if this is not maintained, measuring doc. will NOT be updated).
    5) Now when you confirm the production order, based on number of units created; system will automatically create the measuring doc.
    If there is any problem with CA01, CO01 or CO11n; ask your PP consultant to assist.
    Do let me know if there is any problem in this.
    Regards
    Hemant

  • Measuring point/document is not updating

    Dear all,
    I am  new in PM. I have one issue over here.Measuring point/document is not updating automatically after production order confirmation via co11n . I tried with following steps
    1) Created the equipment as (P)Production resources/tools -->created measuring point as a counter ---> maintain the usage value formula SAPF02 in the PRT tab . Unit of measurement for the characteristics and base unit of measure of material are same
    2) Then i have assigned this equipment as a PRT in the routing of material .
    3) Production order confirmation via co11n  Each unit
    Which steps i am missing. if u give me steps by steps procedure to me for counter based maintenance, its helpful for me.
    STILL not answered and no reply.
    I am waiting for reply.
    Thanks
    tarun
    Edited by: tarun on Oct 5, 2010 5:06 PM

    Hello,
    Have look this thread [Re: Auto Update of measuring point/document;
    Regards,
    Rakesh

  • Measuring Point in Maintenance Plan

    How can I link a measuring point (not a counter) to the Maintenance Plan?
    Currently, I can only link a counter to a Maintenance Plan but not a measuring point.
    The reason why I am asking for this is that I would like to trigger automatic creation of a work order whenever a measurement reading for an equipment goes outside the specified upper and lower limit of a measuring point.  I would like to define a condition in the maintenance plan for this based on the measuring point say for example temperature.
    I believe activating userexit IMRC0001 is just part of the solution.  Is there something else that needs to be done?
    Thanks.
    Giscard

    I have already activated userexit.
    Is it correct that the userexit is triggered upon saving a measurement reading (tcode IK11)?
    Do you have sample code for the userexit so that a Notification or Work Order will automatically be created when the reading entered is outside the upper and lower limit?
    But my questions actually is this - Is possible to link a measurement point (not a counter) to a Maintenance Plan?

  • Measuring point-service order

    Hi,
    I am using measuring point for air compressor for filter replacement after 500 hrs.
    I want system to create service order automatically, once measuring point reaches 500 hrs.
    Can you please suggest how to proceed.
    Thanks and regards
    Karthik

    i am closing the thread

  • Upper Limit - Lower Limit in Measuring Points

    Dear PM Experts,
    In my company we have an Equipment where the temperature of it has to be maintained in a certain range. if the temperature falls out side the range the maintenance team has to attend. In SAP I registered this point as a measuring point. And I'm aware of the fact that we can maintain Upper and Lower Limits of reading for a measuring point in SAP.
    But I want SAP to automatically create a PM Notification/Order once the user enters a value out side the above specified range. I know that this is possible with conters when the reading reaches a certain value. But couldn't figure out a method for the latter.
    Please provide me a solution.
    Rgds
    Deepal

    Hello Deepal;
    You will have to activate exit: IMRC0003.
    Then you'll have to create a maintenance plan, maintaining the equipment & the measuring point. Based on the call object: order/ notification- system will automatically trigger the object when the actual reading falls outside the specified range.
    Hope this helps.
    Regards
    Hemant

  • Question about Measuring Point / Couter

    Dear PM Guru,
    While creating my Maintenance Plan with tcode -IP42 , there's counter automatically appear in the plan.
    I under this counter is from measuring point.
    I am confuse with the Counter in all this tcode IP41 , IP42 & IP01.
    My question are :
    Is this measuring point / counter master data or technical object ?
    Where's the relationship for counter in Maintenance plan ?
    Any impact the counter with the cycles used in the item line?
    What 's the different between IP01 vs IP41 vs IP42?
    Appreciate your input from any PM Guru.
    TQ

    Hi Venu,
    Thank for your reply.
    Understand that In Performance-based Maintenance Plan, SAP automatically links Counter to the Maintenance Plan.
    After my personal investigation , fully understand that only performance based maintenance plan are using counter. Normal Maintenance Order will not use counter as Master data.
    Example Performance Based Plans :
    When the measuring point counter reaches 3000 -1st  order should get generated
    2nd one at 6000, 3 rd one at 9000 etc...
    Or
    1. Single Cycle with counter -- Ex . Maintenance every 3000 hrs
    2. Strategy Cycle plans.. -- Ex. Maintenance every 3000 hrs and every 6000hrs
    3. Multiple Counter Plans..-- Ex Maintenance every 2month  or 1year..
    Process Flow.
    Create equipment with suitable measuring point (inc annual estimate) with Tcode IK01 create measuring point
    Create initial counter reading measurement document
    Create task list (optional for single-cycle plan)
    Create counter based maintenance plan
    Scheduling maintenance plan (IP10/IP30)
    Create measurement documents periodically
    Little Question to ask.
    1) Is this the SAP standard flow ?
    Please correct me if i am wrong.
    Thank you.

  • Plant Maintenance - Measuring Point Counter Replacement

    Dear Expert,
    I had created Measuring Point which is cumulative in nature and the Counter Overflow reading is 999999. Suppose the last reading was 999900. Now my today reading is 500 then system is showing total counter reading 10000400.
    My question is "how system will replace the counter reading as 401 automatically instead of 10000400". I don't want to replace the counter manually. Please guide me where i have to do configuration for this or what is best way to do it.
    Thanks & Regards
    Rajiv Ranjan

    Hi Thyagu,
    Thanks for your reply and valuable suggestion.
    My question is how the Total Counter Reading will become zero and start from zero when it overflow.
    For example :
    Lets Counter Over Flow Reading is 100
    total counter reading on 8th august is 90.
    on 9th august the difference is 40, then Counter reading become 30 and TotalCtrReading               is 130. I want TotalCtrReading should show 30 instead of 130. how to do it?
    Regards,
    Rajiv Ranjan

  • Measurement point addition

    Hi,
    Can we have measuring point which is result of addition of different measuring points ??
    I have a requirement in which there are four boilers, I will create four measuring points to track steam generation from individual boiler & fifth measuring point will be total steam generation from all four boiler, but addition should be done by system automatically and should also create measurement document.
    Also I would like to know weather standard report for analysis of measurement reading is available ?
    Thanks.
    Hitesh

    Hitesh,
      There is nothing in standard to accomplish the automatic generation of measurement doucment by adding existing documents.You will have to develop some custom functionality to generate the same.
      You should be able to use IK17 transaction to analyse the measurement readings.
    Regards
    Narasimhan

  • Functional location in Measuring Point and while creating M.plan or differe

    Hi,
    we found that functional location in Measuring point and M.plan functional location Measuring point are differrent, how to restrict that one ,we need automatically flow of functional location from measuring point to Maintenance plan.
    --Ganesh

    Hi,
    If you created the Measuring Point for the selected FL, then that measuring point will be populated automatically. If you have more than one measuring point, then you can select using Possible entries option.
    In this case, I think its not possible to restrict with configuration.
       IPRM0004 Maintenance plan / item: Customer check for time "SAVE"
    Use this user exit, while saving check for the functional location for the selected measuring point & give error message.
    Use tables IMPTT to get Object Number of FL. Use IFLOT to get the FL.
    Regards,
    Maheswaran.

  • Function Modules for creation of characteristics and Measurement Points

    Hello everybody
    I'm new in ABAP (trainee) and especially the use of characteristics. I'd be very happy if somebody could help me :).
    Can anybody out there with some experience in creating characteristics and measurement points tell me how to create them with function-modules or by changing database tables?
    I'm happy about every hint and ready to give some reward points.
    Best Regards,
    Steffen

    FM and TABLES
    http://72.14.235.104/search?q=cache:71IXBMWcX_8J:reflexcontracts.co.uk/SAP_R3_QUICK_REF.xlsupdatetable+tse05&hl=en&ct=clnk&cd=1&gl=in
    FUNCTION MODULES
    http://www.erpgenie.com/abap/functions.htm
    http://www.sapdevelopment.co.uk/fmodules/fmssap.htm
    http://www.erpgenie.com/abap/index.htm
    http://www.geocities.com/victorav15/sapr3/abapfun.html
    Rewards if useful..........................
    Minal

Maybe you are looking for

  • Statement Line Amount Is Not Within The Tolerance Range

    Hi. I have an issue with the CE autoreconciliation tolerances. Case. A RECEIPT statement line with $1244.89 with bank transaction type code (Journal ) cannot be automatically reconciled with a Debit available transaction $1244.90 due to this error. "

  • PLEASE let's use metadata to our advantage!!

    Ok...I right-click on an image in Bridge and select "File Info". The **FIRST** item on the first menu presented is "Document Title". Yet when I go to 'batch rename' the only 'EXIF metadata' options I'm presented with are: Date Time Digitized, Image U

  • Where i could customize Transaction/event type for movement type?

    I need to get table behind of "transaction/event" (mkpf-vgart) type for material movement... Ex. i have movement type 101, where i could check/get transaction/event type (mkpf-vgart) for it? I know that it is 'WE'  but where i could get link table be

  • PLease help i scrwed something

    Ok well i went to update and it said it had dependency problems so i unistalled libgnomecanvas and no i can abrely start any programs, only the couple in the ss will open and all the icons are just x's...  I'm running xfce and would like to get my de

  • Turn on Timecode overlay in Programmonitor

    Hi, I cant find any options on how to turn on the source timecode overlay for all the clips in my main sequence. I can see the source timecode fine when I double click clips in my project and they open up in the preview window. However I can only see