PRT- Maintenance Plan

Hi Experts,
Here is my Issue ,
We have Created Maintenance plan for PRT Equipment - for that Measuring point in counter over readg 500 pieces and Annual Estimate also 500 pieces .our Maintenance Package is every 200 cycle.BY confirming the production order exceeds the 200 pieces, the maintenance order also created by measuring document, in this juncture my doubt is , how to maintain the tool life and we wants the tool life is max of 500 pieces only , after exceeding the production order qty 500 pieces , the system will not allow to make production order confermation for that PRT Equipment, what is the settings for that,?
For Example a Planner m/c is Created by M- categary ( plant maintenance) , but the tool in which is used in planner m/c can be created  P- categary ( PRT) .       is it Right?
Tool -life only for 500 pieces , in that how to set for Mainetanacec package? instead of 200 pieces,can we assign 500 pieces?
ok If we set 500 in M.package  , mainetance plan will be created and say tool  is to be replaced, based on the plan we replace the tool and we instal new tool for the planner m/c. now can we create new PRT equipmnet- tool , for the planner m/c ? , For the new TOOL -PRT equipment , can we create new plan for that ? is it Right means what about old plan?
With  Regards
SM.Charles Edwin

HI
sam,
As per ur requirment My understadnding is wirtten here-
1. First off, Creat all Tools as PRT Equipment... because in this way only u can generate maintenance plan for them and can perform maintenance.
2. For track of PRT Usage or Life u have to define a Measuring Point in PRT (Equipment). Whenever production order get confirm a measuring doucment will be posted...
in the Measuring point u can see last entered measurement reading that will reflect usage of PRT.
3. U have to assign a Maintenance Plan in PRT ( Equipment)
    When PRT Usage exeeds certain level..(after confirmation of production order) Maintenace call object would be generated and subsequent maintenance can be carried out.
4. Besides all these we can not block usage of PRT in Production order.
5. PRT Must be assigned in Routing ..other wise it won;t work.
6. so prequesties for PRT Usage and Maintenance is
create Measuring point and a Performance Based Maintenance Plan. and assign it in PRT(Equipment).
7. in this case don't create PRT as a Material.
If Still in Doubt please ask.
Regards,
Amit kushwaha

Similar Messages

  • How do I create Notifications automatically from Maintenance plans

    Hi folks
    I have a new requirement from a client.
    They would like some of their Maintenance plans to automatically create Notifications which can later be converted to maintenance orders.
    Please let me know what configuration chnages i need to carry out.
    Thanks, Felix

    HI
    goto SPRO>Plant Maintenance and Customer Service>Maintenance Plans, Work Centers, Task Lists and PRTs>Maintenance Plans>Set Maintenance Plan Categories-->
    new entries , enter PM notification slect call object as 2 notification and ref obj100 or copy existing from NC.
    tehn at the time of creating plan IP42, slect this and yu get option to enter the notification tyrpa nd other deatisl
    -ashok

  • Maintenance Item assignment to a Maintenance Plan

    Dear Expert,
    we need some help about the following scenario.
    Currently we are working on preventive maintenance in SAP ECC 6.0 system. We have created several maintenance items without assignment to maintenance plans in order to use them like models: to make quickly the creation of a maintenance plan our users can choose the suitable maintenance item from a range.
    In these items we have inserted only strategy and maintenance task list but we have not insert the technical object.
    We carry out the following steps:
    1. we run transaction IP42;
    2. we insert the maintenance category and the strategy;
    3. in the tab "Item" we press the button "Assign more items";
    4. system runs report RIMPOS00 (Display Maintenance Item: Selection Criteria) in order to select the item to insert in the maintenance plan. In this screen the followin fields are locked (we can not change them):
    - "Maint. plan cat.";
    - "Maintenance strategy";
    - "MaintPlan assignment" and the radio botton is set on "without".
    In this way if a maintenance item has been already assigned to a maintenance plan users can not select it for the current plan.
    In your opinion could we open the radio buttons for the field "MaintPlan assignment" ? Could anyone help us ?
    Thank you very much for your help.
    Kind regards.

    Hi,
    Pl.try following path in SPRO,
    Plant Maintenance and Customer Service..Maintenance Plans, Work Centers, Task Lists and PRTs..
    Maintenance Plans..Set List Editing for Maintenance Items
    After clicking on Execute button u will get a pop up " Customising list editing "Double click on selection do the changes & save.
    It will work i think.
    Pl.try.
    Regards,
    Amit

  • Table for maintenance plan and maintenance cycle and Unit

    Hello,
    I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
    I know that we can get the maintenance cycle and unit from MMPT table.
    Question 1
    If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
    Question 2
    Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
    Regards,
    Narendra

    Hi,
    Please review PM tables
    PM/SM/SD Tables
    MPOS                       Maintenance Items
    AFAB     Network - Relationships
    PLKO     Task list
    PLAS
    AFFH     Operations
    PRT assignment data for the work order
    AFFL     Work order sequence
    AFFT     Order process instructions
    AFFV     Order process instruction values
    AFFW     Goods movements with errors from confirmations
    AFIH     Maintenance order header
    AFKO     Order header data PP orders
    AFPO     Order item
    AFRC     Table of planned changes to conf.: Automatic goods receipt
    AFRD     Default values for collective confirmation
    AFRH     Header information for confirmation pool
    AFRU     Order completion confirmations
    AFRV     Pool of confirmations
    AFVC     Operation within an order
    AFVU     DB structure of the user fields of the operation
    AFVV     DB structure of the quantities/dates/values in the operation
    MPOS     Maintenance ITEM
    AFWI     Subsequently posted goods movements for confirmations
    AUFK     Order master data
    AUFM     Goods movement for order
    MPLA     Maintenance Plans
    BGMK     Master warranty header
    BGMP     Master warranty item
    BGMS     Text item master warranty
    BGMT     Master warranty text
    BGMZ     Warranty counter information
    CRHD     Work Center Header
    CRTX     Text for the Work Center or Production Resource/Tool
    EQKT     Equipment short texts
    EQST     Equipment link to BOM
    EQUI     Equipment master data
    EQUZ     Equipment time segment
    HIKO     Order master data history
    IFLO     Functional Location (View)
    IFLOT     Functional location (TABLE)
    IFLOTX     Functional location: Short texts
    IHGNS     Plant maintenance permit segment
    IHPA     Plant Maintenance: Partners
    IHSG     Object-related permits in Plant Maintenance
    ILOA     PM object location and account assignment
    IMPTT     Measuring point (table)
    IMRG     Measurement document
    KAKO     Capacity Header Segment
    KONP     Conditions (Item)
    KONV     Conditions (Procedure Data)
    OBJK     Plant Maintenance Object List
    QMEL     Quality notification
    QMFE     Quality notification - items
    QMIH     Quality message - maintenance data excerpt
    QMMA     Quality notification - activities
    QMSM     Notification - Tasks
    QMUR     Quality notification - causes
    STPOA     Name is does not have an A at the end; BOM items
    T001     Company Codes
    T001L     Storage Locations
    T001W     Plants
    T077D     Customer account groups
    T003O     Order Types
    T352R     Maintenance revisions
    T353I_T     Maintenance activity type description
    T356     Priorities
    T357G     Permits
    T357G_T     Table 357G texts
    T370A     Activity category for PM lists
    TINCT     Customers: Incoterms: Texts
    TVKO     Organizational Unit: Sales Organizations
    TVKOS     Organizational Unit: Divisions per Sales Organization
    TVKOV     Org. Unit: Distribution Channels per Sales Organization
    TVTA     Organizational Unit: Sales Area(s)
    VIAUFKST     Order selection view
    MMPT Cycle detail
    Regards
    Carlos

  • Copy GOS attachment from maintenance plan to order

    Hello,
    we use maintenance plans to create maintenance orders.
    The idea is to attach checklists and other documents (excel, word, pdf) to the maintenance plan and this should be copied to each maintenance order. We attach att the moment this documents using GOS.
    Is there a standard way to copy document attachments from plan to order?
    Or has one of you realized a solution for this requirement?
    Thanks a lot.
    Kind regards
    Manfred

    Hi,
    PRT is Production Resources / Tools.
    PRT can be an equipment or a material or document or even a free text.
    Simply, it is an object/item that is required to carry a particular application.
    There are other benefits os PRT as well.
    Comprehensive documentation is available online.
    You can attach a document as a PRT by:
    1. Select the task list operation & click on PRT push button below operation list.
    2. On PRT selection dialog box, select "Document" push button.
    3. You will get relevant fields for selecting a document from DMS.
    4. Select your document & save.
    Regards,
    Vijay

  • In process inspection related with PRT maintenance

    Hello SAP QM gurus,
    I have one issue of In process inspection related with maintenance of PRT. The detail is as follows.
    I have an inspection plan for SFG (Semi Finished Goods) with 15 parameters to check. For production of this SFG material we are using a Production Resource Tool (PRT). After 2000 pieces of SFG production the PRT is to be taken out for maintenance. I have maintenance plan for this PRT and system gives me maintenance order after every 2000 pieces of SFG production.
    My client wants to check the 15 parameters of SFG just before and after of PRT maintenance. After the PRT maintenance and when the production is OK then for every next lot client wants to check only 3 critical parameters and to skip remaining 12 parameters. How to map this scenario?
    Will the DMR (Dynamic Modification Rule) be effective in this case, or else any workaround ?
    Please guide.
    Sanjay

    Dear QM gurus,
    One correction in my thread,
    15 parameters to check SFG is in routing of SFG and not the inspection plan.
    Please guide me.
    -- Sanjay

  • "Value cannot be null" error when trying to edit or create Maintenance Plan in SQL Server 2008

    I have SQL Server 2008 installed on Windows Server 2008 64bit, every time I try to open or create a new Maintenance Plan I receive the error:
    Value cannot be null.
    Parameter name: component (System.Design)
    Program Location:
       at System.ComponentModel.Design.DesignerHost.System.ComponentModel.Design.IDesignerHost.GetDesigner(IComponent component)
       at Microsoft.DataTransformationServices.VsIntegration.DtsDesignerService.OpenDesigner(String connectionString, Object connection, String objectUrn)
       at Microsoft.SqlServer.Management.DatabaseMaintenance.MaintDesignerMenuHandler.Invoke()
    And in the Design view screen
    "Microsoft SQL Server Management Studio is unable to load this document: Could not load type 'Microsoft.SqlServer.Dts.runtime.Wrapper.IDTSPackageSigning100' from assembly 'Microsoft.SqlServer.DTSRunTimeWrap, Version=10.0.0.0, Culture=neutral'. 
    I have searched for a possible solution and have tried some suggestions of registering the msxml6.dll but and have installed VS2008 SP1 but I'm not in a position where I can do a full reinstall of SQL Server right now. Any help is appreciated. My SQL server
    environment information is below. 
    Microsoft SQL Server Management Studio
    10.0.1600.22 ((SQL_PreRelease).080709-1414 )
    Microsoft Analysis Services Client Tools
    2007.0100.1600.022 ((SQL_PreRelease).080709-1414 )
    Microsoft Data Access Components (MDAC)
    6.0.6002.18005 (lh_sp2rtm.090410-1830)
    Microsoft MSXML 3.0 4.0 5.0 6.0 
    Microsoft Internet Explorer 8.0.6001.18943
    Microsoft .NET Framework 2.0.50727.4206
    Operating System 6.0.6002

    I digged a little deeper and figured out it was a missing directory/file in %TEMP%. Seems some CleaningTool removes all files/directories in %Temp% and after that SSMS was not working any longer. The missing file is actually not needed, but the
    missing directory causes the "Value cannot be null" error.
    My missing file name was:
    C:\Users\<username>\AppData\Local\Temp\2\6vvdaozf.tmp
    But the file name changes on every startup.
    So my missing directory name was:
    C:\Users\<username>\AppData\Local\Temp\2
    After creating a empty directory with the name "2" in %TEMP% all went back to work fine for me.
    I'm not sure the directory name is every time the same, but you can discover your missing file with the process monitor from Sysinternal Tools and filters to "Process Name is ssms.exe" and "Path contains AppData\Local\Temp"
    Hope this helps other people to solve their issues too.
    Thank you!! When I run %temp% it takes me to "C:\Users\Admin ...~\AppData\Local\Temp\some random number". At first the random number was 3, after I logged off and back on it was 2. My temp variable in enviromental variables is correct. I looked on another machine
    running SQL2008 and temp is correct there. If I try to rename the numbered folder SSMS stops working. Any idea?

  • Work Order - Maintenance Planning plant change

    Hi Gurus,
    Is there any way to change the maintenance planning plant in a created work order? We are having an issue on work orders and we need to tranfer our open work orders to another plants to solved the issue. Please me let me know if this is possible to do in SAP. And let me know how to do it in SAP.
    Thanks in advance,

    Hi,
    The start of the plan is not option as this will surely have an impact. Anyway, work around for this issue was provided and this is OK now. We will continue with the old orders untill such time they will finally be closed. No postings will be created against this old orders and if there's a need to do GR new orders will be created in new plants for the postings.
    Thanks for you help,

  • No maintenance plan has been confirmed for Order 000004024181; Follow-up ca

    Hi
    I try to close a list of preventive order (initiated by maintenance plan) from the transaction IW38 but the system displays the following error message
    "No maintenance plan has been confirmed for Order 000004024181; Follow-up call exists
    Message no. IW597"
    thank you for your help

    Hi,
    You mean close -
    >TECO???
    If yes Go in IW38 select all orders  ,click Enviroment Tab and you can do the TECO but that order should not have Open reservation.
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Aug 26, 2010 1:02 PM

  • Certain Maintenance Plan not getting scheduled in the background job

    Hi Gurus,
    I am facing an issue here.
    A weekly background job (RISTRA20) runs every weekend and schedules the maintenance plans.
    But we have noticed that some maintenance plans are not getting scheduled. i.e no orders or schedule is getting generated.
    When I run IP30 manually for these plans then the schedule gets generated and orders get called.
    I have checked up the background job and it is running fine.
    Also, i have noticed a similarity in all these plans which are not getting scheduled. There schedule has been restarted (through IP10) at somepoint or the other.
    But i don't see any direct impact of this?
    Can any of you provide some help on this?? Points will be rewarded.
    Thanks and regards,
    Nitin Saini

    Hi Narender,
    Thanks for replying.
    The message number for 'Groups don't match' is ME303.
    I think this does not have anything to do with the restart as i have done further investigation.
    Whenever I run IP30 with sortfield input as AS02*, i get the error as mentioned above for a certain number of maintenance plans while the remaining plans get scheduled.
    If i run IP30 for any other sort fields, it runs fine and i don't encounter the error
    mentioned above.
    If you send me ur email address, i could forward you screen-shots of the issue.

  • Maintance jobs with Maintenance plans - troubleshooting

    Some of our old servers have maintenance jobs created with inbuilt mainteance plans. We find difficulty in troubleshooting these kind of jobs when it fails. Can anyone shed a detailed analysis of how to troubleshoot these jobs which are created with maintenance
    plan like where to look, any system table/view that could help etc. The job history gives very minimal details and often result in cropped off messages.
    I was told that if we alter the maintenace plans associated with the jobs and save it. It will break the job, is it so?

    For SQL server 2000
    You can check the failure logs either from jobs or Maintenance plan history
    In enterprise manager, expand the server group
    Expand the management folder and select the database maintenance plans
    Right click the maintenance plan that failed and select the Maintenance plan history
    Check for the failure occurred and double click the failed row to see more details or on failure
    Similarly from SQL server 2005 onwards maintenance plan history, you can check from maintenance plan
    In SSMS, connect to SQL instance
    Expand the Management folder and select the maintenance plans
    Select the maintenance plan and click on maintenance plan history and check for the failure
    Please click the Mark as answer button and vote as helpful if this reply solves your problem

  • Reversal of a maint. order which was released through a maintenance plan?

    Hi All,
    Is there a way to do reversal of a maintenance order that was released through a maintenance plan?
    Because I do not want to process the order; as such I would like to put a reversal indicator for that order and go ahead with the next order that was called through a maintenance plan.
    If YES, kindly let me know how to do it?
    Many thanks in advance.
    Kannan J

    Hi Thyagarajan, Thanks for the response!
    When I want to skip the maintenance call object that was generated through a plan, the system gives me the following message.
    "CALL CAN NO LONGER BE SKIPPED"
    When I press for further help, system gives me the following message:
    "Call can no longer be skipped
    Message no. IP405
    Diagnosis
    You have tried to skip a date that has already been called.
    System Response
    Since maintenance call objects, for example, maintenance orders, already exist for the dates that have been called, you can no longer skip a date within the scheduling process.
    Procedure
    If you do not want to perform the maintenance call objects due on that date, you must reverse the orders that have been called.
    You can select the maintenance call objects that have been called using the list editing functions in maintenance processing."
    Which means there should be a way to reverse the order, isn't it?
    May be with this message you may be able to throw some help on this.
    Many thanks in advance
    Kannan J

  • Unable to edit maintenance plan Sql Server 2008R2

    Hi All,
    I am unable to edit sql server maintenance plan and it is failing continuously from job as well.When I try to open the same the throws an error:
    Microsoft SQL Server Management Studio is unable to load this document.:
    Error loading from XML. No further detailed error information can be supplied for this problem because no Event objects was passed where detailed error information can be stored. It used to work pretty well in the past.Throws same error when I try to connect
    remotely.
    Regards
    Rahul

    Has the MP been developed in SQL Server 2008r2 as well?
    Best Regards,Uri Dimant SQL Server MVP,
    http://sqlblog.com/blogs/uri_dimant/
    MS SQL optimization: MS SQL Development and Optimization
    MS SQL Consulting:
    Large scale of database and data cleansing
    Remote DBA Services:
    Improves MS SQL Database Performance
    SQL Server Integration Services:
    Business Intelligence

  • BAPI for Maintenance Plan Scheduling with EHP5

    Hello.
    In documentation for LOG_EAM_CI_4 mentioned that: [API functions have been developed for the scheduling of maintenance plans. These APIs provide the same functions as transaction IP10: the creation of maintenance calls or the changing of existing maintenance calls|http://help.sap.com/erp2005_ehp_05/helpdata/EN/33/46AC67364447A3BA2F4EFA65B8C014/frameset.htm].
    We have activated EHP5 and all LOG_EAM_CI* business functions in our system, but still can't find this "magic" BAPI.
    Does anybody know its name?
    BR,
    Pavel
    Edited by: Pavel Nedvijaev on Nov 7, 2011 5:37 PM

    Maheswaran.K thanks for your reply, but as i wrote above we have activated all LOG_EAM_CI* including LOG_EAM_CI_3.
    Version of software components SAP_APPL, EA-APPL is 605 as it needed.

  • Update was terminated error while scheduling maintenance plan

    HI Friends,
    I created a maintenance plan.I scheduled the order and i saved.
    Now when i tried to see the schedule i am getting a message
    "Update was terminated"
    the detailed error is
    Update was terminated
    System ID....   DEV
    Client.......   XXX
    User.....   XXXXX
    Transaction..   IP10
    Update key...   49041E2C02935CCCE10000000AFA0209
    Generated....   30.10.2008, 17:22:18
    Completed....   30.10.2008, 17:22:19
    Error Info...   00 671: ABAP/4 processor: SAPSQL_ARRAY_INSERT_DUPREC
    Can anyone tell me why this error is coming and how to rectify.
    Thanks in advance
    Vivek
    Edited by: vivek mankad on Oct 30, 2008 1:38 PM

    Vivek,
    Talk to your ABAP/Basis team
    PeteA

Maybe you are looking for

  • Instance takes a long time to be actioned

    Hi, We are currently migrating to 10g from 5.7. We found that some automatic activities (which usually takes seconds to process) are taking a long time to be processed. Some can take up to 5 hours. When we look at the Audit Trail, we can see the foll

  • RFC Error while running the extended fiori application

    Hi experts,             When i run extended fiori application in fiori launchpad i am getting 500 internal server error in the console. When i run the transaction in the NGW with t-code /IWFND/ERROR_LOG i am getting error as shown in the snapshot. pl

  • Using Safari 5.1.7, I found a book on a web site that is free and downloadable, but when I click Save As, the Save button is grayed out.

    Today (1/11/13) I found an online book, a .pdf file ( a math book from the Univ. of MI) that is advertised as free and downloadable. However, when in Safari I click on File/Save As, the window that opens has the Save button grayed out. The window ope

  • Portuguese char set.

    Hello All, I have discuss my problem in a thread,character set AL32UTF8; ,but still missing few things, so decided to post it here, i will explain my problem again here. I have database oracle 10gr2 and have performed following test. SQL> insert into

  • I Have Accidentally Put My System Folder In The Trash...

    Hello, One day i was cleaning up my harddrive when i think i may have accidentally dragged my system folder to the trash can. At which point i shut down the computer. Now i went to restart the computer and a panic screen pops up and i cannot load int