PRT - Updation of Mea.Doc. in REM Process

Experts
I want the measurement document to be updated automatically when a production order is confirmed.
I tried this by creating an equipment as a PRT attaching measurement point (counter) to it and a plan. The measurement document was updated when i confirm my production order. But this process was in Discreet Manufacturing.
When I tried to do the same in REM process, measurement documents are not updated.
Any suggestions ?
Venkat.
Duplicate [thread|REM - PRT ?;, this one being locked
-Paul
Edited by: Paul Meehan on Nov 23, 2009 9:19 AM

Hello Mahesh,
Thanks for your reply.
Your suggestion was valid if we were working with single step stock transfer process.
But as stated in the question , we are working with two stage process.
Here the stock determination button itself is not appearing on the SAP screen in MF60.
So I think your answer is not right Or may be let me know how
to bring the stock determination button on the SAP screen when you are creating the reservation.
Waiting for your reply.
Regards
Ravindra Deokule

Similar Messages

  • Goods issue in REM process

    hi sir,
    I am new to SAP, so plz guide me.
    in Paper industry this is the actual
    Business Process:
    In  papers industry  they have different varieties of paper production in which they are characterized by the GSM (thickness), sizes  and  grades. These characteristics are not given by customer, they are pre-defined and are fixed i.e based on the available variety of paper that is produced in paper  mill the customer makes the order for sheets or reels(FG). The different customer makes the order for different grades and GSM of paper. In 7th day of  every month they compile the orders in order to get the net quantity of paper quality type  to be produced and based on that the production is done. Remaining materials like pulp, power, steam, water treatment production are continuously takes place without any reference to the FG(paper) to be produced. There is fixed production lines.
    Eg:
    A,B, C are the grades of paper.  If for A-10MT,5MT,15MT are the orders and for B-4MT,2MT similarly for C-15MT,20MT are the orders. Then totally for A-20MT, B-6MT and for C-35MT planned to produce in a month.
    Note: If the customer needs the new variety or changes in the paper variety that is already available then R & D is made on that variety and a new name is given to it.
    Hence, this is Make To Stock  with Repetitive manufacturing process.  Is this process is right??
    As per SAP best practices in repetitive process scenario, there will wont be conversion of planned order to production/process order, based on planned order the production takes place and then we will do the Operative backflushing.
    Here, the client requirement is on what basis the goods issue has to be done for production?? as there will be no production/process orders.

    Hi,
    REM process has been developed by SAP for less complicated scenarios. I mean where product varieties are less and process is less complex.
    That is the reason there is no concept of order. Cost is getting captured on the product cost collector lever rather individual order level(In discrete).
    Goods issue is on planned order which is of PE type (Once order is LA type you can assign the material to planning table. Then it will be PE)
    GI happen through back flush.
    Please refer the above links for better idea.
    Regards,
    Krishnendu.

  • Mass updation of Priority field in the process order header screen

    Hi Friends,
    Can any body knows on how to do mass update the Priority field in the process orders after release.(with out upload using BDC).
    or can we update the priority field in process order during mass release of process orders using  T- code: COHVPI?
    Is there any standard transaction? else please tell me the solution if there is any other way of doing this task.
    thanks&regards,
    Purna

    Purnachander,
    Your requirement can not be fullfilled with any standard transaction.
    BDC is best suitable option.
    Hope this helps you.
    SmanS

  • Airport Ver 7.4.1 will not update firmware.  Goes throught the process, reboots with the same firmware version.  Power cycled the airport, did not help

    Airport Ver 7.4.1 will not update firmware.  Goes throught the process, reboots with the same firmware version.  Power cycled the airport, did not help.

    Please see the answer to your other post.

  • HT5278 update will download but will not process

    I am trying to update my iPhone and the software will update, but when it goes to process, it tells me to check my settings and that the system timed out.  Any ideas how to problem solve?

    This usually means a corrupted OS X installation, so I would try reinstalling OS X:
    Reinstalling Lion/Mountain Lion Without Erasing the Drive
    Boot to the Recovery HD: Restart the computer and after the chime press and hold down the COMMAND and R keys until the menu screen appears. Alternatively, restart the computer and after the chime press and hold down the OPTION key until the boot manager screen appears. Select the Recovery HD and click on the downward pointing arrow button.
    Repair the Hard Drive and Permissions: Upon startup select Disk Utility from the main menu. Repair the Hard Drive and Permissions as follows.
    When the recovery menu appears select Disk Utility. After DU loads select your hard drive entry (mfgr.'s ID and drive size) from the the left side list.  In the DU status area you will see an entry for the S.M.A.R.T. status of the hard drive.  If it does not say "Verified" then the hard drive is failing or failed. (SMART status is not reported on external Firewire or USB drives.) If the drive is "Verified" then select your OS X volume from the list on the left (sub-entry below the drive entry,) click on the First Aid tab, then click on the Repair Disk button. If DU reports any errors that have been fixed, then re-run Repair Disk until no errors are reported. If no errors are reported click on the Repair Permissions button. Wait until the operation completes, then quit DU and return to the main menu.
    Reinstall Lion/Mountain Lion: Select Reinstall Lion/Mountain Lion and click on the Continue button.
    Note: You will need an active Internet connection. I suggest using Ethernet if possible because it is three times faster than wireless.
    Try the  updates after you have reinstalled OS X.

  • How to update the payload of a BPEL process instance

    Hi I have another question.
    How do I update the payload of a BPEL process instance without the activity being a Human Task. I know there are ton's of example showing how to update the payload of a user task using BPEL API's. But in my case I need to update the payload of a BPEL process instance which has no human task.

    Thanks
    For confirming that the payload in the BPEL process instance is read-only. Now I can see what alternatives I come up with besides the DB save option.
    Guys if you can take the time to answer/comment on another question I have posted in this forum that will be great
    here is the link
    Multi step Human Task
    Regards,
    Jayesh Nazre
    MCSD, MCSE, SCJP, PMP

  • How to update my app Docs to go with my new ID and new password. I forgot my hold password and I don't have my old e mail adress

    how can I update my application Docs To Go with my new ID and new password? I forgot my old password and don't have my old e-mail adress. When I answer the question about my age it says that it is not the right date!!!!

    Hi Guys,
    I've sorted it  
    All I needed to do was add my old e-mail address - not as the primary but as an alias. This allowed me to delete the account on my iPhone 4S and re-sign in with the correct e-mail address.
    Happy now  

  • HT5654 Tried updating my iPad wirelessly today. Process seemed to have gotten stuck and later wi fi crashed. Restarted iPad and got a picture of a wire leading to iTunes icon on the iPad screen. Nothing happens even when connecte it to my Windows PC. iTun

    Tried updating my iPad wirelessly today. Process seemed to have gotten stuck and later wi fi crashed (in that order, I believe). Restarted iPad and got a picture of a wire leading to iTunes icon on the iPad screen. Nothing happens even when connected it to my Windows 8.1 PC, and iTunes doesn't seem to recognize the iPad.

    Hello there, uromr.
    The following Knowledge Base article provides some great troubleshooting steps for the issue you're having:
    iOS: Device not recognized in iTunes for Windows
    http://support.apple.com/kb/ts1538
    If once the iPad is recognized, you still see the Connect to iTunes Screen, then this article provides some additional steps for updating your device:
    If you can't update or restore your iOS device
    http://support.apple.com/kb/ht1808
    Thanks for reaching out to Apple Support Communities.
    Cheers,
    Pedro.

  • HT4972 I have an IPAD 2 ios verison 4.3.3.  I am trying to update my ios to current version.  I dont get the option from Settings General for a software update.  How do i complete process?

    I have an IPAD 2 ios verison 4.3.3.  I am trying to update my ios to current version.  I dont get the option from Settings>General for a software update.  How do i complete process?

    If you are using iOS 4 (or earlier) there is no Software Update in Settings. That feature was first added in iOS 5.
    To update you will have to connect your iPad to iTunes on a computer (preferably the one you sync with and backup to).
    See here: http://support.apple.com/kb/HT4972

  • If i update from 10.6.8 to mavericks on one long in and say i have two longins, will it update both or just the one, and will it delete any saved docs in the process regaurdless

    little unsure with all this so i might be typing it in a few extra spots
    If i update from version 10.6.8 to mavericks on one user login will it update both if i have two logins on the mac. and if it does update both logins on the mac will it delete any documents saved on either of the logins.
    please and thank you could really use the feed back and support and it would be much appreciated.

    Upgrading the OS is a system wide thing. So all users will receive the upgrade.
    It should not delete files and such. However, if you have for example files made with Pages '09. Then the new Pages that comes with Mavericks will make a copy of those files so you can continue to edit them. But those new files can not be opened in Pages '09. BUT again, some people perfer Pages '09 and they use that still. Mavericks will just hide Pages '09, it's still usable in Mavericks just hidden.
    To be safe, make a back up of your system before doing any major upgrade.
    KOT

  • 9.4.2 update: Merge word docs into pdf BROKEN

    While I am not experiencing the printer problems a lot of users are complaining about after the (so called) "update" to 9.4.2, another (for me) essential function is broken.
    When I try to merge a couple of supported files into one pdf, the process will always stall at the very first non pdf file (e.g. a Word doc). This never happend before the update. This behavior has been reproducable on three machines. Is there any workaround / WHEN will Adobe react and remove or update this buggy patch pack?

    hi there, thanks for the help!
    My OS: Win 7, 64bit, all updates (checked today=
    Office 2010, all updates.
    Process: Acrobat -> merge into single file.
    Merge of "pdf only" files is running smoothly.
    However when there is any word file, there is a halt.
    When the first word doc is processed, Word is starting and prompting me for a file name. After that Acrobat status progress "Converting" this file, but never continues with the next file. The merging dialog stays open but never progress.... no error is displayed.
    This behavior was reproduced on 4 (!) machines! When trying to reproduce this make sure the word file is not the last one to be merged....
    I also tried a installation repair (did not help).
    Thanks for your advice....

  • Updating a XML document with a processing instruction

    Greetings Guru's
    I have a fully functional XML database solution for our new system. The only thing left is for me to update a xml document in the database with a processing instruction to find the style sheet (JAXB strips it out when the XML must go back into the database).
    I can update complete nodes and node elements in the xml document using updateXML in a regular update statement, but I do not know how to add the following processing instruction to my documents.
    <?xml-stylesheet type="text/xsl" href="/RASWEB/JIT_REPORT.xslt"?>
    [pre]
    Thanks in advance
    Derrick                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

    SQL> var xmltext varchar2(4000)
    SQL> --
    SQL> begin
      2    :xmlText := '<Hello>World</Hello>';
      3  end;
      4  /
    PL/SQL procedure successfully completed.
    SQL> drop table t
      2  /
    drop table t
    ERROR at line 1:
    ORA-00942: table or view does not exist
    SQL> create table t of xmltype
      2  /
    Table created.
    SQL> set long 10000
    SQL> --
    SQL> insert into t values (xmltype(:xmltext))
      2  /
    1 row created.
    SQL> select *
      2    from t
      3  /
    SYS_NC_ROWINFO$
    <Hello>World</Hello>
    SQL> update t set object_value = updateXML
      2                              (
      3                                object_value,
      4                                '/',
      5                                xmlconcat
      6                                (
      7                                  xmlpi("xml-stylesheet",'type="text/xsl" href="/RASWEB/JIT_REPORT.xslt"'),
      8                                  object_value
      9                                )
    10                              )
    11  /
    1 row updated.
    SQL> select * from t
      2  /
    SYS_NC_ROWINFO$
    <?xml-stylesheet type="text/xsl" href="/RASWEB/JIT_REPORT.xslt"?>
    <Hello>World</Hello>
    SQL>

  • REM process flow for food manufacturing.

    Hallo,
    I want to know what is the process flow in SAP REM  for food manufacturing compony?
    Thx
    Nikam.D.A

    Dear Dev,
    Check these links for the REM flow along with the T Codes,
    Repetitive Manufacturing
    REM Cycle..........
    Regards
    Mangalraj.S

  • Updating accrual value via extended rebate processing

    We have a requirement to use scaling conditions for a customer's rebates.
    Scaling will be used to accrue against billing documents.
    The rebate will be reviewed weekly, and there will be weekly settlement. This I believe is standard and simple to achieve.
    The one issue I can see with the client's requirements is that, during the weekly settlement process, the client requires the settlement not to post a credit entry to the customer but to just update the accrual postings.
    Example.
    Scale 1 - 1% rebate on first 100k of turnover per week.
              2 - 2% rebate on turnover upto 250k per week.
    So if a customer buys 101k in a week, the accrual would be 1.02k as standard. However the client wants the rebate to be adjusted to 2.02k. I believe that by doing a weekly settlement, the rebate can work that out, and would produce a credit to the custmoer for 2.02k.
    What my client wants, is for the amount accrued to increase from 1.02K to 2.02K and NOT post to the customer.
    Is this possible?
    If so, how is this done - via pricing conditions and values in VKOA?

    Hi Mark,
    I'm not sure, but I understand that you want to change the value of condition while you are running it. Check BADI SD_ENH_REBATES, method V13A_VERIFICATION, I see that you can change I_E_KONP. I am never use it, only I know it, so I don't tell you what kind of troubles you can find.
    I hope this helps you
    Regards
    Eduardo

  • Content filter not updating the Wod Doc

    Hi all
    I have created a content filter which updates the "author" value in a Word Doc.
    I have used Apache POI.
    public InputStream getInputStream() throws ContentException {
         try
              POIDocument pdoc;
              IResource resource=this.getResource();
              // HWPFDocument extends POIDocument
               HWPFDocument doc=new HWPFDocument(resource.getContent().getInputStream());
               int rno=Integer.parseInt(resource.getRevisionID());
               pdoc=doc;
              String created= resource.getCreatedBy();
              pdoc=doc;
              pdoc.getSummaryInformation().setAuthor(created);
              doc=(HWPFDocument)pdoc;
              return new ByteArrayInputStream(doc.getDataStream());
         catch (IOException ie)
         catch(WcmException we)
        return null;
    After deploying the PAR file, I restarted the server. Still the author name is not updated inside the document.
    Is there anything wrong with my code?
    Regards
    Parvathy

    Hi Julian
    The FileInputSteam Constructors and their respective parameters are below.
              FileInputStream fin=new FileInputStream(File);
              FileInputStream fin=new FileInputStream(FileDescriptor);
              FileInputStream fin=new FileInputStream(String);
    Which one will I use for my purpose?
    doc.getDataStream()
    returns a byte Array.
    How will I create a FileInputStream Object from a byte Array?
    " write it to a temporary" This I didn't understand.
    Regards
    Parvathy

Maybe you are looking for

  • I am having difficulties with distributing a PDF Form. Acrobat X pro

    I am having difficulties with distributing a PDF Form. When I click the distribute button I choose the "Manually collect responses in my email inbox option" then press next, I select the "Save a local copy and manually send it later and then I specif

  • Colors are off

    I've used previous Photoshop versions and recently upgraded to Photoshop CS5 (I've used the same Dell monitor with previous versions and it looked just fine before). For some reason the colors I use in Photoshop CS5's work-space are off. For example,

  • Help for nokia 7373

    I know this may sound like a strange request, but if there is anyone here with a Nokia 7373 phone, i was hoping you might be able to help me. I have one of these, but i have managed to crush my display so i can't see anything on it. So if there is so

  • Error starting resources with srvctl

    Hi, Has any experienced the following errors when trying to start resource in a 10.2.0.3 rac cluster? [node1:oracle]:/appl/oracle > srvctl start listener -n node1 CRS-1028: Dependency analysis failed because of: CRS-0223: Resource 'ora.node1.LISTENER

  • WLS Console doesnt display all AD users using the AD Authenticator Provider

    I've set up an AD Authenticator Provider from WLS. The trouble is we have two sets of users in different branches on the AD directory. This major problem as you can just set the User Base DN higher up the tree and it picks up both sets of users, and