PS and CPROJECTS implementation

We are running SAP since 1998, and already implemented many modules in the R/3 system and other SAP systems as CRM. We would like to implement a solution for project Management for our projects division, Which is a group that manage a big projects that involve a lot of logistics (material and Service purchasing) a lot of integration with MM and CO and involve a lot of contracting companies that should be managed. Currently they are doing the GANT in MS-Project with no link to R/3 and mange all material demand in R/3.
I would like to know if we should try to implement full project management in PS or to move forward to the direction of cProjects linked to our R/3 system.
We afraid that since the cProjects is out of the R/3 there will be integration problems we also not sure if the tool was originally designed for heavy scale projects with a lot of logistics.
What would you recommend?
Are there any reference sites with a similar profile to us that have implemented a solution based on cProjects?

Its would be good if u implement PS first and then slowly move to c-projects. This would be good in your case as u have already implemented others modules.
The reasons why i'm supporting the implementation of PS is:
1)c-projects is generally used for new product development and program management(managing large scale small projects under a single program.
2)The account integartion for c-projects is again depends on either internal order/WBS element (CO/PS) which are to be created in R/3
3)U can assign only resource cost(overhead) to c-projects all other cost are to maintain the internal order/WBS Element and shown in c-project.
4)All the funcionalities of c-projects are possible in PS.
5) For heavy scale projects with lot of logistics and accounting its suggested to have PS.
But if u want to use the unique functionalities of c-projects such as FMEA, control plans etc. which are very important for automobile industry (R&D), its better to go for c-projects
All the best
enjoy SAP PS
Murali

Similar Messages

  • Online project progress and status implementation.

    Hi friends,
    What are the different methods availalbe in SAP for integrating project Sites with Project office for online progress and status implementation.
    Thank you,
    Prashant

    Hello Prashanth,
    SAP xAPPS provides this feature. xRPM and cProjects are web based applications which are tightly integrated with SAP PS.
    The configuration is done in R/3 backened for the same and front end is web based application. But note that they are not a part of SAP PS soln and are seperate apllications.
    Thanks
    Sarang

  • XPD and cProjects integration

    Hi All,
    We are implementing xPD 2.0 and cProjects 4.0.
    The scenario of integrating the two is that, in the concept stage, a project in cProject will be created from xPD.
    The master guide of xPD 2.0 states that "<i>You can connect additional back-end systems, such as SAP cProjects, to the SAP xPD landscape using SAP Exchange Infrastructure</i>". But this requirement is not mentioned any where else in the other documents.
    Will somebody be able to highlight on this requirement?
    Any inputs will be highly appreciated.
    Regards
    Amitabh

    Hi
    Try the install guides or xPD and cProjects
    http:// service.sap.com/instguides
    xPD >> SAP xApps
    install guide page 73
    Config guide page 9
    cProjects >> mySAP business suite apps > mySAP PLM
    again check both guides.
    cheers Jo

  • PL/SQL and Java implementation

    Hi all,
    We need to implement a fast solution for reporting to our existing web application. Application is totally based on stored procedures written in PL/SQL.
    We have already java classes for drawing different types of charts
    named Chartdirector (http://www.advsofteng.com/)
    This library can create chart images in memory.
    I have already read about calling java classes from PL/SQL and SQLJ too.
    My questions are;
    1. Is this safe to include classes to database and create
    reports by using loadjava in real life. I mean not in theory, in real life?
    2. Is there any experiments of the audience about this method?
    3. Would it be any performance problems about this?
    4. Should i prefer to use any Java container and jsps instead of this method?
    I will continue to research for necessary steps after i could see the light :)
    Thank you to all,
    Regards,
    Gokhan

    > 1. Is this safe to include classes to database and create
    reports by using loadjava in real life. I mean not in theory, in real life?
    Yes.
    > 2. Is there any experiments of the audience about this method?
    Experiments and actual implementation - yes. It works. Granted, it does not always work as easy as running the Java code from the command line. But it does work.
    > 3. Would it be any performance problems about this?
    This is a potential problem with any software code.
    4. Should i prefer to use any Java container and jsps instead of this method?
    To be honest, I prefer not using Java for web graphics as I'm not impressed with the quality and flexibility of the graphs generated. I prefer using (and paying for commercial use) for the JPGraph classes for PHP - and using that from PL/SQL (via Zend Core for Oracle).
    Another option is to use SVG and generated SVG directly from PL/SQL. But this requires a browser plugin and SVG also does not look that great. (this is btw what Oracle's HTMLDB does and uses)

  • Differences between US and UK implementations for HR and Benefits

    Need to know any information about implementing Oracle HR and basic benefits in Europe (France localization with rollup of others). I have HR, OAB implementation experinece in US. Want to understand the differences between US implementations and UK implementations. Any reference documents welcome.
    Thanks
    Alu

    Alu,
    Here are some starting points, but the list is only a subset of published collateral:
    1. MetaLink Note 315928.1 - HRMS for France - Public Sector Updates FP K - June 2005
    2. MetaLink Note 315927.1 - HRMS for France - Commercial Sector Updates FP K - June 2005
    3. MetaLink Note 273558.1 - P11D Implementation and User Guide 2005-2006
    4. MetaLink Note 356684.1 - UK: Payroll Statutory Deductions User Guide incorporating End of Year and Start of Year 2005-2006
    5. MetaLink Note 236455.1 - Teacher''s Pension Extracts in Oracle HRMS
    6. MetaLink Note 236454.1 - Occupational Sick Pay and Occupational Maternity Pay in Oracle HRMS
    7. Oracle HRMS Implementation Guide B14466-01
    8. Oracle HRMS Implementation Guide (UK) B15575-01
    9. Oracle HRMS Implementation Guide (US) B15548-01
    10. Oracle HRMS Enterprise and Workforce Management Guide (Global) B14467-01
    11. Oracle HRMS Compensation and Benefits Management Guide (UK) B15579-01
    Regards,
    Greg

  • Which table if for BADI and its implementation

    Which table if for BADI and its implementation
    I want to know which implementations have already been created and actived for one BADI.

    Hi
    check the tables for BADI
    SXC_ATTR   
    SXC_ATTRT  
    SXC_CLASS  
    SXC_COCO   
    SXC_EXIT   
    SXC_FCODE  
    SXC_FCODET 
    SXC_IMPSWH 
    SXC_SCRN   
    SXC_TABLE  
    SXC_TABLET 
    Regards
    Anji

  • Integration with cfolders and cprojects

    Dear Experts,
    Provide me cookbook for integration of cfolders and cprojects through KM.OR can anyone guide me about how we can do ?
    Rewarded for the answer.
    Thanks

    Hi,
    WebDAV interface enables a connection to be set up between cProjects or cFolders and SAP KM in the Portal.
    Please find the below helpful links,
    http://help.sap.com/saphelp_ppm400/helpdata/en/1b/8688428b42c553e10000000a1550b0/frameset.htm
    https://forums.sdn.sap.com/message.jspa?messageID=7916774
    Regards,
    Vasu

  • General Info on integration between Project Systems (PS) and cProjects

    Hi,
    I would like some general info on the integration scenarios between PS and cProjects. Links to any documentation/blogs on this would also be very helpful.
    Thanks,
    Lashan

    Hi Srini,
    Thanks very much for the links. However, I've already gone through the standard documentation in SAP and they are a bit too high level/vague for me. I have considerable experience in xRPM, cProjects Suite and have good grasp of project management concepts, tool and techniques. My knowledge of PS is somewhat limited though.
    What I am specifically looking for is what type integration options and scenarios are available. For example, cProjects can have phases and tasks defined. How would these integrate with for example WBS elements and networks in PS? What are the things you would do in cProjects and not PS and vice versa? Hope my question is clearer now.
    Appreciate any further information you may have on the above.
    Thanks,
    Lashan

  • Item and cProjects link to PS - Mass Upload

    Hi,
    We are on PPM5.0, having PPM and SAP-PS on different servers.
    We have uploaded Item and cProjects to PPM (using excel upload).
    We are now required to link each of these projects to SAP-PS project.
    What program/function module can help? We are using manual, task-based costing.
    Also, to carry out Financial Plannig, it is required to object-link the SAP-PS project to the Item. Which program/FM will help achieve this link?
    Summary:
    - Item-cProjects uploaded (using excel upload)
    - Each of the cProjects projects is to be linked to a PS project programtically (like it is done under the "Accouting" tab, for costing).
    Please advise.
    Thanks.

    Hi,
    Try RPM_CREATE_OBJECT_LINK FM ...
    // Amit

  • Request to give source code for beans program and its implementation method

    I need beans program with two beans Traffic Light( Implemented as a bacground colors- Red, Green, Yellow) and Automobile ( Implemented as a Text box which states its state/movement) the state of the Automobile should depend on the following Light Transition Table
    Light Transition Automobile State
    Red --> Yellow Ready
    Yellow ---> Green Move
    Green --> Red Stopped

    Homework?

  • HUM and SUM implemented together

    Can HUM and SUM implemented together  , if so what are the advantages and the disadvantages .
    can some one help me on this .
    thanks ,
    ksr.

    Hi,
    it is possible to use handling unit management together with warehouse management. You activate handling unit management independent from storage unit management. Only in case if storage location is full-WM- AND HU-managed, the storage unit management is always active and HU numbers are taken over as SU numbers. In all other cases HUM and SUM are independent from each other and number ranges must be set a way that they are not overlapping.                                                                               
    Regards,
    Ely

  • Send Workflow email to User SAP Inbox with a Popup and cproject link

    Hi,
    I am working SAP portfolio and project management workflow.
    Requirement: Trigger workflow when Portfolio Execution Decision Point status changes,
    We have to send two email notifications as part of the requirement;
    First notification should go to user’s (Only one user) SAP Inbox, Containing two links
    Popup link (It will contain list of question which the user has to confirm) if he
    confirms we have to send second  email notification. (Pop-up layout is attached)
    Link for the user to navigate to SAP PPM cProject to upload the documents. (NWBC)
    The second notification should go to Outlook of the users (via group email) with Link for the user to navigate to SAP PPM cProject.
    We can trigger the workflow using event DECISION_POINT_STATUS_CHG in Class CL_RPM_DECISION. My question is how should design the pop-up and incorporate the Pop-up and cproject link in first notification email sent to user SAP Inbox.
    Please let me know if you need more details.
    Thanks & Regards,
    Amit Singh

    We use transaction NWBC to login to netweaver business client. Then from there we navigate to Project management view and double click to select the project. It opens project element --> Collaborations tab. There we select the folder link. (screenshot attached)
    Regarding addition of multiline container element (Table) let's say 'A'; I create multiline container element A in Workflow element list, Populated  element A using a utility class/method assigned to a background task.
    Then, I created a user decision task, inside the task container another multiline container element 'B' with same type and I did binding b/w workflow container element 'A' and task container element 'B'.
    Now, I am passing &B& in the decision task description. If I execute the workflow, The user decision task description is blank.
    Secondly, I did not get any pop-up asking how to display it (all lines with line break).
    PS: My internal table also has only one field.
    Am I doing something wrong here?

  • Costing and an implementation timeframe

    Hello Every one,
    I'm planning to implement Oracle Dataguard on Enterprise Edition.
    Does someone advice me a rough cost and the implementation timeframe?
    By boss is looking for that to make decision.
    Thank you in advance

    the OS is Windows Server 2000
    the Database is Oracle 10g Release 2

  • XRPM and cProjects Training

    Hi,
    I am looking for some training/certification courses in xRPM and cProjects.
    May I expect some guidance here ?
    Thanks.
    jungleem

    Hi
    You can check following link.
    http://www.sap.com/services/education/catalog/elearning/index.epx
    If you need any documents please let me know. I will forward to your email.
    Regards,
    Srini.

  • Project Manager in Xrpm and Cprojects

    Dear All,
    Could you please send the table name in RPM where i can see the Project manager information for the project.
    And if anybody having the relation between GUID in RPM and Cprojects, kindly share it. Many thanks in advance.
    BR,
    JB

    Resolved my self

Maybe you are looking for

  • How to display long text in alv

    Hi , I need to display the long text of particular object on ALV, with 30 char each line . I have long text in one internal table, master table have one to maany relation with longtext table and long text contains 120 character in each line. i need t

  • Unable to find SWCV in BW system for inbound proxy

    Hello Friends, There is one interface running in our system. It is FILE to PROXY. Every day MDM sends some vendor details in files form. PI polls the file and map to structure for BW. (BW is SAP System). In Operation Mapping, Sender Side : Our own in

  • How to create a fresh database

    Hi, I want to create a fresh instance of database, How should I proceed. Another thing, is it necessary that my listener to be running prior to creation of database instance. please guide me. Sreekant

  • Premiere Pro 7.1 not opening on iMac running Mavericks

    System Specs: OS X Version 10.9, 3.4 Ghz i7 iMac, 20GB RAM, AMD Radeon HD 6970M 2048 MB. All Creative Cloud products updated to latest version. I'll be happy to provide the crash report if it's helpful. Simply put, Premiere Pro CC will no longer run.

  • How to install php5 on clean 10.4 Server install?