PS-HR Integration..................................?????---CATS

Dear Experts,
I need infomation on how CATS are integrated with Project System.
Any documents, infomation on this will be appricaiated,
Thanks in advance,
R.B.paramshetty

Hi Setty,
Check this thread link
/thread/910879 [original link is broken]
Its help you out your issue.
Surya

Similar Messages

  • Integrating CATS with MM-SRV, service entry sheet acceptance

    Hi,
    We're importing time sheets from CATS to MM-SRV using transaction CATM. When doing so, a service entry sheet is created. However, the service entry sheet is not accepted per default, which means each service entry sheet needs to be  accepted in an additional step in order for a GR/accpetance document to be posted.
    Do you know of any way to accept the service entry sheet automatically in this flow?
    Thanks in advance,
    Peter

    use the user exit from the list
    SRVDET           User screen on tabstrip of service detail screen 
    SRVEDIT          Control of service list (maintenance/display)    
    SRVESI           Data conversion: Entry sheet/interface           
    SRVESKN          Set account assignment in service line           
    SRVESLL          Service line checks                              
    SRVESSR          Set entry sheet header data                      
    SRVEUSCR     User screen on tabstrip of entry sheet               
    SRVKNTTP     Setting of account ***. cat. during import if "U"    
    SRVLIMIT     Limit check                                          
    SRVMAIL1     Processing of mail before sheet is generated         
    SRVMSTLV     Conv. of data during import of standard specs.       
    SRVPOWEB     Purchase order for service entry on Web              
    SRVQUOT          Service export/import for RFQ/quotations         
    SRVREL           Changes to communication structure for release   
                  of entry sheet                                       
    SRVSEL           Selection of services from other systems

  • CATS Report- PS integration.

    Hi @ll,
    Is there any standard report in SAP that brings out the actuals entered in CAT2. We have integrated CATS with Project System and I have entered the actuals in CAT2. Then I have transferred the data to PS thru CAT5.
    Pl let me know which report will retrieve the data and show.
    Rgds.
    Venkat

    Try CN48N and/or CATS_DA as well.
    Arya

  • CProject-CATS integration

    Hello,
    I want to run cProjects CATS integration scenario. Can somebody share relevent documentation? I am using cProjects 4.5.
    Regards,
    Milind Dumbre

    Hi Milind,
    For Integrating CATS need to make relevant settings in Project type.
    Make settings in Data entry profile.
    If cProjects & CATS (ECC) are on seperate servers ref Note 954860 - Setting up ALE to integrate cProjects with CATS.
    You also need to have account integration & HR integration to use CATS with cProjects.
    Ref the link for furthur details.
    [http://help.sap.com/saphelp_ppm450sp04/helpdata/en/43/054880bbe822f5e10000000a1553f7/frameset.htm]
    Regards
    Sejo

  • Connect R/3 to cProject

    Hi,
    I want to create a function module in cProject that is called from R/3 side. but I don't know which table to store up the connection information to connect cProject and R/3. I would like to use function module 'SCWB_RFC_PING' in R/3 to check cProject connection.
    In addition, what should I set up to connect servers between cProject and R/3? Please give some idea on that.
    Thanks in advance.
    Cheers,
    Helen

    Hi,
    In order to connect cProjects to systems with which connection is allowed, eg - accounting integration, CATS integration, etc or to have object links with R/3 all you need is just a RFC connection. A RFC connection is created using SM59 transaction.
    In case you have connect to R/3 and use some custom built functionality, there are two scenarios:
    We are assuming both cProjects and R/2 to be different boxes.
    1. Connect from R/3 to cProjects
    Create RFC connection (SM59) in R/3 system pointing to cProjects system.
    If writing a custom function on cProjects server, make sure it is Remote enabled.
    To call this custom function in cProjects server from R/3 server use call function '<Function_name>'
    destination <RFC_Destination_name>.
    If calling a standard cProjects function from R/3, make sure it is a remote enabled function and call function using the destination clause.
    2. Connect from cProjects to R/3
    Create RFC connection (SM59) in cProjects system pointing to R/3 system.
    Calling function remains same.
    In case you need to call a standard funtion that is normal (not remote enabled), create a custom wrapper function that is remote enabled and internally calls the normal standard funtion.
    Pl note that RFC destination names are always case sensitive.
    I hope this clarifies all doubts. If it doesn't pl write back. If it does, reward appropriate points and close the thread.
    Regards,
    Reema.

  • Sap_CATS

    Hi all,
    In CATS by using one data entry profile .... can we fulfill the requirements of  approving time data by Time administrator and Manager ...  for updating data entry profile i need to maintain user profile under parameter section here i will use parameter as CVR for my data entry profile ..
    Example in my company i will use one profile  for FULL TIME Employees and another profile for Customer care employees .... because their timings are different  .... and some of them won't require approval .
    Considering the above situation  ...how could i maintain Data entry profile for Different group of employees in .... Systems -- User Profile -- Own Data -- Parameters.
    How should we  integrated CATS Module with project systems ..... what settings we need to maintain for fulfilling this requirement.
    Please respond to my questions ...
    Thanks & Regards,
    Avanthika.k

    Pl check Feature: CATSX Profile maintenance for Time Sheet for Service Providers.  May be it will help.

  • Help On PS-CATS Integration

    I have a client requirement on CATS - PS integration as below -
    1. I am using work center in project activities and i have employees assigned to work center through HR.
    I have assigned the concerned employees to the activities in PS. Now once the employee, who is assigned to the activity perform the work and go in time entry sheet in CATS in CAT2 T code -
    A. Then in standard SAP, this person can see all the activities to which his work center is assigned But
    I want the person/employee so see only activities to which he is assigned so that he can not book time
    agaist the other activities or work performed.
    I see that this is not the standard functinality and i have also gone through some of the threads in SDN, which says that we can use the user exit in CAT2 T code which will check for this validation during save of CAT2 T code,once emplyee enter the time.
    But i want the employee to see his activity when he is entering into the CAT2 T code so that the additional efforts of entering the time can be saved.
    Has anybody worked on this. request to share your experiance.
    Thanks

    Normally it is based on requirement. There are  resouce optimum utilization / over load/ underload  realted report  you can use very well, if you assign the person at workcenter level & control the same via workcneter capacity utilizations. What I  have observed that when you are alwalys running short of resouce at that time it better to assign person at workcenter level for it's optimum utilization. If you your resouce requirement  is mostly not going to be overloaded in that case you go for the person assignmnet at activity level.
    Regards
    Nitin P.

  • Integration CRM / CATS

    Hi Experts,
    I have problems with the integration to CATS. When creating a service confirmation (status = completed) in CRM 7.0, the system should create a CATS entry in ERP. But in the service confirmation nothing happens (not even an error).
    I have done the customizing in CRM (IMG --> CRM --> transactions --> settings for service transactions --> integration) and in ERP (tx SCRM --> settings for service processing --> time sheet integration / controlling integration).
    Do I need additional middleware settings? Any idea?
    Regards,
    Jens

    Hi,
    Please check
    1. Does your item category of Confirmation have Relevant for COST tick
    2. Have you run the report which transfers the service relevant settings to ECC
    3. Have you assigned the service order and item category relevant for CONTROLLING and COSTING.
    4. If you have maintained all the above, then check whether the confirmation is locked in smq1 and smq2 or is it in distribution lock then release the same and check the transaction.
    Regards
    Surendra More

  • CProjects PS/CATS integration with Rel 4.7

    Hi,
    we will install cprojects 4.5. on a stand alone system. The ERP-system is still on Rel 4.7. in the next few months. Is it possible to use the accounting integration (creating automatically WBS-elements out of cprojects) and to use the CATS-integration? I have read the installation master guide for cproject, on one page it says Rel >4.6 is required and on another if you want to use CATS integration you need ECC 6.0.
    Can anyone help me? What release do we need for PS and CATs integration?
    Thank's for your help!
    bestr egards
    Christine

    Hi Christine,
    Use this note 1088160  and 1088467 for support package .
    you can find all document for plm by using following link
    https://websmp108.sap-ag.de/plm-inst
    thanks
    sunil
    Edited by: sunil jawalkar on Apr 25, 2008 11:13 AM

  • CProjects Accounting / CATS integration

    Hi
    I am working on cProjects Accounting Integration and CATS integration.
    During same I am getting following messages:
      1. Acct Int.: Single-Obj. Contr. in SAP R/3  DCE458547A88A6F1B3640002A5CD3FB0 does not exist
    2.  Inconsistency between currency type 30 and currency EUR  
    Also, Internal Order is not getting generated.
    It is on ECC6 and cProjects 4.0
    Can anyone help me on the same?????
    If someone has any document to share please send it on [email protected]
    Niraj Sikliogar

    Hi Niraj
    To create the internal order , check the following things
         do the following things,
    .1)     Define company Name
    2)     Define company code, Credit control area, business area, Functional area, FM area.
    )3)     Maintain Controlling area.
    Prerequisite:  Need to define to Company following four things
    a)     Currency type: Defined in Company code
    b)     Currency: Defined in Company code
    c)     charts of account:
    d) Maintain Fiscal variant and assign it to company code.
    4)     Create Cost center
    Prerequisite for cost center:  Need to define 1) Standard Hierarchy 
    5)     Create cost element
    6)     Do the following assignment
    a)     Company code to company
    b)     Company code to credit control area
    c)     Company code to FM area
    d)     Profit center to Company code
    7)     Assignment company code to controlling area
    8)     Create model order: put $$  sign as order type.
    9)     Create the order type
    do the following things ,it will help you.
    any problem put the query
    Reward point if useful
    Regards,.
    nitin

  • Integration between MRS and CATS

    Hi experts!
    We are implementing MRS (Multiresource Scheduling) for PS and CRM Services. And we are confirming hours in PS using CATS. I've read that there's a BAdI to pull actual data from CATS to MRS, to the planning board, but can't find it.
    Does anyone know which that BAdI is? Or any way to take those actual hours from CATS to MRS?
    Thanks in advance!
    Regards.

    Hi Thalos,
    Please do let me know, which is your MRS verson so that we are in sync. I am posting this reply with respect to MRS 610.
    1) Instead of method UPDATE_CLOCK_DATA , you may consider using test program /MRSS/TEST_CLOCK_R3 for updating clocking data. It allows you to update clocking status for order operation and personnel resource with timestamp. ( I had used method UPDATE_CLOCK_DATA for integrating between IS-A-DBM with MRS. )
    2) You will have to find suitable enhancement spot in transaction (like CAT2, CATA, IW41...) for calling this program.
    3) Prerequisite for display of timedata in planning board is;
    - Activate time recording in Planning board profile
    - Maintain graphic elements in MRS customizing under User Interface profile
    Please do let me know if this information helps you or if you need any more inputs going ahead.
    Regards,
    Dhairyasheel

  • Is there an integration between CATS and TEM?

    Hi friends,
    I have this requirement:
    I wanna see the training plans of an employee -that are made in TEM module- in his/her timesheet so that project managers can assign less work in the specified time interval.
    Is there such an integration in the system?
    Thanks in advance,
    Best regards,
    Dilek

    Hi
    There is no direct integration with TEM for CATS.
    In CATS you book time against the training TASK and the time is then sent to Time Magmt and from time it is sent to TEM with the Integration of Time and TEM.
    The EE can book time for future period in CATS against the TASK type created as training and that can be visible to the manager.
    The time booked on the particular TASK type is sent to Time Magmt.
    R K

  • CATS INTEGRATION WITH PP AND PM MODULE ( TO FIND ACTUAL MANPOWER COSTING THROUGH ACTIVITY TYPE)

    Hi Experts,
    We have a scenario like, Client wants to track the actual manpower costing through activity type ( Ex: How much hours an employee worked on a particular work center to produce an “X” product, So that his actual cost should be loaded on that product.
    We have employee ( 1. Staff 2. Worker 3. Contract labor employee and apprentice from third party roll and staff and worker we plan to go with negative time management and for contract labor and apprentice will go with through cats.
    Since we are not going to run the payroll for contract labor employee and apprentice, we just maintaining the employee data as a group ( Ex: Group A,B,C etc.. Each group consists 20 or 30 employees, According to system each group as one employee and according to us each group consists as 20 or 30 employee.
    The Activity type as well cost center will be created by Co module, the same will be assigned in info type 0315, but still i want more input from experts on the same, since i am new to cross application time sheet configuration, could any one help me out to find the actual manpower costing in a better way.
    Regards,
    Prem

    Hi Experts,
    Can any one please reply on the same.
    How to arrive the exact manpower costing through activity type ?..
    Regards,
    Prem

  • CATS - PS Integration

    Hi Experts !
    I want to see out of 50 persons , how many people have filled in the time sheet ( CATS ) and how many have not .  Do we have some T-Code or report in PS which can tell us that how many people are left to fill in the time sheet and how many have already filled it ..
    Reply would be greatly appreciated
    Thanks,
    Dhruv Kumar Malhotra

    User Tcode: CATS_DA enter Personal No. range and execute

  • Integration of CATS with invoicing

    hi,
    I wanted to know how CATS  used in invoicing ?
    plz reply
    Thanks & Regards,
    siya

    Hi Sam,
    Cost Center - They are buckets where costs can be captured ie an organizational unit wherein it defines the location of cost incurrence.
    Controlling Area - The controlling area is the highest organizational level within CO. It must exist before Cost Center Accounting (CCA) can be used. A controlling area will be created on a one-to-one basis with the company code created in FI.
    As cProject provide the intgration with CATS i.e. actual recording happens in the ERP system and the data is transferred to and from cProject system so it is a prerequiste to enter the controlling area, Cost center and activity type so that the accounting can be done.
    Paths to define:-
    Step 1 : Create Controlling Area:
    Menu Path
    IMG:Controlling > General Controlling > Organization >
    Maintain Controlling Area T-Code : OKKP
    Step 2 : Create Cost Center:
    Menu Path
    IMG:Controlling > General Controlling > Cost Center Accounting>Master Data>Cost Centers
    Maintain Cost Center : KS01
    Step 3 : Activity Type
    IMG:Controlling > General Controlling > Cost Center Accounting>Master Data>Activity Types
    Maintain Activity Types : KL01
    Hope this helps.
    Regards,
    Jatin

Maybe you are looking for

  • Iphone: On a new domain

    My company just swithed to a new domain and I went into my Iphone 3g and changed my domain name. I still and getting an error of, Cannot connet to the server. I have also deleted the accound and tried starting over and I getting the same issue. Any i

  • Tuning procedures

    hi all i have some procedures which are used to calculate the required data i want to fine tune them but really don kno how to do how can i find where my procedures take time i tried to study execution plan but couldn understand much can any one tell

  • Screen mode selection in CS5.1

    When I open a file or create e new file in CS5.1, it fills the screen. In CS3, at the bottom of the tool bar, is a tool "screen mode" that lets me open a file that doesn't fill the screen so that I can put two or more small files (images) on a new bl

  • Airport Express (1st generation) does not reconnect to wireless network after router is cycled on/off

    Operating System: os x 10.9.1 Airport Utility 6.3.2 Airport Express 802.11n (1st generation) Linkus router: Model WRT310Nv2, Firmware Version 2.0.01 Motorola Cable Modem: Model 2210-02, Firmware 7.7.3r5 The Airport Express (AE) is setup to join my wi

  • Images in flash slideshow not appearing

    Other people have recently asked this question, and I've tried some of the solutions offered to no avail. It will play in DW and locally, but when uploaded, no images. I have photos.xml, photogallery.html, photogallery.swf, AC_RunActiveContent.js, an