PS Progress Analysis -

Dear Guru's,
I am facing problem while executing the Progress Analysis report in SAP PS for one of our client. I am getting only the Schedule plan value and actual... rest of the column like BCWS, ACWS are comming blank which is important for client.
If any body work on customer project pls suggest..
Regards,
Rupesh Kumar Singh

Hi Shashank,
Right now I'm facing the same problem, I've already implement the user exit but I would like to know if you have an example of the implementation, I still don't know where to find the info of the structures to calculate the POC.
Thanks,
Héctor

Similar Messages

  • Comparing Progress analysis data saved in past periods

    Hi forum team,
    We are using PS in SAP R3 ECC 6.0 system
    With the intention to reviwe at later stage, we had saved 'Progress
    Analysis' report data (CNSE5)in 'Other selected version' in past periods
    i.e.in July, August etc.When we open these reports in November all its
    fields (Adj/Nonadj/Agg/Non Agg/PlanPOC/ActualPOC....) except actual
    cost shows current period (November) values.
    We thought this version copy would be a sort of screen shot but now it appears as a dynamic report.
    How can we save this report (cnse5) in ERP database as we save project version for comparision in future?
    Please suggest.
    Thanks,
    Mohan Parab

    Hi
    The standard method is KKA8. But you need to reverse the settlement.
    Or you should be able to delete  the data from RPSCO with Value type 32.
    But once you delete, you will be running the RA again for the last 10 Years? If so will you be settling it again? In that case how do you reconcile this with FI-CO and PA?
    Thanks
    psconsultant

  • SKF for Progress Analysis

    Hi,
    I have successfully run progress analysis using Estimate method .  As my understanding after I run CNE1, system will record POC that I maintained in Estimate table into SKF.   Which report I can use to see this SKF value ?
    I have checked all SKF report in PS and even in Cost Center Accounting,  but the report has no data.

    Hi,
    Did you check the report CNE5???
    Once you run CNE1 accordingly reports on CNE5 will update.
    Regards,
    SL

  • Define Measurement Method as Default in Progress Analysis

    Hi All,
    I have defined Measurement Method 0000000003(Milestone) in progress analysis for my company code.
    But while running CNE1 for my project it is not picking the measurement method i have defined for my company code but it is picking the 0-100 Method .
    Please advice.
    Muzamil

    Hello All,
    I have read all the posts on the subject, we are facing the same problem as reported by Muzamil. I have done the follwing
    1. Creat Progress Version
    2. Define Measurement Method as Default Values
         2.1. Define measurement methods for WEBE
         2.2. Ddfine measurement methods for all activity types
    3. Assign progress versions to the WBS Elements and Activities in their progress tabs.
    But, wen I run CNE1, SAP does not pic the default methods while analyzing progress. SAP uses 0-100 method, which is not right.
    Please propose some solution
    Regards,
    Murtaza

  • Estimation method of progress Analysis

    Hi,
    We are having following scenario.
    We are creating the project in PS. Then creating the PM order & assigning
    the order to WBS element.
    We want to use the Estimation method of progress analysis. Hence we havedefined Estimation method as default measurement method (both plan &
    actual )for following objects,
    1. WBS element
    2. Internal processed activity
    3. External processed activity
    4. General cost activity
    5. Order (Other than Network)
    For WBS element & all activities we are able to manually maintain planned
    POC & actual POC in CJ20n.
    But for PM order we are not able to manually maintain planned POC &
    Actual POC.
    Can you please let me know where we can manually maintain the planned &
    actual POC for PM Order.
    regards,
    Pradip Shelke

    /@#$%%%%@ wrote:
    > Can you please let me know where we can manually maintain the planned &
    > actual POC for PM Order.
    I do not think it is possible for order to use estimation method..
    Please go for Cost / Time / Work proportional

  • How to view the results of progress analysis

    Dear Experts,
    I executed progress analysis for my project analysis in CNE1 for my project.
    After execution, PA has been completed for two WBS elements. But iam not able to see any POC values or costs.
    Where should I check and confirm that Progress analysis has been carried out successfully.
    Pls suggest.

    Hi,
    Run the transactio CNE5 for the project progress analysis ,you will get the following reports.
    The standard reports offer various values we can use to assess the progress of our project. The following fields are defined in the standard progress analysis reports:
    - Planned POC in percent
    - Actual POC in percent
    - Budget Cost of Work Schedule, BCWS
    - Budget Cost of Work Performed, BCWP
    - Cost variance (CV)
    - Schedule variance (SV)
    - Value index (CPI)
    - Estimated costs at completion (EAC)
    Regards,
    Raj

  • Default report display for Project Info System: Progress Analysis Report

    T-Code: CNE5
    At the Progress Analysis Initial Screen, I chose the fields from the menu Views > Choose Fields, Then I saved the Variants as Test_Variant ( GoTo > Variants > Save Variants )
    Every time I run the report, it will run the Test_variant but once I logout and login again to run CNE5  Test_variant will not be used.
    Can I set the default variant, so that every time I logout and login and run the Progress Analysis(cne5), Test_variant will be used as default.
    Appreciate advise
    Thanks.

    If you want the same variant should default to all the users then you can assign the variant in SE93 to transaction CNE5. write your variant there-->save.
    Other option is to look at possibility of creating screen variant using transaction SHD0 for CNE5. Take help of ABAP in this case.
    Regards
    Nitin

  • PROJECT PROGRESS ANALYSIS FOR NETWORK HEADER

    < MODERATOR:  Message locked.  Please read the [Rules of Engagement|https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/rulesofEngagement] before posting next time. >
    Dear all,
    We can get the progress analysis data (tcode CNE5) for a network activity and also for WBS element. However data is not cumulated at the network header. Need your urgent help for getting this at the network header level. Is there a workaround like user exit for doing this?
    Also let me know available user exists for PS. Please guide me how to find an user exit for PS in particular.
    Regards,
    Prakash.

    arenk03 wrote:
    > Is there any possibility to assign progress versions to network activitys automatically when creating a new network activity?
    No , it is not possible.
    Please search the forum for further details, as it discussed many times earlier.

  • Progress analysis scenario

    Can some one help me with a sample scnario for Progress Analysis which can help in understanding what events will lead to Cost Variance or schedule Variance and will give me EAC, ETC etc.
    I have all the settings done for progress analysis, but I am getting same values for BCWP & ACWP.
    Also, how is Plan POC related to schedule/duration/period of the activity?
    Regards,
    VDS

    Dear Rupesh,
    please have a look at the SAP online documentation following this link:
    http://help.sap.com/saphelp_erp60/helpdata/en/b4/ba853488601e33e10000009b38f83b/frameset.htm
    Project Progress -> Progress Analysis:
    There you can find a list with the relevant KPI's, formulas and questions they will help to answer.
    Project Progress -> Progress Analysis Progress:
    There you can find a short scenario with a diagramm which explains the cost variance and schedule variance.
    The relation of the POC calculation to values like schedule/duration/period is depending on the measurement method which is used, as every measurement method uses different values as basis for the calculation. So a general answer can't be given on that.
    Kind regards,
    Dirk

  • Progress Analysis, Plan/actual % comparision based on activity confirmation

    hello guyz,
    I have to monitor the project progress based on activtiy confirmation, can anyone guide how can i see progress of project based on percentage with plan/actual dates comparison.
    The business scenario is:
    One top level WBS under which 2 WBS assign, each 2nd level WBS have one network assigned. The  second level WBSE represent individual site where i have to perform various internal activities without cost involvements, only dates and number of durations to be maintained in each internal activity with finish start relationship.
    The structure is:
    Root WBS (level 1)--SITE 1 WBS (level 2)--
    SITE 2 WBS (level 2)
    > (Network 001) -
    > (Network 002)----
    > 001 0010 (1st Internal activity 2 days) -
    > 002 0010 (1st Internal activity 2 days)-
    > 001 0010 (2nd Internal activity 4 days) -
    > 002 0010 (2nd Internal activity 4 days)-
    > 001 0010 (3rd Internal activity 1 days) -
    > 002 0010 (3rd Internal activity 1 days)-
    > 001 0010 (4th Internal activity 3 days) -
    > 002 0010 (4th Internal activity 3 days)-
    In the above project structure i have entered the start planed dates for each network / site. The system automatically calculate the planned end dates after scheduling.
    In execution phase, i have also maintained actual dates on activity confirmation only.
    Now i need assistance to see the project progress for each network site.
    Regards
    Saqib Usman

    the problum is still there kindly provide assistance...
    I have to monitor the project progress based on activtiy confirmation, can anyone guide how can i see progress of project based on percentage with plan/actual dates comparison.
    The business scenario is:
    One top level WBS under which 2 WBS assign, each 2nd level WBS have one network assigned. The second level WBSE represent individual site where i have to perform various internal activities without cost involvements, only dates and number of durations to be maintained in each internal activity with finish start relationship.
    The structure is:
    Root WBS (level 1)--SITE 1 WBS (level 2)--
    SITE 2 WBS (level 2)
    > (Network 001) -
    > (Network 002)----
    > 001 0010 (1st Internal activity 2 days) -
    > 002 0010 (1st Internal activity 2 days)-
    > 001 0010 (2nd Internal activity 4 days) -
    > 002 0010 (2nd Internal activity 4 days)-
    > 001 0010 (3rd Internal activity 1 days) -
    > 002 0010 (3rd Internal activity 1 days)-
    > 001 0010 (4th Internal activity 3 days) -
    > 002 0010 (4th Internal activity 3 days)-
    In the above project structure i have entered the start planed dates for each network / site. The system automatically calculate the planned end dates after scheduling.
    In execution phase, i have also maintained actual dates on activity confirmation only.
    Now i need assistance to see the project progress for each network site.
    Regards
    Saqib Usman

  • PS Progress analysis CNEx0031

    Hi,
    I am exploring the enhancement CNEX0031 to be able to write some code for progress caclulation.
    As per the docuementation,this exit is triggered in txn CNE1.
    However, in spite of putting a break-point in the user -exit and thereafter running CNE1, the program control is not stopping at the user exit.
    Any suggestions  as to how I can achieve this.
    If someone has used this user exit, an example of what kind of code can be written in it, will also be helpful.
    regards,
    Shashank.

    Hi Shashank,
    Right now I'm facing the same problem, I've already implement the user exit but I would like to know if you have an example of the implementation, I still don't know where to find the info of the structures to calculate the POC.
    Thanks,
    Héctor

  • Milestone Billing & Progress Analysis

    Hello Experts,
    We are implementing PS for a manufacturing client where the client opting for a milestone billing as well the tracking of the progres of the project from the milestone for percentage billing processed, as have not come across this scenarion could any one please kindly help me out to configure this milestone billing process as well as the generation of the progress for the project.
    Kindly provide the brief how to go about the configuration once after that is done the process to go about it to acheive billing and progress for the project
    Awaiting for your kind reply.
    Thanks and Regards
    Praveen B M
    Edited by: Virendra Pal on Dec 3, 2009 12:57 PM

    Hello,
    Thanks for your reply as well for your suggestions. Yes have gone through the SAP help and i couldn't able to trace out the proper guidelines for project progress based on the milestone billing so, i opted to post in SDN.
    Could you please suggest me on progress tracking of projects with reference to milestone billing.
    Regards
    Praveen B M

  • PROGRESS ANALYSIS: what does COST PROPORTIONAL measurement method use for?

    Hi Experts,
    When I tried to use the COST PROPORTIONAL measurement method, I found 1 thing:
    + actual POC = actual cost / overall value
    + BCWP = actual POC x overall value
    It means that BCWP = ACWP (actual cost) --> Cost Variance (CV) = BCWP - ACWP = 0
    Hence we cannot see the cost variance when we apply the COST PROPORTIONAL method.
    Could you please help me to explain the use of COST PROPORTIONAL method?
    Thanks and best regards,
    Khoa Huynh

    Hi Abdul Khader,
    Thanks for your answer. I got your point.
    But can you explain more about "Cost proportional measurement method is suitable for work packages where costs and services have a constant relationship"
    Thanks a lot,
    Khoa Huynh

  • Progress analysis

    Hi expert,
    can anybody give one example , explaining BCWS,BCWP and ACWP having different values.
    Thanx in adv.
    Ashis

    Hi
    Adding to explaination of Muzamil, the figures depends on how POC is calculated too.
    To explain consider following simple example :-
    lets take an example of a activity in Construction project
    Activity = Concreting
    Work = 1000 m3
    Planned overall cost = Material Cost of Concrete (as material) at Activity
                                   = Quantity Required X unit rate
                        = 1000 X 3000
                        = Rs. 30,00,000
    Noraml duration = 60 days
    So, at 30 days Planned POC (based on work i.e. degree of processing) is = 500 m3 = 50 %
    & BCWS = Planned POC X overall costs
                  = 50 % X 30,00,000 = Rs. 15,00,000
    Actual Confirmation at 30 days = 400 m3 = 40 %
    So,  BCWP = Actual POC X overall costs
                      = 40 % X 30,00,000 = Rs. 12,00,000
    Now consider the GRN of "Concrete" material as 450 m3 (till date),
    so ACWP = 450 m3 X 3000 (unit rate of material) = RS. 13,50,000
    Hope this helps you.
    Regards

  • Statistical Progress Key Figures

    Hello Community!
    I had a problem with the creation of the Statistical Progress Key Figures; in order to perform the progress analysis at (PS) I need to determinate the statistical key figures in which the percentages of completion (POCs) are recorded. This settings are created per controlling area (CO). At the moment to record this key figures an error occur, that the Key figure is incorrect due that the unit of percentage is not defined correctly.
    Who can help me with this matter?
    What is the best way to define unit of percentage for progress analysis?
    Thanks a lot!
    Regards,
    Manuel Gonzalez

    The solution to this case was based on the Percentage Unit of Progress. This unit were created at the Tr. CUNI and regarding the ISO Unit (SAP Note 576981)
    With this attributes the Key figure is configured at per Controlling Area and assigned to the Progress Analysis.
    The Unit test is correct!
    Regards,
    Manuel GU

Maybe you are looking for

  • Shutdown/reboot occasionally takes a long time - log attached

    Shutting down or rebooting occasionally takes around a minute to finish. It always hangs when rebooting from gnome, but shuts down normally when gdm is disabled. Hoping somebody can help me figure out the issue. The log was generated from following t

  • What is the best HD output settings for YouTube uploading?

    Trying out iMovie '09 for the first time. I shot a 2.5 minute video (AVCHD) and with the video output settings I selected it is taking about 20 minutes to encode. That is way too much time...or is it? Based on a YouTube video I watched on editing in

  • Photoshop CS5 crash when copy and paste (XP)

    Hello all i'm a big problem, i've trial version of PS CS5 installed on XP pro, and i realized that every time i copy and paste the program crashes!!! In the error details i've: AppName: photoshop.exe  AppVer: 12.0.0.0  ModName: unknown ModVer: 0.0.0.

  • Where does movie file go on your computer when you watch it?

    Basically i've been looking at some HD trailers on the apple website and i have been noticing the large sizes of each hd file... some being like 150MB... is this actually downloaded to your computer? and where can i delete it?

  • Question about pencil tool in  Flash CS4

    The thing that I am having difficulty with is the pencil tool.It does not render a line as I draw it but only after I release the  mouse. How do I correct this? thanks Mango