PS with SD - assembly processing
hello
I would like to make assemly processing, assignement between SD and PS, what I have at this time:
1. I have standard project with one element PSP the structure is:
AR-0001 - definition,
AR-0001 - main element,
AR-0001.01 one element PSP,
I checked SD/PS assignement
2. I have standard network:
10000 - network definition,
10 - internal activity
3. I have material index
this is HAVA type, in MRP 3 view in strategy group field I entried 80
4. I have in CN08 assignements:
material index width above standard network, and above standard element AR-0001.01
So when I create in VA01 SD order the system doesn't generate project. Why? What should I check more to generate SD order?
Link below should be able to provide you the check:
http://help.sap.com/saphelp_erp60_sp/helpdata/en/95/1613a8837b11d2b6700000e82d8bd1/content.htm
Regards
Sreenivas
Similar Messages
-
Configurable Network with Assembly Processing
Hi,
Is it possible to user configurable network with Assembly processing? Is there any issues using this functionality?
Thxhi,
refer the below wiki about assembly processing and assignment of configured network.
http://wiki.sdn.sap.com/wiki/display/PLM/AssemblyProcessinProjectSystems
http://wiki.sdn.sap.com/wiki/display/PLM/ADemoonConfigurableNetwork
regards,
Edited by: NAG on Jul 21, 2010 1:28 PM -
Hi expert,
I have question with BOM and production process. In packaging industry, At start we have 8 components for finish goods. but recently, 2 component 0020 and 0030 (example bottle cap and sticker) will issue from warehouse for assembly process before return to warehouse. then re-issue to use for finish goods.
usually component 0020 and 0030 will convert to another component or change to semi-finish goods.i must create this BOM , Routing , and Open Production Order.and change component in finish goods,
if i not create BOM , Routing , and open Production Order. but create new component as semi-finish goods for item from assembly process to use in finish goods BOM as phantom assembly.
how is my resolution, possible or impossible? , will be any problem in the future. any advise is good.
regards,
kittisak.Hi,
There are 2 possibilities in this case.
If you do not want to make stock of your HALB then make this as Phantom and include the assembly operations (manufacturing operations) in the header level material so that the activities will be captured at the Time of FERT confirmations.
If you want to make a track of the stock for re issue from Warehouse then no other way.
You should maintain it as HALB with BOM nad Routing, Pl. Order and Production Order route to capture the stocks and issue it to FERT production.
Hope this clarifies..
Regards,
Siva -
Hi Guru,
i would like to know the assembly Process with CIN details.
please give the details regarding the above.
Thanks
BR
sivaHi Guru,
we are using the following process.
Direct Material
Prcourement from the supplier who are coming under VAT taxation
Procurement from supplier who are coming under CST taxataion
Procurement from the supplier where C form need to be given
Procurement from the Subcontracting Suppliers
Indirect material:
Service Procurement and relevant taxation
Consignement Procurement
Procurement from the supplier with account assignement purchase
Capital Goods
Capital Goods Procurement for Machineries
Capital Procurement for Machine accessories - Grinding wheel
Import
Procurement from other Plants
Procurement of Steel from Suppliers
Procurement of Capital Goods
Service Procurement for Tool Calibration
Pricing
Domestic pricing with Tax calculation
Option to edit the Tax condition type value in the PO
Option to enter the tax condition value or % in PO
Import Pricing to include the required condition of Excise and Govt requirement
Incoming Excise Invoice
Capture Excise Invoice During GR
Option to Edit the value after Excise Invoice Capture
Returnable Excise Invoice Form
Import Duty Capture and Excise Invoice posting
Registers
RG23A - Part I and Part 2 update
RG23C - Part I and Part 2 update
Cenvat Regeister
Sales Tax Regeister
Payment of tax to central and State - Separate GR posting
CIN Configuration Check list - PTP
Excise Registration
Check Excise Registration is updated for all plants
Check Excise Reg is updated with the Excise Range Information
Check Excise reg is updated with the ECC NO for all the plants
Check Excise Reg, Division and Range is maintained in Excise Reg
Plant Settings:
Check whether Excise Registration is assigned to plant or not
Check the manufactruing plant is unchecked with Depot Indicator
Check Multiple goods receipt/Multiple Credit option is set for Manufcaturing plants
Check the Depot plant has been flagged with Depot Indicator
Check Multiple goods receipt/Multiple Credit option is set for Depot plants
Excise Group
Check Excise Groups is created for manufacturing plant
Check the outgoing Excise Invoice settings
Check Default Challan Qty from GR is flagged in Excise group
Check Depot setting are deflagged for manufacturing plant Excise Group
Check in MIGO setting of Excise group all the below
EI Create/23D deflagged for manufacturing plant
EI Capture, Post, Duty different at GR, update RG1 at MIGO are flagged.
Check Depot settings are flagged for Excise groups for Depot
Check EI Create/23D is updated with flag mark for all Depot Excise Groups
Check the assignement of Plant, Excise Registration and Excise Group
Subcontracting
Check the sub contracting attribute is maintained as per plant requirement
Check the maintain movement type group is maitained with correct movement types
Incoming Excise Invoice
Check the assigned movement type for EI and Register Updates
Maintain Rejection code to cancel the Excise Invoice
Excise Regesiters
Check SAP Script is assigned
Number Ranges
Incoming Excise Invoice
Subcontracting Challan
Thanks
siva -
Problem in Assembly Processing in Project System
Hello All,
My Client want to implement Assembly Processing. We have configured the system as per SAP Standard. we are testing this in Quality System along with SD & PP Modules. we have template which contain Material WBS Process WBS & Other Cost WBS But we are getting all cost of material and process cost on one Material WBS after Production order confirmation. How can we divide this cost separately for Material & Process WBS.
As SAP Standard Process we maintained activities for different process also but when we tested this we are not clear about the use of these activities. We are not getting any cost or don't have any relation in any way for these activities.
Please Help me about this Assembly Process.
Thanks
Warm Regards
Sunil1. Create a Inquiry in VA11 --OK
*2. Create Quaotation in VA21 wrf to Inquiry*--OK
3. Create a Sales order in VA01, while creating sales order, as soon as we assign the material component in SD line item a pop will come for entering std wbs, std ntw, network profile. once we enter this at bottom we can see that scheduling is carried out. Note: if we define material/std wbs/std ntw in CN08 then pop will not come. Now check for errors and save the sales order, at bottom we can see that project order is created. Note: Project number is same as sales order no:---OK
4. in Billing plan tab at item level we can see the milestones for new project.--In sales order i don't see any milestone or any type of setting. can you please tell me about this we are not able to execute milestone billing in our case.
Ans to Query: For Milestone billing to work you need to do the following settings in SAPSD
1. Create Billing Plan in SD and assign the Billing Plan to Sales Document type you are using. Path: IMGSDBillingBilling Plan
2. In the above node , do settings for Define Billing Plan Types, Define And Assign Date Categories, Maintain Date Proposals For Billing Plan Types, Assign Billing Plan Types To Sales Document Types, Assign Billing Plan Types To Item Categories.
By doing above settings you will get an additional tab u201CBilling Planu201D in Sales order where you can get the milestones generated for new project. For exiting project you can copy milestones to SD from project.
If you want Billing Plan at sales document item level, assign the billing plan type in Item category.
5. In Sales order we can see that billing lock is set against the milestones.---Not Found
Ans to Query: By doing the above settings as in slno 4, you can see the billing block against the milestone*6.Now open the project in Cj20n and go to network we can see sales order no with line item no.*---OK
7. Now verify the mile stones in the project.--Adding milestone but no effect in billing
*Ans to Query : you can see that milestone no in Sales order and Project will be same. Note: Subject to in your standard network you should have milestones, so that we you create a sales order new milestones will get generated wrt to milestones in Std network. So when project is created you can see mile stones are also created.*8 .check the requirement list in MD04 against the Finished product we can see that requirement is generated againt project wrt to sales order.---No requirement is displayed .
To generate the requirements. Check the settings in requirement class.
9. Run MRP in MDBT/MD02/MD01, based on procurement type in MM , PR's and Pld order will generated. Note: ALL PR's and PLD Orders are account assigned to WBS.---When we execute this MRP this is not picking requirement from project. BOM created by CS01. if we assign material to activity than this MRP is picking requirement from project.
10. Now do Pr>PO>GR>(ALL all accounted against project.--OK
11. Convert Pld order to Production order> release the order> Goods issues against production order.--OK
12. Confirm the Procution order wrt routing operation one by one in CO11N.--OK but we want sageregated cost for material cost and process cost to different WBS as we have material WBS and Process WBS.
Ans to Query: This is not possible because in Assembly order processing single account assignment is only possible for the finished products, and for that finished product routing is also account assigned to the WBS assigned to Production order. So operation cost comes and sits in same WBS. If at all you want to track separately you can transfer the actual cost for process to process WBS in tcode:KB11N
Using KB11N tcode we can manual transfer cost from one WBS to another WBS.13. in cost element reports at projects we can see the cost breakup for all production activities as well as for material.--you mean CJI3 report
*Ans to query: Yes you can see in CJI3 report or in SALR_870135452 report also_*14. settle the production order.----where to settle this production order? and how?
*Ans to Query: For assembly processing account assignment is u201CQu201D so automatically in production order we can see the settlement rule is set against the WBS. So the cost from production order is settled to WBS and subsequently from project to the respective receiver as per settlement rule in project.*
15. conform all activities in Project.----OK CN25 or CJ20N
In any of the above tcodes
16. Do billing in SD as when when mile stone reaches to post actual revenues.----OK
17. run RA in KKA2 and save the RA results--OK
18. Run settlement in CJ88 ---Not using any settlement
19. set the status of Project as Teco and Clsd.---OK
Please let me know if you need more clarifications
Regards
kishore
Edited by: Virendra Pal on Jun 1, 2011 11:53 AM
Please do not use bold and underline text message short cuts etc - in future your posts will be removed
Secondly all that you are mentioning is available in SAP Help or in the wiki -
Error coming while creating sales order Thru' Assembly processing.u00A0
Hi,
I am working on assembly processing. when i am creating sales order if order qty when i am giving more then 999 means if i given 1000 kg it giving an error like the exection factor in the network is reduced to 1000 to 1 kg and confimed as 1 kg only and system is giving msg *Change not accepted (execution factor in network too large)* where i have tomodify this .
In above context i would like to brief you that i can't extend quantity more then 999(Three alfabet).
All suggestions will be apreciated with good points.
Regards,
Vishal Kr. SharmaHi vishal
Check in MMR the following settings :
1) Base unit of measure
2) sales unit
3) Strategy group maintained in MMR ->MRP 3 view
4) Availability check(sales/general plant view in MMR ) and MRP type (MRP1 view in MMR) has been maintained or not.
5) Check the fields maintained in the MRP 3 view.
Regards
Srinath -
Ps assembly processing:WBS have not be created when saving the sales order
In the ps assembly processing, I want to generate a network when I create a sales order. So I did the following steps:
1-Use the TCODE cj91 to create a standard WBS "E-000007.1".
2-Use the TCODE cn01 to create a standard network "10000000" and assign the standard WBS "E-000007.1" to it.
3-Use the TCODE cn08 to config the Network Parameters from Sales Order like below:
Material number : 600000-000000-0009
Order Type : Z301
Std network : 10000000
Class Type : 020
Network Profile : Z0001
MRP Controller : 001
Std WBS element : E-000007.1
4-Use the TCODE va01 to create a sales order and add an item with the material "600000-000000-0009" and save.
When the SAP R/3 System is saving the sales order, a WBS ought to be created u2013 based on the assignment of the standard network to the standard project.But I could not found the WBS.I thought I have do all of steps and could not found the reason.
So I need the experts give me some useful advice and reference to resolve the problem.Thank you.
Regards
YodaHi,
Maintain strategy group in material master MRP tab....
If problem still persist then check is there any credit block to that customer...if it is release it in VKM3....
Once you release it will create automatically.
Regards -
Configurable Networks in Assembly Processing
Hi Gurus,
I have implemented Assembly Processing with configurable networks. I am facing an issue here.
The requirment is to capture the Delivery time ( Z field) from quotation and apply a formula and calculate the normal duration of the activites of the network created on saving the quotation.
I have used Varaiant configuration for the same
I created following characterstics
1. PS_DEL_TIME_TEST - To capture the delivery time from quotation line item
Table Name VBAP
Field Name ZZ_DELTIME
2. PS_DURATION - To fill the normal duration of activity
Table Name AFVGD
Field Name DAUNO
3. PS_DIST_DUR_TEST- User field of activity
Table Name AFVGD
Field Name USR04
The Dependency that is used is
000010 $SELF.PS_DURATION = ($PARENT.PS_DEL_TIME_Test * 30)*
000020 (MDATA PS_DIST_DUR_TEST/100)
Now the problem is that the Delivery time is not captured in quotation level but is not copied to the characterstic value assignment to the network.
Can some one please help me with this?
BRhi,
refer the below wiki about assembly processing and assignment of configured network.
http://wiki.sdn.sap.com/wiki/display/PLM/AssemblyProcessinProjectSystems
http://wiki.sdn.sap.com/wiki/display/PLM/ADemoonConfigurableNetwork
regards,
Edited by: NAG on Jul 21, 2010 1:28 PM -
Hi,
I have created standard WBS E-9818.Using this WBS, I have created standard Network E-9818.Then I have created material M-9818 & made assignment in CN08.
After this when I try to create sales order using order type PS1, it is not creating sales order with no. 9818. But it is creating sales order with no. 12117.Also it creates project with no. E-2117.Ideally speaking it should create project with no.
E-9818.
Please let me know what could be the problem?
Any pointers on this will be highly appreciated.Useful answers will be rewarded with good points.
Regards
TusharHi Tushar,
What the System does is correct.U have created std WBS and assigned them to the activities in STD network.So when ever the Sales order is created,it can create various order types thru assembly processing, since network is an order type 20,it creates std network first thru which it picks up the std WBS to create operative WBS.
So whatever may be your STD wbs id , as soon as a sales order is created ,a project will be created with the last four digits of the sales order as the project id and similarly for the WBS element.
thanx,
reward points if usefull. -
Delete project/network from assembly processing
Hi'
We have a situation where we have created a contract line item with an assembly material = we have a project and network created.
But - the material is wrong and we want to delete the contract line item and create a new line item with another assembly material.
I know it is possible to delete the line item - but the project is still not deleted and it is not possible to create a new line item.
I cannot delete the project because it has connection to contract line item (but I can delete the line item anyway - strange but true).
How can I solve this problem in the contract?
Best regards
Lone WürtzHi'
When I delete the line item, the Network are marked as deleted - but not the WBS-elements.
If I try to create the new line item after deletion of the old, I get this error message:
"Project TM-40102872 is allocated to standard WBS TM-00000008."
The material I want to add at the new line item is connectec with standard WBS TM-00000009 (another standard project and WBS)
Then Im asked to enter WBS acct. assng an billing WBS. I can choose from existing operative (not templates/standard WBS)
After this input I get an error:
"Error when processing Network
Message no. V1380"
I can only choose "Exit" and I leave VA42 without any changes
I have tried to mark the old WBS-elements with status deletion flag - and the old Project Definition the same. But I still get the same error messages.
I need to be able to deleted the old project completely.
I cannot delete the old Project/WBS because the network is allocated to them.
I cannot remove the allocation between network and WBS (no changes are possible because the network still have connection to a deleted line item).
Im feel Im in a deadlock
Regards
Lone -
Querries about Assembly Processing
Hi,
In our scenario we planned to trigger Project thru sales order.We did the necessary setting. In standard WBS I defined one header level WBS & below it four 2nd level WBS.but the Project which generated the SD document contains only one Header level WBS n Network Header only. Can I trigger the entire project hierarchy say of @ 100 WBS & 150 networks with material thru SD document by definining a single sales material ? if yes How ? Wht should be the process flow in scenarios of Assembly processing where i hv to generate project thru Sales document. also I want to run MRP for production ?
Pl suggest.
RgdsHi,
It seems that you have assigned only top level WBS to standard network. Goto CN02 enter your standard neywork and click on Total tab and assign other WBS to activities.
You can create only 1 network for 1 line item, number of WBS can be more than 1 provided they are defined as standard WBS and assigned to standard network.
Refer this link thouroghly:
http://help.sap.com/saphelp_erp60_sp/helpdata/en/ab/5d4868733311d2b6600000e82d8bd1/frameset.htm
Regards -
Hi All
I am doing assembly processing for project with varient configeration
When I create and save sales order for a material taking quantity as 1 a project is being generated for SO with quantity 1 for a material
when I put quantity more than one in SO say 2 , the project is bening generated with quantity for material as 1 ony.
My requirment is the project should get generated with quantity 2 ( equal to SO quantity)
any setting required for transferring quantity of material in SO to project ?
waiting for reply
shashankSystem uses execution factor for sales order quantity. Enter execution factor in standard network as '1' ie., the network, activities and materials are assigned for 1 no. of sales order quantity. if your sales order quantity changes to 2, then system will change the execution factor to 2 and so the material quantities in network.
Try this. -
Assembly Processing Information
Hi,
I'm new with SAP technology. I'm working on Assembly Processing in order to have automatically filled WBS element in a sales order, once saving it.
I would like to kindly ask you if the Assembly Processing can be implemented only with Standard WBS (Standard Network) or if it can be implemented with WBS normally (not standard).
With Standard WBS it is not possible to store any planning data, planned costs or revenues, but business needs is to manage them.
Thanks a lot,
IsaHi,
I agree with what Abdul has to say. Refer SAP Help and get the concept of Assembly Processing cleared. Most of your doubts will get cleared once you are through with that. Secondly, you can refer the WIKI section in SDN. There is a very good article that explains the configuration details required for Assembly Processing.
This should suffice as of now. Revert later with specific queries.
Regards,
Gokul -
Dear all,
I am working on assembly processing . wht i have done i will tell you first.
1) strategy 85 in material master
2) Created sale order , automatic generate project .
Now could you plz tell me for further step like In this scenario where the stock and cost will update ? In slae order or project? and how?
plz gude meHi ,
In project u can hv option of No stock/non valuated stock /valuated stock.
refer
http://help.sap.com/saphelp_di46c2/helpdata/EN/d7/b8853488601e33e10000009b38f83b/frameset.htm
cost booking is either thru GR/GI for material or service against WBS or activity or production order confirmations or direct finanacial postings for project.
Assy processing has its advantage for auto generation of projects in line with the sales process due to this the further cost booking or stock update processes didnt affect.
Rgds -
Reqmnt class assignment to material for assembly processing?
Dear All
How can i assign a requirement class to material which enables assembly processing ??
Thanks in advanceIf you go though this help link it will clear your understanding. Also chekc thread for the assembly processing, will get lots of information .
http://help.sap.com/erp2005_ehp_04/helpdata/EN/95/1613ab837b11d2b6700000e82d8bd1/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/41/191e9e45fd11d188ff0000e8322f96/frameset.htm
With Regards
Nitin P.
Maybe you are looking for
-
Why does it say you've been signed out when I try to sign in?
Im trying to download Photoshop CC and everytime I try to sign in, Im told I've been signed out.
-
Unable to display new PDF's in Illustrator 10
Unable to open PDF files in Illustrator 10.0.3. Using a trial version of Adobe Acrobat X Pro (via Suite) and worked to import into AI which indicates that the files are corrupted and unrepairable. Ugh...use older version of Acrobat? T
-
SDN, My question is the OLAP variable used at infopackage levl. Is that variable got entry when queri runs or from where it gets value? I didn't understand this I'm just confused in this regards. why olap variable(BEX varialbe ) at ip level pls could
-
Adding option to smart album drop-down list
I want to create a smart album of all 5-star images, but to exclude one project. So I create a new smart album, go to the gear, add "Other Metadata" and in the first list, select "Project." But there is no option in the second drop-down for "is not."
-
Is there an easier/simpler way of obtaining this result ?
Good morning (afternoon to you, BluShadow), I obtained the following correct, as desired, output (derived from the EMP table): D10 D20 D30 PREZ MGRS ANALS SALESM CLERKS CLARK JONES WARD KING BLAKE FORD ALLEN ADAM