PU Ordered quantity exceeded by 123,456

Hi,
I have selected the default value for 'Propose all items' in the MIGO settings option, to enable early GR against a Scheduling Agreement.
Now, When i try to do a GR with MIGO i am getting the following error message: PU Ordered quantity exceeded by 123,456
I beleive we can change this 'Error Message' into a 'Warning Message'. Please help with the configurations to do this.
Please help. This is very urgent.
Thanks,
Manju

hi,
I have implemented whatz mentioned in OSS Note # 741385.
Use transaction CMOD create a new project.
Enter MEVME001 as enhancement, select EXIT_SAPLEINR_001 function module
under Components, and enter the following source code in INCLUDEs ZXM06U28:
data: ls_ekpo like ekpo.
move pot to ls_ekpo.
f4 = ls_ekpo-menge + ls_ekpo-menge * ls_ekpo-uebto / 100.
Activate the function and exit the project.
Note that in transaction MIGO the 'propose all items' field should be set
to the default values.
But still when I check the document i am getting the same error PU Ordered quantity exceeded by 123,456
Please advise. This is very very urgent.
Thanks,
Manju
Edited by: Manju Veena on Mar 26, 2008 6:51 AM

Similar Messages

  • ML81N - M7 022 - PU Ordered quantity exceeded by

    I have a PO (NB) with item cat = D
    The Over Del Tol on the Item->Delivery is flagged and the services have unlimited tolerances and unlimted overall service tolerances. The item qty = 1 AU as you expect and the service qty is 100 EA.
    When I process ML81N to accept a service entry sheet  for 1 EA on that service it gives "M7 022 - PU Ordered quantity exceeded by 1 EA"
    Other info:
    - the service was pulled into the service entry sheet via Adopt/Select Services i.e. it´s a planned service
    - no other sev. entry sheets exist
    SAP OSS and forums only mention the need to flag the Item -> Delivery Unltd Over Del Tol flag, which is flagged in my case.
    Any ideas?

    Hi Gurus,
    I cannot 'accept' a Service Entry sheet.
    It just gets to the 'will be accepted' status.
    When I press save, I get more or less the same error.
    The error in my case is: "PU Ordered quantity exceeded by 1 AU : 1808".
    I am wondering why this happens because when we tested it in a dev box, there were no problems accepting the entry sheet.
    I am not very familiar with SAP MM and your help will be welcomed.
    Info:
    • This occurs when we test it in the test box
    • The Delivery > Overdelivery tolerance limit flag is enabled.
    • The Services > Overfulfillment tolerance flag is disabled.
    • Changing the qty in the SES does not help.
    Thanks.
    ~ ric

  • PU Ordered quantity exceeded by  QTY8 EA

    Hi Experts,
    we have a process. we created Purchase order ( Intercompany). The Po will create SO ,Delivery, GI through batch jon. Then we go to me23n. we have corresponding Inbound delivery for Delivery doc.But when i create GR,system is showing error message (PU Ordered quantity exceeded by 8 EA ). ven though though inbound delivery happened and stock available.
    Thanks & regards,
    Vamsi

    Hi,
    SO will divide  qty 8 each due to availability check. first line item was confirmed for  qty 8 . and the second lienitem confirmes after few hrs with qty 8 due to APO availabity check. it was common in our process.. so delivery doc created for qty 8 each. respectively inbound delivery is 8 for each delivery doc.after inbound , i am unable to do GR either MB01 nor invound delivery change mode and click goods receipt.both the ways, i am unable to do GR for both the qty's
    Hope this Helps.
    Regards,
    Vamsi

  • PU ordered quantity exceeded by...

    While doing MIGO for Schedule agreements the following error occurs :  PU Ordered quantity exceeded by..... can u suggest a possible reasons and solution for the same...
    regards
    Dhinakar

    Hi,
    For example,
    You have done GR for 10 nos against a PO of 25 nos.
    So remaining 15nos only,you can do GR.
    But,if you try to do the GR for 20 nos, the error will appear.
    I think it will clear you.
    Reward if useful.

  • PU Ordered quantity exceeded by 2 EA

    Hi
    If the PO qty is 10 and i want to do a GR for 12 qty. i am getting a "Erro message" as "PU Ordered quantity exceeded by 2 EA"
    So my question is, I want to change this ERROR TO WARNING message.
    Where i can get this.
    Thanks
    Anand

    Hi,
    Since this error is during MIGO or GR, i suggst you to got o the customizing of GR settings.
    Go to MM--- > Inventory Management -
    > Goods Receipt --- > Tolerance Limits.
    Adjust to required value. Then try to create GR. The values will be taken depending on the tolerance limitsOver Tolerance) settings.
    Ex: If Over Delv tolerance =25%.
    PO quantity is 100. You want to do GR for 125nos, The system will accept becacuse it has been customized for 25% more.
    IF 126, it throws error.
    Hope this is helpful.
    any queries, let me know.
    Thanks & Regards,
    Smitha

  • MB01 ERROR M7022 PU Ordered quantity exceeded

    OMCQ - messages are as Worning, Set Tolerance Limits are either "Set Tolerance Limits" or "Set Tolerance Limits 99%". In PO I ordered 10 pce, but in MB01 (goods receipt) I change quantity into 12 pce. But I receive Error message (hard in program) - please, how it is possible to change to Warning?
    Thank you for your help
    Faba

    1)Firstly, find the message class and number of the sytem message by clicking on to the message and then change the message status to warning in inventory management node of customizing.
    OR
    2)Change the tolerance limit in item detail of PO .Increase the overdelivery tolerance of the item of the PO and perform the GR

  • DTW : How to Create goods receipt with quantity exceeding purchase order ?

    Hello DTW Experts,
    is there any way to deliver or receive an quantity exceeding the quantiy of the purchase order using DTW, or the only way is to create additional order (create a goods receipt is based on a purchase order).
    When i try the system gives me these 2 different messages :
    1 - One of the base documents has already been closed  PDN1.BaseEntry[line: 1]Erreur définie par l'application ou par ...
    2 - One of the base documents has already been closed Erreur définie par l'application ou par l'objetoPurchaseDeliveryNotes
    Thanks,
    Hafid

    The best way is to draw the purchse order through then add an additional line to the Goods Receipt for the additional quantity. This will close the PO properly, but record the additional quantity

  • Purchase Order quantity must not Exceed Sales Order quantity

    Dear Experts
    My requirement is when i am creating PO in me21n and taking Document type as Domestic PO and giving account assignmnet as "C" Sales Order, must have to enter Material and quantity and must have to Give Sales Order number and item no in account assignmnet tab , the quantity i am entering in PO must not exceed my Sales Order quantity that is my requirement.
    Regards
    Abi

    Hi,
    You do not create a PO with reference to sales order. In PO you enter sales order number for reference. A purchase requsition can be created directly from Sales order or through MRP depending on the system settings. Then this PR can be converted to PO. here you can restrict the quantity. As in order to change the quantity in PR also you will have to change the quantity in sales order.
    Regards
    Raj

  • Delivery quantity should not exceed order quantity

    Hi,
    in delivery delivery quantity should not exceed order quantity what should i do
    please let me now what should i do it is urgent
    Thanks in advance
    Srinivas

    Hi,
    You may consider an enhancement with a user exit:FORM USEREXIT_SAVE_DOCUMENT_PREPARE in include MV50AFZ1.
    Here you can put additional conditions to check the delivery qty and also can put a message for the user to correct the delivery qty in case he has manully increased it.
    Please reward points if this helps.
    Hemant

  • Sales Block for order whose quantity exceeds % of available stock on hand

    Hello gurus,
    I am wondering if there is standard SAP functionality that could enable the following scenario:
    For a material in material group XYZ, if a sales order is entered that exceeds 50% of stock on hand, a delivery block is placed on the order.  If a sales order is entered that is under 50% of stock on hand, no delivery block is placed on the order.
    The number 50% is arbitrary and would be specified based on the material group.  As well, this can be based on the material.  I'm hoping there is configuration out there that would block the delivery creation if an item on the sales order exceeded a pre-defined % of available, unrestricted stock in the plant.  Any help would be greatly appreciated!

    Hi Andy,
    Let me summarise ur question - You have Material - A, B & C all of them belonging to a particular Mat. Group lets say - 444. Lets think if the stock of all the Materials - A, B & C is 100 CS's.
    When a Sales order is created for Material - A for Quantity of 60 CS - You want a Delivery block.
    If my understanding is yes, I think the requirement is too complex, but achiviable.
    Because -
    - If this can be achived its possible with only User exits, but the requirment is linked with Availability,
    - If we want to implement this in the Save user exit, the code has to go check the stock in availability and if the conditions are met needs to block the delivery,
    - you need to consider the stock situations as the re-scheduling will also be happening in the background,
    - Wht would happen if there are more than 1 material entered and both are different Material grounps. [Need to consider this scenario as well]
    Instead of Delivery block - You can implement the changes to Reject the line if the % crosses. That is reason for rejection. As this is more specific to line item.
    Create a Z* table and update it with the Material groups that you are planning to use. And give the %.
    Implement the code changes in the Save user exit in MV45AFZZ to check this table for each material group and validate it and then compare the Ordered Quantity with the available stock of that material. Not sure though from where you want to get the stock figures.
    I tried, but this might be a start. All the best.
    Thank you,
    Chaitu...

  • Good receipt exceed purchase order quantity

    Hello all, I am trying to do a good receipt that exceed purchase order quantity but I have an error message that I can´t do it.
    I configure tolerance limits B1, B2 and VP but it doesn´t work.
    I only can do a good receipt that exceed purchase order if I put tolerance limits in the PO Delivery tab
    Is there another way?
    Thanks in advance
    Rosa Rodríguez

    Hi Rosa,
    You can see the SAP Note 24312 - Inventory management - system message M7022 - Release Indep.
    As stated in it:
    "During the goods receipt with reference to the purchase order or the production order, overdeliveries are only allowed if this was determined in the purchase order or order (indicator "Unlimited" or definition of the "overdelivery tolerance"). If this is exceeded, the system will always display an error message.
    The corresponding system message was hard-coded as error message in the program. In these cases, the Customizing settings have no effect."
    Also see the SAP Library:
    http://help.sap.com/
    SAP ERP Central Component
    -> Logistics
       -> Materials Management (MM)
          -> Inventory Management (MM-IM)
             -> Inventory Management and Physical Inventory (MM-IM)
                -> Goods Receipt
                   -> Goods Receipts for Purchase Orders
                      -> Underdeliveries, Overdeliveries, and Final
                         Deliveries
    "Overdeliveries:
    In the standard, overdeliveries are not allowed. In the event of an overdelivery, the system issues an ERROR message.
    If overdeliveries are to be allowed, you can specify the following data in the purchase order:
    .- Unlimited indicator:
    If this indicator is set, overdeliveries of any size are allowed. The system does not issue any message.
    .- Overdelivery tolerance:
    You can enter a percentage overdelivery tolerance in the purchase order.
    If a quantity of goods received is larger than the order quantity plus the overdelivery tolerance, it is not accepted by the SAP system."
    So you can only overdeliver the quantity ordered by setting the "unlimited" (EKPO-UEBTK) indicator or by defining Overdelivery tolerances at the Purchase order item level.
    It is not allowed either to receive more than the quantity ordered plus the overdelivery tolerance.
    The system forbids overdeliveries by hardcoding the message as error in the system.
    As already stated by the note 24312 the customizing settings do not have any effect.
    I hope this helps you.
    Best regards,
    Esther.

  • Goods issue quantity exceeds the ordered quantity

    Hi Gurus,
                    I created a sales order with single line item for 100 MT. Subsequently i created outbound delivery against the order. Now the 100 MT quantity gets copied in the delivery. now i created an additional line item in the same delivery for 10 MT against the same material . After this i did the PGI. To my surprise system allowed to do the PGI for this additional item that i had added. Now in this case the goods issue quantity exceeds the Sales order quantity. How can i restrict such functionality.
    My requirement is that the goods issue quantity should never exceed the ordered quantity in any case. Moreover the line items should be copied directly from sales order and there should not be any scope of adding any additional line item during delivery. The outbound delivery document should be copied from sales order and no manual alterations should take place during delivery or PGI . How can i achieve the same . Please help.
    Thanks in advance.

    Also for your delivery document tpye,under order reference,keep item requirement as '201' so that system will not allow any new entries in the delivery.
    Phani Prasad.
    P:S: Please check the forum before you post your questions as this query was answered a number of times earlier.
    Edited by: phani.prasad on Mar 6, 2012 11:29 AM

  • Return/Replacement Confirmation quantity is exceeding order quantity

    Hi All,
    When an R/R is replicated from CRM to ECC in the sales order the confirmation quantity is exceeding order quantity .
    What can be possible reason for this behavior ?
    Kind Regards,
    Naval

    Hi Naval,
    I can think of possible reason is rounding profile is activated on item category to round up based on the product.
    Thanks
    Ajay

  • Reg: P0 Notified quantity exceeds quantity ordered 50 EA

    Dear gurus,
    My scenario is intially a PO was made for 50000 with price Rs. 2/-.for this they have done Goods reciept of 25000.
    Now the Material value has changed from Rs2/- to Rs3/- for the rest of 25000 quantity for which Goods reciept is yet to be done.
    so for this i am going and changing PO as two line items 25000 each and giving respective price.
    In our process PO->Inbound Delivery->Goods reciept is followed.so when i am doing the above change in the PO i am getting the error as Error : Notified quantity exceeds quantity ordered 50 EA
                             Message no 0161.
    Please guide me.
    With regards,
    Mallik

    HI,
    You have an order confirmation (or advanced shipping notification , or inbound delivery) in your PO item coonfirmations tab that has a quantity that is 50 smaller than your goods receipt quantity.
    Change the confirmed quantity in the PO. then you can do you GR without error
    Regards
    KK

  • Sales Order quantity Must not exceed Purchase order quantity

    Dear Experts,
    My requirement is when i am creating a Purchase order giving referenece as Sales Order .. system must not allow the user to enter  more than Sales order quantity.
    Ex : Sales Order 1234
            Material : AAAA
            Quantity : 100
    while creating a Purchase order for Mat AAAA giving  reference of Sales order i.e 1234 and quantity 150 system must not allow user to enter more than sales order quantity . If user wants to create PO for 150 he must have to ammend the sales order from 100 to 150  is it possible.
    Kindly do the needful
    Regards
    abhi

    Dear Abhinav,
    First of all, Purchase Order will get created with reference to Purchase requisition (T. Code: VOV7 --> Item Cat.: TAS --> Tab: Transaction Flow --> Field: Automatic PO Creation), and not with reference to Sales Order.
    This is Purchase requisition, which gets created with reference to Sales Order; based upon settings in:
    T. Code: VOV6 --> Schd. Line Cat.: CS
    Order Type            NB    Purchase Requisition
    Item Category         5     Third-party
    Acct Assgt Cat.       X     All aux.acct.assgts.
    Now, coming to your requirement (based up on my inputs),
    My requirement is when i am creating a Purchase order giving referenece as Sales Order .. system must not allow the user to enter more than Sales order quantity.
    To Restrict Purchase requisition quantity in PO, then in T. Code: OMCQ
    Or, Path: SPRO > img > MM > Purchasing > Environment Data > Define Attributes of System Messages
    Here make following messages as Error;
    06 076 Materials of requisition & item & alr. ordered in full
    06 254 Order quantity greater than requisition quantity
    Now,  in Purchase Requisition, if it is created for 100 qty (with ref. to Sales Order) and if you adopt the same in Purchase Order and try to change the qty to 150, then system will not allow you change and throws the error.
    Best Regards,
    Amit

Maybe you are looking for

  • I can no longer activate home sharing on my Apple TV

    I have an Apple TV 2nd (or 3rd) generation. It was working fine until I updated the firmware one month ago. I can no longer activate home sharing. The WIFI connection works fine as I was able to restore the device. Home sharing is active on my comput

  • Can I add a downloadable pdf document to my epub?

    Can I add a downloadable pdf document to my epub?

  • Two types of video

    I am new to FCP however I keep hearing about the ability of the program to adjust to different video clips. My project has 1920x1080 (29.97) and 1280x1080 (29.97) is this an issue? Is this the reason I am getting a large amount of dropped frame warni

  • PAL anamorphic projects seem to be coming out at export at 4:3

    I have Final Cut Studio 1 with all the latest updates. I am doing more video projects these days and I've noticed that upon export things seem to be going a bit wrong. Both straight to quicktime and using compressor to export a 16:9 project and out c

  • Libgpib.a(cib.o): In function `oserr', undefined reference to `errno'

    Hi, I just tried to compile my DAQ code using nigpib-0.8.3 using gcc3.2 on linux. I get the following error: /usr/local/nigpib/libgpib.a(cib.o): In function `oserr': /home/dwilson/src/nigpib-0.8.2/Linux-x86/cib.c:59: undefined reference to `errno' co