Puchase Req. Creation from MRP Run

I am running MD03 of single item and the purchase requisition getting created is NB type, where as configuration is for EC type purchase requisition.
Can you please help analysis this issue/.
Thanks & Regards
Milesh.

Hi,
Check NB type link with plant with MRP group?
Maintain the MRP group in the Mrp-1 view of the material and then in t.code: OMDT link your plant, MRP group and the default document  types of PR( EC type as required) & save.
For more check SAP note: 550844
Regard,
Biju K

Similar Messages

  • MRP-Exclude STO document type from MRP Run

    Hi,
    I want to exclude STO document type from MRP run, so that STO Open qty will not be considered as open qty while  doing MRP.
    I have checked below settings but didn't worked.
    1. In OMI8 - I have unchecked "Stock in Transfer"
    2. SPRO->Materials Management->Consumption-based Planning->Planning->Define torage Location MRP per plant
         Here I have excluded ONE storage location from MRP and same storage location has been used in the STO.
    Can anyone know how to resolve this ?
    Regards,
    Rakesh

    Rakesh,
    Yes, they will not be relevant for MRP.  Neither will anything else in that storage location.  However, the setting is not in configuration, but in the material master (MRP4 tab).
    The configuration setting you mentioned has no impact on existing material masters, it is only used to determine the default settings for newly created storage location entries for a material/plant..
    You can set a particular material/plant/stlocn to be irrelevant for MRP.  This relevancy is irrespective of document type, it can be a STO, a purchase req, a sales order,  a production order, or it could be stock (inventory)  - all supply and demand in this material/plant/stlocn are excluded from MRP processing.
    MRP relevancy of storage location is set at the material/plant/storage location level in the material master.
    If you do not wish to exclude a storage location from MRP, then you will have to find another way to make your STOs Irrelevant for MRP.  As I said earlier, STOs (like any other Purchase orders that are configured to process stock ), are generally considered to be relevant for MRP.    
    If you were a client, I would suggest that you rethink your business model that drives this requirement.   
    If the business model cannot be altered, and the storage location solution is unacceptable, then you will be stuck with a customized solution.
    Best Regards,
    DB49

  • Exclusion of Stock Transport specific MRP Elements from MRP Run

    Hi,
    How can we exclude specific MRP Elements from planning?
    I want to exclude the MRP elements like - Ord.DS, PRqRel, PlORel etc from MRP run.
    (After MRP run, they should only be displayed in MD04 and not planned)
    MRP run should treat all other MRP elements normally.
    Warm Regards,
    Madhavi.

    I think I understand what you want to do, and I think it is not possible without some major MODIFICATIONS, because it goes against the grain of what MRP is supposed to do: balance demand and supply.
    One thing you might consider as a possible work-around: create a "virtual plant" say 5000, that is a plant that isn't really used for anything. Then point your special procurement keys in plant 2000 to plant 5000. This is where you then get the purchase req releases etc, and they will not affect plant 1000.
    This doesn't require modifications... but it will also not display the elements in MD04 for plant 1000.
    Just an idea...

  • Differentiation between PRs' Coming from MRP Run & Reservations

    Hi,
    How can we differntiate that a PR is coming from MRP Run (If quantity falles below ROP) and Reservation (If Max is 2 and reserved is 4)
    Appreciate your responses
    Regards,
    Talha

    Hi,
       I didnt get the second part of the question...could you please elaborate.
       The PR creation indicator will be in PR - item level - contact person tab as shown below.
    Regards,
    AKPT

  • How to exempt a storage location from MRP run

    Hi all,
    How do I exempt a storage location and all its materials from MRP run.
    I am creating a new storage location and this should not be considered for MRP and  no idoc should be generated if a purchase order or a delivery is created from this storage location( should we stop entering this storage location in BD64 filters or anything more to prevent triggering of the idoc).
    Can somebody please through some light on these issues. 
    Kind Regards
    Chakradhar
    <REMOVED>

    Hi
    You need to set up master data for that material.In Mrp-4 View  set  storage location indicator as 1(one) .In this case your storage location stock will be exclude from MRP .
    Hope this will help
    Dilip

  • Excluding storage location from MRP run in Long Term Planning

    Hi,friends,
         In my scenario , i want to exclude storage location from MRP run in long term planning.When i set storage location MRP indicator "2" in SPRO and SLoc MRP indicator "1" MRP4 in material master, i can exclude the storage location after run MRP with MD01/MD02,and i can see the expected result in MD04.But in Long Term Planning scenario the storage location can not be excluded after run MRP with MS01/MS02,and the requirements list in MS04 include the stock in the storage location i want to exclude. i dont know if i miss something.Plz give me some advice.
    Regards
    Joey

    Hi,
    Refer the OSS Note 208017 - LTP: Long-term planning and storage locations
    ==========================================================================
    Symptom
    In long-term planning (Transactions MSBT / MS01 / MS02 / MS03), the MRP indicator of a storage location for a material is not taken into account (material master, view MRP 2 [up to and including Release 3.1I] or MRP 4 [as of Release 4.0A]).
    The storage locations excluded by MRP or planned separately are also planned in the plant segment.
    Additional key words
    LTP, MM01, MM02, MM03, master data, MRP indicator, LGORT ...
    Cause and prerequisites
    The MRP indicator for a certain storage location of a material is only taken into account in operative planning (requirements planning, MRP).
    The long-term planning occurs exclusively at plant level.
    Solution
    This is no error. The system works as intended.
    The individual storage locations should not be distinguished in the long-term planning, in order to perform a comprehensive long-term planning.
    This is important, for example, within the kanban processing where the storage locations with kanban MRP are excluded from the MRP, but in spite of that should be included in the long-term planning.
    ==========================================================================
    Regards,
    Siva

  • Storage location to be excluded from MRP Run

    Dear Gurus ,
    We are trying to exclude perticular Storage location from MRP Run with the Configuration setting
    IMG >>> Production >>>.MRP >>>.Planning >>>>.Define Storage Location  MRP per plant >>>> Indicator 1 is set
    Still the Stock is being considered
    As I know this can be done thr' MRP4 view , but we don't want to go Part No wise ,
    Suggest better sloution
    Thanx in advance

    Vasu,
    Above IMG path is only used  for defulting the storage location exclusion in material master.
    Whenever  materials are extended to this storage nlocation in mm01 or mmsc, this defult value would be proposed automatically .
    However this does not mean setting it in IMG would change existing materia storage location extensions automatically. Also MRP will not pick from above IMG settings.
    Once again above setting is only valid from defulting the values while extending the Materials to storage locations.
    Hope it helps.

  • Number Range for PR converted from MRP Run

    Dear Experts,
    We are experiencing problems with our number range when converting our MRP generated planned orders into PRs. We convert planned orders to purchase requisitions using MD03. We have 1 Plant with 2 MRP Groups which assigned to specific document types and number ranges as well. For example:
    In T-code OMI8:
    Plant AAAA --> Number Range 1111111111
    (Because 1 Plant only able to have 1 number ranges)
    In T-code OPPZ:
    Plant AAAA, MRP Group : A01--> PR Document Type : ZZZZ
    Plant AAAA, MRP Group : A02 --> PR Document Type : XXXX
    In T-code SPRO "PR Document Types" and "PR Document Ranges"
    PR Document Type : ZZZZ --> Number Ranges 1111111111
    PR Document Type : XXXX --> Number Ranges 2222222222
    When I run MD03, the result is:
    MRP Group : A01 --> PR Document Type : ZZZZ --> Number Ranges : 1111111111
    MRP Group : A02 --> PR Document Type : XXXX --> Number Ranges : 1111111111 (Why the number ranges is not 2222222222 ???????)
    Does anyone have idea? Please help. Thanks a lot..

    Hi Mallinath,
    thanks for your info.
    Note 46919 has been implemented in the system, and also i have maintain Tcode - OMI3:
    * Object Type : 2 (PR) --> PR Document Type : ZZZZ --> Internal number range : 1111111111 --> external number range : " " (blank) --> Reservations : 01
    * Object Type : 2 (PR) --> PR Document Type : XXXX--> Internal number range : 2222222222 --> external number range : " " (blank) --> Reservations : 01
    But still system pick wrong number ranges (1111111111, instead of 2222222222 ) for PR Document Type XXXX if generated from MRP run.
    Do you have any other idea? Thank you.

  • How to exclude the manually create SAP PO from MRP Run?

    Dear all
    There is this situation that due to the long procurement lead time, certain PO is created manually in SAP in advance based on the sales order enquiry made by customer. (In normal case, we will create a sales order in SAP and then run MRP to create PR to converted to PO)
    Most of the time, customer will confirm their enquiry so that we can create sales Order in SAP and this will make it just in time for our raw material to arrive. However, when the PO is created in advance without triggered by MRP caused by Sales Order, this PO booked quantity is often taken up by the consideration of MRP RUN by other sales order. And if later customer confirms their enquiry and there is no PO stock for this due to this stock is already considered by other sales order.
    Is there a way that I can exclude the manually create SAP PO from MRP Run?
    Please advise.

    Dear Csaba Szommer
    Thanks for your reply.
    Sorry for confusing you.
    1. We are in a MAKE TO ORDER (MTO) environment.
    2. There is this situation that due to the long procurement lead time, certain PO is created manually in SAP in advance based on
        the sales order enquiry made by customer. (In normal case, we will create a sales order in SAP and then run MRP to create
        PR to converted to PO).
    3. Most of the time, customer ABCwill confirm their enquiry so that we can create sales Order in SAP and this will make it just in
        time for our raw material to arrive.
    4. However, for the PO that is created in advance (not created by PR  triggered by MRP caused by Sales Order), this PO 
        On Order Quantity is often taken up by the consideration of MRP RUN by other sales orders.
    5. It creates problem that if later this customer ABC confirms his enquiry and we create SAP Sales Order in the system, the
        stock of PO created previously is already  eaten up by other sales orders.
    We are using MTO and do not use Forecast. And MTO Strategy is set at the material master level and as such I do not think we can simply modify the MRP Strategy to suit this unique case, as for the very same material, in one PO it should be considered by MRP but in another PO, it should be excluded from MRP Run.
    Is there a way that I can exclude the manually create SAP PO (for the case of Customer ABC email enquiry without creating Sales Order in the System first) from MRP Run?

  • Excluding PO from MRP Run

    Dear All,
                  I have one requirement that i want to exclude one PO document type( Developements PO) From MRP Run. How can i do this.
    Kindly Help
    Regards
    Sunil

    Hi,
           My scenario is that when a new vendor is developed for Procurement of a existing material then at first Developement Purchase Order is raised against that vendor. After finalisation of vendor standard PO is raised against that vendor. For a material which is being Procured from some vendor there will be Regular Purchase Order, now i need  more vendor for that Material then I will raise Developement PO against those vendor, then on Finalisation of vendor i will start raising regular PO for that vendor. In MRP run this Developement PO quantity should not be considered as receipt element
    Regards
    Sunil

  • Workflow not triggered for PR from MRP run

    Hi,
    I have PR Release strategy workflow configured, working well when i try to create PR manually, triggers workflow.
    PR's created thorugh MRP run, triggers release strategy but not workflow.
    I checked the event trace 'releasestepcreated' event not triggered through MRP run.
    Please respond ASAP.
    Your inputs will be highly appreciated.

    The response i got from SAP.
    Please see note 67866 Purchase req. from materials planning -> no workflow
    Thanks,
    Indira

  • Purchase req type after MRP Run

    Ca we control the type of Purchase req after MRP Run.
    Now for every material it is creating "NB" type purchase req.
    Can we control it material type or by mat number.
    We have 2-3 purchase req types in system for Material.
    Amit Shah

    Dear ,
    Goto -OPPR-Enter Plant Code and Maintain MRP Group -0000( as SAP Standrad for External Procurement ) -Select Scheduling /Doc Type tab -Here you can assing the PR type as per your requirement so the while MRP run , it will selct the PR documents types based on OPPR .At the same time , assing this MRP group in MRP1 view of the material .
    Try and come back
    Regards
    JH

  • Storage location exclusion from MRP run

    Dear Experts,
    please how do i exclude a particular storage location from being considered in MRP Run? and from which table(s) can I get the list of open production orders

    Dear Vincent,
    in OMIR you can exclude particular storage location. input values as 1
    MRP - 4 view For storage location option input value as 1
    in MMSC - same input value as 1
    For your scond query what exactly you mean be open Prd orders
    You can get all details in COOIS by inputting system status
    Regards
    Madhu

  • Exclude special stock (project) from MRP run

    Hi,
    Would need to exclude special stocks representing project stocks from MRP calculation. Could not seem to find a way to control this via config similar to options available for blocked and in-transit stocks.  Is there an option to do this in config?  Thanks...

    Hi,
    You can exclude the stock by creating storage location MRP.
    Create separate str location for project stock by MMSC.
    In the material master of mrp 4 view, str location indicator - select Exclude str loc from mrp  for new ie, project str loc.
    Check your Plant & str location by checking Plant/ data view in material master whether you have excluded the correct str location which you have newly created.
    When mrp run system exclude this str location.
    Regards,
    Dharma

  • Order of delivery schedule line counter at schedule agreements from MRP run

    Currently we are using schedule agreements for our long term external suppliers, but we are facing a problem with the order of new delivery schedule lines created during MRP run.
    Because of master data settings like, lot size, rounding value, plan delivery time and planning time fence to set as firm new requirements, multiple schedule lines are created with no order for schedule line counter.
    Does anyone is aware of a BADI, user exit or customizing control to have this schedule line counter in order?
    Thank you
    Daniel Guillen
    IT
    Skyworks Inc.

    Hi,
    Pls put this query in SD fourms  and get immly help because this is technical fourms.
    Anil

Maybe you are looking for

  • IPod Touch cannot connect to local Wi-Fi

    So, iPod Tuch 4g with OS 5.1.1 finds my local router, but it just says "connection to network [...] failed". MAC-filter is activated, but the iPod is authorized to connect. It doesn't work even if the filter is deactivated. It worked with no problems

  • Airport Extreme invalid IP address, no DNS server

    Hardware: Motorola SURFboard SB6141, Airport Extreme A1408 I recently set up a new internet service with Cox, plugged in the SB6141 and A1408 and everything set up perfectly, solid green light and wireless was flawless. However, electricity to my hou

  • BEAN : Bean included in JSP Page

    Hi , I had developed a web-application in that I had included a bean in a JSP code by using the following <jsp:useBean id="testbean" scope="session" class="path.test" /> now the problem is some times when we click on that particular JSP page where th

  • Can I hyperlink text to open an email in Apple Mail?

    Hi, Are there the equivalent of URLs for mail in apple mail?  I'd like to click on a link in say a Word document, that would immediately open up a related email, but I can't find out how to get the URL (or whatever it might be called) for an email wh

  • Changing a PDF to a word.doc

    Hi im trying to save a file on safari that is from a uni intranet(lecture notes) so that i can view it in word or powerpoint inorder to adjust the text and pic sizes so that when printed they are easier to view. The problem i have is that the saved f