Pull list in REM

Hi,
please suggest me what to do bit confused after going through the threads.
My scenario is like this:-
I HAVE TO TRANSFER OR ISSUE THE GOODS FOR PRODUCTION FROM THERE RESPECTIVE STORAGE LOC
I am working on REM make to stock scenario.
There is one FG and two SFG all together I am getting three planned order to execute on three different Production line (WC)
There are some SFG (halb) which is produced in one production line and used in another production line.
I am able to transfer the Raw material from main storage loc to Shop floor storage loc through PULL LIST and PICK LIST.
My problem starts when I try to transfer the SFG (halb) material to the other production line for production through PULL LIST.Here the issue storage loc and replenishment storage loc becomes same and system does not allow to proceed if the storage loc is same
I have three storage loc 1. A - for main store (RAW MATERIAL) 2. B - Shop floor storage loc (for production )3. C - for FG
My question is whether I am doing the right thing using PULL LIST and PICK LIST in this scenario.
if yes than how to do SFG transfer through PULL LIST and PICK LIST.
Is there any other way do the transfer I mean by MB1B manually.
Please revert back for more information
Regards
Kumar

Dear Kumar,
1.If my understanding is correct then pull list - MF60 is used to stage the materials as per the planned order quantity or as per
the BOM explosion(for the production quantity).
2.The system displays the required and the missing quantity for staging the components from one storage location to
production storage location.
3.If the main(issuing) and the production storage location is the same means then why do you expect to do a material staging
for the components?
check and revert back.
Regards
Mangalraj.S

Similar Messages

  • Run Pull list in REM

    Pull list in REM :
    I can’t display the pull list of a material.
    Please explain what is the process to run the pull list.
    Thanks

    Dear Omar,
    1.Pull List can be made use for Reserving materials in REM.
    2.It can be with respect to the Planned orders or With respect to BOM Explosion.(Also for Production/Process Orders option is
    available).
    3.Enter the plant,Staging Types - Storage Location Level,remove the date from selection period for requirements,then Under Global
    Settings,Remove the tick mark against Include all requirements and rest other options tick mark should be there,enter the planned
    order and then execute.
    4.Then after executing,click on replishment Elements,then select the row from the total requirements for which a reservation has to be
    created and click on Create Replenish.Proposals.,then in the bottom portion of the screen,you will be able to see the Replenishment
    Elements and then select this row and stage.
    5.The system creates a reservation for the elements for 311 movement.The reservation no can be obtained in MB25.
    6.Transfer for this materials can be confirmed in T code MF65.
    I hope now you will be able to make use of Pull List.
    Reward points if useful.
    Regards
    Mangalraj.S

  • REM pull list storage location

    hai gurus,
    i have one issue in rem pull list storage location.
    1) Fert = product A  and ROH = product B
    2) storage location in MRP 2 view for fert = 1000 and ROH production storage location is 1000 and external
        storage location is 2000.
    3) after procuring ROH from outside and doing MIGO the material is in 2000 storage location .
    4) While doing MF60 i had given rep storage location as 2000, but when viewed the stock status under
        MMBE  the stock is lying only in 2000 storage location area ,it is not posted to 1000 area.
    How to do the posting , as when i done MF60 i got the msg as - posting made sucessfully.
    with regards,
    sekar chand

    as there is no answers ,  i am closing this
    thread.
    regards,
    sekar chand

  • REM(Pull list)

    Hi
    I am working REM pull list.So i want to stage the material with respect to planned order in the MF60 transaction i will enter the planned order then it has to display the missing component with respect to planned.
    So over all requirement is stage the material against planned order no with respect to header material

    Hi,
    since u want to stage against Particular Planned order, do the following settings.
    Global setting -> deselect "Include all requirements"  under missing part cal tab,
    Now access the planning table with Planned order No , system will show missing part list  against planned order only.
    regards
    pradeep

  • How to use the Pull List in Discrete Scenario?

    Hi Gurus,
    I am using pull list MF60 in REM.
    How to use the Pull List for creating material reservations in Discrete Scenario also?
    Anyone used this Pull list in discrete, pl share.
    How is helpful in discrete scenario?
    Srini

    Hello,
    You can use Pull list for st.location transfers, if you are into WM managed then this pull list used a lot.
    You can use the pulllist to the max. extent. But with IM managed plant the use is limited and this is used only for storage location transfers.
    Issue cannot be done for Production orders. You can bring the materials to the req. storage locations and after that you have issue in the order or manually for the order.
    Regards,
    Manick.

  • Pull list for the component of the phantom assembly

    Hi
    I am in rem process. while doing the pull list for the fianl product using Entry with bom explosion.
    i did not get the components (level 3)for 1 assembly(level 2 ) which is phantom one under the final product (level 1) BOM.
    i also maintained the production stor loc for the components and the phantom assmy.
    i check the stock in the production storage location . no stock is there in the location.
    what is the problem . how to get the component of the phantom in the pull list.

    Dear Raj,
    If your FERT contains a HALB and inturn this HALB contains say HALB1 which is a phantom assembly
    and and another 2 raw materials means,when you execute MF60 For HALB,you will get the 2 raw
    materials along with the component's of phantom assembly.
    Check and revert back.
    Regards
    Mangalraj.S

  • Selection of default variant on MF60 pull list

    Hello,
    I am working in REM, using Pull list --MF60 in ECC 6.0
    My requirement is to set default variant on the MF60 screen for a User ID.
    The user will save his screen input in the variant and it is attached as default to the user profile.
    When the user comes to MF60 screen , he need not have to select the variant.The variant will come automatically , as it is attached to the user id.
    Is the above requirement possible?
    PP experts , please let me know about the same.
    Waiting for your reply.
    Regards,
    Ravindra

    Go to MF60
    On menu bar
    Goto--> Variants --> get variant (here select variant)
    Now again Goto --> Variants --> Save as variant
    pls see if useful

  • Pull list shortage qty list

    Dear PP Gurus,
                          In Rem make to stock scenario, we stage the missing parts through pull list, In this report system shows shortage qty and available qty at prod storage location.
                            But our client want to see the available stock overview of warehouse collectivly of all components of Bom.
                            Is there any standerd report which can show the above reqmt or is there any other solution. please give the inputs in details.
    Thanks & Regards
    Dhananjay Kulkarni

    Hi Dhananjay Kulkarni,
    U can see the stock overview of each components at Pull list itself.
    Goto Total requirement table  of the Pullist(Top one) select the  any one component ->Environment-> IM stock overview.
    Like wise u can see the stock overview of all the components.
    Please come back
    Regards
    Pradeep

  • Pull LIst MF60

    Hi
    I have REM scenario
    Iam not able to see any material in Pull list.
    I have dispatched planned orders, i can see issue storage location in planned order.

    Dear Mayuresh,
    1.Ensure the config setting in OSPP is configured for performing the same and Are those Planned orders with order type PE
    (Run Schedule Header Quantity)?If so is it having proper BOM components assigned in the planned order?
    2.After going to MF60 enter the check box for storage location type, plant,remove the date from
    selection period for requirements and under global settings include all the check boxes except for
    Include all requirements.
    3.Check what's the stock of the components in the required production storage location before executing MF60.If sufficient
    stock for the components is already at the production storage location means,then you may not get any materials list for staging.
    Regards
    Mangalraj.S

  • How to enable ALV like pull list (SAPLRMPU) ?

    Hi all,
    I'd sure like to get any piece of advice as to how the ALV like Pull List (this is SAPLRMPU in PP-REM) can be enabled with MF63...
    The SAP implementation I'm working on shows Version 500 for the SAP_APPL component ; which should provide with an ALV like pull list.... whereas all I seem to get is the good old "basic list" style display.
    The reason I'm fairly confident an ALV exists is because of OSS note # 135231 that I've come across ; and which seems to indicate an ALV like pull list should be available (even an interactively configurable one) as of rel 4.5A.
    I can't find anything in customizing that would seem to help enabling the ALV style list.
    Thanks in advance for any valuable tips.
    Yacine.

    Okay... Got a feedback from SAP saying there was no such thing as an ALV like pull list in standard SAP.

  • Pull List (Material Staging)

    Hi All,
    I am facing a problem with Pull List - Trigger Replenishment.
    I am into REM Mfg and i'm trying to do Matl Stgng against planned order. ( i have selected stk trnsfr resvn in Global settings). But after  i entr planned ordr no  and selection period n execute , the next screen is displayed without any details.
    N sometimes i get an error message in the 1st screen " No Orders Found"...
    Please guide me to correct above problems and also brief me abt  matl stgng against planned order and with "Entry with Bom explosion".
    with regards,
    LN

    Hi.
    Please ensure the following settings at Initial screen of pull list,
    Staging Type: "stor.loc.leve "selected
    Selection periods for req: Finish date of Planned  order. Global settings:-> Dialog control->
    create Rep.propsal= Automatic
    Stage rep .propasal= Automatic,
    Assign the Planned  order number .
    Along with standard settings of pull list, if u do above settings, and access with Planned  order number, system will give missing part overview and replenishment proposal .
    Assign replenishment storage location from which stock should be transfered to prod storage location and execute.
    Pradeep
    Edited by: Pradeep Kumar on May 8, 2008 3:59 PM

  • Pull list with 2 step transfer

    dear SAPper,
    We use pull list in the stock transfer,because the distance of staging area and raw material sloc is quite far (different block building) we must use two step movement type for transfer (303)
    The inventory will post the reservation from pull list with mvt 303 into good in transit from raw material (1010) to 1020(staging area)
    But some case is when the production order quantity increases and the production people create again pull list.
    here is the problem :
    the good is still in good intransit for staging area, pull list still create the whole quantity without consider that there is good in transit in staging area
    the pull list should only create the remaining increases because some is already availablt in good in transit
    is there any idea for the solution?
    best regards,
    freddy ha

    no solution

  • Stock transfer using PICK LIST / PULL LIST

    Hi Friend,
    We have two storage locations in the plant say 1000 - Main store which is ware house managed and 2000 - Production storage location.
    The goods issue needs to be done from production storage location 2000. How to transfer the material from 1000 - Main store which is ware house managed to 2000 - Production storage location using PICK LIST / PULL LIST concept.
    Kindly give the solution.
    Regards,
    Narendra Bora

    Hello Madhu,
    If you can suggest me as well. I am moving the goods to production storage location from raw material storage lcoation,
    While executing the MF60 it creates the reservation and display log
    RMPU     stock transfer reservations 00000412 22.03.2010 created successfully
    But does not move the goods using 311 movement type and stock is still in the raw material storage location.
    2ndly in MMBE, if i found the stock in Produciton location, it shows me
    Reserved                     20.000
    GR blocked stock         20.000
    Rcpt reservation          20.000
    If you can enlighten me in this area please, Would it move the stock or I need to make some other  steps also.
    Regards,
    JPS

  • How to create a push pull list?

    I am trying to create a push pull list and thought there was some easy way to do this? I have looked everywhere and can't find anything about these.
    I just want to be able to do something similar to the push pull found in the master detail wizard when you push columns over to display.
    Do I need custom javascript for this?

    Follow these steps in htmldb:
    Create New Page
    Form
    Master Detail Form
    Then select a table in your schema
    There are 2 boxes below - available columns and displayed columns. You can use the buttons in the middle to push and pull (or add and remove).
    This is what I call a push pull list and I assumed that as it was used here then the same functionality is available for use elsewhere (like in a wizard for an item maybe).
    Hope this makes more sense

  • Material Pull List

    Hi All,
    Can anyone explain me what exactly mean Material Pull List?. What is the use of this list and what T-Code do we use to see the Material Pull List.
    Thanks in advance

    T.Code - MF60
    Purpose
    The pull list controls the in-house flow of material for supplying production with materials. The system assumes that the components required for production have already been produced in-house or procured externally and are now available to be transferred from main stores to the production storage location.
    The pull list checks the stock situation at the production storage location and calculates the quantities of missing parts. Replenishment elements are created for these missing parts. Components are staged using stock transfer reservations.
    Integration
    The pull list is an integral part of repetitive manufacturing and shop floor control.
    The basis of replenishment planning is MRP - the component requirements are calculated in the MRP run. The system takes requirements from run schedule quantities and manual reservations into account.
    Prerequisites
    The pull list is to be used in the scenario, where components are stored in Central stores & are then transferred to shop storage location for production. If the components are stored & consumed from same shop storage location only, then pull list is not applicable.
    Constraints
    It is not the primary task of the pull list to determine the location of the required components.
    The pull list is primarily responsible for planning material staging (calculating missing parts and initiating replenishment) by creating stock transfer reservations in the form of replenishment elements. The actual staging is carried out by Central stores person.

Maybe you are looking for

  • Songs Cut Off Before Finished

    Can anyone tell me why on my Mini songs occasionally stop abruptly before they finish and the next song begins? The latest song to do this, which came off my CD, plays to completion on iTunes. Thanks. Sheldon

  • Assign contract to sales order item

    Hello *, I want to assign a contract to a sales order item in a ABAP report. The function module "BAPI_SALESORDER_CHANGE" seems not be suitable for this action. The document link is not correct. Do you have any idea how to solve the problem? Regards,

  • Acs 4.2.1.15 and ssh authentication with ios xr

    Hello, we have a new acs appliance (1113) with version 4.2.1.15 and we want to authenticate user through ssh from routers with ios xr software. unfortunately this doesn't work. Here ist our configuration of the router: line template VTY access-class

  • How to add ocr pdf to address book quickly

    I have many printed sheets of contacts that I need to import to address book. Other than manually typing or through the magic of ocr (http://en.wikipedia.org/wiki/Optical_character_recognition) then copying and pasting to address book, is there an ea

  • Is this website legal?

    Hi, Anyone tried this website http://www.ipodblockbusters.com/? Is this legal? I would like to be able to download movies, but I want it to be legal. Any reply would appreciated. Thanks, ApplePi