Hi
I have REM scenario
Iam not able to see any material in Pull list.
I have dispatched planned orders, i can see issue storage location in planned order.

Dear Mayuresh,
1.Ensure the config setting in OSPP is configured for performing the same and Are those Planned orders with order type PE
(Run Schedule Header Quantity)?If so is it having proper BOM components assigned in the planned order?
2.After going to MF60 enter the check box for storage location type, plant,remove the date from
selection period for requirements and under global settings include all the check boxes except for
Include all requirements.
3.Check what's the stock of the components in the required production storage location before executing MF60.If sufficient
stock for the components is already at the production storage location means,then you may not get any materials list for staging.
Regards
Mangalraj.S

Similar Messages

  • Material Staging through Pull List(MF60)

    Hi Gurus,
    1.My senario is Repetitive
    2.main Store:X,Production Store:Y
    3.Stock is available to Main Store
    4.material is being staged at Sorage Loc level
    5.Selection is through Planned Order(RSQ)
    6.Pull list is configured in IMG
    But I am not getting the materials to be staged. Pl guide me ,if I am missing any setting?
    regards
    Reshmi

    Dear Reshmi,
    After entering all details in MF60, go to Global settings
    Here Just check the tick marks & make as you required
    More over is stock is alredy exixts in Issue storage location then you cannot get in MF60
    After making required ticks in Global settings you can get
    Also check in OSPP whether Movement type 311 is defined or not
    Regards
    Madhu

  • Selection of default variant on MF60 pull list

    Hello,
    I am working in REM, using Pull list --MF60 in ECC 6.0
    My requirement is to set default variant on the MF60 screen for a User ID.
    The user will save his screen input in the variant and it is attached as default to the user profile.
    When the user comes to MF60 screen , he need not have to select the variant.The variant will come automatically , as it is attached to the user id.
    Is the above requirement possible?
    PP experts , please let me know about the same.
    Waiting for your reply.
    Regards,
    Ravindra

    Go to MF60
    On menu bar
    Goto--> Variants --> get variant (here select variant)
    Now again Goto --> Variants --> Save as variant
    pls see if useful

  • How to use the Pull List in Discrete Scenario?

    Hi Gurus,
    I am using pull list MF60 in REM.
    How to use the Pull List for creating material reservations in Discrete Scenario also?
    Anyone used this Pull list in discrete, pl share.
    How is helpful in discrete scenario?
    Srini

    Hello,
    You can use Pull list for st.location transfers, if you are into WM managed then this pull list used a lot.
    You can use the pulllist to the max. extent. But with IM managed plant the use is limited and this is used only for storage location transfers.
    Issue cannot be done for Production orders. You can bring the materials to the req. storage locations and after that you have issue in the order or manually for the order.
    Regards,
    Manick.

  • Goods Issue print for Pull list

    All,
    WHile doing Goods Issue by 201 mvt type one print format is coming .
    So we are designing a format for that .
    This print is coming thru output type WA03 .
    Also while doing pull list (MF60) , one print document is coming .
    Business wants a different format for that .
    And for both transactions ,output type is WA03 .
    How to tackle this situation ?
    regards

    Hello Sandeep,
    I think this query is already addressed. Follow the steps in this post, if you still have problem write to this forum.
    Goods Issue Print
    Hope this helps.
    Regards
    Arif Mansuri

  • Pull list issue

    Hi,
    My business process is make to stock - Discrete
    I would like to post the material through Material list and pick list.I created Poduction order for FG.
    but when i use to transfer the material through pull list (MF60), the componets are not appearing in the pull list.
    I checked config. for material staging, it is assigned to plant correctly and material is non back flush, stock is available
    What could be the issue Can you please clarrify.
    Regards
    Karthik

    Dear
    Please check the folliwing for this :
    1.Did you extended  the storage location(S) for those materials in Production order in MMSC if the material is
    present in more than one ?? Issue  Storage Location in MRP2 or in Production Version ??
    2.Did  you remove the mark  under global settings not to  include all requirements ,if you
    are going to pull the materials for individual production order ??
    3.Did you enter the requirement date ??
    4.In Production Order /Process Order tab , componenet , do not mark Backflashing , Movement Allowed
    5.Check the total selection in Global Setting -General setup and Dialogue Control
    6.Check If your material is in Production Stoarege loacation where as you may be  entering Raw material storage location ??
    Regards
    JH

  • Pull list in REM

    Hi,
    please suggest me what to do bit confused after going through the threads.
    My scenario is like this:-
    I HAVE TO TRANSFER OR ISSUE THE GOODS FOR PRODUCTION FROM THERE RESPECTIVE STORAGE LOC
    I am working on REM make to stock scenario.
    There is one FG and two SFG all together I am getting three planned order to execute on three different Production line (WC)
    There are some SFG (halb) which is produced in one production line and used in another production line.
    I am able to transfer the Raw material from main storage loc to Shop floor storage loc through PULL LIST and PICK LIST.
    My problem starts when I try to transfer the SFG (halb) material to the other production line for production through PULL LIST.Here the issue storage loc and replenishment storage loc becomes same and system does not allow to proceed if the storage loc is same
    I have three storage loc 1. A - for main store (RAW MATERIAL) 2. B - Shop floor storage loc (for production )3. C - for FG
    My question is whether I am doing the right thing using PULL LIST and PICK LIST in this scenario.
    if yes than how to do SFG transfer through PULL LIST and PICK LIST.
    Is there any other way do the transfer I mean by MB1B manually.
    Please revert back for more information
    Regards
    Kumar

    Dear Kumar,
    1.If my understanding is correct then pull list - MF60 is used to stage the materials as per the planned order quantity or as per
    the BOM explosion(for the production quantity).
    2.The system displays the required and the missing quantity for staging the components from one storage location to
    production storage location.
    3.If the main(issuing) and the production storage location is the same means then why do you expect to do a material staging
    for the components?
    check and revert back.
    Regards
    Mangalraj.S

  • Pick list and pull list

    Dear all
    1.Can any one explain the difference between Pick list(CO27)  and  Pull list(MF60) with a simple example.In which scenario we go for this pick and pull list
    2.What is Production storage location for components and finished product.How it is different from genereal storage location

    Hi,
    PIck List:
    Pick List is a document by which you carry out Goods Issue for the required materials from Storage location by Production order wise , material wise etc.By pick list you generate reservation for the particular materials and then issue them against that reservation for shop floor manufacturing.
    You can print the list, assemble the requested materials from the storage location accordingly, and post the goods issue via the pick list.
    Pull List
    Purpose
    The pull list controls the in-house flow of material for supplying production with materials. The system assumes that the components required for production have already been produced in-house or procured externally and are now available to be transferred from their current storage location or bin to the production storage location.
    The pull list checks the stock situation at the production storage location and calculates the quantities of missing parts. Replenishment elements can be created for these missing parts. Components can be staged via direct stock transfer or using stock transfer reservations. Replenishment can also be triggered by setting a kanban to u2018emptyu2019 or creating transfer requirements in Warehouse Management.
    Integration
    The pull list is an integral part of repetitive manufacturing and shop floor control.
    The basis of replenishment planning is MRP - the component requirements are calculated in the MRP run. The system takes requirements from run schedule quantities, production order reservations and manual reservations into account.
    Depending on the environment, replenishment can consist either of direct stock transfer, stock transfer reservations, kanbans or transfer requirements, which are then processed in the appropriate module.
    Features
    You can access the pull list by material to be produced (that is, by assembly), by component, production line or MRP controller, amongst others.
    The pull list calculates the missing parts by checking which requirements fall within a certain period of time, which stocks are available in the production storage location, and which replenishment quantities have already been initiated via the pull list.
    You can also use the pull list to create replenishment elements for the missing parts. The system first creates a replenishment proposal for the missing parts. The system can post this proposal as a replenishment element (stock transfer reservation, kanban or WM), or carry out a direct stock transfer.
    Constraints
    It is not the primary task of the pull list to determine the location of the required components. The only exception is in the direct stock transfer procedure where you have to enter a replenishment storage location or the system has to determine a replenishment storage location via stock determination.
    The pull list is primarily responsible for planning material staging (calculating missing parts and initiating replenishment) by creating a work list in the form of replenishment elements. The actual staging is carried out by a warehouse clerk, for example, and is supported by transactions which are carried out subsequently, based on the replenishment elements.
    Issue Storage Location
    In the case of a material produced in-house, this is the key of the storage location that is copied to the planned order, production order, or run schedule quantity.
    If the material is a component, it is the issuing storage location to which a backflush is posted.
    If the material is produced, it is the receiving storage location to which the receipt of the material is posted.
    Procedure
    You specify the receiving storage location for repetitive manufacturing in the production version for the material master record.
    Hope this helps.
    Edited by: surendra patil on Dec 29, 2008 1:22 PM

  • MF60 - Pull list - TR to TO conversion fails if no inv. to pick from.

    In MF60 pull list, the user is shown the requirement quantity and the component inventory in the PSA.  They then set the quantities they want to be delivered and save, creating a Transfer request (TR).  The TR is then converted to a Transfer Order (TO).  The problem arises if there isn't sufficient inventory to pick from.  The TR hangs and TO conversion fails.  The user doesn't get their material and doesn't know there is a problem.
    Is there a way to show IM inventory level in the Pull list selection screen in addition to the PSA inventory? I know it can be done 1 material at a time, but my users are pulling dozens of materials per pull list. 
    Can the pull list be modified to skip the TR and directly create a TO (I have immediate TO creation  in the user global settings already) AND give the user an insufficient inventory error?
    Is there a different way to solve this problem?

    Hi John,
    In MF60 you can see the req. date, net. req. qty, available stock & missing qty, does this not meet your need?
    Regards,
    Vivek

  • MF60 pull list questions

    Dear experts,
    I'm using transaction MF60 in order to transfer the materials form main st loc to the production str loc according to the production orders. I have two problems.
    1) I want to create reservation in MF60 and make the goods movements in MF65. But when I create replenisment elements and save it directly make the goods movement in MF60.
    2) If there is stock transferred for a previous  production order, i cannot see the material in MF60 because there is stock for another production order. But I want to take pull list for each order seperately

    Dear experts,
    I have solved the first problem by using global settings in MF60.
    But I have not find a solution for the available stock which is transferred with another production order pull list. Please help.

  • MF60 (Material staging) - Display different requirement dates in pull list

    Hi
    I've got the following problem.
    If I choose a couple of process orders, the pull list of the material staging, summarize the quantitys and shows only just one requirement date. Instead I need the different orders and the different requirement dates to be shown for the consumption of components in the pull list.
    Anybody know how to configure the pull list to show this scenario?
    Thanks a lot.
    Francisco O.

    Hi,
    When you make a pull list , the system will create reservations
    for the components that comes from all the open orders collectively.
    The reqmts date will be the earliest one.
    Now you have to click the Blue lens in which the system will
    show the reqmts of components arising from various orders separately and each orders reqmts date will be shown individually.
    Regards,
    nandha

  • Pull list for the component of the phantom assembly

    Hi
    I am in rem process. while doing the pull list for the fianl product using Entry with bom explosion.
    i did not get the components (level 3)for 1 assembly(level 2 ) which is phantom one under the final product (level 1) BOM.
    i also maintained the production stor loc for the components and the phantom assmy.
    i check the stock in the production storage location . no stock is there in the location.
    what is the problem . how to get the component of the phantom in the pull list.

    Dear Raj,
    If your FERT contains a HALB and inturn this HALB contains say HALB1 which is a phantom assembly
    and and another 2 raw materials means,when you execute MF60 For HALB,you will get the 2 raw
    materials along with the component's of phantom assembly.
    Check and revert back.
    Regards
    Mangalraj.S

  • Stock transfer using PICK LIST / PULL LIST

    Hi Friend,
    We have two storage locations in the plant say 1000 - Main store which is ware house managed and 2000 - Production storage location.
    The goods issue needs to be done from production storage location 2000. How to transfer the material from 1000 - Main store which is ware house managed to 2000 - Production storage location using PICK LIST / PULL LIST concept.
    Kindly give the solution.
    Regards,
    Narendra Bora

    Hello Madhu,
    If you can suggest me as well. I am moving the goods to production storage location from raw material storage lcoation,
    While executing the MF60 it creates the reservation and display log
    RMPU     stock transfer reservations 00000412 22.03.2010 created successfully
    But does not move the goods using 311 movement type and stock is still in the raw material storage location.
    2ndly in MMBE, if i found the stock in Produciton location, it shows me
    Reserved                     20.000
    GR blocked stock         20.000
    Rcpt reservation          20.000
    If you can enlighten me in this area please, Would it move the stock or I need to make some other  steps also.
    Regards,
    JPS

  • Material Pull List

    Hi All,
    Can anyone explain me what exactly mean Material Pull List?. What is the use of this list and what T-Code do we use to see the Material Pull List.
    Thanks in advance

    T.Code - MF60
    Purpose
    The pull list controls the in-house flow of material for supplying production with materials. The system assumes that the components required for production have already been produced in-house or procured externally and are now available to be transferred from main stores to the production storage location.
    The pull list checks the stock situation at the production storage location and calculates the quantities of missing parts. Replenishment elements are created for these missing parts. Components are staged using stock transfer reservations.
    Integration
    The pull list is an integral part of repetitive manufacturing and shop floor control.
    The basis of replenishment planning is MRP - the component requirements are calculated in the MRP run. The system takes requirements from run schedule quantities and manual reservations into account.
    Prerequisites
    The pull list is to be used in the scenario, where components are stored in Central stores & are then transferred to shop storage location for production. If the components are stored & consumed from same shop storage location only, then pull list is not applicable.
    Constraints
    It is not the primary task of the pull list to determine the location of the required components.
    The pull list is primarily responsible for planning material staging (calculating missing parts and initiating replenishment) by creating stock transfer reservations in the form of replenishment elements. The actual staging is carried out by Central stores person.

  • Pull List

    Hi experts,
    We are having the scenario of when we create the production order the reservation will be generated automatically. Based on the production order req qty stores will transfer the stock to production area. From that stock will be consumed to the production order.
    For that i'm using MF60 t.code. I'm not able to generate the reservation here.
    Can anybody tell me the process to create the reservation for pull list.
    I made a settings for the plant with movement type 311 in OSPP.
    Naren

    Dear Naren,
    1.Assume for the components in the production order the storage location mentioned is 0010 and assume the component stock is
    zero for all the components during production order creation.
    2.The system creates reservation for 261 movement for all the production order components once the order is saved and goods
    movements against the order can be performed only after order release.
    3.Assuming the availability check in activated for the order type during order creation,now the system displays the missing parts.
    4.Based on this missing parts which can be checked in T.Code CO24,directly the stores person can transfer the missing parts to
    production storage location90010) from central stores say 0020) through MB1B or else first you can create the stock transfer
    reservation for the missing parts through T.Code MF60 and based on this reservation for 311 movement the actual stock transfer
    posting can be performed.This gets transferred to production storage location.
    While executing MF60,the input parameters are important to check the missing parts and then the staging can be performed.
    Check and revert back with your queries.
    Regards
    Mangalraj.S

Maybe you are looking for

  • IPad can't get out of recovery mode.

    I literally have done everything I can think of. TinyUmbrella can't even detect the iPad. It detected my iPhone in like a second though. Dr. Wonderfone and Recboot simply can't work for some reason. When I try to restore using the normal way over itu

  • Nano won't update or restore in iPod Updater

    -My nano when connected to my PowerBook does not show up in iTunes -When iTunes is opened, it askes if I want to do a software update for the iPod -In the updater, it says that it is formated in Windows, and will not allow me to restore it (saying th

  • Outbound HTTP Connection Configuration

    Hi I need to invoke a REST service from HANA. Is there any way to configure the outbound connection as opposed to hardcode the connection paramteres in the code? Thanks, Diego Vinas

  • Can I update to Safari 7 on my iMac 10.6.8?

    Am I able to download Safari 7 to use on my iMac 10.6.8?

  • IPhoto 4.0.3 - Sharing Error

    Hi. For a while now I have been getting the following error message when I start up iPhoto - "SHARING ERROR Other users will not be able to access your shared photos because port 8770 is being blocked by your firewall software. Please disable the fir