Purchase-How could I consider Transit time and lead time in imported mat.

My doubt refers about master data configuration of imported material.
My sittuation is :
Material - Lead Time:  (depend on source)
               Transit Time: (depend on source)
My company is responsable to transport all bought material. Besides, I can buy of differents suppliers.
Considering these rules, It s impossible to fix dates in material master, because material purchase is related with center and not with supplier. By the way, I need to discover other master data to configure it maybe : Inforecord, quotization... Whatever...
I need to correct this to generate Purchase order with dispatched date of my source against required date of my company after execute MRP.
I tried to study this scenario but until now I ve not got a solution.
Probably, you have had it before and can help me.
I hope your help!
Thank you!
Regards!

Create POs with respect to either PIRs (if you don't need to print out) or Contract/item, both of these are Vendor/material specific so you can set lead times accordingly .  Probably best to use Source List and set requirement in material master too (Purchasing view).
Regards,
nick

Similar Messages

  • LTP run ignoring GR processing time and Lead time

    Hi,
    I am trying to find out way to create a planning scenario (MS31) and run LTP (MS01) which will ignore the GR processing times and Lead times from Material master.
    I would like to use MCEC report (after running MS70 valuation) which will show the values only in my new fiscal year - for budgeting purposes. Currently because of the long GR processing times and Lead times in material master (sometimes even 60 days) - some planned values show in MCEC report 2 or 3 months before the new fiscal year and the last two periods of new fiscla year are empty.
    I would be grateful if you could help me with getting rid of these additional Times and adjusting the periods only for Report purpose. The desired final output should be that S012 table for this specific planning scenario has the values only in periods of the Fiscal year - without hitting previous Fiscal year last periods (due to lead /GR processing times).
    Thank you,
    Karol
    Edited by: Karol on Oct 12, 2010 2:50 PM

    Dear,
    Master data is taken from normal MRP views. there is no other setting is available. you can create a different matrerial number for LTP planning.
    Raj

  • Difference between Req with insufficient lead time and lead time const

    Hi ,
    1) Can anyone explain the difference between Requirement with insufficient lead time and Requirement lead time constraint exception messages. Both seems to be similar for me with the compressed time.Also at what situations these exceptions are generated.
    2) what is minimum lead time required ,actual lead time and its calculation.
    Thanks...

    Check out
    http://help.sap.com/saphelp_scm50/helpdata/en/99/ed3a981d0f11d5b3fc0050dadf0791/content.htm
    particularly the section "Which functions of the operations relevant to scheduling are supported?"
    It will give you a flavour of what can lead to difference in planning.

  • When I send messages off-line, they enter in the addressed mailbox with the date and hour which I've clicked "Send later". How could I set up to the real time?

    When I send messages off-line, they enter in the addressed mailbox with the date and hour which I've clicked “Send later”. How could I set up to the real time?

    What you say about Send Later timestamp is correct.
    When you click Send or Send Later a time is set regardless of when you actually sent the Send Later email.
    Please voice your vote at this link:
    https://bugzilla.mozilla.org/show_bug.cgi?id=560901
    You will need to logon/register.

  • How to caculate the duty,fall time and rise time of signal

    I am currently using Lv6.1, and have one NI GPIB-ENET/100 Controller, throught the oscillograph I want to caculate the duty of input signal, and it's fall time and rise time also, but, try it long time, I still no know how to do it, could you give me some tips? Examples is preferable.
    Thanks.

    Programming these oscilloscopes is very easy using gpib commands I use the tds5104 daily and have written many programs for it. the driver vi's are very easy to use. I personally would just let the scope do it.
    Here is an example vi converted to 6.1
    and for 7.0
    Message Edited by jhoskins on 08-19-2005 08:08 PM
    Joe.
    "NOTHING IS EVER EASY"
    Attachments:
    simple_example_for_5104b.vi ‏38 KB
    simple_example_for_5104b.vi ‏43 KB

  • I created a form with Single Choice fields, 4 days with times listed. But, I want the user to only be able to choose one time, and the time chosen to be unavailable for other users. How do I do this?

    I created a form with Single Choice fields, 4 days with times listed. But, I want the user to only be able to choose one time, and the time chosen to be unavailable for other users. How do I do this? I have 4 blocks of Single Choice fields in order for the summary page to give me each day in the final report. But, I need the user to be able to make a selection of any day and time and that apointment to no longer be available to future users when they log in. Plus, when the user clicks on the time, they are unable to change their mind and choose another time. Here's the link if you want to see what I'm talking about: 2015-2016 Workload Apportionment Review

    I'm afraid not.    It's not rocket science but you need to do some coding. 
    You'll need to find a script (php) and save it to your local site folder.  Then reference the script in your form's action attribute like so.
         <form action="path/form-to-email-script.php" >
    The input fields in your HTML form need to exactly match the script variables. 
    I'm  assuming you're hosted on a Linux server which uses PHP code.  Linux servers are also case sensitive, so upper case names are not the same as lower case names.  It's usually best to use all lower case names in your form and script to avoid confusion.
    Related Links:
    Formm@ailer PHP from DB Masters
    http://dbmasters.net/index.php?id=4
    Tectite
    http://www.tectite.com/formmailpage.php
    If this is all a bit beyond your skill set, look at:
    Wufoo.com (on-line form service)
    http://wufoo.com/
    Nancy O.

  • I've tried to d/l itunes 3 times and every time I get this message: .....Downloads\iTunesSetup.exe.part could not be saved, because the source file could not be read.  I have no idea what I'm doing. Does anyone have any ideas to help? Cheers.

    I've tried to d/l itunes 3 times and every time I get this message: .....Downloads\iTunesSetup.exe.part could not be saved, because the source file could not be read.  I have no idea what I'm doing. Does anyone have any ideas to help? Cheers.

    I've tried to d/l itunes 3 times and every time I get this message: .....Downloads\iTunesSetup.exe.part could not be saved, because the source file could not be read.  I have no idea what I'm doing. Does anyone have any ideas to help? Cheers.

  • How to track the login time and logout times of clients

    hai
    please give me the solution
    suppose there are 5 systems connected in LAN.
    how to track the login time and logout times of clients
    for a given time(may be one day or 1 hour) using any programming language.
    please give me the solution

    When the client logs in you write the client's ID and the current time to a database. Likewise when the client logs out. Assuming of course that you have a program that knows when those events occur.

  • How could force tomcat to stop and start on every build on Ide?

    How could force tomcat to stop and start on every build on Ide?

    Hello,
    See this help article:
    *[https://support.mozilla.org/en-US/kb/How%20to%20set%20the%20home%20page How to set the home page]
    Or try go to about:config page, search for "browser.startup.homepage" change its value to "about:home"(default) or "about:blank"(blank page)
    *[http://kb.mozillazine.org/About:config about:config]

  • The time for transit, transportation lead time and loading time of the mate

    Dear Friends,
    Please mail to me, where should I give the time for transit, transportation lead time and loading time of the material at the ware house.
    This is at the time of Transportation scheduling, for a specific material.
    With regards,

    i am giving u the exact & specific answer.
    please follow the menu path in SPRO
    IMG, Logistics execution, shipping, basic shipping functions, scheduling, delivery and tranportation scheduling, maintain duration,
    In that screen, maintain the settings
    Hope it answers
    Do reward points if it is useful

  • How could we delete transport request and task(the released one)

    Hello
    We have a released transport task(not request). Transport request is not released.
    How could we delete transport request and task(the released one). Namely we would not like to transport it to production

    Hi, never delete directly in table.
    There are more tables which depends each other...
    Here, you can find nice example how to do it: Help on ABAP: Few Tips for Transport Request Manipulation
    Using program: RDDIT076 and changing status.

  • How to know the process chain start time and end time

    Hi Experts,
                   How to know the process chain start time  and end time .
    Thanks in advance
    Regards
    Gutti
    Edited by: guttireddy on Feb 23, 2012 11:30 PM

    Hi Reddy,
    You may find the run time of a PC using below steps.
    1. Call SE38 > /SSA/BWT > Execute  > Enter your PC , choose the date and time > Execute. Here Run-time of a PC is displayed. (or)
    2. Call RSPC1 > Enter your PC > Execute > Goto Log view > Right click on the start Variant > Displaying Messages > Note down the start time in Chain Tab. Now Right click on the last Process type of the PC > Displaying Messages > Note down the End time in Chain Tab. The Difference b/w start time and end time gives the Run-time of your PC.
    Hope this helps.
    Regards
    Sai

  • I reset my macbook pro a few days ago.. and when i started to use it again i noticed all my apps were gone (keynote, iMovie, garage band, etc) i don't know how to get them all back and every time i try it tells me i must buy them.. what do i do?

    I reset my macbook pro a few days ago.. and when i started to use it again i noticed all my apps were gone (keynote, iMovie, garage band, etc) i don't know how to get them all back and every time i try it tells me i must buy them.. what do i do?
    should i come into the actual apple store or can you help online ?

    Hi vickkjayy11 and welcome to Apple Support Communities,
    Just to be clear, we are a peer to peer support community and have nothing official to do with Apple.
    So to your problem, when you say:
    "I reset my macbook pro a few days ago"
    What exactly happened? Did you have a Time Machine backup?
    Read this:
    OS X: About OS X Recovery - Apple Support
    It would help to know the exact model (size and year) and which OS you're using.

  • HT4718 By mistake, I delete OS X lion from my MAC app store "purchases"  how could I get it back?

    By mistake, I delete OS X lion from my MAC app store "purchases"  how could I get it back.?

    Did you see these threads in the forum?
    https://discussions.apple.com/message/18287573#18287573
    https://discussions.apple.com/message/17573559#17573559

  • Hello, I was going to have my presentation on my macbook air. But when I putted it up on the big screen it wasn't a normal presentation. There was two pages at the time and a timer came up. How can I fix this as fast as posible? Thank's in advance.

    Hello, I was going to have my presentation on my MacBook Air. But when I putted it up on the big screen it wasn't a normal presentation. There was two pages at the time and a timer came up. How can I fix this as fast as posible? Thank's in advance.

    Your MacBook is using the big screen as the Presenter Display, and the MacBook Air display as the Show display. Tap the 'x' key to swap them during the show.
    Here is more information about using the Presenter Display.

Maybe you are looking for