Purchase order for stock material in production order
Hi
does anybody know how to link a purchase request to production order in case of stock material ? When MRP runs aggregate all requirements for stock materials in one purchase request, and I wold like to find list of order that generated the request,
thanks
Gabriele
Gabriele Montori wrote:
>
> 2) I would like to know if there is a way to bind purchase request to Production Order (not planned order) BEFORE the MRP runs and create a Purchase Order, because when creates a PO for stock it aggregates all requests in one order.
I think I understand what you are trying to achieve -> this sounds like you would want to do what SAP standard would do with KD/E-requirements (customer specific) = every material=item=position in a SD-order will create it's PR or production order. In the same way you want to generate one PR-item per production-order component - wait! - Maybe you want to create a single PR for every component in the production order???
Gabriele Montori wrote:
>
> I hit that road but for stock material, RESB-AUFNR is left empty in table..
You will have to talk to your MM/PP-functional ... if you do not have RESB-entries I have no idea how this process is setup. You probably do not have components in those production orders, only one header-material (CAUFVD-MATNR). Depending on what is configured in the material-master MRP views + what modifications/enhancements are installed around the complete process, you could have almost any setup. It's impossible to say without seeing it. Make sure s/he explains to you exactly, since even with different stock-materials there could be different setups for procurement.
Edited by: Mylène Dorias on Jul 22, 2010 11:37 AM
Similar Messages
-
Revision number for Header material in Production order.
I have maintained Revision number in material mster for Header material in Production order and also for components.
1)Revision number for Header material in Production order is not appearing in AFKO table against production order.
2)Revision number for components in Production order is not appearing in RESB table against reservation.
Any settings for that please guide.Hi,
Revision number generation is using ECM only possible. Are you using the ECM with revision levels. Check this.
Regards,
V. Suresh -
Purchase request for stock material
Hi
when MRP runs, take all purchase request of all production order for STOCK material and aggregates all request together in one purchase order. In this way, I lost binding between purchase request and production order. Is there a way to make MRP not aggregating request but use different position for different purchase request in case of stock material?
regards
GabrieleGabriele,
MRP does not create purchase orders. I assume you are talking about the Purchase requisitions created by MRP.
In MTS by definition there is no 'binding' between supply elements (such as Purchase reqs) and demand elements (such as production order reservations). In MTS, all production is 'anonymous'.
You can cause MRP minimize the amount of aggregation of supply elements by changing lot size of the components to EX, and ensure that the 'individual/collective' indicator (MRP4) is not set to '2', but there is no way to guarantee a 1-to-1 relationship under all circumstances between mrp rqments and mrp supply (purchase requisitions)
Companies that have a business requirement to 'hard-link' supply to demand use MTO. If this is your requirement, it will never be completely satisfied with MTS.
Rgds,
DB49 -
Purchase order from production order for stock material
Hi,
Can we issue purchase order for stock materials (item category L) for components in production order. We want a PO account assigned to production order . How can we achieve that.
With regards,
MrinalDear
1.Goto MM02-Enter componenet item code -Selec MRP4 view -Keep Individula nad Collective indicator as 1
2.Goto MM02-FG Material -MRP4 view -Keep Individaul and Collective indicator -1 and in Sale.Org1 view keep item categoery as MTO .
3.Create Sales Order and run MRP in MD02 (NETCH , 2,1,1,3,2, 2)-If the compoenets are not available , then it will generate PR with an Account Assing Categery E with sales order refernce and line item .Converthis PR into PO cnd check the same in Accounting Tab .
This is only possible in MTO scinarion in case you want to have PO account assinged for FG production Order .
Regards
JH -
Function modul for a material throufh production order
hi,
Is there any function modul available in SAP for production order for a material
ie passing input as production order to get the material no and production order date .Hi ..
No ya these 4 func.modul is not in 4.6c can you pl send a right fun.mod. for 4.6 c ver. so that i can use it.
regards,
Lakshman -
Special stock indicator in production order
Hi,
We have a new business scenario from sales department.
For example, A is a MTO item, it has component B & C. Now there is a sales order for A come in, and system create a production order, but there is no enough stock for B. They want to:
1, Allocate C to the production order and other production order or sales order can not take it away via V_V2 or MRP run.
2. Create another seperate purchase order for B and want this purchase order also allocate to this production order.
3. They do not want to use WIP stock because it is difficult to display WIP stock in SAP you know.
I trying to use the special stock indicator "E" for components in production order, and I move C to custom stock via 412 E with no issue.
But when I create a purchase order for B with account assignment "F", it goes to normal stock in MD04. After I post GR for the purchase order, the quantity goes to production order directly, does not show in MD04 and did not reduce the requirement quantity.
If I create a purchase order for B with account assignment "E", it gives an error message "Sales document item is not defined for the transaction. I tried to change the requirement type from "KMFA" to "KE" in the sales order for A, and the production order disappeared, it is not accepted.
How should I define and configure the process?
Thank you so much.
AlbertHi Albert
I suggest you to take a look on the setting "individuall/collective" on the tab MRP4 of the material master.
For both components, you should set the value 1 and system will always plan the components under the sales order special stock.
BR
Caetano -
Planned Order for stock and planned order for customer requirement
Hello everybody
I want to make a different, in MD04, between the planned order for stock and the planned order created for a customer requirement
Thank for your helpHi,
True planned order are generated for both the cases but the planned order generated for sales order will have sales order number in the below column and for stock will show independent requirement. Mainly no sales order reference will be there for make to stock scenario.
Hope it will help.
Regards,
Alok Tiwari -
Production Order for a material without BOM and Routing
Is it possible to create a production order for a given material without routing and BOM, I know we can
create a production order for a material without a BOM (with a default routing) just wanted to check with
the above criteria
Thanks in Advance!!Members:
Thank you for your valuable replies and time
Santosh:
Tried what you have mentioned, but system still picks up a default routing
Kaushik:
Maintained Default values in OPJG for the given order type, but system still picks up
default routing
Mangalraj:
have no issue in creating a production order without a BOM, but I am trying to see
is there a way where I can create a production order without a BOM and routing (not
even default operation )
Any suggestions on how to create a production order for a material without a BOM
and routing (not even default one ) -
Creating a production order for a semi finished product
Hi
I am having a multi level bom scenario over here.
one of the bom components of the header material is a semi finished product.
I am using the planing stratagy 40 for that material.
in standard sap when i create a production order for header material. the requirement gets transerd to all the components. if the components are not available then only a requirement is placed. when i run MRP that requirement gets converted in to a planned order. which converts in to a purchase req or a production order,
well for my semi finished product. its a Work in process item. there wont be any stock for that item in the storage location any time.
what my requirement is. when i create a production order for my finished product it should automatically create a production order for the semi finished product.
is this possible with some configuration settings.Dear Deepu,
for ur requirement u need to maintain MRP type PD for FERT material and also for ur HALB.
If u run MRP only, it will create planned order for FERT and for all its dependent requirement(for PD).
If u create order manually for FERT material then it will not create order for HALB material, u need to create manualy for this also.
sree -
Make to Order for Configurable Material & Error in Confirmation
Hello, PP Gurus,
I am doing one MTO for Fabric business but during the confirmation I am getting error that
SALES order Stock does not Exist as well Please inform me Costing procedure in this scenario.
*is it necessary to run MRP in this scenario?*
Please see the all Details of Business so that U can give answer properly.
One is raw fabric (Raw material) which has to passed different process to convert Colored fabric as my Finish product as well I can sale Raw fabric also.
is it possible to maintain raw fabric and Colored fabric with same mat.code?
I have configured the material as well all pricing BOM, Recipe its working properly.
How can I assign the material to Operation? I am getting GRAY field in New Assignment in change recipe mode ..
Is it possible to use Material type other than KMAT? I want to use Finish material type. If yes How?
Right now I can create Process order from the Sales order but I am facing error in confirmation that Sales Order stock does not exist than I have to transfered stock to Sales order and error get solved temporarily but I want to avoid this manual transaction to remove this error. Any configuration is required please inform.
My configuration is given below.
MRP Type : PD
BOM item Category: L Stock Item.
In dependency & Profile I have set radio Button as Single level Bom explosion.
Order Bom selection in profile.
Strategy : 25 make to order for configure material.
How can I do ? please suggest any changes
I have only 9 months of SAP experience within short time I have gain lot knowledge from this site and other reading material as well my learning Learning thirst.
thanks to all SAP gurus..
THANKS IN ADVANCE .... Definitely I will reward points even if my some questions get solved...
Regards,
Bhavik dangi.Hi,
You can use variant configuration for selling the colored fabric. Use the basic fabric as raw. and maintain variant configuarations to have many variants.
Please use strategy 25. When you run MRP the planned orders will be generated and will be assigned to the sales orders. You can see it on the account assignment tab.
In material master pleasse maintain Individual collective requirement indicator to 1-individual in the MRP-4 view.
Then the stocks will be reserved to the specific sales orders.
Thanks and regards
Murugesan -
Excess Issue of Material against Production Order
Hi
For Goods Issue of Material against Production order , i want the system to control excess issue of material against Production order. How can it be controlled.
Regards
Madhesh KumarHi Madhesh,
there are many loop holes to issue excess stock against production order
so better you use user exit so that when ever any material issued against production order and it is in excess then throw error
Thanks
Bala -
Valuated Sales order stock with CO Production Order
Dear All,
Our clinet is manifatcuring cables and having 2 plants, for one plant we have configured PP module so we are arriving valuated sales order stock, for another plant we didnt configured PP module so we planned CO production order, but where as we are not meeting our ultimate goal i.e; valuated sales order stock.
So please guide me how to arrive valuated sales order stock with CO Production Order.
Thanks & Regards
Narasimham TValuated sales order stock is not dependent on PP, so you should be able to still to use it. The requirements class associated with the sales order item determines whether the item is valuated sales order stock and it also determines the valuation method. If you do not have Boms and routings in this plant you can still value the line item based on the material valuation in the material master. You can also value it based on a unit cost estimate that can be created seperately for the sales order item. Justt make the desired settings in the requirement class.
thanks, -
Standard Report for missing parts at production order operation level?
Hi PP Gurus,
We have standard report for missing parts at production orders level.
For our client, they need a report for missing parts analysis at production order operation level. Do we have any such standard report in the SAP?
Please help.
Thanks,
Reddy.Hi Arvind,
Thanks for for your response.
1. List: Components, Layout: Standard layout set the Missing part
It shows the component requirement/withdrawn quantity for each operation of production order. It is not showing the commit quantity.
2. List: Components, Layout: Pick list set the Missing part
It shows the component requirement/withdrawn quantity for each production order.
3. List: Components, Layout: Missing Parts List-Material View set the Missing part
It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
4. List: Components, Layout: Missing Parts List-Order View set the Missing part
It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
We are unable to get the solution from all these 1 to 4 reports from COOIS.
Do we have any option to change the existing layout (ex: 3 ) to get the commit quantity for operation with missing parts indicator?
If avilable, what is the procedure to be followed?
Thanks,
Reddy. -
Number range for serial Number in production order
Hi all,
I want to use the Serial Number in production Order ... It should be generated automatically ... when i try this system creating the serial number from 1.....i want the number to start from 2000000 , How to configure this number range ....
Please advise me ...
Regards,
kumarDear
Following steps are required in Serial Number Management :
1. OIS2 or Go to path SPRO > Plant Maintenance and Customer Service > Master Data in Plant Maintenance and Customer Service > Technical Objects > Serial Number Management > Define Serial Number Profiles. There enter "2" in Stkck column for your serial profile.
2.SPRO->SAP Customizing Implementation Guide->Plant Maintenance and Customer Service->Master Data in Plant Maintenance and Customer Service->Technical Objects->Equipment->Equipment Categories->Define Number Ranges
3. IQ01 Create Serial Number
4. MM02 You need to add the above created Serial Number Profile in the Material Master ion the work scheduling view .
5. CO02 Assigning the Serial Number through Production Order,
Also Serial Number can be created automatically by clicking on u201CCreate Serial Number Automaticallyu201D , Release the Order
6. MB31 Do the GR for the above created Production Order and Check in MMBE for serial Numbers
Try and check
Regards
JH
Edited by: Jiaul Haque on Nov 22, 2010 7:43 AM -
Error while issue material against production order
Hi,
In our development server recently we have created on ecompnay code and plant by copying the one existing company code and plant, now for this new plant I have created new profit center with KE51 and after that I have create done cost ceneter in that this new profit center is assign now while goods movment with MB1A with movmen type 201, 202 it works OK system is not giving any error but while issue the material against production order in MB1A with movement type 261 system is giving error message
No postings can be made to profit center DUMMYBAOPC in company code MT50
Message no. KM183
Diagnosis
Profit center DUMMYBAOPC cannot receive postings in company code MT50.
this profit center DUMMYBAOPC we use in old compnay code and for this new company code is not activated for new we have new profit center then it is linking to that what can be the solution.
regards,
zafarHi,
After asigning new profit center in the Production order problem solve.
regards,
zafar
Maybe you are looking for
-
Failed to open the connection, when view returns no data.
Hi Guys, I'm having a minor issue. I'm running a report in the crystalreportsviewer in asp.net. The report is retrieving it's data from a view. The report also has a subreport with an overview with totals, using the same view and the same parameters
-
Win 8 Monthly Update - T430S WAN Miniport Problem
The May 2013 monthly update for Windows 8 leaves a Device Manager error, as well as an error message in Lenovo Solution Center. Four T430S machines receive push updates published by Microsoft every 2nd Tuesday of the month. After this month's push
-
I've just bought a Macbook Pro 15" and I'm trying to use Photoshop, but the resolution its displaying the images at for 100% are too small. I have to design for the web, so need to be intricate with detail, but I'm finding it adjusts the resolution o
-
INR format while printing the check
Hi, am printing the check every thing fine. but on check the amount is coming us language mean millions and billions. but i want lakhs and rupees mean print 'Ten Lakhs Rupees' not 'One million rupees" If knows any one how to change that please explai
-
Query Problem Oracle9i Release 9.2.0.7.0
Hello, I need help with this one. I have xml file like this: <?xml version="1.0" ?> - <TecKomBS xmlns="http://www.bsi.si" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.bsi.si http://www.bsi.si/_data/tecajnice/Te