Can we issue purchase order for stock materials (item category L) for components in production order. We want a PO account assigned to production order . How can we achieve that.
With regards,
Mrinal

Dear
1.Goto MM02-Enter componenet item code -Selec MRP4 view -Keep Individula nad Collective indicator as 1
2.Goto MM02-FG Material -MRP4 view -Keep Individaul and Collective indicator -1 and in Sale.Org1 view keep item categoery as MTO .
3.Create Sales Order  and run MRP in MD02 (NETCH , 2,1,1,3,2, 2)-If the compoenets are not available , then it will generate PR  with an Account Assing Categery E with sales order refernce and line item .Converthis PR into PO cnd check the same in Accounting Tab .
This is only possible in MTO scinarion in case you want to have PO account assinged for FG production Order .
Regards
JH

Similar Messages

  • Purchase order from production order !!  (Missing material no)

    Hi,
    This purchase order is created directly from production order.( My problem is the material number is no where shown on PO. but when I print it (print preview) i can see the material number along with the Production order number. I am writing a new report and need material no.
    Interesting thing is, even when the Material no is missing. I can see the short txt for material as 'Galvanise'.
    Pls help me in finding the material number.(item wise)
    Thanks & Regards
    Hrishi

    Hi
    1. Check table EKPO, if material number is stored against said PO,
    2. Check ME23N, ME23N, ME22, ME23 screens are u able to see material no. in any of T-code.
    If one of T-code not showing material number, it is sort of bug in system
    Regards,
    NNK
    PS:Award points for useful ans

  • Purchase Order from Production order

    Hi,
    This purchase order is created directly from production order.( My problem is the material number is no where shown on PO. but when I print it (print preview) i can see the material number along with the Production order number. I am writing a new report and need material no.
    Interesting thing is, even when the Material no is missing. I can see the short txt for material as 'Galvanise'.
    Pls help me in finding the material number.(item wise)
    Thanks & Regards
    Hrishi

    Hello
    To optimize the workflows, you can change certain functions of the standard material master by using customer exits.
    You can tailor the display of the material number to your requirements by using the SAP enhancement MGA00003. If, for example, a material has the number 123, you can use this enhancement to determine that the material number is to be displayed with a prefix such as MAT-. (The number 123 is still saved in the database.)
    Control for the material number assignment
    MGA00002
    EXIT_SAPLMG02_001
    (Internal number assignment)
    EXIT_SAPLMG02_002
    (External number assignment)
    Control for the material number display
    -{}-MGA00003
    EXIT_SAPLOMCV_001
    (Number conversion from display format to database format (input: start))
    EXIT_SAPLOMCV_002
    (Number conversion from display format to database format (input: end))
    EXIT_SAPLOMCV_901
    (Number conversion from display format to database format (input: start))
    EXIT_SAPLOMCV_902
    (Number conversion from display format to database format (input: end))
    Regards

  • Thard party Purchase requisition From Production order

    Hi ,
    We have a Concept like third party PR ( Purchase Requisation) should raise Thorugh Production order
    Normally We are raising the PR based on Sales Order and Item category is TAS,
    But my clint Want some of the material in Production BOM After running the MRP it become a third party material,
    It meens Some small components are third party material
    Please let me know how shall i do this process.
    Regards,
    Gangi Reddy.

    Hello,
    As Silvia says, what we want to know is if it is possible in a standard SAP to assign different account assignments depending on the plant.
    In the two scenarios we have, the account assignment would be different:
    1. Modify the production order: in one operation we change the control key from PP01 to PP02 so a purchase requisition is created ACCOUNT ASSIGNMENT F (PRODUCTION ORDER)
    2. One of the components in the BOM is purchased, so when the MPS is execute, a planned order is generate for the finished product and a purchase requisition for the component. ACCOUNT ASSIGNMENT C (SALES ORDER).
    Is it possible to have in transaction OPJP account assignment C and then via  user exit COZF0001 Change purchase req for externally processed operation determine account assignment F for case one?
    Thanks so much for your help,
    Ana

  • Intercompany Text-Based Standard Purchase Order from Production Order

    We have a business scenario where a material is made in a plant and then another plant performs a service on that material.  The customer wants the purchase requisition that is created from the production order from the producing plant to apply a vendor that is an intercompany vendor.
    The issue is, these purchase orders are text based purchase orders.  This process works perfectly when there is a material master.
    Scenario:
    Plant X = Production Order to make Material A
    Plant X = Production Order creates a purchase requisition in Plant X; Intercompany Vendor is assigned
    Buyer = Creates the purchase order from the purchase requisition
    Error Message: SAP issues an error message that this vendor cannot be used.
    We are looking for a way to create a text based purchase order (that represents a service) and assign to a intercompany vendor.

    The exact error message we receive is:
    Diagnosis
    You are entering an ordering transaction involving a vendor to whom a plant has been assigned. Normally, materials would be supplied by one plant to another in such a transaction.
    This process involves a delivery and billing document in the SD system. The PO for this appears directly in the delivery due list of the issuing plant (vendor) and therefore does not need to be transmitted.
    However, items without a material master record cannot appear in the delivery due list.
    Procedure
    Items without a material master record can only be ordered from vendors without a plant assignment.
    The point is if we create a vendor without a plant assignment, how can the inter-company posting be accommodated.

  • Occurs error when create purchase req. from product order with 'PP02'

    hi,friends.
    when i add a route with 'co02', and select control key 'pp02',
    then it leave to the view of 'Ext. Processing',
    i input the values of 'Cost Element' 、'Purchasing Group' 、'Material Group'....
    and the value of 'Res./Purc. req.'  is  '3',
    but when i return,it shows the error:
    Error occurred during creation of purchase requisition for operation 0050
    Message no. C2325
    Diagnosis
    During automatic creation of the purchase requisition to operation 0050, an error (ME 673) occurred.
    System Response
    The system cannot create the corresponding purchase requisition.
    Procedure
    For further proceedings, read the long text of error message (ME 673) in transaction SE91. Check the operation affected and change or complete any missing data that led to the error message.
    double click the route,goto the view of 'Ext. Processing',
    and the value of 'Res./Purc. req.'  changed  to  '2',
    why?
    and the purchase request isn't be created.

    thanks for K.Madhu Kumar
    the value of Res./Purc. req. be changed to '2'
    so the purchase requisition con't be created.
    if i Release the production order,it will be created,
    and the item cat. is null, the acct assgt cat. is 'F'
    Edited by: tizo lee on Jul 20, 2010 5:11 AM

  • Sales Order from production Order - MD_STOCK_REQUIREMENTS_LIST_API

    Hi,
    We are using MTO scenario, in which after the MRP run, Production order are created using the sales order / order item / Schedule line.
    I can able to view this information in MD04 and also using BAPI 'MD_STOCK_REQUIREMENTS_LIST_API'. Now my problem is how can I identify the Sales Order/ Item / Schedule line based on the production order number in the output of this BAPI 'MD_STOCK_REQUIREMENTS_LIST_API'?
    Regards,
    Kumaresh

    I will pass only the Prod Order as input. And I should get the Sales Order information... Very important is I need the schedule Line Number along with the Sales order and item.
    To recap once again,
    In MD04..or in BAPI MD_STOCK_REQUIREMENTS_LIST_API, I pass the input
    WERKS - Plant Code
    MATNR - Material Id
    Output should be like this,
    MRP element                                     MRP Element Data
    PrdOrder                                           OrderNumber/OrderType
    CusOrder                                          Salesorder/Item/ScheduleLine1      
    CusOrder                                          Salesorder/Item/ScheduleLine2
    PrdOrder                                           OrderNumber/OrderType
    so with the output, how can I find the Salesorder/Item/ScheduleLine for a particular prod order? I think I am clear with my question.

  • Copy from Sales Order to Production Order

    Hi all,
    Is there a way to copy direct a Sales Order to Production Order (probably for item with BOM).I am using SAP B1 2005
    Thanks in Advance

    Hello,
    Currently you can choose relevant Sales Order from Production Order but only for information purpose.
    I think you can try to use SDK to implement it.
    Hope this helps.
    Regards,
    Maggie An
    SAP Business One Forums Team

  • Purchase order for stock material in production order

    Hi
    does anybody know how to link a purchase request to production order in case of stock material ? When MRP runs aggregate all requirements for stock materials in one purchase request, and I wold like to find list of order that generated the request,
    thanks
    Gabriele

    Gabriele Montori wrote:
    >
    > 2) I would like to know if there is a way to bind purchase request to Production Order (not planned order) BEFORE the MRP runs and create a Purchase Order, because when creates a PO for stock it aggregates all requests in one order.
    I think I understand what you are trying to achieve -> this sounds like you would want to do what SAP standard would do with KD/E-requirements (customer specific) = every material=item=position in a SD-order will create it's PR or production order. In the same way you want to generate one PR-item per production-order component - wait! - Maybe you want to create a single PR for every component in the production order???
    Gabriele Montori wrote:
    >
    > I hit that road but for stock material, RESB-AUFNR is left empty in table..
    You will have to talk to your MM/PP-functional ... if you do not have RESB-entries I have no idea how this process is setup. You probably do not have components in those production orders, only one header-material (CAUFVD-MATNR).  Depending on what is configured in the material-master MRP views + what modifications/enhancements are installed around the complete process, you could have almost any setup. It's impossible to say without seeing it. Make sure s/he explains to you exactly, since even with different stock-materials there could be different setups for procurement.
    Edited by: Mylène Dorias on Jul 22, 2010 11:37 AM

  • Error while converting planned order to production order for config materia

    Hi experts,
    While converting a planned order to production order for a configurable material.I am getting the following error meassage. Message No.CO684,
    "You cannot make an assignment to make-to-order stock"
    ( DiagnosisThe component cannot be allocated to an individual stock because make-to-order production and engineer-to-order production cannot be executed with this order.
    A possible cause is that you are trying to create an order with reference to a sales-order/project, where an account assignment to a sales order/project is not allowed in the settlement profile that is assigned to the chosen order type. This is inconsistant.
    System ResponseThe following responses are possible:
    Order processing is cancelled.
    The system resets the special stock indicator back to the original value.
    Procedure
    Choose another order type).
    I have checked some of the threads related to this error. But no where there is any solution.Please tell me if there is any settings to make so as to work on this scenario.
    Thanks,
    Sham

    Hi,
    This will be a MTO scenario. Please check your requirement type,Requirement class and strategy type config along with your Item category and schedule line category from SD.
    Also check your Production order type config and settlement profiles.
    I mean to say that you need new production order type to be configured for specific above mentioned combination.
    Are you working on a production system..?? is it the first time you are creating the order for this config material..??
    Regards,

  • Purchase request for stock material

    Hi
    when MRP runs, take all purchase request of all production order for STOCK material and aggregates all request together in one purchase order. In this way, I lost binding between purchase request and production order. Is there a way to make MRP not aggregating request but use different position for different purchase request in case of stock material?
    regards
    Gabriele

    Gabriele,
    MRP does not create purchase orders.  I assume you are talking about the Purchase requisitions created by MRP.
    In MTS by definition there is no 'binding' between supply elements (such as Purchase reqs) and demand elements (such as production order reservations).  In MTS, all production is 'anonymous'.
    You can cause MRP minimize the amount of aggregation of supply elements by changing lot size of the components to EX, and ensure that the 'individual/collective' indicator (MRP4) is not set to '2', but there is no way to guarantee a 1-to-1 relationship under all circumstances between mrp rqments and mrp supply (purchase requisitions)
    Companies that have a business requirement to 'hard-link' supply to demand use MTO.  If this is your requirement, it will never be completely satisfied with MTS.
    Rgds,
    DB49

  • Configurable material - Error converting plan order to production order CO6

    While I am coverting planned order to production order with configurable material, I am getting the follwoing error:
    You cannot make an assignment to make-to-order stock
    Message no. CO684
    As read in previous forum messages I am check settlement profile assigned for  new order type (ZSD01) with standard sett profile (SD1) at OKO7 and set "Valid receivers" with value "1" in Order, Material, Profit.segment, Sales order and Order item.
    Configurable material have item category group "0002", MRP type "PD", Lot size "EX", Strategy group "25" and "Individual requirements".
    Sales order with configurable materiale have item category "TAC".
    Where is the problem?
    Thank you in advance
    Oscar

    Hi,
    There are some OSS Notes to address this problem..(OSS Note: 311651, 432109 etc..)
    But all ae for older versions of SAP.
    Regards,
    Siva

  • Goods Issue from Production Order in SAP

    Dear experts,
    I faced one issue not yet solve is that my customer created the production order
    then already issue for production for all quantities of child item .
    Example:
    Production OrderItem A
    Item A1 = 2 Qty
    Item A2 = 2 Qty
    Item A3 = 2 Qty
    Issue for Production Item A
    Item A1 = 2 Qty
    Item A2 = 2 Qty
    Item A3 = 2 Qty
    But later on, my customer found out that 1 Qty of Item A1 already damaged.
    So they want to issue one more Qty of Item A1 instead of one that already damaged.
    How can I issue one more Qty for this item?
    Please your advices are necessary for me.
    Best regard,
    Borey

    Hello Borey,
    Solutions may depend upon the way you want to book the cost for the damaged part A1.
         (a) If you want to book the cost to the production order itself (production order is a cost object), manually book consumption for another quantity using MB1A, 261 movement (you will have to mention the production order during posting this consumption).
         (b) If you do not want to book higher cost to that production order, you can:
               1. Extract damaged quantity of A1 from that production order using MB1A 262 movement.
               2. Create a manual QM lot and after rejection, move that damaged quantity to blocked stock.
               3. You can scrap or rework from that blocked quantity later.
               4. Issue another quantity of A1 from unrestricted stock to that production order using MB1A                261 movement.
    Hope I could help you.
    Best Regards.
    Rajen        

  • Automatic posting of purchase order from sales order

    hiii
    experts,
    i m doing automatic purchase order from sales order. i have generated purchase requisition number from sales order now when i m trying to do automatic po the system says no suitable purchase requisition available.I have maintained info record, source code,automatic po tick in material master and in vendor master.what could be the problem .waiting for ur valuable inputs.
    warm regards
    thanks
    subhash kulkarni

    Hello,
    Please check all the things mentioned by our experts e.g Source allocation ,infor record, source list.
    Beside that I would suggest check document flow whether already PO is created or not.
    If every thing is in place then try to create PO with reference to PR by transaction ME21N & see what error you receives.
    Hope this help you ,
    Regards,
    Prashant

  • Order type settings for  convert planned order to production order

    Dear sir,
    I have 1 company code ,under 2 virtual plants are there.My scenario is plant 1(main plant)and plant 2 (virtual plant)
    both plant same FERT material.in plant 2 i am creating sale order and atual production will be done in plant 1.
    FERT material plant 2(strategy-40 sp.procurement-40 setting in spro ref plant (plant1) )and  plant 1 material (strategy 82)
    run the MRP MD50.panned orders are created but iam not getting production orders directly not getting the production orders
    .i have done settings in spro OPPE order type is given.in MD04 manual conversion planned order to production order system asking order type ,but i given order type in OPPE
    What are the settings for  production order directly from sale order at the time of RUNNING MD50
    Regards,
    Naresh.

    Hi,
    You will not get a production order out of MD50. That would have to be set up in the SD customizing for the sales order item, but I am not sure that would work with your two-plant setup.
    After MD50 you need to run CO41 for the collective conversion (and I also recommend the mentioned production scheduling profile customizing and then maintain this profile in the material master work scheduling view)
    BR

Maybe you are looking for

  • Validador GRC SP17 não está funcionando corretamente para XML 3.10

    Caros, Recentemente subimos o SP17 no GRC (SAPK-90017INSLLNFE) e também implementamos as notas para nota versão do XML 3.10 no ERP (1933985 - NF-e new layout 3.10 e seus pré-requisitos). O XML está sendo gerado corretamente, mas nos casos em que algu

  • How can I get my new ipod touch to work?

    I have been trying to get the ipod touch (4th gen.) to work.  I tried loading itunes v. 10.5 on my windows 7 but I kept getting an error message.  After searching for answers, I found someone that told me to use v. 9.0 of itunes 64.  I finally got it

  • How to show all non schedule customer from customer master data?

    Dear all expert, i need some guide upon CRM. I have a report which i need to show all the business partner. But ineed to filter out all those business partner which is in the schedule (for visit, plan or opportunity). What i want to show in the repor

  • Measuremen​t Studio with TFS Build Server

    Hello, I searched for both a FAQ and specific answers, so I hope I'm asking my question in the correct place. I am using the Enterprise version of Measurement Studio, and want to start a continuous build process using Team Foundation Server.  Adding

  • Is it possible to switch off the auto reverse function

    Hi, I just bought a new iPod Shuffle. Is it possible to switch of the auto reverse function e.g. that the iPod starts to play from the beginning again after the last song of a playlist is reached? Thanks Sascha