Purchase Requisition Import failing for Dropship orders

Hi,
EBS - 115.10
When dropship order is booked, data is populated into po_requisitions table...After running the import error message says 'Invalid Deliver To Location'.
Which is basically populated from LOCATION_ID of SHIP_TO Site.
DESTINATION_ORGANIATION_ID is populated as Inventory Org
DELIVER_TO_LOCATION_ID IS populated as LOCATION_ID of SHIP_TO Site.
So anything wrong in this. If yes, what needs to be changed?...Please suggest

Can you check if it is 'internal location_code' of that inventory instead of customer site location ?
Location_code is from hr_locations, location is from hz_locations.

Similar Messages

  • User exit/BADI  for Purchase requisition through release of Process order

    Hi ,
    i need to add some text to the Pur Req.
    The Pur Req will be created THROUGH the release of PROCESS order. Please let me know any exits are available for the same.
    regards

    Hi
    Check the following Exits and BADI for Pur Requisition
    Enhancement
    MEVME001                                WE default quantity calc. and over/ underdelivery tolerance
    MM06E001                                User exits for EDI inbound and outbound purchasing documents
    MM06E003                                Number range and document number
    MM06E004                                Control import data screens in purchase order
    MM06E005                                Customer fields in purchasing document
    MM06E007                                Change document for requisitions upon conversion into PO
    MM06E008                                Monitoring of contr. target value in case of release orders
    MM06E009                                Relevant texts for "Texts exist" indicator
    MM06E010                                Field selection for vendor address
    MM06E011                                Activate PReq Block
    MMAL0001                                ALE source list distribution: Outbound processing
    MMAL0002                                ALE source list distribution: Inbound processing
    MMAL0003                                ALE purcasing info record distribution: Outbound processing
    MMAL0004                                ALE purchasing info record distribution: Inbound processing
    MMDA0001                                Default delivery addresses
    MMFAB001                                User exit for generation of release order
    MRFLB001                                Control Items for Contract Release Order
    AMPL0001                                User subscreen for additional data on AMPL
    LMEDR001                                Enhancements to print program
    LMELA002                                Adopt batch no. from shipping notification when posting a GR
    LMELA010                                Inbound shipping notification: Transfer item data from IDOC
    LMEQR001                                User exit for source determination
    LMEXF001                                Conditions in Purchasing Documents Without Invoice Receipt
    LWSUS001                                Customer-Specific Source Determination in Retail
    M06B0001                                Role determination for purchase requisition release
    M06B0002                                Changes to comm. structure for purchase requisition release
    M06B0003                                Number range and document number
    MEQUERY1                                Enhancement to Document Overview ME21N/ME51N
    MELAB001                                Gen. forecast delivery schedules: Transfer schedule implem.
    MEFLD004                                Determine earliest delivery date f. check w. GR (only PO)
    MEETA001                                Define schedule line type (backlog, immed. req., preview)
    ME590001                                Grouping of requsitions for PO split in ME59
    M06E0005                                Role determination for release of purchasing documents
    M06E0004                                Changes to communication structure for release purch. doc.
    M06B0005                                Changes to comm. structure for overall release of requisn.
    M06B0004                                Number range and document number
    Business Add-in
    ME_PROCESS_REQ_CUST                     Enhancements for Processing Enjoy PReqs: Customer
    ME_PROCESS_REQ                          Enhancements for Processing Enjoy PReqs: Internal
    ME_PROCESS_PO_CUST                      Enhancements for Processing Enjoy Purchase Order: Customer
    ME_PROCESS_PO                           Enhancements for Processing Enjoy Purchase Order: Intern.
    ME_PROCESS_COMP                         Processing of Component Default Data at Time of GR: Custome
    ME_PO_SC_SRV                            BAdI: Service Tab Page for Subcontracting
    ME_PO_PRICING_CUST                      Enhancements to Price Determination: Customer
    ME_PO_PRICING                           Enhancements to Price Determination: Internal
    ME_INFOREC_SEND                         Capture/Send Purchase Info Record Changes - Internal Use
    ME_HOLD_PO                              Hold Enjoy Purchase Orders: Activation/Deactivation
    ME_GUI_PO_CUST                          Customer's Own Screens in Enjoy Purchase Order
    ME_FIELDSTATUS_STOCK                    FM Account Assignment Behavior for Stock PR/PO
    ME_DP_CLEARING                          Clearing (Offsetting) of Down Payments and Payment Requests
    ME_PURCHDOC_POSTED                      Purchasing Document Posted
    SMOD_MRFLB001                           Control Items for Contract Release Order
    EXTENSION_US_TAXES                      Extended Tax Calculation with Additional Data
    ARC_MM_EKKO_WRITE                       BAdI: Enhancement of Scope of Archiving (MM_EKKO)
    ARC_MM_EKKO_CHECK                       BAdI: Enhancement of Archivability Check (MM_EKKO)
    MM_EDI_DESADV_IN                        Supplementation of Delivery Interface from Purchase Order
    MM_DELIVERY_ADDR_SAP                    Determination of Delivery Address
    ME_WRF_STD_DNG                          PO Controlling Reminder: Extension to Standard Reminder
    ME_TRIGGER_ATP                          Triggers New ATP for Changes in EKKO, EKPO, EKPV
    ME_TRF_RULE_CUST_OFF                    BADI for Deactivation of Field T161V-REVFE
    ME_TAX_FROM_ADDRESS                     Tax jurisdiction code taken from address
    ME_REQ_POSTED                           Purchase Requisition Posted
    ME_REQ_OI_EXT                           Commitment Update in the Case of External Requisitions
    ME_RELEASE_CREATE                       BAdI: Release Creation for Sched.Agrmts with Release Docu.
    ME_DEFINE_CALCTYPE                      Control of Pricing Type: Additional Fields
    ME_CHANGE_OUTTAB                        Enrich ALV Output Table in Purchasing
    ME_CHANGE_CHARACTER                     Customer-Specific Characteristics for Product Allocation
    ME_CCP_DEL_DURATION                     Calc. of Delivery Duration in CCP Process (Not in Standard)
    ME_CCP_BESWK_AUTH_CH                    BAdI for authorization checks for procuring plant
    ME_CCP_ACTIVE_CHECK                     BAdI to check whether CCP process is active
    ME_BSART_DET                            Change document type for automatically generated POs
    ME_BAPI_PR_CREATE_02
    ME_BAPI_PR_CREATE_01
    ME_BAPI_PO_CREATE_02
    ME_BAPI_PO_CREATE_01
    ME_BADI_DISPLAY_DOC                     BAdI for Internal Control of Transaction to be Invoked
    ME_ACTV_CANCEL_PO                       BAdI for Activating the Cancel Function at Header Level
    MEGUI_LAYOUT                            BAdI for Enjoy Purchasing GUI
    ME_CHECK_ALL_ITEMS                      Run Through Items Again in the Event of Changes in EKKO
    ME_COMMTMNT_REQ_RE_C                    Check of Commitment Relevance of Purchase Requisitions
    ME_COMMTMNT_REQ_RELE                    Check of Commitment Relevance of Purchase Requisitions
    ME_COMMTMNT_PO_REL_C                    Check for Commitment-Relevance of Purchase Orders
    ME_COMMTMNT_PO_RELEV                    Check for Commitment-Relevance of Purchase Orders
    ME_COMMITMENT_STO_CH                    BadI for checking if commitments for STOs are active
    ME_COMMITMENT_RETURN                    Commitment for return item
    ME_CIP_REF_CHAR                         Enables Reference Characteristics in Purchasing
    ME_CIP_ALLOW_CHANGE                     Configuration in Purchasing: Changeability Control
    ME_CIN_MM06EFKO                         Copy PO data for use by Country version India
    ME_CIN_LEINRF2V                         BADI for LEINRF03 excise_invoice_details
    ME_CIN_LEINRF2R                         BADI for CIN India - Delivery charges
    ME_CHECK_SOURCES                        Additional Checks in Source Determination/Checking
    ME_CHECK_OA                             Check BAdI for Contracts
    Reward points if useful
    Regards
    Anji

  • Conversion of Planned Order to Purchase Requisition thro MD04 for Quota Arr

    While converting Planned Order to Purchase Requisition  thro' MD04 for a Quota Arrangement  material, on the screen in the Reference section Purchase org automatically does not default  while for a non Quota Arrangement material it defaults. Need P.Org to automatically default.
    Any suggestions
    Thanks

    Does anybody has no answer?
    I have done some researches and i have found that i have to work on the transaction MD14. I have also tested the next enhancement project
    LMDR2001
    LMDZU001
    but they are not called during the execution of the transaction even if those enhancements are activated.
    Lello

  • Creating Purchase Requisitions in ECC for CRM Service Items

    Hi,
    We are implementing ECC6.0 and CRM5.0 for a client.
    In this implementation we require to create a scenario for Procurement of services.
    I have maintained the basic settings in CRM and ECC.
    But i am still unable to generate a Purchase Requisition for the service order created in CRM for service material of type DIEN.
    Looking forward to help.
    Thanks and Regards,
    Rekha Dadwal

    Hi Rekha,
    We are still struggling to create a purchase requisition in ecc from service order.
    I know you should have faced gthe same problem and I understand you might have solved it as well. Please guide us if possible on the same.
    rightnow we are facing the error in which the system is tryig to create a purchase requisition but it is picking a default purchasing organisation 0001 from somewhere... and trying to check its assignement with the material plant.
    is there somwhere we assign a default purchasing org in crm ecc integration... or where is it picking up this default purchasing organisation...
    i will award you with points
    Surendra More

  • Purchase requisitions which created during Sales Order missing in MD04

    Hi Guys,
    I have an issue with MD04.
    Purchase requisitions which created during Sales Order missing in MD04 are not appearing in MD04, but these are showing in ME5A. After MRP Run only PRu2019s are showing in MD04.
    Requirement type used 511 during creation of Sales Order.
    Please advise me if any config/ Master data is missing OR If required any enhancement.
    Regards,
    Purna

    Did you checked for the Firming indicator in PR's?

  • EAM OSP: How to Disable Requisition Import AutoRun on Work Order Release?

    Hi,
    We want to create Purchase Requisition for OSP resource Items from eAM Work Orders by manually running Requisition Import request from purchasing. But as work order is released Import Requisition is auto run and requisition created. Is there any parameter or profile option to stop this request from auto run on release? Kindly guide.
    Regards,
    Syed Mustafa Arshad   

    Hi Hrishi,
    Thank your for your response.
    The second option you specified Operation is used in case of Oracle Discrete Manufacturing not for EAM. It is used when you want to start requisition as Item is moved from one operation to next so it cannot be used in case of EAM.
    We wanted it because our requirement was to generate requisition in incomplete status and with requisition import automatically parameter is passed as "Yes" for Workflow and requisition is generated in Approved Status. There is a patch but it was not working fine with 12.1.3 and the issue is on SR and we needed a work around urgently. But now a new patch was provided and it seems our issue is resolved now and now Workflow parameter is passed as "No".
    And about requisition creation time, I came to know after raising service request that it is standard functionality and requisition import cannot be delayed to run it later manually.
    Thank again for your response.
    Best Regards,
    Syed Mustafa Arshad

  • Purchase Requisition on creation of Production Order

    Dear Experts,
    Please clarify the following points
    1 In our Business Scenario on creation of Production Order for a Material, Purchase Requisition is being created on creation of Production Order itself for all Dependent Materials where the items are declared as Non Stock items in BOM  and for the stock items only on MRP run the Purchase Requisitions are created. Is this the standard procedure, or can we customize to create the PRs for all the items on creation of Production Orders??
    2 What exactly the processing indicator in MRP list indicate?
    Thank you,
    Regards,
    Ramakrishna

    For Non Stock items it is understandable, that a PR has to be created with production order creation , as they are not in the stock.
    For Stock items, the creation of PR cannot be linked with Production order creation but can be done with MRP run.
    We can make the system create planned orders or Purchase requisitions or PR in opening period during MRP.
    Processing indicator gives you the scope of PLanning.
    PLanning all the materials within the Planning horizon  --NETPL
    Plaqnning all the materials beyond also--NETCH
    Deleting the current plan and recreating the plan.-regenarative PLannng
    regards
    Ratan

  • Purchase requisition creation (STO) from Sales order

    Hi Gurus,
    Read the following scenario:
    Sales order is created with delivery plant A. No stock on plant A.
    Purchase requisition is created from plant B to plant A (intra-company flow or stock transfer order).
    Problem is that the purchase requisition needs a price. It is not logical because intra-company flow (stock transfer in same company flow) is like a stock transfer without purchasing. So in my mind, I don't have to maintain price.
    Also if I use ME27 to create manually STO between both plants, price is not asked.
    Other question is: is it possible to create directly a purchase order when sales order creation (and not purchase requisition, newt convert into PO)?
    Many thanks.
    Stéphane

    Hi Stéphane Vituret, Did you manage to find a solution for this. I have a similar problem as well.
    Please find the scenario below.
    Cusotmer places order of Mat-XX to Company A. The Company A creates PO to Company B. Company B delivers to Company A and then invoices Company A. Company A receives the goods into own stocks. Now the Company A delivers to the customer from its own stocks and then invoices Customer.
    I decide to go ahead with the Individual Purchase order solution and since the Company A is buying from Comapny B, I decided to integrate the Cross Company STO flow in the procurement part. Hence the flow in SAP is like;
    Cusotmer placese order to Company A
    Comapny A creates a Individual Purchase order type Sales order. So the Item category is TAB.
    This sales order generates a PR. PR is conveted into a CC_STO as thenvendor is Plant B in this case . Now this STO appears in the delivery due list of plant B.
    Now I genreate the delivery to move stocks from plant B(of co.cd B) to Plant A(of co.cd A).
    Here is the problem. I am not able to do PGI as the system checks for "sales order" stock at plant B and throws error
    "Sales order stock 36637 000010 does not exist". This should not be the case as the stocks should get attached to the sales order only when recieved into Plant A. Hence system should not check for "sales order stock" at plantB while trying to deliver from Plant B to Plant A.
    Lets take a normal IPO scenario.
    CusotmerA places order of Mat-A to Company A. This sales order generates a PR. The Company A converts the PR into a std.PO to external vendor. The PO from the sales order will have a account assignment "M- Ind. cust. w/o KD-CO". The stocks will be received into Plant with spl indicator "E" while GR (MIGO). Now the system ensures that this stock can only be delivered against the particular sales order. Thus the stock procured for the customerA is delivered to customerA and not consumed by anybody else. In this case there is only one delivery involved, in SAP, which is 601 mvmt type from the Plant A.
    However if the vendor becomes another Plant (Plant B) belonging to another company code then there are two deliveries involved in the SAP system one with mvmt type 643, from Plant B to Pant A, and the second with 601 from Plant A to the customer. Hence the system should check if the stocks are attached with a spl indicator only during the second delivery of 601 mvmt type. I am facing a problem because the system does it for the first delivery itself. If you know the answer please do let me know. I really appreciate it. Thanks a lot in advance.

  • Sub contracting Purchase requisition not created thru Service Order

    Hi Experts,
    I configured to create Service order automatically from Customner service.
    Now we have the SM03 repair service order .When we try to create Sub contracting Purchase requisition.
    (Selecting Subcontr tick in External tab of Components tab)system gives error saying  --
    Op. 0010 must have exactly one component as 'Rework Material to Subcontr.'
    Message no. AD_SUBCON109
    I checked the notes and It was not help ful.I understand I was doing something wrong in creation.
    The control key used is SM03. Can any body help me in the above problem.
    Regards
    Rammohan.

    Dear Sen,
    The same error message refers to one of the following material provision indicators getting to me also:
    "S" - an entry within table T417 is missing where KZBRS (A&D-Specific Material Provision) is not set
    "X" - an entry within table T417 is missing where KZBLF (Rework Material from Subcontractor) is not set
    "F" - an entry within table T417 is missing where field ADSUB_DEFDLV (Deferred Delivery) is not set
    also, i Insert a row with S and keep MPCust and MPVend blank and Check the A&D MP box
    getting following error "
    Op. 0010 must have exactly one component as 'Rework Material to Subcontr.'"
    Can u tell me the config for MPI??

  • Reciept element purchase requisition not appearing in  mrp order report

    Dear Gurus
    Receipt element purchase requisition is not appearing when I am trying to see the order report after running the mrp for the finished product .But the reciept element planned order is appearing for the semifinished products which are in the bom of the finished product.And if stock for raw materials are there then also it is showing the reciept element stock.Why is this happening ?
    Regards
    Sandip Sarkar

    Unable to interpret your query.
    Based on my guessing.... a PR is not visible for the Finished material as it must be a make material & if a planned order is showing up it means there is not enough stock to meet the demand. Now the dependent demand flows down from the finished to SFG & RM respectively & hence the supply proposal.
    The above is a straight forward planning cycle flow, so what the issue am not able to figure it out. Either you upload some screenshots & paste the link here or provide a detailed explanation to get a clear understanding.

  • Purchase requisition type while converting planned order

    When We convert planned order to purchase requisition in MD04 how the system picks the  Purchase requisition type ?What configuration needs to be done in Spro

    Dear
    Please check the following
    Basically , document type selection for PR depends on the planned order profile -SPRO-MRP-Procurement Proposal-Planned Order Profile .
    Check in
    1.OMDV -Conversion of planning run -Purchase Req item -Order Type -It should be NB
    2.Or else , check in OPPR-Carry plant parametrs MRP group -Scehdel/documets type .-NB.
    MRP checks in MRP group level.
    Regards
    JH

  • Purchase Requisition Release strategy for MRP based Requisition

    Hello Gurus
    We want to set up the urchase Requisition Release strategy for MRP based Requisition ..Any can one Please share your experience about the impact down the road?
    Thanks
    Nick

    Hi,
    If you want include the MRP related PR in Release strategy.
    You need to include the field CEBANESTKZ-Creation Indicator (Purchase Requisition/Schedule Lines) in one of the characteristics which you create and include the characteristics value as per the field values like AReal time, BMRP, CConverted Planned order etc.. and include the charactristic in the Release Strategy will release group & release codes.
    So when ever the PR is created through MRP run then this creation indicator will update in the PR as per that release Strategy will trigger in the PR.
    there is one more option you need to create the separate document type as MRP PR then create document type as characteristics and include the values of all these document types and include in Release strategy.
    But it will  not pop up for direct PR from MRP run only trigger when planned order is converted to PR manually there you need to select this MRP document type then release strategy will trigger.
    I think first one is best suited.
    rgds
    Chidanand

  • Stop purchase requisition being generated for third party scenario

    Hi All,
    I have a requirement that in case of third party order the Purchase Requisition should Not be created if the order has a header level Delivery block.
    How to fulfill this requirement?
    Thanks & Regards,
    Amrish Purohit

    Hi Amrish,
       I do have same requirement can you please let me know what you have done for the same.
    Your reply will be very helpful for me in this regards
    Regards
    kiran

  • Purchase requisition created only for the vendor lead time

    Hello MRP experts,
    I have a requirement that the purchase requisitions should be created by MRP only in the vendor lead time and rest of them should be in planned orders. Can this done and if so how. Thanks in Advance and due points will be awarded.

    Hi,
    As per my understanding there is no standard settings to achieve this requirement.
    Regards,
    Manish

  • Maintaining the purchase requisition field mandetory for certain PO Doc typ

    Hi,
    I have tried to maintain the purchase requistion field in PO as mandetory field for certain PO docuemnt types and for transaction code ME21N.
    I copied the standard fields setting NBF to ZBF and assigned the same to PO docuemnt types as well and in the reference data, item i mainatained purchase requisition as mandetory field . But observed that  Purchase requisition field is still not mandetory. Then  for ME21N  in the reference data, item i mainatained purchase requisition as mandetory field .
    Still it is not appear as mandetory field in po.
    Please guide how to achieve this , is any customization i am missing.
    Best Regards
    MM

    HI
    1) In transactiono OMET create Function Authorisation as Z1" there flag "Reference to Purchase Requisition".. then assign the "Z1" in txn. SU01 for parameter id EFB..and it wil make the user to create PO with reference to PO.
    2) At screen layout level :
    SPRO>MM>Purchasing>PO>Defince screen layout at screen level...
    Select ME21N details and select "Reference data Item" flag required indicator for Purchase Requsition..
    Regards,
    BK

Maybe you are looking for

  • [RPC Fault faultString="HTTP/1.1 415 Unsupported Media Type" faultCode="Server.Proxy.Request.Failed"

    Hi, Posting in the 'General' forums as well. Did not yet get any response for the topic posted in the 'Configuration and Getting Started Discussion' forum. I am having nightmares to call the POST method of a REST service thru Flex. Initially tried wi

  • REALLY odd SATA problem -- bet you can't fix this

    So, I go to a LAN party on Tuesday night. I leave my computer downloading stuff from newsgroups and I come back to find everyting packed up for me nice and neatly. I asked if my computer stayed on through the entire time I was gone and my friend told

  • PR and PO list-SAP Std. T-Code

    Hi We have an urgent requirement from client  to know the list of purchase order converted from purchase requisition on daily basis .Selection option will be : Plant : USXX Date : Purchase Order Create/Purchase Conversion date Out put should be : Pur

  • Row-base security : how to filter on a set of value ?

    Hello all! I am currently trying to setup the row-based security in OBIEE and I am facing some difficulties, not sure if they are basic or not: I'd like my users or groups to access data depending on a list of value. I know the best practice is to cr

  • My keyboard has stopped working. How do I fix it?

    Hello! Today I got back to work after my summer vacation and for some reason my keyboard has stopped working. I tried with my collegues keyboard but that didn't work either. The keyboard works if I give my virtual machine in Parallels direct access t