Purchase Requisition with wrong purchasing group - release strategy

Hello
There is a lot questions about release strategies but I cannot find answer.
I have release strategy based on:
- Plant
- Purchasing Group
If I create Purchase Requisition with right purchasing group release strategy is assigned to PR item.
When use wrong purchasing group - release strategy is not assigned.
How to easy set control – if user use wrong purchasing group system automatically set one strategy which not allow to create purchase order.
There is too many plants (150) and purchasing groups (60) to create all combinations in strategy. So I cannot do that.
Maybe there is some useful user-exit?
I use SAP ECC 6.0
My problem occurred because SAP allow to create PO with reference to PR which have no assigned strategy.
Thanks in advance for help
Arek

Yes it is solution
But as I wrote before – there is too many incorrect combination.
Example
PG A1, A2, A3, A4…. A50
Pl 2200, PG A1 – OK
Pl 2200, PG A2 – OK
Pl 2200, PG A3..50 NOK
For this example I have to set 48 combinations (strategy with S).
I noticed that I would have to set about 200 strategies. Client don’t want accept it.
You wrote – “set up one unique strategy”. How? As I know I need 200 strategies (or there is something I don’t know
Kind regards
Arek

Similar Messages

  • Purchase requisition  not subject to a release strategy

    Hi All,
    When I will release PR, appears Error: "Purchase requisition  not subject to a release strategy". I've check the configuration, but it was appropriate. Can anyone help me to find the solution?
    Regards,
    MamaRara

    hi
    In our case also we have faced this problem
    Usually when you are executing ME54N the system displays the latest viewed / modified PR.
    Hope in your case the latest PR viewd / modified is not subjected to release.  Hence it is showing the message
    Go to ME22N  open your PR - Press save button.  Then try to open the same in ME54N.
    Hope this will help you
    SAS

  • Purchase Requisition with wrong details - Sending back to Originator

    Hi Experts,
    In SAP Purchase Requisition contents found incorrect on the stand of technical specification then buyer do not have provision to send back it through SAP to the originator (Design department) for correction.
    At present buyer are resolving such issues on the basis of Email. Till the time PR get corrected by originator it shows pending for action on buyer’s a/c .
    Hence considering above facts request to suggest us the method for sending the Incorrect PR line items to the originator through SAP.
    Regards,
    Shekhar Gaikwad

    Hi,
       Configure release strategy for PO at item level along with workflow. The release code can be the buyer and once the buyer found any error in the technical specification, he can reject the release, which will notify the creator.
       Refer the help doc: Workflow for Reject Purchase Requisition Item (SAP Library - MM - Materials Management: Workflow Scenarios)
    Regards,
    AKPT

  • SRM creates purchase requisition with wrong functional area

    Hi,
    We face the situation that we have postings to wrong functional Areas. These postings belong to a PO related GR. The PO originates  to a purchase Requisition. The functional area is can see there iw wrong, too. This seems the initial problem. If I create a PR using the same cost center and account it derives the correct funtional area. The PR is created out of SRM.
    We upgraded this year to EhP6 and it seems the issues started shortly after.
    Any idea how to correct?
    Thanks
    Exberliner

    Hi,
    Hope your BAdI is working now.
    MD51 is used for project. It creates replenishment orders against a WBS element. After this, you can run MD01 which will create replenishment order by material/plant level.
    If you have a question related to PS, maybe you can post your thread in this space:
    SAP Project Systems (SAP PS)
    Kind Regards,
    Mariano

  • Purchase Requisition with wrong ordered quantities

    Hi,
    I´m facing the following problem:
    In a PR item, field EBAN-BSMNG are filled with quantities, but there are no subsequent documents with reference to this PR item. Also the item processing status is N - not processed.
    Any ideas why the EBAN-BSMNG are filled with quantities?
    Thanks.
    Hermano

    Hi,
    not sure but  read following sap note
    SAP Note 194221 - LB:EBAN-BSMNG incorrect after part.convert in PO
    Regards
    Kailas Ugale

  • PO with differents plants and Release strategy

    Hi Experts,
    How Can I do?,
    Currently when I create a Purchase Requistion with differents plants the release strategy doesnt works (Just for one plant).
    I need to do a Purchase Requistion with differents plants, but I would like to keep any Realease strategy.
    could Anybody help me?. where I have to set in the customize?
    Tks in advance,
    Ignacio

    if the plant is avilable in the communication structure cekko then only your strategy will work and i think it is avilable in there
    and as i am getting your problem
    i suggest u to maintian a blank value in the char. werks in tcode ct04
    some times when u put so many values for same charac. in po
    then system is not able to judge that on whihc basis it should block the po so system will send a blank vule in the strategy and hence the strategy does not work
    so my suggestion is u main tin a blank value in the char. werks or plant in ct04 for the strategy
    if u need further clarification then let me know

  • Creation of Purchase requisition with reference to Contract documents

    Dear All
    I am not able to create the Purchase requisition with reference to Contract documents, in outline agreement field if I enter the contract document number which is already existing it is not copying the details, again I have to enter all the details like Plant, Material, document type, Qty etc.  Even after selecting the PR document type as RV for outline agreement also it is not coping. Kindly let me know that can we not able to give reference of Contract number in this outline agreement field to create Purchase requisition.
    regards
    Dhanu

    1.Logistics--Materials Management--Purchasing ---Purchase Requisition --Follow-on functions --- Assign and Process
    2.ME57
    3.Select the Assigned Purchase Requisitions checkbox if you also want to see requisitions already assigned, and choose Execute.
    4.On the Assign and Process Purchase Requisitions screen, select the requisition lines for your material.
    5.Choose Assign Manually if the info record already exists.
    6.On the pop-up Assign Source of Supply Manually dialog box, make the following entries:
    Agreement     46XXXXX            Agmt item     10          
    7.Choose Assign Source of Supply.
    For assign the source of supply, you can also choose Assign Automatically (only if not already assigned by MRP due to existing source list). If more than one source exists, select the contract in the Source Overview for Purchase Requisition 100XXXXX window and confirm with Enter.
    When assigning a source, make sure to select the contract.
    8.Choose Save.
    9.Select the line item, and then choose Assignments Overview (SHIFT+F5).
    10.On the Assign and Process Requisitions: Overview of Assignments screen, select the line below Vendor (you can only select one at a time), then choose Process Assignment.
    11.On the Process Assignment: Create PO window, check and make sure the Order Type (NB), Purchasing Group and Purch. Organization fields then choose Continue (Enter) to confirm.
    12.On the Create Purchase Order screen, select the requisition in the Document Overview section and choose Adopt in the left part of the Document Overview screen.
    13.Choose Save.

  • Automatic convert of planned order to purchase requisition with latest info price

    Dear Friends,
    Our client want to convert planned order to purchase requisition through background job,but they want to pur requisition picking price should be latest info record price.
    how can i map in to sap,is that possible in T.CODE MDUM, pl help on this requirement.
    Thanks &regards,
    Sabhapathy R

    Hi Sabhapathy R,
    The price in the Purchase Requisition is the Valuation Price of the material master.
    If you press F1 in the Purchase Requisition on the field Valuation Price at tab Valuation , you will see the SAP documentation:
    Price in Purchase Requisition
    Shows the price of the requested material per price  unit.
    Use
    The price and quantity set out in the purchase
    requisition determine the value of the purchase requisition item or
    purchase requisition. In turn, this value is applied in determining the release
    strategy for the requisition.
    In Customizing for Purchasing under Purchase Requisition ->
    Define Screen Layout at Document Level, you can set price and price unit.
    The Valuation price field can be set as a mandatory or optional input
    field.
    Procedure
    Input mandatory:
    If a material master record exists for the
    requested material, the price is automatically taken from the valuation
    price field.
    This is explained in several threadhs:
    Info record price not comming in PR after "Assign source of Supply" in PR
    The price of the Info Record will be determined when the Purchase Order is created.
    If you want price to picks from your Info Record when the PR is created, then check for a user exit or BAdI.
    Thanks and Regards,
    Mariano

  • New Purchase Requisition required once Purchase Order Released

    Dear Expert,
    Here i am creating Purchase Requisition from the project by assigning
    material component in Network Activity. All the Material assigned to a
    single network have a single Purchase Requisition with different
    different Line Item which is acceptable but once the Purchase Order
    created and released and a new material component is assigned to the same
    network. Now it will added into the same purchase requisition with
    separate line item, which is not acceptable since that purchase
    requisition was already closed and Purchase Order was released then
    system should generate a new Purchase Requisition against the same
    Network,
    Pls suggest how it could be configure, is there is any setting in config
    to full fill this requirement.

    Hi,
    As such there is no config requirement.
    Its purely your process needs to be re think.
    You are assigning the material to activity and getting PR,PR,GR and all . Once the material is consumed, thinking that activity is also over. In this case, again you are assigning other material to the same activity and you want to have the different purchase requistion not same PR with line item.
    option 1, you can have the different PR nos always whenever you are assigning the materials to same activity. If 1 activity requires, 10 materials, you will have 10 PR's which is practically not correct. chnages you can do it in parameter for network type.
    Option 2, New materials which is required can have a new network.
    Regards
    N.Raju

  • Purchase requisition with Item Category – L creation via Maintenance orders (Plant Maintenance)

    Hi Guru’s,
    I have a scenario where purchase requisition with Item Category – L (subcontract External) for Repair items (Storeroom Process) need to get generated with Item category-L.This requirement is to MAP in my system.
    I am aware that purchase requisition can be created with reference to maintenance orders.
    Can anybody through some light on the integration between PM and MM.
    If creation of purchase requisition is possible via maintenance orders then please explain me with detailed steps both configurations and master data so that I can able to replicate the same as per business requirement.
    I look forward to the expert’s response.
    Regards,
    Kumar

    Hi Kumar.S
    You have to installed DIMP 6.0, and activated the business function Refurbishment and Subcontracting (LOG_EAM_ROTSUB) and Serial Numbers in Purchasing (LOG_MM_SERNO) .
    Please check the below link:
    http://scn.sap.com/thread/1956895
    Hope it will help you to resolve your issue.
    Regards,
    Ritesh

  • How To Restrict Users To Only Create Purchase Requisitions with Item Catalog?

    Hi, everyone 
    Please help me, 
    How To Restrict Users To Only Create Purchase Requisitions with Item Catalog? is it possible? 
    Regards,   Manuel

    Hi Steenie Norman
    First click on the text item ---> Tools ---> Property Pallete ---->
    and change the Keyboard State to Local Only also this Depend in your OS
    hope this useful ....
    Regards
    Mohammed

  • Delete purchase requisition with item category Subcontracting

    Hi all,
    I need to delete a purchase requisition with item category = L (subcontracting).
    I am using already BAPI_REQUISITION_DELETE to delete other purchase requisitions but for the subcontracting it doest not work. In fact in the BAPI code you can see:
    Requisitions with dependent reservations won't be processed
        IF xeban-pstyp EQ 3 AND xeban-rsnum NE space.
    So I am looking for other BAPI but I don't find any to delete this kind of requisitions. Do you know any way to do that or I have to do a batch input?
    Thx,
    Manel

    Hi Manel,
    I am using BAPI_PO_CHANGE to set EBAN_EBAKZ, however in most of the cases error thrown as "Instance PO Number of object type  could not be changed".
    Could you please help on this?
    Thanks,
    Murali

  • Purchase Requisition with mat-nr and without mat-nr

    Hi,
    if I create a Purchase Requisition with a material number it will be transfered into the EPRTRANS,
    but if I create a Purchase Requisition without a materialnumber (only with account assignment)
    then it will be not transfered into EPRTRANS .
    Do you have an idea why this strange behaivour happens.
    Maybe there must be made some changes in Function Module BBP_EPRTRANS_MAINTAIN ?
    Regards
    ilhan

    in order to perform a Purchase Requisition-Upload from R/3 Backend system into another system there
    are several steps necessary.
    When I am creating a Purchase Requisition at the Backend regarding a valid material-number,
    the Purchase Requisition will be automatically inserted into the table EPRTRANS.
    But not in case of if you create a Purchase Requisition without a Material-Numnber.
    e.g. Purchase Requisition with free text and account assignment.
    Function Module BBP_EPRTRANS_MAINTAIN is reposible for transfering of Purchase Requisition
    into table EPRTRANS.
    I need these PR in the EPRTRANS in order to perform the report BBP_EXTREQ_TRANSFER finally.
    It trnasfers all Purchase Requisition from EPRTTANS to the external system.
    I hope it clarifys some of the confusion .
    regds
    ertas

  • Purchase requisition with MRP controller

    Hi everybody, I need support because I have to control during purchase requisition to block users with specific MRP controller.
    I mean, user A only have permission to create purchase requisition with MRP controller Z and user B only have permission to create purchase requisition with MRP controller Y.
    Thanks for all the ASAP cooperation.
    Regards.

    Hi Mitra,
    You will find your answer here.
    MRP controller for PR document type
    Do let me know if it helped, as I might have to explore this option for an upcoming requirement.
    Thanks
    Shailesh

  • Copy purchase requisition with me51n

    Hi,
    I have a problem when I want copy a purchase requisition in me51n.
    I have two documents types in specific and I use a variant of transaction who fixed the document type.
    I execute me51N
    I search a purchase requisition with other types.
    I do a drag & drop to copy the purchase requisition.
    But in the first copy, there is a document type present on header level was copied and in the second copy it is a document type comes from reference that is copied.
    I want for the first copy, the document type comes from reference in the copy.
    What am I doing ?
    Thanks.

    in order to perform a Purchase Requisition-Upload from R/3 Backend system into another system there
    are several steps necessary.
    When I am creating a Purchase Requisition at the Backend regarding a valid material-number,
    the Purchase Requisition will be automatically inserted into the table EPRTRANS.
    But not in case of if you create a Purchase Requisition without a Material-Numnber.
    e.g. Purchase Requisition with free text and account assignment.
    Function Module BBP_EPRTRANS_MAINTAIN is reposible for transfering of Purchase Requisition
    into table EPRTRANS.
    I need these PR in the EPRTRANS in order to perform the report BBP_EXTREQ_TRANSFER finally.
    It trnasfers all Purchase Requisition from EPRTTANS to the external system.
    I hope it clarifys some of the confusion .