Purchasing document release strategy to be cancelled at all changes

I want the release strategy of  PO/ Contract/ Sch. Aggr. to be cancelled at every change i make to the document and not only the value. I do not want to include any fields at the class, i just want any change (like addition of new material, change of account assignment etc) to cancell the release document.
Regards

The way to achieve this requirement is to create a custom field in the PO header that signifies that the PO has been changed.
It should be populated with a value say - X when a change is done and presence of this X should trigger release strategy. So you will need only this field in the characterisitcs and through user exit populate this field with X when PO was created and once released, make it blank. Then when changed repopulate with X
In this way you can ensure that any change to PO will trigger the release strategy

Similar Messages

  • User Exit for Purchase Order Release Strategy

    Hi,
    I am a little new to this, how do I search for a user exit for purchase order release strategy (TCode ME29N).
    Thanks in advance.
    Mick

    Hi
    Check the following Exits and BADI for Pur Requisition
    Enhancement
    MEVME001 WE default quantity calc. and over/ underdelivery tolerance
    MM06E001 User exits for EDI inbound and outbound purchasing documents
    MM06E003 Number range and document number
    MM06E004 Control import data screens in purchase order
    MM06E005 Customer fields in purchasing document
    MM06E007 Change document for requisitions upon conversion into PO
    MM06E008 Monitoring of contr. target value in case of release orders
    MM06E009 Relevant texts for "Texts exist" indicator
    MM06E010 Field selection for vendor address
    MM06E011 Activate PReq Block
    MMAL0001 ALE source list distribution: Outbound processing
    MMAL0002 ALE source list distribution: Inbound processing
    MMAL0003 ALE purcasing info record distribution: Outbound processing
    MMAL0004 ALE purchasing info record distribution: Inbound processing
    MMDA0001 Default delivery addresses
    MMFAB001 User exit for generation of release order
    MRFLB001 Control Items for Contract Release Order
    AMPL0001 User subscreen for additional data on AMPL
    LMEDR001 Enhancements to print program
    LMELA002 Adopt batch no. from shipping notification when posting a GR
    LMELA010 Inbound shipping notification: Transfer item data from IDOC
    LMEQR001 User exit for source determination
    LMEXF001 Conditions in Purchasing Documents Without Invoice Receipt
    LWSUS001 Customer-Specific Source Determination in Retail
    M06B0001 Role determination for purchase requisition release
    M06B0002 Changes to comm. structure for purchase requisition release
    M06B0003 Number range and document number
    MEQUERY1 Enhancement to Document Overview ME21N/ME51N
    MELAB001 Gen. forecast delivery schedules: Transfer schedule implem.
    MEFLD004 Determine earliest delivery date f. check w. GR (only PO)
    MEETA001 Define schedule line type (backlog, immed. req., preview)
    ME590001 Grouping of requsitions for PO split in ME59
    M06E0005 Role determination for release of purchasing documents
    M06E0004 Changes to communication structure for release purch. doc.
    M06B0005 Changes to comm. structure for overall release of requisn.
    M06B0004 Number range and document number
    Business Add-in
    ME_PROCESS_REQ_CUST Enhancements for Processing Enjoy PReqs: Customer
    ME_PROCESS_REQ Enhancements for Processing Enjoy PReqs: Internal
    ME_PROCESS_PO_CUST Enhancements for Processing Enjoy Purchase Order: Customer
    ME_PROCESS_PO Enhancements for Processing Enjoy Purchase Order: Intern.
    ME_PROCESS_COMP Processing of Component Default Data at Time of GR: Custome
    ME_PO_SC_SRV BAdI: Service Tab Page for Subcontracting
    ME_PO_PRICING_CUST Enhancements to Price Determination: Customer
    ME_PO_PRICING Enhancements to Price Determination: Internal
    ME_INFOREC_SEND Capture/Send Purchase Info Record Changes - Internal Use
    ME_HOLD_PO Hold Enjoy Purchase Orders: Activation/Deactivation
    ME_GUI_PO_CUST Customer's Own Screens in Enjoy Purchase Order
    ME_FIELDSTATUS_STOCK FM Account Assignment Behavior for Stock PR/PO
    ME_DP_CLEARING Clearing (Offsetting) of Down Payments and Payment Requests
    ME_PURCHDOC_POSTED Purchasing Document Posted
    SMOD_MRFLB001 Control Items for Contract Release Order
    EXTENSION_US_TAXES Extended Tax Calculation with Additional Data
    ARC_MM_EKKO_WRITE BAdI: Enhancement of Scope of Archiving (MM_EKKO)
    ARC_MM_EKKO_CHECK BAdI: Enhancement of Archivability Check (MM_EKKO)
    MM_EDI_DESADV_IN Supplementation of Delivery Interface from Purchase Order
    MM_DELIVERY_ADDR_SAP Determination of Delivery Address
    ME_WRF_STD_DNG PO Controlling Reminder: Extension to Standard Reminder
    ME_TRIGGER_ATP Triggers New ATP for Changes in EKKO, EKPO, EKPV
    ME_TRF_RULE_CUST_OFF BADI for Deactivation of Field T161V-REVFE
    ME_TAX_FROM_ADDRESS Tax jurisdiction code taken from address
    ME_REQ_POSTED Purchase Requisition Posted
    ME_REQ_OI_EXT Commitment Update in the Case of External Requisitions
    ME_RELEASE_CREATE BAdI: Release Creation for Sched.Agrmts with Release Docu.
    ME_DEFINE_CALCTYPE Control of Pricing Type: Additional Fields
    ME_CHANGE_OUTTAB Enrich ALV Output Table in Purchasing
    ME_CHANGE_CHARACTER Customer-Specific Characteristics for Product Allocation
    ME_CCP_DEL_DURATION Calc. of Delivery Duration in CCP Process (Not in Standard)
    ME_CCP_BESWK_AUTH_CH BAdI for authorization checks for procuring plant
    ME_CCP_ACTIVE_CHECK BAdI to check whether CCP process is active
    ME_BSART_DET Change document type for automatically generated POs
    ME_BAPI_PR_CREATE_02
    ME_BAPI_PR_CREATE_01
    ME_BAPI_PO_CREATE_02
    ME_BAPI_PO_CREATE_01
    ME_BADI_DISPLAY_DOC BAdI for Internal Control of Transaction to be Invoked
    ME_ACTV_CANCEL_PO BAdI for Activating the Cancel Function at Header Level
    MEGUI_LAYOUT BAdI for Enjoy Purchasing GUI
    ME_CHECK_ALL_ITEMS Run Through Items Again in the Event of Changes in EKKO
    ME_COMMTMNT_REQ_RE_C Check of Commitment Relevance of Purchase Requisitions
    ME_COMMTMNT_REQ_RELE Check of Commitment Relevance of Purchase Requisitions
    ME_COMMTMNT_PO_REL_C Check for Commitment-Relevance of Purchase Orders
    ME_COMMTMNT_PO_RELEV Check for Commitment-Relevance of Purchase Orders
    ME_COMMITMENT_STO_CH BadI for checking if commitments for STOs are active
    ME_COMMITMENT_RETURN Commitment for return item
    ME_CIP_REF_CHAR Enables Reference Characteristics in Purchasing
    ME_CIP_ALLOW_CHANGE Configuration in Purchasing: Changeability Control
    ME_CIN_MM06EFKO Copy PO data for use by Country version India
    ME_CIN_LEINRF2V BADI for LEINRF03 excise_invoice_details
    ME_CIN_LEINRF2R BADI for CIN India - Delivery charges
    ME_CHECK_SOURCES Additional Checks in Source Determination/Checking
    ME_CHECK_OA Check BAdI for Contracts
    Reward points if useful
    Rgds,
    Naren

  • Document release strategy

    Dear Gurus,
    The question is regarding purchasing documents release procedure.
    According to workflow setup(SWDD T-code), the required document flow finishes when CONFIRMATION sent after document is released, thus if I've issued output from the released document further cancellation of release is not possible. Could you please advice whether this option can be turned off? And where I can define output type for this Confirmation?
    e.g. my requirements- to be able to release/cancel release for purch docs without any additional checks

    The way to achieve this requirement is to create a custom field in the PO header that signifies that the PO has been changed.
    It should be populated with a value say - X when a change is done and presence of this X should trigger release strategy. So you will need only this field in the characterisitcs and through user exit populate this field with X when PO was created and once released, make it blank. Then when changed repopulate with X
    In this way you can ensure that any change to PO will trigger the release strategy

  • Problem with purchase order release strategy

    Hi Guru's
        i am dealing with problem of  service purchase order release strategy , when i making the service  po ,  i am not giving any over fulfillment tolerance  ,  after release & making Service entry sheet of PO ,   when i go to the change mode and change
      over fulfillment tolerance say 90%  , system allow me to make , and not applying release  strategy again  ,  so  there can be a miss use of this Scenario ,  so is there any possibility that release strategy , will appear again when change the tolerance ,
    0r  any other idea from your side , to avoid this ,
      your suggestions are really always helpful to me ,  please guide me for this also
    Thanks & regards
    Neha

    Hi Neha,
    A reset of the release strategy only takes place if
    -  the changeability of the release indicator is set to '4' in
       case of a purchase requisition and '4' or '6' in case of
       another purchasing document (purchase order, request for
       quotation, contract, scheduling agreement),
    -  the document is still subject to the previous release
       strategy,
    -  the new TOTAL NET ORDER VALUE is higher than the old one.
    The total net order value is linked to CEKKO-GNETW for a purchase order,
    CEBAN-GSWRT for a purchase requisition item-wise release and CEBAN-GFWRT
    for a purchase requisition overall release.
    If you have maintained a Tolerance for value changes during release
    (V_161S-TLFAE), the release strategy is reset when the value of the
    document is higher than the percentage you have specified and if the
    document is still subject to the previous release strategy.
    Review the SAP note 365604 and 493900 for more
    information about Release strategy.
    Regards,
    Ashwini.

  • Purchase requisition release strategy tab missing

    Hi all
    I configured purchase requisition release strategy and ME51N is working issuing no error but it is not displaying Release Strategy Tab , please help me where i am wrong.

    hi,
    check few reasons:
    1. There might be more than 1 release strategy using the same class, due to which it is not possible for sap system to determine the unique rel. strategy..this normally happens when you copy the exsisting class and assign it to own new one...
    2. check the release strategy OMGSCK, is there any problem with your release strategy...
    3. Check whether you have maintained all the classified field in the document or not..
    4. check whether the release is assigned to any workflow...if so, then check the inbox pls...
    regards
    Priyanka.P

  • User Exit for Purchase Requistion / Purchase Order Release Strategy

    Hi
    Can any one please tell me the List of User Exit / Enchancement Package for Purchase Requisition / Purchase Order Release Strategy .
    Thanks

    M06B0001                                                               
    Role determination for release of requisitions                         
    M06B0001                                                               
    Changes to communication structure for release of requisitions         
    M06B0005                                                               
    Changes to communication structure for overall release of purchase     
    requisitions                                                           
    M06E0004                                                               
    Changes to communication structure for release of purchasing document  
    M06E0005                                                               
    Role determination for release of purchasing documents

  • Purchase order release strategy report

    Dear Gurus,
    We are using purchase order release strategy with classification.
    We have 3-4 level of release. We want to develop a report where we will come to know at which level purchase order is pending for release .
    How to get it ?
    Please provide ur help for the same
    Rgds,
    Saurabh

    Hi,
    Basically in EKKO table there is a field name FRGZU  -
        Release status based on that we can write a logic take the report.
    for example A1,B2,C3 ARE THREE release codes in that if A1 released means with check thable whether A1 released once it is release it will go to next release code it iwll check the status again inthe loop....
    Just tell him the logic to ABAP person they will develop
    Rehgards
    Murugan J

  • Graphical view in Purchase order release strategy

    Hi Experts,
    I have added new position in existing Purchase order release strategy which is running properly.
    I am facing the problem of visual display in header on tab release stratege for the PO which are already released by respective authority.
    It is showing final release balance all though release indicator set to "1".
    For e.g.
    PO number 123 was released by 4 persons in past.
    As per new modification release agencies are 5 nos.
    for this PO release flag set to "1"
    As 4 persons involved in PO release the graphical display shows 5 agencies for release but release tick infront of these show only 4.
    My Problem is client wants correction in this graphical display.
    Please help me on this.
    Regards
    Dhananjay

    TELL THE SOLUTION DEAR ..SO ANOTHER WOULD GET HELP IN FUTURE.
    REGRDS
    MANOJ

  • Change in Purchase Order Release Strategy Values

    Dear All,
    I am in process of changing Purchase Order release strategy values.
    I have following release strategy -
                           Current Value                  (Proposed Value)
    Level 1 -         Upto INR 0.1 Mn               (Proposed value - Upto 1.0 Mn)
    Level 2 -         From 0.11 Mn to 0.5 Mn   (Proposed Value - From 1.01 Mn to 5.00 Mn)
    Level 3 -         From 0.51 Mn to 1.0 Mn   (Proposed Value - From 5.01 Mn to 10.0 Mn)
    Level 4 -         Above 1.0 Mn                  (Proposed Value - Above 10.0 Mn)
    My questions are -
    1) Will this change affect the existing Purchase Orders (already created) which are not yet released?
    2) Will this change affect the existing Purchase Orders (already created) which are released?
    3) Are there any risk factors?
    Can you pl. put light on above questions?
    Regards,
    Prashant Kolhatkar

    Hi,
    Actually, what you had given is not enough to determine if the existing PO will be impacted or not
    If you are just changing the classification but not changing the number of release level of the release code in the release strategy, the partial released PO will not be impacted unless there's PO changes. PO that are released will definitely not be impacted unless there are changed.
    In general, after a release strategy is determined for PO, SAP will retrieve the latest list of release code of that release strategy for display for that PO. If this list never change (mean you only change classification of the release strategy), then they will not be apparent to the user. But if this list change (you add new release code, replace existing release code or remove release code), then you will see some discrepency on screen as you will only see the modified list of release code and not the old list of release code
    Hope this help

  • Purchase Order Release Strategy Approval

    HI All,
    I have an issue with the Purchase Order Release Strategy, I need to set the Release strategy at 2 levels.
    Level one will have 1 approver
    Level two must have two approvers.
    The scene is:
    Level one will approve all purchase orders betwee 400 to 5000 euros.  1 approver only
    Level two will approve all purchase orders above 5000 euros.  2 approvers.
    The problem is that the level two approvers must have the same Purchasing Group, Release strategy and Code, that is.
    Pur. group G70, Release Group GC and release strategy DF.
    I have completed the customising and the Release simulation is working correctly but when the PO is created the is no release strategy proposed.
    CL20N is completed for both levels and works correctly for level one approval but not for level two
    Can any please help
    Leslie

    Hi,
    May be in your case the values are not properly designed in release strategy for PO Value (ZPO_GNETW) release characteristic.Now go for creation of following release characteristics
    1. PO Order Type (ZPO_BSART),
    2. Company Code (ZPO_ BUKRS),
    3. Purchasing Organization (ZPO_EKORG),
    4.Plant (ZPO_WERKS)
    5. Purchasing Group (ZPO_ EKGRP) and
    6. Total net PO Value (ZPO_GNETW)
    Create one release class ZPO_CLASS & then add all above release characteristics
    And then design your release strategies as required.
    AND under release characteristic for PO Value (ZPO_GNETW) keep following values
    A. <= 400 EUR
    B. 400.01- 5000 EUR
    C. >5000 EUR
    As you already created Release Group GC & release strategy DF (1st level), now create another release strategy DS (2nd level).
    NOTE: As you needed one releaser at 1st level and then two releasers in 2nd level. So create three release codes C1 for 1st level and C2 & C3 for 2nd level.
    In designing release strategies for PO , you can keep value 400.01- 5000 EUR with release codes C1 under DF release strategy and Keep value >5000 EUR with release codes C2 & C3 under DS release strategy.
    Regards,
    Bijju K

  • Purchase order release strategy based on over delivery tolerance level

    Hi Boss,
    I like to set the Purchase order release strategy based on the over delivery tolerance. But when i checking, the over delivery tolerance filed UEBTO is not in the communication structure CEKKO. Can you please help me how should i extend the CEKKO with field UEBTO.
    I do not have the ABAP experience, please guide me with coding.
    Thank you,
    Siva

    Hi Siva:
    You should request the development key for this structure under your SAP system, then you can add the extra fields in CEKKO.
    Good luck
    Z.T

  • Purchase order release strategy with a characteristic value as a variable

    Hi all,
    We have Purchase order release strategy based on the following characteristics:
    Total Net Order Value
    Purchasing Organization
    a few other custom fields
    We would like to add a characteristic based on the creator of the PO. In the purchasing department there are two person which have the authorization to create an release POs. The goal is now to check if the actual user, who release the PO, is different from the PO creator. The value of this characteristic may not be a fix value, it must be contain the name of the actual user name.
    Is there are a possibility to insert the characteristic value as a variable such as SY-UNAME instead a fix value?
    Thanks,
    Charles

    this is verymuch possible.  You can use unsed fields user1, user2 etc in CEKKO or (ii) insert a new field in CEKKOZZ and use the new field.  You need to build up logic in user-exit such that this field will take the value of person who had logged in. This can be done by ABAPer.
    Hope this resolves ur problem

  • Purchase order release strategy with multiple characteristics

    Hi All,
    We have Purchase order release strategy based on the following characteristics:
    Total Net Order Value
    Purchasing Organization
    Release strategy Type
    a few other custom fields
    We would like to have PO's with release strategy based on a particular Material Group [say X]. I have created a new Characteristic with respect to CEKKO-MATKL and added this characteristic to the same class.
    I have created a new release code [HR] [we need a different person to sign off] and a new release strategy [TR] for which I have assigned the release code HR. In this release strategy, I have set it to get activated for a particular Material Group that does seem to work, but the remaining PO's are not getting triggered for other material groups. For other release strategies, I have left the material group field blank, because they need to be triggered for any material groups except X.
    Could you please let me know if I am missing something  or is there an alternate approach to this ?
    Thank you,
    Satish

    Hi,
    Obviously system will not trigger release strategy in ur case since in the classification data for other strategies u have left it blank excepting X for one strategy.
    Since u have added a new characteristic Material group  and assigned it to class then system expects an input for Material group for triggering release tab.If this is left blank then system by default will not trigger release strategy tab.
    Solution:
    First add all existing material groups in values tab of mat group characteristic then maintain the required set of material groups except X in other strategies in classification data.
    Hope this is clear to you.
    Regards,
    Uzair

  • Badi for Purchase Requisition Release Strategy

    Can any help me to know about the BADI for Purchase Requisition Release Strategy .Is their any BADI to  control the PO Price for a PR release strategy
    Thanks for your help

    This badi is for schedule agreement ?
    BAdI: Release Creation for Scheduling Agreements with Release Documentation
    Use
    You can use this Business Add-In (BAdI) to influence release creation.
    This BAdI is used in the application component Scheduling Agreements (MM-PUR-OA-SCH).
    This BAdI includes the following methods:
    Change Data Before Release Creation (BEFORE_CREATION)
    Change Data After Release Creation (AFTER_CREATION)
    This BAdI is called during manual and automatic release creation.

  • Tranposrt - Purchase Requisition Release Strategy with Classification

    Gurus!
    Tell me if I want to Transport the Purchase Requisition release strategy with classification. The Data in each charisteristics in each PR Strategy that I have set in Dev is not getting transported to Quality.
    Do I have to enter the data in characteristics again in Quality and the same procedure I have to apply for Production.
    If yes, in this scenario, Can I make Production modifiable.
    Regards
    Sajid

    Hello,
    Create a special ID in PRD with access to change characteristics. This ID should be released for specific purposes and with approval (project manager/SAP support manager). You can also turn on auditing so that all activites performed are logged which can be used to satify auditors.
    Cheers !

Maybe you are looking for

  • Memory Expansion on Envy Touchsmart 14-K111nr

    Wanting to expand memory on laptop from installed 8GB to 16GB. Specifications state maximum allowed memory capacity is 16GB. Laptop does not recognize 16GB (2 x 8GB - DDR3 1600 12800 SODIMMs) but only recognizes 12GB (1 x 8GB and 1 x 4GB). Any guidan

  • Modifying web photo gallery templates

    Hi all! I created a web photo gallery in Photoshop. I want to modify the template so that I can make the gallery look more in line with the rest of the site I'm designing. I see in the Help Center that I need to modify the "tokens" in the html, but I

  • Business Connector upgrade !?

    I have just joined a project with an exisiting Business Connector implementation talking to a SAP 4.0B box. They are upgrading their SAP system to ECC6 and want to keep BC. I have just read the various SAP Notes, replies on SDN, etc and I am still un

  • French special characters not displayed properly in discoverer 11g

    Gurus We are upgrading to discoverer 11.1.1.3 I have found that French special characters (letters with accents) are not displayed properly in the discoverer tool menu. Example Sélectionner is displayed as S?lectionner. This doesn't seem to be a serv

  • Latest update makes my itunes crash on launch

    When I launch iTunes on my MacBook Air v10.6.8 it prompts me to enter my apple id and password. when I do, the program crashes, quits and puts up an error page. Any ideas what to do? My error page says: Process:         iTunes [8058] Path: