QM-Assign inspection plan to a variant of material (classification view)

Hello,
Inspection plans are commonly assigned to materials.
In my case, I would like to manage, in <b>Classification view</b> (MM01), a new characteristics named "Variant" that could have 2 or more values, depending on which variant I order to my supplier.
<b>But is it possible to assign an inspection plan at this sub-level ?</b> In QP01 the only possibility I see is assigning a material to the inspection plan. Can I customize something, or does it exist a trip to manager another level of assignment ?
Thanks a lot for your help !
Emilie

Hi Emilie,
Now I understood your requirement. But I would like to know the exact purpose of this requirement so that I can try to give you correct solution.
I will consider your example:
Material : 123
Classification: Inspection
Characteristics 1: Variant 1 for Inspection 1
Characteristics 2: Variant 2 for Inspection 2
Selection of inspection plan takes place during the creation of inspection lot. So now you have to link this material/classifcation/inspection plan combination at the time of inspection lot creation. I doubt whether this can be done using one user exit.
The user exits are
EXIT_SAPLCZCL_001
EXIT_SAPLCZDI_001
EXIT_SAPLCZDI_002
Please let me know whether it helps.
WR,
Sanjeev
Message was edited by: Sanjeev
Selection of inspection plan takes place during the creation of inspection plan
changed as
Selection of inspection plan takes place during the creation of inspection lot
        Sanjeev

Similar Messages

  • Procedure to Assign Inspection Plan and to Execute it

    Dear All,
    pls explain me the step by step procedure to ceate an inspection plan and assigning it to an manufactured item and also explain me how to clear the goods from QM after the production confirmation.
    Regards,
    Srini

    Hi muthu
    First include quality view in material master. There assign inspection type 04. Inspection during GR. Then activate this.
    Then in QA 32 assign inspection characterstics with UD code and set release to this.
    Once you do GR for production in MB 31 goods will be automatically posted to inspection stock.
    Then double click on that in MD 04 screen and do UD with good quantity and scrap qty with correct storage location.
    after savings this goods will be automatically posted to unrestricted stock.
    Hope this will clear
    Regards
    J . Saravan

  • ERROR WHEN RUNNING B.D.C FOR ASSIGN OF INSPECTION PLAN TO MATERIALS

    HI GURUS,
    WHEN I RUN B.D.C TO ASSIGN INSPECTION PLAN TO MATERIAL
    I AM GETTING THE FOLLOWING ERROR.
    Error occurred when checking type  group .
    Message no. CP852
    Diagnosis
    Errors occurred when checking the routing.
    Procedure
    u2022     If the check occurred online, display the checking log and remove the causes for the errors.
    u2022     If you saved the routing, call it up again and check it online.  Display the checking log and remove the causes for the errors.
    +NOTE: THIS INSPECTION PLAN WE HAVE ASSIGN MULTIPLE+ M.I.Cs WHICH ARE SIMILAR E.g.
    CHARA180:SMS,
    CHARA:190:SMS;
    CHARA:200:HRM:
    CHARA:210;HRM
    WHEN WE RUN COPY MODULE B.D.C.WE ARE GETTING ABOVE ERROR.
    REGARDS
    AMIT

    Hi Atul,
    WHEN WE DELETE THE REPEATED M.I.Cs AND ONLY RUN THE B.D.C WITH 16 CHARACTERISTICS WHICH ARE NOT REPEATED. THE PROGRAM/RECORDING RUN SUCCESSFULLY.
    AS SOON ADDED THE M.I.CS WHICH REPEATED IN CHARA:170,CHARA:180;CHARA;190;CHARA;200;CHARA;210;CHARA220.
    WE ARE NOT ABLE TO SAVE THE RECORDING AND WE GET ABOVE ERROR.
    MY ABAPER IS SAYING ITS A FUNCTIONAL ERROR.
    REGARDS
    AMIT

  • Inspection plan assignment

    Iu2019m facing an issue when creating inspection lots.
    I have one task list group with 3 counters inside.
    Counter 1     Material A / Plant A / Customer A;
    Counter 2     Material A / Plant A / Customer B;
    Counter 3     Material A / Plant A / Customer C.
    When I create these inspection lot through of transaction QA01, the system is assigning  the  inspection plan properly to each one of these combinations.
    If the creation is done through a delivery the system doesnu2019t assign any inspection plan.
    Somebody can help me?

    The inspection lot origin that I'm  using is 02
    I created 2 inspection plans to  2 differents customers.
    I also created 2 delivery process with 2 differents customers and the Inspection Lot was created after the Goods issue in the delivery process, but the Status is CRTD.
    As I believed that it was wrong, then I tried to create new inspection lots through the transaction QA01 to each one of this customers, with lot origin 02 to check the system behaviour.
    At this test the system assigned properly the inspection plan to the inspection lot.
    I read the explanation of marwadi, and I understood that can't assign inspection plans at the Customer level.
    Can you check if is it OK?
    Thank you
    Tiago

  • Inspection plan selection based on production workcenter for Inspection typ

    Dear QM Guru's,
    I have requirement of automatic inspection lot creation based on production work center.
    For example :- I have Inspection Plan A, Plan B and Plan C for Material XYZ. My requirement is that, when inspection lot created for material XYZ ,when we release production order (Early lot creation) , it should create inspection lot based on production work centers in the order. In this case, if production workcenter A is in the prodiction order, system automatically assigned inspection plan A, when workcenter B,it should choose inspection plan B and same for C workcenter.
    Can we have this set up in the system?
    Let me know if u need any other details.
    Thanks in advance.

    The workcenters in QM and PP don't have to be the same.  In the user exit your going to code in the logic you want to use to select the inspection plan.
    I suggested creating the workcenters the same and the code can use that info to match up the correct task list group to assign the inspection lot. But if that doesn't work pick something else.
    Your code can use any logic you want.  You can put a description in the short text if you want. 
    You can just have an understanding that task list group 10 is always used for production work center XYZ and task list group 20 is always used for production work center ABC and task list group  30 is always used for production work center 123.  In the user exit you check which production line and just change the group to 10, 20 or 30 then.
    I don't care what you pick or how you do it, neither does the function module.  I believe the function module will pass in the parameters of the task list it is planning to assign.  You then have the ability to use the code to pick a different one and pass back new parameters for the task list.
    Craig

  • QM : First inspection lot - inspection plan, other inspection lot another insp. plan

    Hello.
    Is it possible with standard SAP  when it is create the first inspectio lot for material/vendor  ( origin 01) that it takes an inspection plan, and for the next inspection lot that will be created for the same material/vendor ( origin 01) that system takes from another inspection plan ????
    Or have i to user a badi/user-exit?? which?
    Regards.
    Antonio

    Dear Antonio,
    Try this
    1. In material master do not set the auto release indicator for 01 inspection type
    2. Make inspection plant for material with group counter 2
    3. Now you have two different inspection plans with group counter1 &2
    4. Do the GR for same material for two times
    5. Two inspection lots will be generated
    6. Assign inspection plan manually for first inspection lot with first group counter
    7. Assign inspection plan manually for first inspection lot with second group counter
    Please let me know is it working or not
    Regards,
    Jagan

  • QM- delete inspection Plan

    Hi Guys,
    i have an issue regarding master data and inspection plan.
    i need to change the base unit of measure on a material.
    when i tried the system gave me this message:
    The base unit of measure cannot be changed.
    The reasons for this are:
    Routings already exist that are assigned to the material.
    Type Group    GrC Plnt
    Q    235723   1   USNA
    so i have checked table PLKO and found my material.
    i have seen that an Inspection Plan has been created, so i deleted the IP with QP02. went to MM02 tried to change the Bum but same error.
    run tcode QSR6 but i am not able to delete this I.Plan. am i missing something?
    can you please help?
    thanks
    C.

    BTW: for your process you don't need to delete the inspection plan.  All you need to do is go to the material assignment screen at the header level of the insp. plan and delete the assignment of the material to the plan.  Then, if you wanted to, after changing the BUOM in the material, you could use QP02 to change the UOM used in the inspection plan, and the reassign the material back to it.  Save you from having to recreate the plan.
    FF

  • Usage decision and inspection plan

    Hi,
    1. Once Usage decision has been done, can we still change it? how can i set that it can be changed?
    2.Is it possible to create an Inspection plan for a group of material? for example, I just need to maintain 1 Inspection plan for 30 material. something like it can be group like reference operation set? if yes how? if no, why?
    Thank you so much,
    raymond

    Hi
    Hi,
    1. Once Usage decision has been done, can we still change it? how can i set that it can be changed?
    Yes UD  can be changed anytime but you can not change the stock postng.Also for history in QM view tick on "document req"
    2.Is it possible to create an Inspection plan for a group of material? for example, I just need to maintain 1 Inspection plan for 30 material. something like it can be group like reference operation set? if yes how? if no, why?
    Yes this is possible through QP01/02 --->in header there is one tab"Material assignment" here you can enter
    Group conter (same say "1" ) material & plant.
    Same Inspection plan is reffered to the multiple materials.You can add as materials possible.
    But remember that Unit of measurement of all materials must be same.
    Sujit

  • Create Inspection plan at once for many materials through QP01. Possible?

    Dear Friends,
    Is it possible to create Inspection Plant for more than one material at onece through QP01 when operation activity and Characteristics are same. I will change the Characteristics specifications afterwards.

    As suggested in earlier reply you can assign multiple materials to one inspection plan.
    But you may still need more than one plan because of
    1. UOM is maintained in Inspection plan header. So you have to create different inspection plan if you receive materials in different Unit of measures.
    2. Usage is also at header level, so depending on configuration, usage for 01 inspection type may be different from usage for 0101 inspection type.
    If you like the user exit approach.
    1. Create a dummy material and assign default inspection plan to this material.
    2. In the user exit change the inspection plan assignment.  Assign inspection plan from this dummy material.
    Form us this was a very useful approach during testing or for new material where inspection plan was not created in time.
    Once this default inspection plan is assigned, inspection lot is released even without inspection plan. If we need,  we can always change the default inspection plan in QA02 transaction before RR
    AK Marwadi.

  • Inspection plan Vs Material specification

    What is the difference between this and their limitation ,,when we have to use Inspection plan and when for the Material specification ?..Any detailed explanation   please
    Thanks for the help

    Inspection plan and when for the Material specification
    Inspection plan is plant specific material & plant combination.Means if same material is used in other plant you can not have Inspection plan of other plant used.
    Whereas when you hava material specs then it is not plant specific.Nce created it can be used for any plant.
    This can be used when your specifications are not plant depeendent.
    Explore on sdn you will get more explainations..........
    Inspection plan Vs Material specification
    Material specification and Inspection plan - Task list usage
    Inspection plan and material specification

  • Assigning a different inspection plan to an inspection lot

    Hi,
    I have a situation where the incorrect inspection plan is assigned to an inspection lot. Is there any mechanism to assign a different inspection plan to an inspection lot i.e. without having to reverse a goods receipt.
    Regards,

    >
    Shyamal Joshi wrote:
    > Hi Kaushal,
    >
    > There are more than one reason for this error. Check the followings.
    >
    > - The key date for inspection lot should be later than the key date for the inspection plan, later then the date when you assigned the material to the plan.
    > - The usage of lot and inspection plan should be same.
    > - The status of inspection plan must be released.
    >
    > Regards,
    > Shyamal
    Why are you not checking these things I am sure the reason would be there only. If dont wana check it is your wish. Any ways best of luck

  • Re assignment of material from inspection plan group

    Dear Experts,
    I have an issue, we got a material which has multiple groups assigned to it.
    How to remove the materials assignment from the inspection plan group?
    Since the group contains more than 1000 line items, it is very laborious to search every line item and delete manually.
    Is there any 1 shot way to remove the assignment?
    Please help me out in this, because of multiple assignment, the lot gets into the status of CRTD.
    Thanks in advance,
    Anitha Pauline.

    hi,
    Use CWBQM.
    Regards

  • Assignning materials to a Inspection Plan by BAPI? QM

    Dear sappers,
    I a help with QP02. I need 2 Functions modules or BAPI's: 1st for assigning material-plant to an Inpection Plan and 2nd for cancelling the assignment of material-plant to the Inpection Plan automatically.
    I have checked all BAPI's in SE37, but more effort is needed.
    I know this is a real thread, so thanks for your help.
    Does anybody have any brilliant idea?
    Thanks a lot.

    Hi Gerard,
    I am looking for an automated way of assigning materials/plants to inspection plans and also for cancelling such assigments. I assume it is not far from the requirement you describe.
    Have you found a way to solve it ?
    Best regards,
    Thomas

  • Assignment of Maintenance Package to Inspection Plan operation

    Hi All,
    For Stability Study I have created Inspeciton Plan and now I need to assign Maintenance Package to Operation. Please help in assiging Maintenance Strategy/Maintenance package to Inspection Plan operations.
    Thanks in advance.
    Regards,
    Devang

    Hi Luke,
    I was able to assign Maintenance Strategy and corresponding package to operation. Thanks for your help.
    But now I am stuck with some other issue. I have completed initial testing, then scheduling as well as result recording against scheduled inspection lots. But when I check "Display Stability History", I am getting tab for Initial Test along with one tab for each assigned conditions. But here issue is, under Intial Test tab I can see all characteristics results while for under other tabs (condition tabs) system shows only first characteristic result. Here please note that I have used same Inspection Plan and even result racorded and valution done (all accepted) is same for intial inspection lot as well as scheduled inspection lots for conditions.
    I am unable to understand why system is showing All Characteristics results under Initial Test tab but only first characteristic is shown under Condition tabs.
    Hope you can help me with this as well.
    Thanks and regards,
    Devang

  • Report to see all materials assigned to an inspection plan

    Hi,
    Is there any way to list all materials with a inspection plan assigned to them?
    Kind regards,
    Kristoffer Pehrson

    HI,
    another way could be the use of QP03.
    Select your inspection plan. In the plan overyou press the button "material assignment". YOu should get a listof all materials that are linked to the plan. But you should keep an eye on thegroup counter, as all group counters and assignments are shown.
    Another way could be to build query with SQ01.  
    Hope that helps.
    Jens