QM in procurement - Inspect partial quantity

Hello all,
In our incoming quality process we have the following requirement: when we do the GR we want only part of the lot to be put in quality stock. The rest should go to unrestricted use.
Samples don't seem to cover this requirement.
Do have any idea on how to solve this issue?
Thanks!
Isabelle

No.  There is not a standard way to do what you want to do.
If you want all the material to go to unrestricted inventory anyway, and you don't consume the material in testing, why does it matter if the sample qty shows in the QI stock anyway?  Your sampling procedure should indicate the amounts/numbers needed for testing and the sample drawing procedures can be printed out for reference. This information is also readily available in various screens so a tech can easily see the qtys required.
If you really want to get it to QI you can try to work the system in two ways.
First, specify that all material go to unrestricted inventory in the settings for the inspeciton type.  Then you can try one of these two.
1) Create a sampling procedure such that you allocate x amount of product to destructive testing. (i.e control indicators on at least one test indicate destructive testing)
2) Specify a qty for reserve samples.
I'm not sure exactly how the system will behave in these cases with the bulk of the material going directly to unrestricted as I have never had to try it! 
In case one, the system will want to consume the material and might not allow you to post it on the stock posting screen. (Don't know if you'll even have this screen available since it all went to unrestricted, but it might since there is a chance you don't destroy all the sample)
In case two, again, I'm not sure if you'll have the stock posting screen or not.  If you do, you can maybe post the material to stock instead of reserves at this point.
Let us know how you make out.
Craig

Similar Messages

  • Inwarsd Inspection - Partial Acceptance

    Hi all,
    We are doing the Inwards Inspection at MIGO level with 103 movement. At UD I am accpeting only a Partial Quantity by 105 movement. Remaining is returned to Vendor by 124 movement. Both 105 and 124 happens at QA32 UD level. (Automatic).
    My client is asking for the Excise Invoice that has to be sent to Vendor so that Vendor will get the Credit for the taxes he paid for the returned qty. ( He would have paid the taxes for the complete quantity and as we have returned partial qty, they should get back the credit from Gov).
    To ensure that Vendor receives the Credit back, what are all the documents need to be sent and How?.
    Note: As I am doing Inspection at 103 level, no stock is updated with the procurement qty. So in this case, I am returning the goods as if I haven't receive them.
    Experts please guide me.
    Best Regards
    Sam

    Thnx Mr.Neeraj.
    I have few doubts in the same context. Why Account document should be generated and why Inventory should get updated before the Quality Inspection is over.
    Why the reversal of Accounting Entries and reversal of Inventory and all other reversal should takes place unnecessarily, if we could reject the materials at Quality Inspection (103) itself.
    Will this not simplify all the process that I have mentioned above.
    Regards
    Sam

  • Partial Quantity and Line item not showing in MIGO

    HI All,
    My User create STO and after save it is automatically created OBD and PGI through BARCODE now problem is at the time MIGO it is take partially quantity.when i going to do manually rest quantity it is not showing all line items.
    Issue 1. It is showing only one line item instead of two line item Qty.
             2. When i am going to select purchaseorder at migo instead of OBD its showing two line item.
    Please suggest what to do.

    HI Please check i am sending screen shot

  • Inspection lot quantity in manual inspection lot (T.Code-QA01)

    Dear Experts,
    I have activated inspection setup "89" with lot origin '89".I have activated this inspection set up to a material in QM view.
    When i want to create a manual inspection lot through T.Code QA01, the inspection lot quantity is a required field. But i do not want to enter a quantity here. I want to create manual inspection lot without quantity. Is it possible?
    If yes, please suggest how to proceed.
    Your help is highly appriciable.
    Regards
    Vivek

    hi
    Use User Exit :QPL10001
    Description
        You can use this enhancement to change all the fields when creating an
        inspection lot. The function module is only run once.
        You must be careful when using this enhancement since this can lead to
        inconsistencies in inventory management. For example, if you change the
        quantity fields.
    Logic:
    Logic will be when you are using a specific Material say MATNR : xyz .......then disable the Qty field LOSMENGE.
    I hope this will help you
    Regards
    Sujit

  • Partial quantity check by the system in third party sales

    Hi
    In third party sales , i created one third party order for 100 quantity and i did MIRO for 89 quantity . Now when iam doing the billing with reference third party order how system will know that i did miro only for partial quantity
    where is the check that system will check the miro quantity and allow that quantity for billing . Where exactlythe link between the sales order and MIRO document

    Hi,
    It's in copy controll VTFA
    got item level >>> Slect item category >>> details >>> put billing quantity as - F (Invoice reciept qty less invoiced quantity)
    Kapil
    Edited by: Kapildev Farakte on Jan 19, 2010 9:31 AM

  • Mile stone billing with partial quantity.

    Hi,
    We are facing problem in the milestone billing. we have scenario where we have payment terms (Ex: 10% advance, 70% on delivery, 10% on installation and remaining 10% on completion) with the materials having multiple quantity. Delivery will be in partial, so except the advance invoice all the remaining invoice require change in the billing quantity before billing, but in the system billing quantity showing in gray mode. After delivery also remaining (10% installation) also will be on different quantity i.e. actually installed at the site.
    As per the law invoicing has to be done with in the 14 days of the installation of the work, once the installation over for partial quantity we required to do the invoice irrespective of the delivered quantity.
    In the system if we do the invoice for the total quantity at the time advance after that we are unable to change the invoice quantity in the subsequent invoices.
    Please suggest us how to make enable the billing quantity field in case of milestone billing.
    Ex: let us say sales order is created for qty 10 with the value of 1,00,000.00 as payment terms as follows.
    10% Advance, 70% on delivery, 10% on installation, 10% final completion.
    First we have raised the 10% advance invoice using 1st milestone with the total quantity.
    When we deliver, we deliver only partial quantity i.e. qty. 5, so we have to create the invoice for (50,000-5,000) Rs 45,000. But when we create the second invoice we are unable to change the billing quantity. Same way when we create the third invoice after installation we may have to bill for qty. 3 if only 3 machines are installed out of 5 delivered, so again we require the quantity change.
    Regards,
    Upendra
    +919824795543

    hi
    Milestone billing means distributing the total amount to be billed over multiple billing dates in the billing plan.
    As each milestone is successfully reached, the customer is billed either a percentage of the entire project cost or simply a pre-defined amount.
    During sales order processing, the system determines from the item category whether a billing plan is required and, if so, which type of plan
    The type of billing plan that is determined at this point is set up in Customizing and cannot be changed in the sales document.
    Billing plans for periodic billing and milestone billing plans for project-related milestone billing have different overview screens so that you can enter data relevant to your
    processing.
    For example, for milestone billing, you must be able to enter data to identify the individual milestones.
    IMG configuration requires :-
    1.  Maintain billing plan types for milestone billing in OVBO.
    2.  Define date description in SM30 - V_TVTB.
    3.  Maintain Date Category for Billing Plan Type IN OVBJ.
    4.  Allocate date category in SM30 - V_TFPLA_TY.
    5.  Maintain date proposal for Billing Plan Type in OVBM.
    6.  Assign Billing Plan Type to Sales Documents Type in OVBP.
    7.  Assign Billing Plan Type to Item Categories in OVBR.
    8.  Define rules for determining the date in OVBS.
    Milestone billing is typically used for billing projects, such as plant engineering and construction projects. Such projects often include a series of milestones that mark the completion of different stages of the work. In the SAP R/3 System, milestones are defined
    in a network along with planned and actual dates for the completion of work. The milestones are also assigned to the billing dates in the billing plan.
    Each milestone-related billing date is blocked for processing until the Project System confirms that the milestone is completed.
    Delivery-relevant order items for which a milestone billing plan applies are billed on the basis of the requested delivery quantity and not on the total of the confirmed quantities.
    Reward if USeful
    Thanx & Rerards.
    Naren..

  • Approving Partial Quantity in ML85 for Service Entry Sheet

    Hi,
    Is it possible to approve partial quantity in ML85(or any other screen) for Service Entry Sheet?
    Thanks.

    Hi,
    I dont think it is possible to approve Entry sheet for partial quantity. Release strategy for Entry sheets are at Header level and not item level.

  • Inspection Lot quantity change (lot origin 03) when Prod. ord. qty changes?

    Hi,
    it seems that for an inspection lot, with lot origin 03:Production, its Inpsection Lot qty doesnt change when the Production order Total Quantity field changes. Only the Actual Inspection Lot changes.
    How can the Inspection lot quantity field of the Inspection Lot be changed accordingly?
    Should the enhancement PPCO0007 be used?and then LOSMENGE (table QALS) =GAMNG (table AFKO)
    Can it be done?
    Thanks in advance

    Hi,
    In that case, you can do it by :
    - Reread the master data of production order(From Menu Bar).
    - The status of production order will be converted from "Released" to "Created".
    - Release the production order again.
    Thanks
    SUMIT

  • Is it possible to accept partial quantity in a bid??

    Hi everybody,
    Is it possible to accept partial quantity in a bid??
    For example, I create a bid for 10 pieces. A vendor makes a bid for the 10 pieces. For any reason, I only have money to buy 9 pieces, so, Can I accept only this 9 pices??
    Thanks,
    Ivá

    Hi,
    SRM 5.5 supports accepting partial line item quantities as well as you can accept few of the line items (say 2 out of 4 lines of the BID).
    You have to click change first in the BID, then you can delete the items you do not want to accept, then manipulate the quantities for the items (system recalculates the value automatically) and finally accept the bid.
    Regards
    Kathirvel

  • Partial quantity to be billed in order related billing ?

    Dear all,
    We have a situation where we need to bill only partial quantity for a order related billing.
    Current strategy is to create a release order kind of document and then bill that. We want to avoid this. Is there any possibility to directly copy the quantity to billing document and change it in the billing document?
    Regards,
    Balaje Raam

    Hi abdulshaik,
    Yes it is possible to create 2 invoices for the 2 line items in order.
    --First do the customization as per the Mr. Lakshmipathi said
    --Go to VTFA copy controls
    --Select your Billing Document & Order Document
    --Click on item level  in Data VBRK/VBRP --assign routine of 006 limited single invoice & save it
    --Go to T.Code VF01 & enter the order no
    --You will find two line items. select the both line items & click on split analysis
    --Now you will find two invoice no with the same order.
    Let me know if your problem is solved
    Regards
    Pradeep

  • Does Transfer Invoice Price Variance pro-rate for partial quantity ?

    We were planning on using Transfer Invoice Price Variance to Inventory but unfortunately, we find when there's an IPV for quantity that's partly issued - the variance is not pro-rated but entirely applied to the remaining quantity.
    Just wondering if this is desired functionality and if so, could we use SLA to ask the program to pro-rate the variance and for partial quantity, apply the pro-rated amount to the quantity remaining and the rest to the Cost Variance account.
    Thanks,
    Sanjib

    TIPV to Inventory doesn't pro-rate for partial quantity.
    It transfers the entire IPV to the remaining quantity.

  • System is not receiving partial quantity in MIGO.

    Hi Everyone
    During receiving the partial quantity in MIGo,system gives me following error.
    Deficit of PU Ordered quantity 5 BAG : 2000380 1000 1002 GREEN TIP
    Can u please tell me to get rid of this error so that the system could receive the partial quantity against PO in MIGo
    Regards:Vijay

    Hi,
    Check on it:-
    partial gr quantity can be cancelled or reversed
    SAP MIGO Partial Goods Receipt of a PO then after close PO
    pherasath

  • Component pick release for partial quantity

    Hi All,
    For R12 environment , customer needs move order to be created for partial quantity using component pick release.
    As far as I know component pick release cannot be done for partial pick release and only possible when onhand qty is not available.
    Can any one pleas elet us know if we can have any alternate solution or easy customization so that client can edit the quantities before going to move order creation?
    Thanks
    Vasudha

    when the move order is created..update the allocation and then perform transact move order
    ex if for 10 qty move order is created..but if u wish to issue 5 qty to the job..then update the allocation..for the remaining u can just backorder the move order
    HTH
    Mahendra

  • TO with partial quantity

    Dear experts
    When I create TO with a delivery number via LT03, I can't create TO with partial quantity. Like the delivery quantity is 10, I only want to create a TO with quantity 5, but system show me an error message "Delivery items requiring processing still exist" and I can not save. I consider the partial TO can be created, what setting I missed? Please give some advice.
    Thanks
    Tony

    In the followin g configuration node you can define the indicator for partial picking at WM level
    Logistic Execution - Warehouse Management - Interfaces - Shipping- Define Shipping control - Shipping control per Wh no
    Here maintain indicator for partial pick

  • Partial quantity of Material in Extended and Classic Scenarios

    Does it possible to pass partial quantity of Material into Extended and Classic Scenario ;for instance we have 100 qty  for a material & out of them 60 qty goes to Extended PO and 40 qty goes to Classic in backend system .
    If yes so how & what criteria would be ?

    Hi Lalit,
    Until now we did not use both classic and extended classic for one organization.
    Are you using that or you just have a doubt??
    Regards,
    Satish

Maybe you are looking for

  • "Payables Open Interface Purge" Program

    Hi Guys, In our production system, it takes 3 minutes to open "Open Interface Invoices" form (AP Manager>Invoices>Entry>Open Interface Invoices). So what should we do so as to avoid this. I was thinking to delete data from two tables (AP_INVOICES_INT

  • Using mini DV tape footage in Premiere Pro

    Normally I shoot video as 720p 30fps and edit in Premiere Pro CC. In my present project I have some mini DV tape footage from a friend I'd like to incorporate, It was shot on his Panasonic PV-GS300 in the wide-screen (16:9) mode, and we'll be using t

  • Javax.naming.NameNotFoundException: java:comp/UserTransaction not found

    Hi, trying to obtain UserTransaction from client: UserTransaction t = (UserTransaction)context.lookup("java:comp/UserTransaction"); but I get this error: javax.naming.NameNotFoundException: java:comp/UserTransaction not found      at com.evermind.ser

  • PS4 CD reader problem

    My PS4 keeps ejecting the disc without me doing anything. when i play, it suddenly just ejects the disc by itself. i´ve tried unplugging the power cable for 3 mins and plugging it back. it works for an hour or two but after that it starts ejecting th

  • Burning cd's or mp3's

    when burning cd's or mp3's onto a blank cd make sure there are no punctuation marks in your playlist title. I just learned after a frustrating past couple of days that that was why it wouldn't burn my cd's. I have learned my lesson.. thnx for everyon