Is there any transaction code by which we can delete the selected materials from the task list of type Q?
For example in a task list group XYX with group counter 1, there are 1000 materials assigned. Now I want to delete say 400 out of it.
Whether QSR6 will serve the purpose? How? what precautions need to be taken while executing QSR6?
Anand Rao

Hi Anand,
Do you want to delete it w/o keeping a track of it in any table you can use this transaction.It will delete it from the table level itself.
If you are Okay to keep a track of it in table ( Del. Id - X), you can go for a LSMW program to do so.
Please clarify how do you want to do it ?
Thanks,
RAVI.

Similar Messages

  • How to block deletion of Inspection Plan

    Dear Experts
    Accicendatally, our users are deleting the Inspection Plan,
    Is there any authorisation object to make Restriction on this,Transaction is QP02.
    Regards
    Sandeep patil

    Hi Sandeep,
    As you said User's are deleting inspection plans. They must be putting it for deletions by clicking on deletion flags.
    If you want to restrict this then you have to get help of security team. They will find role for this transaction -
    > then they will find out the objects matanined in this role -
    > this will display all the activities in that object -
    > then they can cancel deletion activity from object list.
    Then when User will access QP02 then this checkbox will appear grey. Then they will not be able to delete inspection plan.
    Hope this resolves your issue, reward points if helpful.
    Regards,
    Avinash.

  • CWBQM to remove MIC from Inspection plan

    We have requirement to remove few MIC from multiple inspection plan. SO I wanted to use CWBQM trx for that purpose.
    We maintain inspection plan with unique id of group and gp counter.
    Group 111 Counter 1
    Gp 111 Countr 2
    .Group 111 Counter 110 and many more.
    Q-1: From abouve list I don't want to update all inspection plan. I want to update for only few counter of each group. So how to enter these group and group counter combination in initial screen to do mass change.
    Q-2: We wanted to remove MIC1, MIC2, MIC5 from all inspection plan. Where to enter these MICs in intial screen so system pull only those MIC list of insp plan? these are complete copy model MIC.
    Q-3: As said earlier we wanted to remove MIC from inspection plan. Now after excuting CWBQM we are getting list of MIC. So do mass change I'm selecting MIC column and applicable row and clicking on Extra --> mass change. Then system is not giving me MIC in pop-up list. It gives me all other data including qnt and qualitative field of MIC, but we wanted to remove complete MIC from plan. how to do that?
    Please help.
    Edited by: Tom_Eric on Apr 15, 2011 5:39 AM

    I'm following these steps:
    CWBQM work area - Q_OPR_000000000010
    Entering inspection plan data in selection screen - Ctrl + F7
    Got MIC list
    Select Master Inspection chara. column
    Select row to delete particular MIC
    Menu > Extra > Mass change --> Here I got two pop-up screen
    One with name Mass change inspection char -- but this screen is empty - no field on this screen
    There is one more screen which says "select fields" - List of fields like, lower limit, upper limit, catalog type, selected set, info feild, inspection method, plan, insp qualification, long term indicator, item......but there is no field which says MIC
    If I select any field from second pop-up then it pull that field to mass change screen, but that I don't want to do. My purpose to remove MIC, not its field.
    Please let me know where I am wrong?

  • How to delete several inspection plan

    Hi every body,
    I need to delete 4000 inspections plan, but I don't know how I can do it?
    Somedody could help me?
    I try tcode QSR6, but this tcode delete just one inspection plan!!
    tHANK for any help.
    Cdt
    Kari

    Thanks for you tcode but do you try it?
    I don't know how to use it?
    How I can to delet inspection plan?
    Coul you help me, please?

  • Re assignment of material from inspection plan group

    Dear Experts,
    I have an issue, we got a material which has multiple groups assigned to it.
    How to remove the materials assignment from the inspection plan group?
    Since the group contains more than 1000 line items, it is very laborious to search every line item and delete manually.
    Is there any 1 shot way to remove the assignment?
    Please help me out in this, because of multiple assignment, the lot gets into the status of CRTD.
    Thanks in advance,
    Anitha Pauline.

    hi,
    Use CWBQM.
    Regards

  • How to progammatically get Inspection Characteristics from Inspection Plan

    How do I programmatically get Inspection Characteristics from an inspection plan? I am currently getting inspection characteristics from inspection lots via a QM-IDI RFC call (QIRF_SEND_REQUIREMENTS_GET_DAT2), but if the Inspection Characteristic is not in an inspection lot, I don't get it via the RFC call. What BAPI/RFC/IDOCS mechanism can I use from an external subsystem (VB.NET app) to get inspection characteristics (Spec Limits, Target, Operation, Activity) associated with a material in an inspection plan?
    Thanks,
    Ed

    The problem is the SAP system that my external subsystem (VB.NET application using QM-IDI) is interfacing with does not have inspection lots (and the customer is not willing to add inspection lots), so the QM-IDI RFC that I'm using (QIRF_SEND_REQUIREMENTS_GET_DAT2) does not return the inspection characteristics (spec limits, etc) that I require. My customer creates a reference (QP11) with inspection characteristics, then attaches the reference to a Material (QP01). When I try to get the inspection characteristics for the material via QIRF_SEND_REQUIREMENTS_GET_DAT2, I don't get the inspection characteristics because there is no inspection lot associated with the material and inspection characteristics.
    The design is for my external subsystem to do the Material Inspection Characteristic valuation, and then send the valuation results back to SAP. Is there a way to get Material Inspection Characteristics and then send the results back given the SAP setup I described above?
    Thanks,
    Ed

  • CoA results from batch, specs from inspection plan

    Hi there,
    I've a problem with my certificate of analysis (coa). I want to do the following. I perform inspections on my semi finished. With the certificate profile i can print these results on the coa for a finished product. I select the results origin from production chain. But i now want to print the specifications that are present in the inspection plan for the semi finished. But SAP only allows inspection spec origin 03 here.
    Is there a possible way to print results for semi finished products on the report of a finished product. For the result it doesn't matter if it comes from QM or batch classification. But the specifications are only stored in the inspection plans.
    Thanks.

    I want to print the result and spec from MIC 50005 which is in my inspection plan for a raw material.
    In my profile i've the follwing
    MIC 50005
    Result origin 03 inspection/ batch from production chain
    Insp spec origin 01 ins. spec from QM.
    At the materials button. In the first tabel Data origin fro characs from insp i mention the material number from the raw material including the inspection type.
    Still nothing is printed while there was an inspection lot for the batch of the raw material...

  • Request Got Deleted From 0PP_C01(Planned/Actual Comparison Order/Material)

    Hi experts,
    I am a newbie in the BW area.
    We have 0PP_C01(Planned/Actual Comparison Order/Material View) , 0PP_C03(Plan/Actual Comparison Operation/Work Center View) and 0PP_C05(Plan/Actual Comparison Material Consumption) activated in our production system.
    Few days before one data error happened during data load and accidentially, that particular request got deleted from the system.
    When we tried to load data again, it is not allowing since the request is missing and the update mode is delta update.
    Can any one guide me to retrieve the data back to the system??
    Thanks alot in advance
    Shobin

    Hi,
    You can try using PSA if that request it's still there.
    Otherwise, you will need to regenerate that request in source system (by filling setup tables with parameters) and update BW with a full load.
    Hope this helps.
    Regards,
    Diego

  • Create PR from Inspection Plan

    Dear Gurus,
    I have a inpection plan for Inspection type 01 with several operation.
    10 Visual Inspection
    20 Microstructure Inspection
    30 Hardness Inspection
    Operation 10 and 30 can do by Internal QC Dept. but Op.20 cannot do by Internal QC Dept.
    So we must send our sample to third party (vendor) to do Microstructure Inspection.
    I already create inspection lot automatically when GR from PO
    How to create PR automatically when we GR.
    Regards,
    Akbar
    Edited by: Arsyad Akbar on Mar 6, 2012 4:13 AM

    You can not create a purchase req from an inspection plan or inspection lot.
    You can do subcontracting order from the production side. 
    If you are simply sending out samples to an outside lab, most places do not drive the process of creating a purchase order on an inspection lot by inspection lot basis.
    I don't think you'll be able to do what I think you want to do.
    The only way I think you might be able to capture this might be to create a Quality notiification against the inspectoin lot.  From the notification you can maybe raise the purchase order.  But I have never tried that so I can't give you much guidance on that.
    But I don't see that as being an automated process driven by the inspection plan.
    FF

  • Remove mass MIC from inspection plan?

    How can we remove mass MICs from multiple inspection plan?
    These are complete copy model MICs.
    Can we use CWBQM? How?
    Edited by: Tom_Eric on Apr 15, 2011 5:38 AM

    I think this is same question with your another thread.
    You can remove mass MIC at transaction CWBQM.
    Regards
    Luke

  • QM- delete inspection Plan

    Hi Guys,
    i have an issue regarding master data and inspection plan.
    i need to change the base unit of measure on a material.
    when i tried the system gave me this message:
    The base unit of measure cannot be changed.
    The reasons for this are:
    Routings already exist that are assigned to the material.
    Type Group    GrC Plnt
    Q    235723   1   USNA
    so i have checked table PLKO and found my material.
    i have seen that an Inspection Plan has been created, so i deleted the IP with QP02. went to MM02 tried to change the Bum but same error.
    run tcode QSR6 but i am not able to delete this I.Plan. am i missing something?
    can you please help?
    thanks
    C.

    BTW: for your process you don't need to delete the inspection plan.  All you need to do is go to the material assignment screen at the header level of the insp. plan and delete the assignment of the material to the plan.  Then, if you wanted to, after changing the BUOM in the material, you could use QP02 to change the UOM used in the inspection plan, and the reassign the material back to it.  Save you from having to recreate the plan.
    FF

  • Inspection plan deletion

    Gurus,
    Is it possible to do mass deletion of  Inspection plans.

    Hi,
    You can use CWBQM to delete multiple material number assignments at once. QSR6 delete the entire task list . Beware that the deletion of the material assignment doesn't completely delete from the tables. You will need to look at OSS note 60386.
    As you want to use the same group number in future, system will allow you but the counter number will be the next available.
    Cheers,
    Tushar

  • Inspection plan deleted

    Hi,
    My users have just "deleted" certain inspection plans. They marked the plan with the deletion flag. How can I take the deletion flag out of it.
    Please this is very urgent!!!!!!
    Charline

    hi
    if you have put the deletion flag it is possible reove it.just go to inspection plan in change mode (QP02),press the header details then remove the deletion flag indicator.
    if you have run the QCR6 without archiving then it is not possible to revoke it
    kindly refer the following link
    http://help.sap.com/saphelp_47x200/helpdata/en/ce/fa9066f0bc11d283d60000e829fdb3/content.htm
    regards
    thyagarajan

  • Difference between Material Specs and Inspection Plan

    Hi ALL,
    Whats the difference between Material Specifications and Inspection plan...?...Why Material Specification is required in QM...?
    Thanks & Regards,
    Ameya K.

    Hi Ameya,
                    The first thing is that material spec is the client level data in QM where as Inspection plan is the plant level.
    <u><b>
    Case 1:</b></u>    Suppose that there is an attribute Viscosity whivh needs to be checked whose UCL & LCL is 10 to 15. But in one plant where some highy precise requirement is there ...... then in that case we want that for that plant for the material viscocity should be 5 to 7 . In that case the requirement of the inspection plans comes in to picture .
    <b><u>Case 2 :</u></b>    The material got one extra attribute needs to be checked for some plant .... in that case we need to maintain inspection plan for that material with both Insp with material spec &   insp with inspection plan need to be checked  so that during the result recording apart from the attributes in the material spec this extra attribute gets populated from inspection plan
    Note : Apart from this as in material spec the data is maintained in the client level the load in the database will be compartively less  as there will not be any duplication of data which will be there in case of plant level data for the same material ..........
    I hope this will add some info apart from what the gurus has suggested above .....
    Please reward points if helpful.....
    Thanks & Regrads
    Kaushik Choudhury

  • Inspection plan has been deleted- GR from production

    Hi,
    We are doing a goods receipt inspection from production - origin 04.
    The inspection plan group counter that was assigned to the inspection lot has been deleted.
    is there a way to assign another valid inspection plan group counter to the inspection lot so that we can do GR with 04 origin.
    Thanks in advance,
    Manohar

    Hi
    is there a way to assign another valid inspection plan group counter to the inspection lot so that we can do GR with 04 origin.
    Even if the Inspection plan is deleted...you can create a back dated inspection plan with another group counter.system automatically propose next group counter.
    Now lets say that your lot is already created & you want to assign the new inspection plan..
    then go to QA02
    click on reset sample
    save.
    now again go to QA02--->Inspection specification  >click on Inspection specification>click on sample.
    save.
    check the status as REL for inspection lot.
    Now take UD
    I hope you understood
    Regards
    Sujit

Maybe you are looking for

  • Recordings on DVR Expander not displaying

    I have 2 FIOS DVR expanders that are connected to my FIOS DVR. The DVR model number QIP 7232 2.  The expanders are the approved ones form Western Digital.  I connect one of the DVR expanders at a time through the eSATA cable, and I disconnect and con

  • Requirements transfer to follow up materail, if the stock falls below

    Hi All The issue is related to the requirements transferring the follow up material, when the inventory falls below the safety stock, the requirements has to generated for the follow up material,  in which is maintained in MRP 4 ================= Her

  • Fonts went Wonky, what went wrong?

    Hello, I upgraded to iTunes 8.0.2 when the new software icon showed up a couple weeks ago, downloaded and restarted and visited the iTunes Store and all the fonts had been changed to some kind of bold symbol font. You can't read a thing. iTunes itsel

  • Passing a parameter to a report that appears to be ignored.

    I am using VS 2005 and Crystal Reports XI R2 The app I am working on allows users to either email a report as a PDF attachment or preview the report using a CrystalReportViewer. Users select a record number as the report parameter which the app feeds

  • CRMXIF_ORDER_SAVE_M - Lead_Start Date not being populate.

    Hi Gurus, I am migrating Lead Data in SAP CRM using CRMXIF_ORDER_SAVE_M / CRMXIF_ORDER_SAVE_U03 IDOC structure. The problem is that the Lead Start and End dates are not being passed to the database. I am populating the data at Header Level using the