QM process in Procurement Cycle

Hello
I request some help on the role of QM in the Procurement process. Can anyone provide me with the QM cycle in MM along with the T.Codes?
Thanks in advance
Amit

Hi
refer
QM in procurement
Re: QM in procurement
What are the settings required for QM in procurement
This will help you a lot
Regards
Sujit

Similar Messages

  • Pictorial view of business process of Procure to pay cycle.

    Hi
    Can some one give a detailed diagram explaning the AFS  business process of procure to pay cycle
    Thanks and regards
    Sunil

    Hi,
    Based on the stock availability in store room, the store manager will create a request for purchasing the material which is recorded in SAP by means of a Purchase requisition.
    Now the procurement department will look into this PR, check whether this has to be processed f urther or rejected. If it has to be purchased, it releases teh PR and creates a Purchase order (PO) for a specific vendor. This PO will be send to the correct vendor.
    Vendor now manufactures/procures teh material and send it to the store room. Once the material is received in the store room, a Goods receipt(GR) document will be created  in SAP. This will increase teh inventory fo the material and the value of teh material in the store room based on teh GR value.
    The vendor also sends an invoice for the material he has delivered, to the procurement department. This is received by the dept by means of Invoice Receipt(IR). Later the procurement dept, will pay fo rthe invoice.
    This is the basic cycle. There are lot of functionalities within this cycle like selecting the correct vendor for creating POs, updatin gthe correct prices in the PO, checking the PO and GR values, checking PO and IR values, sending PO to vendor by email etc. and so on.

  • Procurement cycle in third party order and stock transport order.

    please provide me in steps the procurement cycle in third party order and stock transport order.

    Hi,
    STO Process: -
    1.Create a vendor for the company code of receiving plant, using account group :0007 using T-Code XK01.
    2. Assign this vendor to Delivering plant
    Go to XK02 >Purchasing view>Extras>Add. Purchasing data>Plant
    3. Create internal customer with the sales area of the vendor. Go To XD01
    4. In Pricing procedure determination relevant to STO, assign document Pricing Procedure and customer pricing procedure appropriate for STO to get the pricing in the invoice.
    5. Maintain condition records for the relevant pricing condition.
    6. Some more setting for STO: Go to MM> Purchasing > Purchase Order > Set up STO > define shipping data for plants > Go to Receiving plant >assign customer here & Supplying SA (for billing) to Receiving plant here
    7. Go to MM > Purchasing > Purchase Order > Set up STO > define shipping data for plants > Go to Supplying plant and assign the sales area of receiving plant.
    8. Go to MM > Purchasing > Purchase Order > Set up STO > assign delivery Type & Checking rule
    Assign the delivery type to document type. In this case, Delivery type NLCC is assigned to Document type NB
    9. Go to MM> Purchasing > Purchase Order > Set up STO > Assign document Type, One step Procedure, Under delivery tolerance
    Assign the document type NB to supplying plant and receiving plant
    10. After all settings , Create the STO using T-Code:ME21N and maintain pricing conditions of freight and Save.
    11. Create Delivery :VL10G
    Click on the Background Button after selecting line item
    A message is flashed : See log for information> next Click on Log for delivery creation Button >click on line item>click on document button to get Delivery document No
    12. Picking, PGI:VL02N
    13. Billing:VF01
    Save the document and its done
    14. J1IIN - Outgoing Excise Invoice
    15. MIGO - Goods Receipt against outbound Delivery
    16. J1IEX - Capture & Post Excise Invoice
    Pricing configuration for STO: -
    In SPRO > MM > Purchasing > Conditions > Define Price Determination Process > Define Schema Determination > Determine Schema for Stock Transport Orders > Here assign Calculation Schema "RM2000" i.e. Stock Transfer Document to Schema Grp Pur. Org, STO Type (For e.g. UB) and Supplying Plant.
    Calculation Schema "RM2000" has condition type P101 which will pick up the MAP of supplying plant automatically during creation of STO in ME21N ("Conditions" Tab).
    You can create new freight / delivery cost conditions in M/06 and assign in pricing procedure "RM2000" in M/08 and also assign the Accrual Key to this and do the Account Determination for this Accrual Key in OBYC
    At the time of PGI, following accounting entry will get generated;
    Stock A/c - Dr - 110 INR (Receiving Plant)
    Stock A/c - Cr - 100 INR (Supplying Plant)
    Freight Clearing A/c - Cr - 10 INR (Supplying Plant)
    Third Party Process Flow: -
    1) MM01 - General Item category Group should be BANS in basic view of material master.
    2) VA01 - Creation of sales order with VA01 transaction in SD module
    3) When sales order is created system automatically creates a PR for the material with item category as "S"--> Third Party Item
    4) ME21N - Directly PO with item category as "S" and delivery address as customer address
    5) MIGO - Statistical GR by MM ( When it is made goods are received and delivered)
    6) MIRO - Invoice by MM for vendor
    7) VF01 - Billing by SD on Customers

  • Procurement cycle

    pl. tell me procurement cycle with excise duty.Is therenecesasary to create excise invoice seperately in J1IS,if it is captured during MIGO and posted in J1IEX.

    Hi
    Please find the procurement cycle mentioned below
    Complete Purchase Cycle Till FI
    Let us go about purchase cycle:
    1. Purchase Requistation : First Purchase requisation has to made to purchase department wheever the product need by the user or production depaartment.They are created by tcode me51k.
    2. Once the purchase requested, then the purchase department will search for the materail, where available and when available. That is called Material determination.
    3. After the search of material is over, then look for who are the parties , who is going to supplies the material in competitive rate. Then select the correct vendor is known as material determination.
    4. After that Tender process done through Tcode-ME41.
    5. After finilisation of Tender, the vendor selected and purchase order issued. The Creation of Purchase Order is ME21N.  There will not be any finance entry while creating the Purchase Order.
    6. Once the purchase order issued, then by the terms of PO, the vendor will supply the materials. The Receipt of Good (GR) , done through MIGO or if it is an service entry done through ML81N.
    The Entry will be
         Inventory account - dr- 
         GR/IR Clearing a/c - cr-
         Purchase a/c       - dr-
         Purchase offset a/c -cr-
    GR/IR clearing is a intermediate account, will be used to connect cost and vendor. 
    In GR/IR clearin a/c - 1. Assesable Value
                           2. Sales Tax
                           3. Surcharge
    ie., Other than Cenvat Clearing will be there.
    7. After the receipt of material, the Good Receipt along with Invoice Bill submitted to the Excise person handling Central Excise matters, to take Credit of duty for the product.
    The entry will be
    1. Cenvat Clearin a/c - cr
        RG23a Part II  a/c - dr
        RG23a Part II cess a/c - dr.
    8. From the Excise person , the bill move towards the person who passing the bills for payment.  He will do the Invoice Receip First through MIRO. Here two document will be created, one for MM and one for FI.
    The entry will be
           Vendor a/c - Cr-
           Gr/IR Clearing a/c - dr
           Cenvat Clearing a/c- dr.
    9. After finalisation of Invoice receipt, the bill is for Payment process mode through F-53.
    The entry will be
           Vendor a/c - dr
           Bank a/c -   cr.
    There is no need to create entry thru J1Is if u post the GR thru MIGO and captuer excise thru J1iex
    J1is is used if u post the document with transaction/sub transation type is others.
    regards
    Reward if helpful
    shailesh

  • External Operation but without entire Procurement Cycle

    We have an operation in the Production Order, where a process is done by a vendor. However this is handled such that the Vendor collects materials across several production orders on a regular basis. The invoicing is also done late, perhaps monthly. Because of this, we find that modelling the operation as an External Operation is difficult since the PO would stay open and the Production Order cannot be closed until all the administration work is completed.
    We would like to capture the external costs of the operation, as a form of immediate 'Confirmation' for that operation and posting into interim costs. Later, when the physical goods have arrived and invoiced CO can reconcile those costs against these interim costs.
    Is it possible to set an Operation as External yet not have to go through entire Procurement cycle?

    Dear
          if vendor is doing first operation, Create a semi finished material with special procurement 30 subcontracting key in material master MRP2 view  and maintain BOM of components which are sending to vendor and routing with external procurement.
    Open another semi finished material for in house production and make BOM of component received from vendor i.e. subcontracting semi finished.
    Result of above given procedure, there will be two documents without interlink (purchase order and production order). then you can open production order as per material available quantity and close whenever you desire and similarly for purchase order.
    if vendor is last operation, procedure will be vise versa of above procedure.
    Thanks
    Muhammad Ashfaq
    Edited by: Muhammad Ashfaq on Jul 21, 2011 6:23 AM

  • Asset Procurement  Cycle need info in sap mm

    Hi All.
    Thanks  in advance for all sap mm dudes.
    Need Asset procurement cycle steps in sap mm.
    From creation of asset,
    Then any inforecord, source list, etc.
    Next Purchase order,
    Next MIGO details like FI Documents,
    FINAL MIRO  with Transaction details.
    Regards.
    Parameshwar
    Note : Search forum or in other sap resources(articles,sap help,wiki etc.,) before posting.
    Edited by: Jeyakanthan A on Jul 22, 2011 2:36 PM

    steps to process the procurement of Assets:
    1. Create requisition ME51N
    2. Release PR if release procedure applicable- ME54N
    3. Create Asset Master by Finance department.- AS01
    4. Create PO (ME21N) with ref to the requisition. Ensure that you select the Account assignment category as 'A'. Enter the asset number, in account assignment tab. The PO can be created without material or if it with material to keep a track on the stock, you can use Non-valuated material type.
    5. Release PO - ME29N or ME28
    6. Print PO (ME9F)
    7. Carry out GR against the PO (MIGO)
    8. Advise finance to update the Asset Master (AS02)

  • Procurement cycle in SNP

    Hi,
    Could someone please suggest me on below scenario mapping
    DETAIL: Currently to meet our business requirement (Load building for vendors), we have mapped vendor as location (with products extended to vendor location) and running SNP planning cycle, i.e., generating TLB orders, between Vendor & DC,  considering truck min/max capacity.
    Vendor ships product on different days of week to different DCs. For some DCs it could be say Monday of the week for others it could be Thursday, i.e., procurement cycle for the vendor varies from DC to DC. Hence we cannot control ship to date by Vendor location calendar, as it is specific to Vendor-DC lane.
    Our requirement is to generate POs for vendor from DC on a specific days of the week. Day of the week could vary from DC to DC.
    Regards
    Seshu

    Hi Sheshu and Julien,
    I am interested to know as how to you built this scenario.
    It would be appreciated if you could reply to me and we can discuss this.
    I am interested exactly in same thing: Using SNP TLB for Vedor to TLB scenario and generating POs.
    Thanks a lot for the help.
    Thanks and Best Regards, Manoj
    Edited by: Manoj Mishra on Mar 7, 2011 1:54 PM

  • Error : Oracle BPEL Process Manager Full Cycle

    {color:#3366ff}Hi,
    I tried to deploy the UnitedLoan sample demo on to the BPEL server, I ran devprompt.sh to set the environment path and changed the oc4jadmin password in properties file, and when I tried to open the BPEL console I am getting the following error.
    Appreciate your inputs.
    Regards,
    Chandra
    {color}<strong>{color:#3366ff}{color:#3366ff}ERROR DESCRIPTION is as follows,{color}
    {color}</strong>
    Oracle BPEL Process Manager Full Cycle
    An unexpected error has occurred while executing your request. This is most likely related to a defect in the Oracle BPEL Process Manager product. We apologize you can post the error to the OTN forum and we will get back to you as soon as possible.
    Attachments:
    Build Information:
    Oracle BPEL Server version 10.1.3.1.0
    Build: 0
    Build time: Mon Oct 09 08:44:49 PDT 2006
    Build type: release
    Source tag: PCBPEL_10.1.3.1.0_GENERIC_061009.0802
    Exception Message:
    [javax.servlet.ServletException]
    Timed out waiting for process load lock.
    Failed to obtain load lock for process "UnitedLoan-1.0"; timed out after 60 seconds.
    Exception Trace:
    javax.servlet.ServletException: Timed out waiting for process load lock.
    Failed to obtain load lock for process "UnitedLoan-1.0"; timed out after 60 seconds.
    at com.evermind.server.http.EvermindPageContext.handlePageThrowable(EvermindPageContext.java:809)
    at com.evermind.server.http.EvermindPageContext.handlePageException(EvermindPageContext.java:756)
    at ngDeployedProcesses.jspService(_ngDeployedProcesses.java:213)
    at com.orionserver.http.OrionHttpJspPage.service(OrionHttpJspPage.java:59)
    at oracle.jsp.runtimev2.JspPageTable.service(JspPageTable.java:453)
    at oracle.jsp.runtimev2.JspServlet.internalService(JspServlet.java:591)
    at oracle.jsp.runtimev2.JspServlet.service(JspServlet.java:515)
    at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
    at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:64)
    at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
    at java.security.AccessController.doPrivileged(Native Method)
    at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
    at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
    at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:621)
    at com.evermind.server.http.ServletRequestDispatcher.unprivileged_include(ServletRequestDispatcher.java:160)
    at com.evermind.server.http.ServletRequestDispatcher.access$000(ServletRequestDispatcher.java:50)
    at com.evermind.server.http.ServletRequestDispatcher$1.oc4jRun(ServletRequestDispatcher.java:97)
    at oracle.oc4j.security.OC4JSecurity.doPrivileged(OC4JSecurity.java:283)
    at com.evermind.server.http.ServletRequestDispatcher.include(ServletRequestDispatcher.java:102)
    at com.evermind.server.http.EvermindPageContext.include(EvermindPageContext.java:396)
    at index.jspService(_index.java:104)
    at com.orionserver.http.OrionHttpJspPage.service(OrionHttpJspPage.java:59)
    at oracle.jsp.runtimev2.JspPageTable.service(JspPageTable.java:453)
    at oracle.jsp.runtimev2.JspServlet.internalService(JspServlet.java:591)
    at oracle.jsp.runtimev2.JspServlet.service(JspServlet.java:515)
    at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
    at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:64)
    at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
    at java.security.AccessController.doPrivileged(Native Method)
    at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
    at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
    at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:621)
    at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:368)
    at com.evermind.server.http.ServletRequestDispatcher.unprivileged_forward(ServletRequestDispatcher.java:259)
    at com.evermind.server.http.ServletRequestDispatcher.access$100(ServletRequestDispatcher.java:50)
    at com.evermind.server.http.ServletRequestDispatcher$2.oc4jRun(ServletRequestDispatcher.java:193)
    at oracle.oc4j.security.OC4JSecurity.doPrivileged(OC4JSecurity.java:283)
    at com.evermind.server.http.ServletRequestDispatcher.forward(ServletRequestDispatcher.java:198)
    at com.collaxa.cube.fe.DomainFilter.doFilter(DomainFilter.java:131)
    at com.evermind.server.http.EvermindFilterChain.doFilter(EvermindFilterChain.java:15)
    at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
    at java.security.AccessController.doPrivileged(Native Method)
    at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
    at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
    at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:619)
    at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:368)
    at com.evermind.server.http.HttpRequestHandler.doProcessRequest(HttpRequestHandler.java:866)
    at com.evermind.server.http.HttpRequestHandler.processRequest(HttpRequestHandler.java:448)
    at com.evermind.server.http.HttpRequestHandler.serveOneRequest(HttpRequestHandler.java:216)
    at com.evermind.server.http.HttpRequestHandler.run(HttpRequestHandler.java:117)
    at com.evermind.server.http.HttpRequestHandler.run(HttpRequestHandler.java:110)
    at oracle.oc4j.network.ServerSocketReadHandler$SafeRunnable.run(ServerSocketReadHandler.java:260)
    at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:303)
    at java.lang.Thread.run(Thread.java:595

    ..hi.did u fix it or went for re-install..we got similar error...and found that some jar files are found at more than one classpath directories ...we moved them out..e.g., common-logging???.jar...we removed and it worked just fine...give it a try...

  • Scm500 process in procurement

    hi experts
    i don't know about SCM. i want basic knowledge of scm500 process in procurement for SRM. please help me
    thanks,
    velu

    Hi Velu,
    Could you tell me what exactly u want?
    SCM or procurement process in SRM?
    If so in SRM I can give some inputs on contract management.
    Regards,
    Krishna

  • Consider scenario in Procurement cycle as under

    Dear Gurus,
    Consider scenario in Procurement cycle as under
    a) There is a residual open liability (say GR/IR or Freight liabilities) created after GR against PO
    b) This liability created is more than actual payable;
    thus liability discharged after IV (transferred to vendor liability) is less than the above created
    Thus the difference is the open residual liability
    c) This portion of liability needs to be removed WITHOUT (further) payment (as not payable)
    d) Practically it would not be feasible to reverse transactions & amend PO & recreate
    We need to understand how to remove(/transfer) this open non-payable liability & to which GL Account to be discharged to.
    Pls help

    Hi,
    SAP has provided a Standard way of clearing these GL A/c.
    Use MR11 - GR/IR Clearing Account Maintenance for this;
    Use: -
    Quantity differences between goods receipt and invoice receipt for a purchase order result in a balance on the GR/IR clearing account.
    If the quantity invoiced is larger than the quantity received, the system then expects further goods receipts for this purchase order to clear the balance.
    If the quantity received is larger than the quantity invoiced, the system then expects further invoices for this purchase order to clear the balance.
    You can also clear differences for delivery costs.
    If no more goods or invoices are to be received, you must clear the balance manually.
    This can be done in different ways:
    You can return the extra goods to the vendor.
    You can cancel the invoice and post a corrected invoice or a credit memo for the surplus posted quantity.
    You can clear the GR/IR clearing account manually.
    GR/IR Account Maintenance: Account Movements
    Use: -
    The offsetting entry to clear the GR/IR account is the same as the posting made when you enter an invoice for a purchase order.
    Material with Moving Average Price (MAP)
    The GR/IR account is cleared against the stock account, unless no stock coverage exists. If the material stock is smaller than the quantity to be cleared, only the actual stock quantity is debited or credited proportionally. The remaining amount is posted to a price difference account.
    Material with Standard Price
    The offsetting entry is posted to a price difference account.
    Purchase Orders Assigned to an Account
    The offsetting entry is made to the cost or fixed asset account shown in the account assignments in the purchase order.
    Also refer following link;
    [Maintaining the GR/IR Clearing Account|http://help.sap.com/saphelp_erp60_sp/helpdata/en/30/1060387db94003e10000009b38f8cf/frameset.htm]

  • SRM MM-SUS procurement cycle without ASN possible?

    Hi, SRM guru:
    Is it possible to run MM-SUS procurement cycle without ASN? if yes, can you give something advice on how to acheive it by customizing?
    Thanks in advance
    George

    Hi George
    Please contact him for SUS supports /Queries  as mentioned in the SAP Note 700350
    Dr. Dirk Schirrmeister
    SAP Consulting Deutschland
    PU Purchasing Solutions/ SRM
    SAP Deutschland AG & Co. KG
    Hasso-Plattner-Ring 7
    69190 Walldorf
    E-mail: dirk.schirrmeister at sap.com
    SAP Note 700350 - Supplier Enablement: Deployment
    Scenarios integrating SUS
    You can use this function to create, edit, and send advanced shipping notifications (ASN) in Supplier Self-Services (SUS).
    Integration
    This function is only relevant for the Plan-Driven Procurement with Supplier Integration business scenario.
    When you create an ASN in SUS and send it to the purchaser, an inbound delivery is automatically created in Materials Management (MM).
    Features
    Create ASNs
    You can create ASNs on the basis of a purchase order.  -> here I could not see plural of Purchase order. so you may be correct but our MM system accepts in One ASN for different Purchase orders .It could be via EDI 856 ASN.
    The document control settings in the purchase order determine whether or not you can create an ASN for an item. Purchasers use these document control settings to specify which follow-on documents they expect. The SUS system copies all of the items for which a purchaser expects a confirmation from the purchase order to the ASN
    Br
    Muthu

  • Procurement cycle of capital goods

    all gurus,
    can u pls let me know how to procure and take part 2 entries of capital goods
    thanking
    ujwal

    Hi,
    Procurement Cycle of Capital Goods: -
    Domestic Purchase of Capital Goods: -
    1. ME21N u2013 Create Purchase Order
    2. ME2N u2013 List of Purchase Orders
    3. MIGO u2013 Goods Receipt against PO
    4. J1IEX u2013 Post Excise Invoice
    5. J1I7 u2013 List of Excise Documents
    6. MMBE u2013 Stock Overview
    7. MB51 u2013 List of Material Documents
    8. MIRO u2013 Enter Vendor Invoice
    9. MIR5 u2013 List of Invoice Documents
    Import Purchase of Capital Goods: -
    1. ME21N u2013 Create Purchase Order
    2. ME2N u2013 List of Purchase Orders
    3. MIRO u2013 Enter Customs Invoice
    4. J1IEX u2013 Capture Bill of Entry
    5. MIGO u2013 Goods Receipt against PO
    6. J1IEX u2013 Post Bill of Entry
    7. J1I7 u2013 List of Excise Documents
    8. MMBE u2013 Stock Overview
    9. MB51 u2013 List of Material Documents
    10. MIRO u2013 Enter Vendor Invoice
    11. MIRO u2013 Enter Clearing Agentu2019s Invoice
    12. MIR5 u2013 List of Invoice Documents
    Note: - This includes Reports along with Transactions.

  • Procurement Cycle Screen shot

    Hi,
    Can anybody send the SAP screen shot of the Procurement cycle with each Tcodes from PR>PR Release>RFQ>Quotation>PO>PO Release>GR>GI>Invoice Verification
    email: varaghamurthyck at the rate of gmail.com
    Points will be rewarded
    Regards

    Chech the Links
    http://www.sap-img.com/materials/complete-purchase-cycle-till-fi.htm
    http://www.sap-img.com/materials/list-of-sap-mm-transaction-codes.htm
    http://www.sap-img.com/materials/important-sap-mm-tcodes-1.htm
    http://www.sap-img.com/materials/important-sap-mm-tcodes-2.htm

  • Iterative processing in distribution cycles

    HI,
    Would any one pls tell about the Iterative processing in distribution cycles.
    As per my understanding
    if Receiver also becomes a sender in different segment then we have to activate this iterative processing option while creating a cycle in KSV1.
    Please confirm friends, since its of high priority...!!
    We need to do the testing......& prepare the client for go-live..
    Thanks in Advance Friends....!!!
    Regards,
    Neela

    Hi
    An iterative process is a process for calculating a desired result by means of a repeated cycle of operations. An iterative process should be convergent, i.e., it should come closer to the desired result as the number of iterations increases.
    http://help.sap.com/saphelp_46C/helpdata/EN/66/bc701243c211d182b30000e829fbfe/content.htm
    Regards

  • Oracle BPEL Process Manager Full Cycle

    Hi there -
    I am using the SOA suite v 10.1.3.3.1 and deployed my process using jDeveloper BPEL designer. I created a test process for a simple manager approval, deployed it, and approved/denied it in the worklist. It worked fine. I created a new process (a human task for a manager to approve a request), deployed it, went to the worklist and received the above error. The error began when I went to approve/deny. It stated that "An error occured while processing your request". When I dug a little deeper, this was the entire error message below. Any ideas? How do I troubleshoot this more?
    Thank you for your help and suggestions.
    Error while evaluating the routing slip http://soadev:7778/orabpel/sandbox/ProcardService/1.0/ManagerReviewAndApprove/ManagerReviewAndApprove.task. This routing slip is used by workflow sandbox_ProcardService_1.0_ManagerReviewAndApprove.
    If you need more information, please check with your administrator with the following exception-identifier: "2008/03/20_11:10:34:693_jstein"
    Here is the error from 2008/03/20_11:10:34:693_jstein:
    Oracle BPEL Process Manager Full Cycle
    An unexpected error has occurred while executing your request. This is most likely related to a defect in the Oracle BPEL Process Manager product. We apologize you can post the error to the OTN forum and we will get back to you as soon as possible.
    Attachments:
    Build Information:
    Oracle BPEL Server version 10.1.3.3.1
    Build: 0
    Build time: Fri Nov 30 03:12:29 PST 2007
    Build type: release
    Source tag: PCBPEL_10.1.3.4.0_GENERIC_071130.0200
    Exception Message:
    [javax.servlet.ServletException]
    Cannot find work items.
    An attempt to fetch the work items using the where condition " wi_state = ? AND fault_name LIKE ? " from the datastore has failed. The exception reported is: ORA-00904: "FAULT_NAME": invalid identifier
    Please check that the machine hosting the datasource is physically connected to the network. Otherwise, check that the datasource connection parameters (user/password) is currently valid.
    sql statement: SELECT * FROM admin_list_wi WHERE ci_domain_ref = 1 AND wi_state = ? AND fault_name LIKE ? ORDER BY wi_modify_date desc
    Exception Trace:
    javax.servlet.ServletException: Cannot find work items.
    An attempt to fetch the work items using the where condition " wi_state = ? AND fault_name LIKE ? " from the datastore has failed. The exception reported is: ORA-00904: "FAULT_NAME": invalid identifier
    Please check that the machine hosting the datasource is physically connected to the network. Otherwise, check that the datasource connection parameters (user/password) is currently valid.
    sql statement: SELECT * FROM admin_list_wi WHERE ci_domain_ref = 1 AND wi_state = ? AND fault_name LIKE ? ORDER BY wi_modify_date desc
         at com.evermind.server.http.EvermindPageContext.handlePageThrowable(EvermindPageContext.java:866)
         at com.evermind.server.http.EvermindPageContext.handlePageException(EvermindPageContext.java:813)
         at ngActivityList.jspService(_ngActivityList.java:611)
         at com.orionserver.http.OrionHttpJspPage.service(OrionHttpJspPage.java:59)
         at oracle.jsp.runtimev2.JspPageTable.service(JspPageTable.java:462)
         at oracle.jsp.runtimev2.JspServlet.internalService(JspServlet.java:594)
         at oracle.jsp.runtimev2.JspServlet.service(JspServlet.java:518)
         at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
         at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:65)
         at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
         at java.security.AccessController.doPrivileged(Native Method)
         at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
         at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
         at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:623)
         at com.evermind.server.http.ServletRequestDispatcher.unprivileged_include(ServletRequestDispatcher.java:160)
         at com.evermind.server.http.ServletRequestDispatcher.access$000(ServletRequestDispatcher.java:51)
         at com.evermind.server.http.ServletRequestDispatcher$1.oc4jRun(ServletRequestDispatcher.java:97)
         at oracle.oc4j.security.OC4JSecurity.doPrivileged(OC4JSecurity.java:283)
         at com.evermind.server.http.ServletRequestDispatcher.include(ServletRequestDispatcher.java:102)
         at com.evermind.server.http.EvermindPageContext.include(EvermindPageContext.java:453)
         at activities.jspService(_activities.java:427)
         at com.orionserver.http.OrionHttpJspPage.service(OrionHttpJspPage.java:59)
         at oracle.jsp.runtimev2.JspPageTable.service(JspPageTable.java:462)
         at oracle.jsp.runtimev2.JspServlet.internalService(JspServlet.java:594)
         at oracle.jsp.runtimev2.JspServlet.service(JspServlet.java:518)
         at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
         at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:65)
         at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
         at java.security.AccessController.doPrivileged(Native Method)
         at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
         at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
         at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:623)
         at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:370)
         at com.evermind.server.http.ServletRequestDispatcher.unprivileged_forward(ServletRequestDispatcher.java:259)
         at com.evermind.server.http.ServletRequestDispatcher.access$100(ServletRequestDispatcher.java:51)
         at com.evermind.server.http.ServletRequestDispatcher$2.oc4jRun(ServletRequestDispatcher.java:193)
         at oracle.oc4j.security.OC4JSecurity.doPrivileged(OC4JSecurity.java:283)
         at com.evermind.server.http.ServletRequestDispatcher.forward(ServletRequestDispatcher.java:198)
         at com.collaxa.cube.fe.DomainFilter.doFilter(DomainFilter.java:131)
         at com.evermind.server.http.EvermindFilterChain.doFilter(EvermindFilterChain.java:15)
         at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
         at java.security.AccessController.doPrivileged(Native Method)
         at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
         at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
         at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:621)
         at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:370)
         at com.evermind.server.http.HttpRequestHandler.doProcessRequest(HttpRequestHandler.java:871)
         at com.evermind.server.http.HttpRequestHandler.processRequest(HttpRequestHandler.java:453)
         at com.evermind.server.http.AJPRequestHandler.run(AJPRequestHandler.java:302)
         at com.evermind.server.http.AJPRequestHandler.run(AJPRequestHandler.java:190)
         at oracle.oc4j.network.ServerSocketReadHandler$SafeRunnable.run(ServerSocketReadHandler.java:260)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:303)
         at java.lang.Thread.run(Thread.java:595)

    Does the BPEL console not work at all? Or are you trying to view an BPEL process instances that is not in the dehydration store anymore?
    Marc

Maybe you are looking for

  • Recreate playlist from iPhone

    I recently did a clean install of Windows, which also whiped out my iTunes playlists. I currnetly have playlists on my iPhone, which are made from songs I have on my computer. How do I port these playlists to my computer? I've tried dragging the play

  • Standard Program for Retirement Calculation or Year of Service

    Hi, I like to know whether there is any standard report program for Retirement Calculation or Year of Service. If it is available please share it ..

  • Problems with the built in line in

    In garageband I can record with the built in microphone, but when the built in input is chosen I get no signal. I have tried using audacity and the built in input works fine. any ideas?

  • New MacBook and problems burning a CD

    Hello: My new MacBook won't burn a CD. Blank disc icon does not show up on desktop. No drop-down menu appears. Mac Help no help since it assumes blank disc and menu appears. Disk utility also no help -- when I open it, it shows a Repair menu with no

  • Outgoing Messages: 3 (NOT TRUE)

    I just sent one e-mail using Apple Mail 4.2 and in the bottom-left corner of the window it said Outgoing Messages: 3. What's that all about? Why is it counting three, when I only sent one?