QM qusetion realted to limit change in Inspection lot

Dear All,
I have question, In the result recording screen (Transaction is QE51N,QE11,etc) there are some option that are not available, I mean they are found disable that I can't click & check the functionality of it. E.g. In RR screen Goto>Change unit to be insp.>All four function for this node are not available. Can any one make me clear why it's so this and what should I do to to use/activate it.
I have came across this functionality because of an online query.
In one in process inspection lot the user has rectified the pH limit was wrong and I had and extreme urgent requirement to correct it.
I have suggested them to use unplanned MIC in place of this wrong MIC and force close the wrong one or reverse the entire process.
With Best Regards,
Shyamal Joshi

Hello all mentors,
I think i will not get any relpy for this thread hence closing it to contribute for new announcement for "Question Limit of 10"
Regards,
Shyamal

Similar Messages

  • Change of Inspection Lot Specifications at the time of lot creation

    Hi,
    We are using In-process inspeciton.
    At the time of Production Order release an Inspection Lot is created automatically.
    We want the Lot Specification values to be changed based up on the Configuration of the Sales Order.
    Is there any User Exit or BADI  that can be used for this purpose?
    Ramakanth

    Hii,
    Lot specifcation values cannot be changed once inspection lot is created. If u know specification only after creation of inspection lot then u include unplanned inspection charcteristics. Here u can define spec after lot creation also.
    with regards,
    K.Lokesh.

  • Mass change in Inspection lote, when assigning UD Code.

    Dear all,
    curently we are facing an issue of having to mass change inspection lotes when assigning UD code.
    The senario is as follows:
    using the tcode QA16 I can mass assign UD code for various inspection lotes using the option "in background". The requisition of the client is, however, to enter also a description text, for all the lotes treated. I an use the tcode QA16 and run a UD manual option, that lets me enter a long text for each inspection lote, along with assigning UD code. That is not acceptable, since there are daily hundrets of lots, we are talking about. That makes the manual option very time consuming.
    Anyone had a similar issue? What I am looking for here is some exit, or other type of solution that allows me basically replicate the long text (the same for all treated lots) for various lots automatically. I was thinkig of QA16, making some necessary adjustments, but I not sure if it will serve for this purpose.
    Any suggestions will be highly appreciated,
    best regards,
    Anna

    Hi,
    I think you would need to go for BDC to achieve this. Since this is required on daily basis, you should run BDC to enter the long text against the UD for each batch. This should work.
    ntn

  • Update of Order Changes in Inspection Lots

    Hi all,
    Is it possible to update production order changes in an inspection lot automaticaly with inspection lot origin 04?
    I know this is possible with inspection lot origin 03, but we use 04 in our company.
    Thanks in advance,
    B.
    Edited by: Brian O'N on Jul 21, 2010 2:06 AM

    Did you ever find a solution for this?  We have a similar requirement where we need to see the change history for our batch master characteristics.

  • FM to change an inspection lot

    Hi folks,
    when inspection lot is created i have no information about the batch. so SAP creates the inspection lot without the batch information and sets the state CHER. unfortunately you can't fill in results to an inspection lot with state CHER.
    Now i need some functionality to tell the inspection lot the batch it concerns before using "BAPI_INSPCHAR_SETRESULT".
    Any ideas?
    thx martin

    Hi Martin,
    Check FM CO_QM_INSPECTION_LOT_UPDATE
    Thanks
    Lakshman

  • User status change in inspection lot

    sir,
    when i am doing  ud in qa11 that there is compulsary a USER STAUS must be QAA Aprroval by QA manager if user staus is QCNA not approvewd by QA manager then it gives error for user status changes must be compulsary.
        so where we can change that user status of .I have a one option in qa02 is there any another options.
    Please guide me

    Dear Prakash
    If you want to manualy change the status in QA11, you can change there itself. Near to the user status there is a change where you can change the user status ( Set status button - tick and change button)
    Regards
    Gajesh

  • Inspection lot sample Qty change manual

    Dear Friends ,
    Is there any T Code or procedure to change inspeciton lot sample size in inspection lot
    like how we change the Inspection lot Qty
    Thanks & Regards
    Raj

    Hi
    You can only reset the sample Quantity using qa02>enter inspection lot>click on sample ->save>This will reset the sample(remove task list)
    Now you can change the task list an attach modified sample
    Or
    Assign manual sapme calculation in Inspection type (without inspection task list)
    This will allow you to maintain/enter the manual sample size during lot creation.
    try this

  • Creating inspection lot for vendor returns

    Hi All,
    In Subcontracting, components are sent to vendor using Mov Type 541, if vendor returns the components without any value addition we recieve the goods with Mov type 542.
    Now, when we recieve the goods using 542 customer requires that the material has to be posted to quality inspection and a lot has to be created.
    I have already tried with inspection type 08 but its not working.
    Any ideas how it can be done?
    Regards
    Naveen Goveas

    Hi Naveen,
    You have come across a common problem in later releases of SAP. Ram is nearly right in the settings for control of inspection lots for goods movements. In the standard system movement type 542 has no inspection lot origin assigned, so even if you have maintained an inspection type for your material there is no "trigger" for the inspection lot creation from that movement type. Unfortunately, you cannot change the inspection lot origin settings for movement types. The only choice you have is to create (as a copy) a customer defined movement type (one which already has the appropriate inspection lot origin assigned) and use that instead. You have to also be careful about the 'Quantity' and 'Value' updating strings for your new movement type.
    Hope that helps.
    Colin

  • Outbound trigerring for Inspection Lots

    Hi Friends,
    I am working on QM. I have to trigger inspection lots data in the form of an outbound idoc. I need to find out any creation/change in inspection lots data.
    In this scenario the inspection lots will be created/changed when:
    1) there is a creation/change (QA01, 02)
    2) Production orders are released (CO02, 05)
    3) GR done (MIGO), stock posted in QI.
    Has anyone worked on such a requirement earlier? Any suggestions on flow-logic for picking up the inspection lots data in a custom wrapper program?
    Thanks in Advance...
    Birendra Chatterjee

    Hi,
    you should be able to create inspection lots when executing                 
    BAPI_GOODSMVT_CREATE. See for example the attached note 536769 that         
    is about wrong status in the inspection lot created in this way.                                                                               
    Please review your data used for testing this BAPI. 
    Best Regards,
    Arminda Jack

  • Scenarios for "manual creation of inspection lot"

    Hi QM gurus!!
       I would just like to ask the main function of QA01 or "<b>Manual creation of inspection lot</b>"
    What are the cases/scenarios where this tcode is used? I would really appreciate if you could help me.. Thank you.
    Regards,
    Heinrick Palad

    HI,
    The table below provides a brief overview of the functions you can use to process inspection lots. Appropriate cross references are included for the more extensive tasks or for those for which additional information is available.
    Prerequisites
    The inspection lot processing functions can be linked to various authorizations that are checked by the system whenever you try to process an inspection lot. The following types authorizations are relevant to inspection lot processing:
    Material authorizations
    The material authorization for QM is stored in the material master. For more information, see  Creating and Changing QM-Specific Data for a Material.
    Inspection type authorizations
    This authorization controls which inspection type the user can access in order to create an inspection lot. The inspection type authorization is plant-specific.
    No authorization checks are executed in QM when an inspection lot is created automatically.
    Features
    Function
    Pushbutton / Menu path
    What you should know
    Accessing the initial screen for the inspection lot processing functions
    Logistics ® Quality management ® Quality inspection ® Inspection lot processing ® Inspection lot
    Creating an inspection lot manually
    See Creating an Inspection Lot Manually
    Changing an inspection lot
    Choose Change
    Enter the number of the inspection lot you want to change and then choose Enter.
    Displaying an inspection lot
    Choose Display
    Enter the number of the inspection lot you want to display and then choose Enter.
    Creating a new batch in an inspection lot
    See Batch Creation in Inspection Lots
    Cancelling an inspection lot
    Call up an inspection lot in the change mode and choose Inspection lot ® Functions ® Cancel lot.
    See Cancellation of an Inspection Lot
    Blocking/unblocking an inspection lot
    Call up an inspection lot in the change mode and choose Inspection lot ® Functions ® Block lot.
    To unblock an inspection lot, choose Inspection lot ® Functions ® Unblock lot.
    When you block an inspection lot, you cannot process the lot further. You must unblock the lot if you want to perform any additional operations.
    Transferring stock in an inspection lot
    See Stock Transfers
    Making corrections to inspection lot quantities
    See Corrections to Inspection Lot Quantities
    Creating a QM order
    Call up an inspection lot in the create or change mode and choose Goto ® Insp. lot acc. assgnmt.
    See QM Order Creation
    Resetting the sample calculation
    See Resetting the Sample Calculation
    Printing inspection instruction/sample-drawing instruction
    See Printout of Instructions
    Approving a task list
    Call up an inspection lot in the create or change mode and choose Inspection lot ® Functions ® Give approval
    If the task lists in your company must be approved before they can be used, you should make sure that only approved task lists are assigned to an inspection lot. If the system selects a task list that has not yet been approved, you can use this function to approve the task list (provided you have the necessary material authorization).
    this link help u.
    http://help.sap.com/saphelp_erp2004/helpdata/EN/be/00bbe7ca5311d2961800a0c930e04c/frameset.htm
    reward is usefull.
    tahnks.

  • Change Limit in Inspection lot.

    Dear All,
    I have question, In the result recording screen (Transaction is QE51N,QE11,etc) there are some option that are not available, I mean they are found disable that I can't click & check the functionality of it. E.g. In RR screen Goto>Change unit to be insp.>All four function for this node are not available. Can any one make me clear why it's so this and what should I do to to use/activate it.
    I have came across this functionality because of an online query.
    In one in process inspection lot the user has rectified the pH limit was wrong and I had and extreme urgent requirement to correct it.
    I have suggested them to use unplanned MIC in place of this wrong MIC and force close the wrong one or reverse the entire process.
    With Best Regards,
    Shyamal Joshi

    Hello Shyamal,
    I would like to request you to post this question via OSS/Service Marketplace on the component QM-IM.
    SAP uses different channels for various matters.
    For these detailed system related questions OSS/Service Marketplace is the right channel.
    Best regards,
    Anja Modler-Spreitzer
    SAP AG, Solution Management Life Sciences

  • Change limits in inspection lot

    Dear All,
    I have question, In the result recording screen (Transaction is QE51N,QE11,etc) there are some option that are not available, I mean they are found disable that I can't click & check the functionality of it. E.g. In RR screen Goto>Change unit to be insp.>All four function for this node are not available. Can any one make me clear why it's so this and what should I do to to use/activate it.
    I have came across this functionality because of an online query.
    In one in process inspection lot the user has rectified the pH limit was wrong and I had and extreme urgent requirement to correct it.
    I have suggested them to use unplanned MIC in place of this wrong MIC and force close the wrong one or reverse the entire process.
    With Best Regards,
    Shyamal Joshi
    Edited by: Isabelle Britten on Feb 20, 2008 8:58 AM

    Yes, I believe flexible specs came into play with 5.0?  Not sure.
    You'll have to read the help on implementing them as I haven't had that opportunity on an implementation.  Just in playing in a sandbox and training. 
    I can give you some info.  Flexible specs were developed for the stability functionality.  Basically, you create a universal plan with all the inspection characteristics on it.  When you create the lot, you can select any characterisitics from this plan and add them to your lot.  You can then modify the tolerances and certain other settings for each characteristic.
    To implement this outside of the stability functionality there are a couple of BAPi's you have to implement. (I don't know them off the top of my head). 
    This is not a process that you want to use as a standard business process for day-to-day testing.  It's best application I think is for doing things like testing competitive samples, or pilot plant testing, maybe customer technical investigations.  The one off stuff.
    Craig
    Edited by: Craig Snyder on Feb 21, 2008 3:33 PM

  • Change the inspection stock of material in qm only

    Hi All,
    Error I am getting while doing a Goods Movement is "change the inspection stock of material in qm only". Let me explain you what exactly happend.
    We moved transports, some how moved transports deleted the existing Inspection types in Production system. So there were no inspection types available in the system untill we send another transport. During the period of the transport  in transit Goods reciept agains the Purchase order is done. So inspection lots were not generated. So now inspection types exist due to another transport.
    So Users complained about the inspectiion lots.
    I told them to reverse the Goods reciept documents and do the Goods recipt again so that inspection lots get generated.
    When they are trying to do 102 Mvt Type they are getting the error.
    I was even trying to use 321 Mvt Type, still Unsussesful.
    I tried de-activating the Inspection typem but system throwing an error "Quality stock exist".
    Is there a way to Move stock from Quality to Unrestricted?
    How to generate an Inspection lot for the existing stock to move the stock from  quality to unrestricted?
    QA01 inspection lot creation, i dont see the purchase order field. Is there any possibility of adding purchase order to the inspection lot?
    Thanks,
    Quantum.

    hi ,
    How to generate an Inspection lot for the existing stock to move the stock from quality to unrestricted?
    activate  0800 inspection type in material master, its basically for stock which is in qulity and does not have a inspection lot.
    regards
    satish

  • How to change the Status CRTD of the Inspection Lot?

    Dear all.
    I want to Complete an Inspection Lot 10000000005 In the T-CODE qvm2.When I select the Inspection Lot 10000000005 and press F8 to Complete the Inspection,the SAP show an error message "Status check error".
    And the detail info show that the error was cause by the Status CRTD of the Inspection Lot.I check the Status of the Inspection Lot 10000000005 and found that it's Status was CRTD CHCR SPRQ.My question was how to change the Status CRTD of the Inspection Lot?
    Regard
    Yoda

    Hi
    CRTD means ...
    In material master QM vew-inspection setup->Inspect with task list tick is there.
    Now to change status,
    Go to Qp01>create a task list for material(If not exists)>remember date of creation of task list must be prior to date to creation of inspec lot
    If task list is created/exists>go to QA02.<inspection specification -->click on Inspec Spec
    and attach task list
    go to sample tab....click on sample.
    Now save it.
    Status will change to REL
    Regards
    Sujit

  • Inspection Lot status not getting changed to LTCA from REL for SubCon scenario

    Dear All,
    For ERSA material 01 inspection type is active with indicator Post to inspection stock only as it can be purchased. No other indicator is set.
    This material can be sent for repairing outside with DAMAGE valuation type (stock provided to Vendor with DAMAGE valuation type).
    For SubCon scenario, Purchase Order with Account Assignment Category F and Item Category L has been created.
    Once GR using MB01 with 101 movement, consumption posting takes place and as Insp type 01 is active Inspection lot is getting created with status REL CALC.
    At this time, DAMAGE stock against Vendor is getting reduced with Qty of 543 movement.
    Now when, reversal 102 with MB01 is done against Purchase Order and details are adopted with reference to 101 material document, reversal is taking place, but at the same time respective material doc's Inspection lot status is not getting changed to LTCA. It remains REL only.
    For 122 return to Vendor using MBRL also, Insp lot status is not getting changed.
    Has anybody faced such issue? Is this standard SAP?
    Kindly throw light on the process, is correct process followed?
    Regards,
    Tanuj Parikh

    Thanks.
    Thru MBST Inspection Lot status changed to LTCA.
    Why system is not cancelling thru MB01? 

Maybe you are looking for