Quality agreement and technical delivery term

what is quality agreement and technical delivery term?

Hi Rupali,
Quality aggrement document type is used in Quality Info Record.If you maintain control key regarding Quality Aggrement you must maintain the Quality aggrement otherwise PO or GR will be blocked.
Technical dele term are maintained in Material master-->additional data -->documents.
if you select the control key which has reference of Technical dele term you have to maintain this in MM otherwise PO or GR will be blocked.
Q01 Q-Agreement
Q02 DelivTerms

Similar Messages

  • Print document type Q02( technical delivery terms)  with Purchase Order

    Hi all
    1) I have activated the QM procurement for a certain material and I have assigned the control key that makes mandatory the technical delivery terms on the material master (standard control key 0002).
    2) I have created a Document Info Record Q02 to hold the Technical Delivery Terms assigning a PDF file. Document is released.
    3) I have assigned the DIR to the material master (object link in the DIR).
    I would like to know how to print the this DIR with Purchase Order. I am testing this scenario in IDES system and the form does not get printed.
    Could anyone please advice how to get the PDF file printed with the purchase order?
    Thank you

    Hi Sappmqm,
    There is no internal way, you would have to create an ABAP program to handle this function, where it would search the material record to pull the DIRs linked and then open them on user's screen for printing.
    Additional SAP add-ons are available as 3rd party apps, can click my name and contact me for more detail if you like.
    Good luck.

  • I have agreed and accepted the terms and conditions multiple times

    I have agreed and accepted the terms and conditions multiple times and I am still being asked to accept. All I want to do is watch the new episode of Glee and I am highly considering doing so illegally or getting a ******* hulu-plus account because iTunes for some reason does not want me to purchase anything. I have been playing along in this treacherous cycle for a ******* half-hour. How do I make this stop?

    Hello ms450,
    I would report an issue with the purchase directly to the iTunes Store support with this article:
    How to report an issue with your iTunes Store, App Store, Mac App Store, or iBookstore purchase
    http://support.apple.com/kb/ht1933
    Cheers,
    Sterling

  • Auto Quality Notification and Return Delivery Via Usage Decision

    Hello Gurus
    Need help !
    I am using the Quality inspection with Material Specification.
    Just an overview of my current system settings -
    Inspection Type 101 for Purchased parts , My Inspection characteristics and Batch Charracteristics are linked .Batch classification is updated as a result of Usage Deceision
    My Requirement -
    If the Inspection lot is getting rejected , system should trigger the Quality notification and return delievery automatically .
    Can someone pl help me with detailed steps for acheiving this...
    Reqward points will be given immediatly for sharing thoughts
    BR

    Hi
    Thanks for reply.
    I think I missed some thing in my question
    I understand that this is Standard Sap when you post the stock into Return Deilivery stock , it 'll do the movement type 122 and create the material docuement.
    However My requiremnet is to get the Delivery Document number with the reference of which i can do the PGI .
    I gone thru the SAP help and learnt that we can trigger the Quality notification automatically if we reject the inspection lot...But not confident "how" as never done before..that the reason i posted my query if someone has done this before..
    OR
    Any option to create Delivery  Document when rejecting one Inspection Lot is UD..W/o Notification also will work for me..
    So I am aiming to get Delivery Document not material document as our materials are WM managed...
    Could some one put some light on this...
    BR

  • About selecting Scheduling Agreement and Forecast delivery schedule

    Hi Experts,
    i want to write a Report, with 2 parameters for the selection : Sold-to-party and Period
    For this Sold-to-party/Period, I want to list all scheduling agreement + Forecast delivery schedule.
    I already found the Function SD_VBEP_READ_WITH_VBELN to read all Forecast delivery schedule lines using Sales Doc.No. , but how can I select all Scheduling Agreement for the Period ?
    Regards,
    David

    Solution:
    by selecting data from table VEPVG (Delivery Due Index) and using function SD_VBEP_READ_WITH_VBELN for each SD Document.
    Regards,
    David

  • Return process in Scheduling agreement and correction delivery creation

    Hi Experts,
    I have couple of Questions:
    1) I want to know the return process in case of scheduling agreement, how exactly we should go about it.
    2) Regarding creation correction deliveries in the scheduling agreements.
    I enter in a valid scheduling agreement number into transaction VA32, click the "JIT DlSch" button, click "Corr. Delivery" button and then enter in a date and quantity.
    After I hit "Save" button, I am taken back to the initial VA32 screen and see the following message...
    Sched. Agr. w/ Rel. ####### has been saved (no delivery created)
    Message no. V1261
    Does anybody have any insight to why this is happening? Thanks in advance.
    Sourabh

    Whether it is a scheduling agreement or sale order, in case of returns, you need to generate the following:-
    a)  Return Sale order or scheduling agreement referencing the parent billing document
    b)  Return delivery if goods are taken back in parent plant via VL01N
    c)  Credit note to customer via VF01
    d)  Excise credit via J1IH
    Last but not least, please spell the name correctly.
    thanks
    G. Lakshmipathi

  • Quality agrement/ Tech-delivery terms

    Hi all,
    I have assigned quality agrement and tech delivery terms both to material/vendor. If i am sending po to vendor then
    1)weather the attachment which i have made  in quality agrement and tech delivery term document will also get attached with PO.
    Because when i am creating PO i am unable to see any attachement witth it.
    and also the long text which i have maintained in the both the document is not getting displayed in the print priveiw.
    ASD

    Hi ASD,
    You can't call the entire attachment in PO.
    But through ABAP program in PO print you can map Tech Name Rev no and QA Agreement Name, Rev No etc.
    That detail store in the Material related and Q Info record Table.
    Regards,
    Babu

  • SCHEDULING AGREEMENT AND SCHEDULING LINE CREATION

    Hello Guys,
    I trying creating a scheduling agreement(SA) for vendor & material combination.
    I have created a Scheduling agreement in ME31L then maintained in ME38.
    In ME38 i have also mentioned the delivery date. when i am checking EKKO for Purchasing document , its created with the delivery date specified.
    My question is how to create a schedule line ? Do we need to maintain a source list of that material, plant and vendor.
    If we have the source list maintained, then what is the next step after SA is created and maintained.
    Do we need to do MIGO? because i tested by creating one SA in ME31L and maintained in ME38. I mentioned the delivery date as today and when i checked EKKO table the Purchasing document is created.
    Do i need to create a Purchase Order?
    If no then do i need to do MIGO? If i need to do MIGO, for what reference do i need to do MIGO???
    My client never maintained a Scheduling agreement, they want the scheduled lines to be created and sent to vendor and we need to receive  the goods on specified delivery date.
    Help will be appreciated.
    Thanks.

    Hi,
    You need to make a distinction between the scheduling agreement (ME31L/ME32L) and the delivery schedule creation (ME38/ME84)
    With ME31L you create the scheduling agreement. In the scheduling agreement which is created for a vendor you maintain the parts that you will order at this vendor, the target quantity that you will order over a certain period and the price.
    In ME38 you use the scheduling agreement number that is created with ME31L to create schedule lines (manually). These schedule lines consist of a date and an quantity. This is the data that needs to be transmitted to the vendor and against which the vendor is shipping the ordered materials.
    Once the vendor ships the materials you post the goods receipt in Migo against the scheduling agreement number.
    That is the basic working of the scheduling agreement and the delivery schedule.
    Now some remarks.
    You need to set-up the required output conditions for transmitting the data to the vendor either via print, fax, email or EDI.
    You can do this manually in each scheduling agreement and each release but typically you maintain the output condition records.
    For scheduling agreement contract (ME31L) you use transaction MN07.
    For the delivery schedule (ME38/ME84) you use transaction MN10.
    In order for you to be able to post the goods receipt the delivery schedule needs to have been transmitted otherwise you will get a message that not requirement are found when trying to post goods receipt.
    Also the goods receipt can only be posted if the requirements are valid on the day that you are performing MIGO. This means if you would post GR today then the open requirements in the scheduling agreement need to be for today or already from previous dates. The system will not allow you to post GR for quantities that are only due tomorrow (if this is required a user exit needs to be set-up).
    If you want schedule lines created via MRP then you need to set-up a source list using ME01. You have to make sure that the MRP key is set to 2 in orer for the system to generate schedule lines and you also have to make sure that you have the correct MRP parameters set-up.
    You can use ME84 to transmit the delivery schedule lines generated by MRP if no changes are required. With the ME84 you can transmit multiple releases at once, however this transaction can not be used to make manual changes to the MRP proposal.
    The scheduling agreement offers lot's more possibilities but the above should get you going with the basics.
    Hope this will help you on your way.

  • Payment terms and delivery terms

    Dear SAP Gurus,
    How to create new payment terms and delivery terms in Materials Management module and what are the settings required/integration with FICO mudule.Please guide me.
    Thanks and regards
    Mahesh

    Dear,
    Payment terms: (In MM side attached with Vendor Master)
    The payment terms represent the typical agreements you have with your customers and vendors. Therefore, you do not have to define this information from scratch for each customer and vendor.
    When a purchasing or sales document is entered for a vendor or customer, SAP Business One automatically copies the information on the payment period, price list, and total discount in the document. This information is used, to calculate the prices for the items, the due date of an invoice, or the total discount allowed etc.
    You can also change the payment term data manually in the transaction itself if a special agreement was made for that transaction. In addition, the information on the credit limit is copied from the payment term to the customer master record and then to the sales document, and can be used for a credit check.
    For the complete process of payment terms visit: http://help.sap.com/saphelp_sbo2004a/helpdata/en/c7/583e38404780498ef3d08b1fa076cb/content.htm
    Delivery terms : In the MM prospective delivery terms generally indicates the status of material delivery. For ex. Goods Must be packed well for protection / Proper handling instructions must be labelled on each pack / Net weight & Gross weight should be mentioned on pack / International Maritime Dangerous goods code should be printed on pack in case of Dangerous goods transported by sea / Like wise similar instructions for Air transport for Dangerous goods / All technical names should be printed and attached on cover of pack / the packs must be perfectly packed with water protection and palletised  like wise the terms of delivery we set to the suppliers of materials.
    Regards,
    Syed Hussain.

  • Global outline agreement and Delivery schedule

    Hi experts.
    I am in SRM 5.5, ECC 5.0 as backend in ECS.
    I would like to have some information about relation between Global outline agreement and Delivery schedule of ECC.
    Can I create GOAs and replicate to ECC as Delivery schedule for automatic generation of schedule lines?
    The schedule lines generated afted MRP run goes to SRM or only goes to SUS if required?
    Thanks
    Nilson

    Hi Nilson,
    The data contained within the global outline agreement is distributed as purchasing contracts or scheduling agreements to the backend systems of the release-authorized purchasing organizations of the relevant corporate group. These purchasing organizations can then use the purchasing contracts or scheduling agreements according to the terms agreed centrally within the global outline agreement.
    For more details.
    http://help.sap.com/saphelp_srm50/helpdata/en/42/f93dfd975f3ee6e10000000a1553f7/frameset.htm
    Nishant

  • HT202159 I keep agreeing to the new terms and conditions, and it keeps taking me back to terms and conditions!! I cannot get my apps to download! What to do? I restarted my phone, agreed to the terms about a million times, and it still keeps asking me to

    How do I agree to the new terms? I keep hitting agree and it keeps taking me back to the first page.

    The iTunes and Mac App Store / iCloud problem spontaneously resolved for me as of 21:54 Pacific Standard Time on 9/30/2012.
    Someone at Apple was aware of and fixed the problem. Finally.
    Yeah!

  • My appstore wont let me download anything. It says i have to agree to the terms and i agree and again it pop up the same thing over and over! Please help me

    My appstore wont let me download anything. It says i have to agree to the terms and i agree and again it pop up the same thing over and over! Please help me

    I thought i was the only one!! but its happening on my ipad! and i dont even want to try on my iphone uhhh its annoying!

  • Difference between Scheduling agreement delivery schedule and PO delivery s

    Dear All,
    Please tell the difference between the Scheduling agreement delivey schedule and PO delivery schdule.
    In PO itself, we can give the delivery schedule.
    Then what is the purpose of making scheduling agreement and maintain schedule in ME38?
    Regards

    Hi,
    Difference between Scheduling agreement and PO is while PO is a legal document whatever the delivery schedules you mention in PO, you are liable to pay for the entire qty in case of cancellation
    In case of scheduling agreement, we have Firm Zone and Tradeoff Zone to provide some cushion against paying for the entire qty you have ordered
    Firm zone: (go-ahead for production)
    If the date of a schedule line lies within the firm zone, the vendor has the go-ahead to produce the relevant quantity with the assurance that the orderer will bear any and all material and production costs associated with the scheduled quantity in the event of subsequent cancellation by the latter.
    Trade-off zone: (go-ahead for procurement of input materials)
    If the date of a schedule line lies within the trade-off zone, the vendor has the go-ahead to purchase any input materials necessary to produce the scheduled quantity. The orderer will recompense him in full for such outlay (but not for any other production costs) in the event that he should subsequently cancel the scheduled quantity.
    Schedule lines that lie beyond the firm and trade-off zones fall within the planning zone (forecast zone) and are for rough guidance only, being without any commitment on the part of the orderer.
    In case of PO if you want to cancel the order, you are liable to pay for the entire quantity, while in case of Scheduling agreement if you want to cancel the schedule and if the days fall in Firm zone or trade off zone or planning zone you have to pay only for raw materials or assembled products according to the above description
    Regards
    Venkat

  • I am trying to create a new itunes account and on the terms and conditions page the Agree button is permanently grey even when i have ticked the check box any ideas

    On my Macbook Pro running Lion - trying to create a new ITunes account and the Agree button on the Terms and condition page will not come active even after checking the box any ideas

    There isn't a way - at least not that I have found.  I'm having an issue with this as well - seems like a shoddy sort of business practice.  I refuse to enter my credit card number to download a FREE app.  I'm encouraging the user community that has a problem with this to please post your opinion as well.  I know this is a use community, but I have to think that Apple will take notice when an issue gets a lot of attention.  Apple needs to hear your voice.

  • I recently updated to iOS 8.0 on my Ipad however when i try to agree to the new terms and conditions i get an error message saying either 'Cannot connect to server' or 'Your session has timed out please try again' what can be done to resolve this?

    Hi, I recently updated to iOS 8.0 on my Ipad mini however when i try to agree to the new terms and conditions i get an error message saying either 'Cannot connect to server' or 'Your session has timed out please try again' what can be done to resolve this problem? Also i cannot download anything from the App store as a result of this.

    Can you check the Object Security for the Analysis Menu and Export button and see if it is restricted?
    Also, is this a Oracle DB?  IF so, has the following 32 bit Oracle Client components been isntalled:
    Oracle Objects for OLE
    Oracle Data Provider for .NET
    Oracle Providers for ASP.NET

Maybe you are looking for

  • How to "divorce" one joint iTunes account into two?

    I've had an iTunes account almost as long as there's been an iTunes.  Several years ago my wife came along and slowly it became "our" Mac and iTunes account, which made sense - we both wanted to be able to listen to our whole music library when eithe

  • Extra accouning line item in billing document with zero value

    Hi, I am using TAXINN procedure, the following accounting document has been generated during billing.This accounting document contains an extra line item with zero value. However, There is no necessary for this line item with zero value. Can you tell

  • Why is it impossible to see an appointment "time" in ical/maverick OS on macbook air?

    Why is it impossible to see an appointment "time" in ical/maverick?  How could this be a good thing when looking at appointments at a glance in day view and you come to a screeching stop because the TIME is invisible, while in month view time isn't t

  • Generic code to minimize all windows in a form

    I want to write a procedure to minimize all windows in a form. This procedure will be called from a menu item. This can be done by using SET_WINDOW_PROPERTY built-in by hardcoding window names in the form and setting the window state to MINIMIZE. The

  • DataGuard- Role Transition

    Hi, I have physical standby implemented on my oracle 10g database. When I create a temporary tablespace in primary database, it doesn't gets created in standby database. What will happen if I give a switchover or failover ? Version:- Oracle 10g 10.2.