Quality Center 11 (ALM) Query - Integration with Subversion and Jenkins

Hi OHPCPaT Forum,
Are there any restrictions to enabling the QC integration with Subversion and Jenkins when the QC server is a SaaS cloud instance? Is there any additional config I should be aware of?
Thanks in anticipation

Hi,
Yes all the users are facing the issue. Please find more details for the issue.
Currently we are upgrading Quality Center 10.0 to 11.0 with HP Enterprise Integration module for SAP applications. The project successfully upgraded from QC 10.0 to 11.0 but there are some error popup for the project for which Application Module and Enterprise Integration for SAP applications Version 2.6 was enabled
Quality Center Details:
HP Application Lifecycle Management 11.00
ALM patch level: 07
Quality Center 11.00 Enterprise Edition
Component     Build
OTA Client     11.0.0.6051
User Interface     11.0.0.6051
WebGate Client     11.0.0.6051
Test Run Scheduler     11.0.0.6051
Execution Flow     11.0.0.6051
Site Administration Client     11.0.0.6051
Extension Version     
Enterprise Integration for SAP applications     2.6.0.3232
Sprinter     11.0.0.6051
Application Model     2.6.0.917
Installation Steps followed:-
1.Installed HP ALM
2.Installed Patch Service Pack 2 (Patch 2,3,4)
3.Installed Patch 6
4.Installed Patch 7
5.Installed the Extensions HP Enterprise Integration module for SAP applications using Extension Deployment Tool by following the steps provided in the Addin Page
6.Created new project in HP ALM
7.Login to the project (no issue)
8.Enabled the Project Extensions
9.Login to the project (able to access the project but error message is popup when we access Test plan and Defect module)
Note: There is no error when we access the project for which the HP Enterprise Integration module for SAP applications EI not enabled. QC 11.0 is not integrated with any tools.
Let me know is there any step we missed or we need to do any manual steps we need to do before enabling EI

Similar Messages

  • Mercury Quality Center ALM 12.0 migration

    Does anyone know how to export projects from Mercury Quality Center 8.2, and then restore it in ALM 12.0?
    Thanks in advance.
    Best regards,
    Igar

    Hi @Igar ,
    Since this is the consumer side of the support forums, you probably won't find many people with expertise in the area you need, but I found a different HP support forum where I think you'll have better luck: Quality Center / ALM (HP Enterprise Business Community)
    Please click the thumbs up button to say "Thanks!"
    Clicking "Accept as Solution" on a reply that solves your problem makes it easier for other people to find solutions.
    I am an HP employee.

  • CRM 5.0 Integration with Twitter and facebook

    HI Experts,
    i am working with SAP CRM 5.0 version,
    My existing client want to set up SAP CRM with twitter and Facebook specially customor services ,
    Does SAP CRM 5.0 has tight integration with twitter and facebook ,
    if yes will you please share iinformation in terms of
    1)Effort Estimation :manpoer
    2)Costing details 
    Thanking you in advance
    Pravin shete

    @sherrysarath:  Could you share some documents to understand how standards works for this issue? And if there aren't standards requirements, could you share your custom solution.
    @pravin wipro : Could you explain what are your requirements?

  • DMS integration with PP and PS.

    Hi SAP PLM experts,
    I would like to know how mySAP PLM's DMS module  is integrated with PS and PP module.
    Any small scenario with T codes and configuration help is highly appriciated.
    If you guyz have any documents/materials for this question, please mail the same to sudhu03 at gmail dot com.
    Thanks in advance,
    S.Achar.

    It is only through the object linkwhich you provide.
    In the business perpective, we attach the contract documents, design drawings and other doucuments to the project for ready referance.
    You can create the DIR directly from PS transaction or you can create it in DMS and attach it to the Project.
    We do have the red lining to identify teh changes reqd in the document.

  • Exchange 2013 owa integration with ADFS and cooexistance with exchange 2007

    Team,
    I have successfully integrated adfs 3.0 and Exchange 2013 owa and ecp.  However, we have a coexistence environment with exchange 2007.  When you access owa, which then redirects you to adfs, sign-in, and then get redirected back to owa. If your
    mailbox is still within exchange 2007, you get a blank login page.  If you mailbox is in exchange 2013 then you successfully get the owa page for 2013.  The problem is that all exchange 2007 mailbox users get blank pages at login. So I have determined
    that exchange 2013 cas is not doing the service location lookup on the mailbox to determine if a redirect to the legacy owa address is needed.  Is there a configuration setting that I might be missing? Or does the integration with adfs and owa not support
    the much needed mailbox lookup for a coexistance environment?  A side note: if we enable FBA with owa, both login scenarios work just fine (legacy and new 2013). The legacy namespace has been created, and applied to the exchange 2007 urls.  

    Hi,
    Try using AD FS claims-based authentication with Outlook Web App and EAC
    http://technet.microsoft.com/en-us/library/dn635116(v=exchg.150).aspx
    Thanks,
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Simon Wu
    TechNet Community Support

  • SQL Developer Data Modeler - integration with subversion

    I just discovered the release of SQL Developer Data modeler, and found this to be very interesting.
    We are still using Oracle Designer for database design, but we are looking for a replacement (for several reasons).
    My question is quite simple:
    Given that the modeler uses a filebased repository, and also given that we have several developers potentially working on a data-model at the same time, how does Data Modeler integrate with subversion for source control etc.?
    Can the repository itself be under source control, and checked in/out directly from Data Modeler?
    Or will only the output files be candidates for version/source control?
    Let me admit right away that I have not read much of the data modeler docs, and I have also not downloaded/installed it (yet), but does anyone have pointers to docs on this , or general input/knowledge around it.
    On a side note, I must say that it puzzles me that a company like Oracle, that delivers one of the best databases doesn't use its database engine to host the repository, but instead chooses to go for files (I assume xml) "scattered all over the place"....
    Well, I guess they a have a reason for it..
    Anyway:
    Sql Developer Data Modeler and Subversion anyone?
    Jens

    Hi Jens,
    It's early days and the initial implementation is indeed file based. Though I'd say not xml files "all over the place", but in ordered folders. Yes, as a database company it does make sense that we'd have a repository for managing and versioning metadata. However the tool supports Oracle and other databases and many companies use open source version control tools, such as Subversion and so anyone using the Data Modeler today can use it with Subversion regardless of the database they are designing for.
    We do plan to have a repository, but in the 6+ months of the early adopter program found that many of the early adopters were happy to place the files under source code control using Subversion and in so doing also managed the multi-user development.
    Integrated Subversion support is planned for a future release.
    Sue

  • Performance problem with Integration with COGNOS and Bex

    Hi Gems
    I have a performance problem with some of my queries when integrating with the COGNOS
    My query is simple which gets the data for the date interval : "
    From Date: 20070101
    To date:20070829
    When executing the query in the Bex it takes 2mins but when it is executed in the COGNOS it takes almost 10mins and above..
    Any where can we debug the report how the data is sending to the cognos. Like debugging the OLEDB ..
    and how to increase the performance.. of the query in the Cognos ..
    Thanks in Advance
    Regards
    AK

    Hi,
    Please check the following CA Unicenter config files on the SunMC server:
    - is the Event Adapter (ea-start) running ?, without these daemon no event forwarding is done the CA Unicenter nor discover from Ca unicenter is working.
    How to debug:
    - run ea-start in debug mode:
    # /opt/SUNWsymon/SunMC-TNG/sbin/ea-start -d9
    - check if the Event Adaptor is been setup,
    # /var/opt/SUNWsymon/SunMC-TNG/cfg_sunmctotng
    - check the CA log file
    # /var/opt/SUNWsymon/SunMC-TNG/SunMCToTngAdaptorMain.log
    After that is all fine check this side it explains how to discover an SunMC agent from CA Unicenter.
    http://docs.sun.com/app/docs/doc/817-1101/6mgrtmkao?a=view#tngtrouble-6
    Kind Regards

  • Problems in query result with infoset and timedep infoobject

    Hi,
    I have the following situation:
    infoobject ZEMPLOYEE timedep
    Infocube 0C0_CCA_C11 (standard cost center/cost element postings)
    -> infoset with infoobject and infocube linked with outer join
    My query should show all active employees in one month without any posting in the infocube.
    My testdata looks like this:
    pernr date from    date to         cost center
    4711  01.01.1000 31.12.2002
    4711  01.01.2003 31.01.2009   400000
    4711  01.02.2009 31.12.9999
    That means the employee is only active between 01.01.2003 and 31.01.2009.
    I expect the following result in the query with key-date 31.01.2009:
    4711  01.01.2003 31.01.2009   400000
    I expect the following result in the query with key-date 01.02.2009:
    no result
    -> because the employee is not active anymore, I don't want to see him in the query.
    My query delivers the following result:
    4711  01.02.2009 31.12.9999
    The first and the last entry in master data is automatically created by the system.
    I tried to exclude the not active employees by selection over cost center in the filter (like cost center between 1 and 9999999, or exclude cost center #). But unfortunately the filter selection does not work, because obviously the attributes are not filled in the last entry.
    Is there anyone who can tell me how I can exclude the last entry in the master data in the query?
    Any help is much appreciated! Points will be assigned!
    best regards
    Chris

    HI,
    problem is that I can't use employe status in this case, beacuse for any reason the people don't use it.
    I have also tried with exceptions and conditions, but the attributes ar enot filled, so it seems that nothing works.
    Do you have any other suggestions?
    Thanks!
    best tregards
    Chris

  • Solman + Quality Center 9.2 Integration

    Hi
    Has anybody used the Solution Manager and Quality Center 9.2 together. I am wondering if there is a plug-in available to integrate solution manager with quality center 9.2. If anybody can throw some light, the help will be highly appreciated.
    I am aware that there was a plug in available for the earlier version Test Director 7.0 and Solution Manager. But with the new version I am not sure.
    If anybody can throw some light as to what are the advantages and disadvantages that will really help us decide for our work.
    Thanks
    Rakesh Jain.

    Hi Praveen,
    I am getting the same error
    "No requirement found in project <Project name>
    Message no. QC_INTEGRATION030"
    we are using Solman Ehp1 and Quality Center 10.0 patch 16
    Please help
    regards
    Naveen

  • Excel integration with Entry and Approval for SSM not working

    Iu2019m having trouble getting excel integrated with E&A for being able to enter large number of historic data points into a cube-built model u2013 Iu2019ve gone through all the docs several times and there is no good concrete explanation on how to do this. I keep getting the following error message:
    Error opening Excel Automation server can't create object. This can be caused by:
    1. - The application is not installed on your machine
    2. - The browser security does not support ActiveX scripts.
    3. - Your were prompted to run ActiveX and you said No, if that is the cause close all browser instances and reopen.
    However, I've done the following:
    -          Iu2019ve installed the excel add-in on both the server and my local machine, and Iu2019ve enabled the add-in part in Excel on my local machine.
    -          The browser security is definitely set to accept all active X scripts
    -          I am never prompted to run activeX when I select u201CHistorical Datau201D within entry/approval. I just get the above error message.
    -          Iu2019ve flushed cache and restarted listener several times.
    What am I missing? I donu2019t see it in any of the docs.
    Thanks!

    Robb,
    Looking at what you've done, there doesn't seem to be an obvious answer. The best suggestion I can make is to fill out a support ticket on this. There must be other factors at work here that will require a deeper look.
    Regards,
    Bob

  • New Article - RoboHelp projects with Subversion and TortoiseSVN

    Some folks have posted questions about Subversion and TortoiseSVN in this forum, so I thought I'd pass along this new article I found in the Adobe Developer Network this week that goes in to detail on how to set up this open-source solution with RoboHelp:
    http://www.adobe.com/devnet/robohelp/articles/robohelp_subversion.html
    Thanks
    John Daigle
    Adobe Certified RoboHelp and Captivate Instructor
    Evergreen, Colorado
    www.showmethedemo.com

    Thread moved to Source Control forum.
    See www.grainge.org for RoboHelp and Authoring tips
    @petergrainge

  • SocialMiner Integration with Linkden and Whatsapp

    Hi Everybody,
    One of my customers wants to integrate Cisco SocialMiner with Linkden and Whatsapp but I did not find integration information in product guides. One of my team members told me that we can achieve Linkden integration through REST APIs, but I am still doubtful because it was not mentioned anywhere in the documents. So please guide me, how can we achieve it.Thanks in advance 
    Cheers :)
    Regards
    Qamar Khan

    I had the client implement a DMZ and have part of the public IP block be assigned to the it. We then placed the SocialMiner server in the DMZ and only opened the necessary ports from the OUTSIDE to DMZ and from the DMZ to the INSIDE. PDI said that doing NAT to the SocialMiner server is not currently supported. Also, we are doing this without setting up the optional proxy server.

  • JSF integration with Webwork and Freemarker ?

    My company is investing a lot in an application that uses Webwork and Freemarker. I'd like to reuse chunks of that but with JSF components for new development. I know it's possible to link to and from external URLs using JSF's navigation, but I don't think that buys me much in this case. Is it possible to use the JSF View (as in Model-View-Controller) with someone else's (Webwork's) front controller? I'm guessing JSF can coexist with Freemarker as it does with JSP and HTML. Or, does anyone know of any successful approach to Webwork integration anywhere?
    thx!

    My company is investing a lot in an application that uses Webwork and Freemarker. I'd like to reuse chunks of that but with JSF components for new development. I know it's possible to link to and from external URLs using JSF's navigation, but I don't think that buys me much in this case. Is it possible to use the JSF View (as in Model-View-Controller) with someone else's (Webwork's) front controller? I'm guessing JSF can coexist with Freemarker as it does with JSP and HTML. Or, does anyone know of any successful approach to Webwork integration anywhere?
    thx!

  • Integration with IP and other 3rd party procurement apps

    I don't know about the rest of you, but one of the primary hurdles that we have to get past with target customers is that most of the big ones already have procurement systems that produce POs. Ideally, they'd like to post those POs as either an RFQ/Auction or directly as a PO for a particular supplier. This is particularly true for big manufacturers who initially want to bring their OEM suppliers and contract manufacturers into an on-line procurement environment and then expand that to auctions and RFQs later. The scenario refers primarily to those trading partners that do not have their own back-end systems and EAI solutions.
    We think we have come up with a workaround by taking the EDI produced out of the buyer's system into our Hub, transforming it into our cannonical form, then turning the data into an OEX OAG XML auction document, uploading it through a dummy account for that buyer, once the bid is placed by the supplier, automatically accepting, and generating a final PO as a PO Akn back to the buyer's system. It is a little hokey, but it is the best we've been able come up with. (Of course, once the PO message from the buyer's system is sent, the buyer wants nothing to do with it after that. They just want to receive a PO Akn back).
    Any ideas?
    David Luper
    [email protected]
    415-325-5028

    David,
    It sounds like you are hitting on two of our critical issues. Specifically, our issues are the following:
    1. We have customers with existing procurement systems containing requisitioning/workflow/approval functionality. They want to continue using this functionality while using our Exchange for sourcing/bidding/tabulation/etc. This gives us the requirement for integration to these procurement systems (iP, SAP, Peoplesoft, etc). We need the ability to load to the Exchange all the parameters for an Auction (open date, close date, type of auction, etc), line items, and potentially even suppliers. We envision that this document load generated from the requisition system could even be flagged to open the auction immediately without the buyer ever having to go to the Exchange. The buyer would then go to the Exchange to see bids and to do the award process. Once the bid was awarded, this would generate a document back to the requisition system for issuance of a PO by the procurement system.
    Our second issue is the ability to simply issue a manual PO. This could be done within the Exchange and/or a procurement system. Right now we are missing significant transaction volume due to the inability for a buyer to go issue a direct PO to a vendor on the Exchange without going through the auction or catalog process. If the goods the buyer wants to buy are under their threshold for required bidding and are not in the catalog, they go around the Exchange with a paper PO. This eliminates all the benefits of integration and our chance to charge for this transaction
    Both of these issues are extremely critical for us. Dee, what can you tell us about the integration capabilities with procurement/requisition systems or the manual PO functionality? We have heard multiple conflicting reports about the availability of integration with iP.
    Thanks!
    John Alexander
    Way2Bid
    [EMAIL][email protected][EMAIL]
    417.447.5042 (Voice)

  • ESS-portal integration with Time and Travel management(HR) in R/3

    Hi,
         Im doing with ESS-portal configuration with Time and Travel Management in R/3,So please kindly send me Documents for integration part.I'll b so thankful if u people send me docu as soon as possible.
    send me documents to [email protected]
    thanks
    pavi

    Hi
    Please go through this functional module HRMS_BIW_EXTRACT_PY1 in r/3 side to know the exact table where u r getting the data.
    There are lot of tables involved in HR-payroll info types.
    As far as your problem is concerned you take one employee and go to PA20 and analyse the payroll for each week or twice a month (depends up on ur client)
    run the report on the payroll cube and find out exactly what u want.
    Thanks
    Roopa
    Assign points if help full

Maybe you are looking for

  • Dynamic Column Heading in Table Control

    Hi I have a table Control which needs dynamic heading for the first column. So i dragged a label and placed it on the Column 1 header. I gave the corresponding declaration and assignment in TOP include for that screen field. I also tried assigning va

  • Pldoc utility to document packages created in sql developer

    I am trying to find a quick way to produce documentation of packages developed in the sqldeveloper. PLDOC claims that we can produce documentation easily. but I find it quite cumbersome to use it. since it is free source, tech support is not availabl

  • Is this hosted by Oracle or hosted at my shop?

    I am unclear about the project marvel environment. Is it strictly hosted as seen here, or is is something we set up and run ourselves, like Portal?

  • How to get sys_context function

    hi, i m working on oracle 10g but i dont hav sys_context function on my sys user. how can i hav it & from where. can i create this kinda function on my oracle 9i ? thxs

  • DEQUEUE_MSGID column in a queue table

    There are three msgid-related columns in a queue table: MSGID, CORRID, DEQUEUE_MSGID I know the meaning of the columns MSGID and CORRID. But what is the column DEQUEUE_MSGID for?