Quality inspection for vendor wise

Hi,
My client is having a vendor in Hyderabad, he is a properitory vendor then  inspection isn't required while receiving the material.Another vendor is  in Bangalore, for this vendor inspection is required. But the material number is same for both the vendors. How can i proceed this scenerio.Can anybody suggest.
Regards,
Krishna

Hi Krish,
You can control this scenario through Inspection control in the Insp. Control tab of Q-info record. Maintain Q-info record for the vendor you need to skip inspection through QI01, Enter the Vendor QM system in the Vendor master record (Consult MM Guy), and select the Existing QM system such that it matches the Vendor QM system and select the inspection control as No Inspection. Your problem will be solved.
Reward if cleared or get back with queries.
Keerthi

Similar Messages

  • Without Quality inforecord for vendor-material  - GR with spection?

    Dear Friends,
    Without Quality inforecord for vendor-material combination  - GR with inspection lots were created, kindly explain me the possible reasons for that. and do also mention that whether the quliaty inforecord is mandatory or not?
    Regards,
    Archana

    In material master - QM view, check the "QM proc. active " indicator and the control key.
    If this indicator is active and any control key except '0000" is assigned in material master, it will ask for Q. info record.
    Vishal
    Edited by: VISHAL JONNALWAR on Dec 13, 2010 7:58 AM

  • Transaction code to know stock lying in quality inspection(for UD)

    Hi,
    Pl let me know transaction code to know stock agaisnt materials lying under quality inspection ( for UD ) for more than one materials or plant wise or pgrp wise or sloc wise ....
    Thanks
    Arul Murugan

    Hi,
    In QA33 Transcation code ,Enter the lot creation ,In list settings select ,Only lots without usage decision and execute.
    In the layout select Quantity to be posted(Quality stock).This will give the list of Inspection lots against the material to be posted to Unrestricted or blocked stock.
    Manoj.N

  • Quality inspection for external opearatio

    Experts
    One of my product having one operation in externel
    Once it coming back after the externel operation confirmation is happening(here material number is not changing)
    In this point i want to create a inspection lot on confirmation
    how we can achieve this what is the inspection type we want to give
    Give me a details step
    Faisal

    Hi Friend ,
    Procedure for Quality inspection for external operation is :
    1) Assign the operation in routing which is done external processing
    control Key : PP02 ( External processing )
    Click on indicator : Insp char. required.
    Hence when production order is released for above scenario , double click on the operation and click on create PR.
    Than PO from PR.
    material is relaesed for external processing agianst PO .
    when material is get external processing and come in through GR . Material goes to quality stock.
    after quality ok , its come in unrestricted stock.
    Regards
    Vinod

  • Quality Inspection for a Movement Type 103 , change batch when doing QA11 .

    Hi all,
    I activated Quality Inspection for a Movement Type 103 .  When do MIGO(GR 103) reference to PO ( include material A, qty 100 PC), it will  create insp lot. Material  A  needs batch management.
    1st time use QA11 to post  50 PC  to stock, it will create a new batch( or you can select a exist batch ).
    2nd time use QA11 to post another 50 PC to stock, it will use the batch 1st time used, and you can't change this batch number .
    The question is : how to change  batch number at the 2nd time ?
    Thanks.

    Hi,
    Pls. check that how u have configured the new batch number in configuration for goods movement.

  • Quality Inspection for the 1st time Receive of Batch

    Hi all.
    My requirement is just to do the quality inspection when the Batch(MCHA-CHARG) is received in the first time in MIGO.
    No quality inspection is required for next & consequtive goods receive for the same batch.
    for the 1st time receive, the stock will go to quality inspection stock for any batch of a material. From the next time , the stock will go directly to unrestricted stock without quality inspection. is it possible? plz advice.
    Thanks
    pabi

    Hi Pabi,
    I am not sure if this will help you, but here are the three options that you might want to consider:
    - Source inspection. The idea here is that an IL is created for a purchase order prior to GR. All subsequent receipts for this PO can be configured to skip inspection.
    - Control if insp. lot in material master (insp. set-up). In this case, the system will not create new insp. lot, if there's already one open for the same batch - it will merely add the qty of the new GR to the same open insp. lot.
    - With dynamic modification you can let the following receipts of the same material from the same vendor to go without QI, but you can't fine-tune it by batch.
    I know this is not the same what you want, but I can't recall at the moment a function that will satisfy your requirement exactly.
    BR
    Raf
    Edited by: Rafael Zaragatzky on Aug 7, 2011 4:32 PM

  • Issue of Quality Inspection for consignment return delivery

    Hello,
    I am doing a returns delivery(from a Sales Order) from a Customer Consignment.
    I am getting a error when I do a Post Goods Receipt(PGI). QM is active for that material.
    The error I am getting is
    "Change the inspection stock of material XXX in QM only"
    Procedure says
    "Check both the QM inspection setup data and the movement type for material XXX in the quality management view of the material master"
    The movement type used in the returns delivery is 655(GD returns for QI).
    What is the solution for this error. Do I need to change/add new Inspection type based on the Movement type?
    Please let me know ASAP.
    Thanks
    Regards
    SAP Fan..

    Hi,
    You can read this link for inspection for customer return [Inspection for customer return|http://help.sap.com/saphelp_47x200/helpdata/en/92/b808b1d52a11d2962200a0c930e04c/frameset.htm]
    It looks the material master is set-up inspection type with 06 - returns from customer. Also the movement type 655 moves the goods into QI stock.  In this case, the Quality personnel needs to change the inspection stock type using transaction code QA32. They will change the usage decision on the customer returns.
    Once the change the inspection type is changed, you can do the post goods receipt.
    Regards

  • Zreports for vendor wise Delivery schedule release

    hi ,
    Can some one help me with codes for  the reports for the Delivery Schedule Release vendor wise. which shows vendor details , on titles, Schedule agreement Nos and then the material listed with the qty and targetted date.
    Kindly help
    regards
    Kim

    How to release directly from ME38 ?
    I tried in the path  delivery sche > Edit > generate Forc Sche
    but the msg below:
    Error generating release against scheduling agreement  (cause 2)
    Message no. 06857
    Diagnosis
    The function module for generating a scheduling agreement release (forecast delivery schedule or JIT delivery schedule) has run up against an error, causing processing to be terminated.
    In this case the cause of the error is 2.
    *System Response*
    The error may involve one of the following situations:
    1: The nature of the error cannot be specified precisely.
    2: The forecast delivery schedule or the JIT delivery schedule was generated but no message record could be generated.
    3: A document type for which the functions "Generate forecast delivery schedule" or "Generate JIT delivery schedule" are not defined may be involved.
    4: A material for which the function "Generate JIT delivery schedule" is not defined may be involved.
    5: A scheduling agreement that has not yet been released by all persons responsible may be involved.
    6: The factory calendar has not been maintained correctly.

  • No Quality Inspection for Stock Transfer

    Hi,
    There is a scenario now in which a material is activated for quality inspection. This same material is also used for Stock transfer from other plant with same company.
    So if material if received using STO, how can I deactivate Quality Inspection and just transfer to unrestricted use.
    Thank You,
    Raymond

    Hi
    check user exit.
    QAAT0001 Inspection type determination different from variant 01
    You can install enhancement QAAT0001 ,the function modules contained in this enhancement are called up in the
    programs in which you can access the master inspection type if necessary.
    The inspection lot is then created with the inspection type that was
    determined using the enhancement.
    logic will be for STO it will consider Z mvt type of origin 08 ,for STO material activate a Z mvt type & do not tick on Post to inspection.
    For normal stock trnsfer system will create 08.
    I hope this will add some value
    Regards'
    Sujit

  • Quality Inspection For WBS & Network Activity

    Hi All,
    In one our project scenario it is required that the qaulity inspection has to be perform for WBS or Network activity.
    Can anybody explain me the steps.
    Thanks,
    Vishal

    Dear Vishal
    QM in projects I dont think SAP has any solution currently available for this. Option available can be
    1) Create a WBS itself as Quality Inspection. You can capture all the QM activities in this particular WBS
    2) Create manaul inspection lot with reference to WBS and record the results.
    Regards
    Gajesh

  • Quality inspection for the items issued for Sales order

    Hi, How to map the qc for the items issued for sales order?

    Dear Yadav,
    -Activate insp type 10 in the Material Master-QM view insp setup (MM01)
    -Create Inspection plan (QP01) with usage as Goods issue & assign Insp characteristics
    -Create Sales order (VA01)
    -Delivery against the Sales order (VL01N) or through sales order menu. Delivery Insp lot gets created after Delivery is made.
    -Do results recording and take usage decision (QA32)
    Note:
    -This inspection is non stock relevant inspection. There will be no stock posting through Quality Management.
    -Post Goods issue in the delivery can be made only after taking the usage decision.
    Regards,
    Keerthi.

  • Quality inspection for the Operation

    Hi Gurus,
    I have multiple operation routing here which is having operation 010, 020,030 ,040 ,050 .
    client requirement is that they want to have the quality check at each operation .
    usage decision at each operation but result recording at the specific operation like 040
    How can i achieve it .

    Hi
    1. You have to use the inspection type 03 ( In-process inspection)
    2. It is possible for results recording at a specific operation. You have to assign the MIC in the particular operation for which you want to do results recording.
    3. Giving usage decision for each operation is not possible in Standard SAP. Because only one inspection lot will be generated for an order, in the same lot  you have to do the results recording by selecting the required operation. But usage decision is possible for the whole inspection lot only not for each operation.
    Regards
    Bala

  • Quality inspection for stock transfer inspection type 8

    Dear Friends ,
    For inspection type 8 , when there is a stock transfer from plant to plant a inspection lot is created automatically
    and then the stock goes to QI and we do RR and UD and stock posting to Unrestricted stock if pass
    Is my understanding is correct
    Thanks & Regards
    Raj

    Hi raju
    ur understanding is correct after giving inspection type 8 in material master and ur transfering material from plant to plant then lot get genrated and after RR and UD it goes to unrestricted stock
    regards
    sachin

  • Quality inspection stock for a vendor

    Hi,
    When receiving material against PO for a vendor, stock should get posted always in quality inspection for this vendor. This requirement is only for particular vendor, not for all. If in material master, QM procurement key is active, then it will be for all vendor, which is not required.
    Please suggest.
    Regards
    parag

    please check the vendor purchase view, there would have been a check mark.or may be the check mark in the info record.

  • Goods receipt from specific vendor always posted to Quality Inspection

    Hi ,
    For specific- vendor PO, during the GR, the stock type is automatically posting to "Quality Inspection", for all the materials.
    Not allowing to change during the MIGO .
    Want to know how this is set. and remove it. Because all the GR for PO -101 , should go to "Unrestricted Use" , only acc to current practice.
    Pls advise.

    HI,
    You can post the Stock to Inspection Stock always
    1. Either mainatain this to MMR in Purchase View. It will post to inspection irrecpective of vender.
    2. In Punchase PO in, Maintain Stock Type ...Inspection stock...here u can specify with vender also.
    But not from Material master, stock is as inspection Post will always post to inspection not vender specific.
    Hope Help u 1
    Regards,
    Pardeep Malik

Maybe you are looking for

  • Different selection in a single query according to an ID

    Hi I'm looking for a way to perform different selections in a single query according to a specific value: Here is the first selection:   select g.*,gf.*,gs.*            FROM graphs g   LEFT JOIN graph_frames gf on g.graph_id = gf.graph_id   LEFT JOIN

  • Connect 2 external Displays with a iMac 27''

    Hi, is there a way to connect two external Displays with a iMac 27inch. Eyefinity? Its a Radeon 5750 inside the iMac isnt it?

  • How to you bring up that "Calibrate Camera by waving in an eight ~~" dialog

    - (void)locationManager:(CLLocationManager *)manager didFailWithError:(NSError *)error //User denial core location access. if ([error code] == kCLErrorDenied) [manager stopUpdatingLocation]; [manager stopUpdatingHeading]; else if ([error code] == kCL

  • Script to turn on remote login in preferences

    I like to make a script that would open port 22 (remote login) in the sharing pane. I have do shell script "/usr/bin/open /System/Library/PreferencePanes/SharingPref.prefPane" this brings up the correct window. But now I am stuck, how do I get the re