Quality Inspection For WBS & Network Activity

Hi All,
In one our project scenario it is required that the qaulity inspection has to be perform for WBS or Network activity.
Can anybody explain me the steps.
Thanks,
Vishal

Dear Vishal
QM in projects I dont think SAP has any solution currently available for this. Option available can be
1) Create a WBS itself as Quality Inspection. You can capture all the QM activities in this particular WBS
2) Create manaul inspection lot with reference to WBS and record the results.
Regards
Gajesh

Similar Messages

  • Table for WBS,Network , Activity from CJ20n

    Hi All,
    What's the table to check WBS, network and activity?
    Thank you.
    Best Regards,
    Nies

    Hi
    Project it is PROJ table where Project is PSPNR.
    WBS it is PRPS the field is PSPNR,
    the link is PROJ-PSPNR = PRPS-PSPHI (PSPHI is the project definition).
    Activity Table is AFVC and the link is
    PRPS-PSPNR(WBS elements of PRPS) = AFVC-PROJN (WBS elements of AFVC).
    Network table is CAUFV and the link is
    AFVC-AUFPL = CAUFV-AUFPL
    <REMOVED BY MODERATOR>
    Thanks.
    Edited by: Alvaro Tejada Galindo on Feb 22, 2008 2:54 PM

  • Create Inspection lot at 'Network - Activity' level

    hi all,
    We are having a requirement to see if there's a possibility to Create inspection lot at 'Network - Activity' level for activities that are "In-house" processing. So that the user can record the Inspection information against a Network - Activity.
    Ex - Network Activity:
    1)Plate cuttingu2014 Inspect cut edges 
    2)Welding - Inspect Weld joint 
    3)Rolled tube - Check Inner diameter

    Any suggestions plz!!.

  • Quality Inspection for a Movement Type 103 , change batch when doing QA11 .

    Hi all,
    I activated Quality Inspection for a Movement Type 103 .  When do MIGO(GR 103) reference to PO ( include material A, qty 100 PC), it will  create insp lot. Material  A  needs batch management.
    1st time use QA11 to post  50 PC  to stock, it will create a new batch( or you can select a exist batch ).
    2nd time use QA11 to post another 50 PC to stock, it will use the batch 1st time used, and you can't change this batch number .
    The question is : how to change  batch number at the 2nd time ?
    Thanks.

    Hi,
    Pls. check that how u have configured the new batch number in configuration for goods movement.

  • Transaction code to know stock lying in quality inspection(for UD)

    Hi,
    Pl let me know transaction code to know stock agaisnt materials lying under quality inspection ( for UD ) for more than one materials or plant wise or pgrp wise or sloc wise ....
    Thanks
    Arul Murugan

    Hi,
    In QA33 Transcation code ,Enter the lot creation ,In list settings select ,Only lots without usage decision and execute.
    In the layout select Quantity to be posted(Quality stock).This will give the list of Inspection lots against the material to be posted to Unrestricted or blocked stock.
    Manoj.N

  • Logic for Activity Qty and its unit of meas for external network activity,

    Hi,
    For external network activity, controlling key PS02. I want to read Activity Qty and its unit of measure.
    Is there any function module or Bapi for this or any selection table logic?
    I have tried BAPI_PROJECT_GETINFO and BAPI_NETWORK_GETDETAIL but I am not able to get this field?
    If anyone has solution please let me know.
    Thanks.
    Prem

    Got the alternative solution

  • Quality inspection for external opearatio

    Experts
    One of my product having one operation in externel
    Once it coming back after the externel operation confirmation is happening(here material number is not changing)
    In this point i want to create a inspection lot on confirmation
    how we can achieve this what is the inspection type we want to give
    Give me a details step
    Faisal

    Hi Friend ,
    Procedure for Quality inspection for external operation is :
    1) Assign the operation in routing which is done external processing
    control Key : PP02 ( External processing )
    Click on indicator : Insp char. required.
    Hence when production order is released for above scenario , double click on the operation and click on create PR.
    Than PO from PR.
    material is relaesed for external processing agianst PO .
    when material is get external processing and come in through GR . Material goes to quality stock.
    after quality ok , its come in unrestricted stock.
    Regards
    Vinod

  • Issue of Quality Inspection for consignment return delivery

    Hello,
    I am doing a returns delivery(from a Sales Order) from a Customer Consignment.
    I am getting a error when I do a Post Goods Receipt(PGI). QM is active for that material.
    The error I am getting is
    "Change the inspection stock of material XXX in QM only"
    Procedure says
    "Check both the QM inspection setup data and the movement type for material XXX in the quality management view of the material master"
    The movement type used in the returns delivery is 655(GD returns for QI).
    What is the solution for this error. Do I need to change/add new Inspection type based on the Movement type?
    Please let me know ASAP.
    Thanks
    Regards
    SAP Fan..

    Hi,
    You can read this link for inspection for customer return [Inspection for customer return|http://help.sap.com/saphelp_47x200/helpdata/en/92/b808b1d52a11d2962200a0c930e04c/frameset.htm]
    It looks the material master is set-up inspection type with 06 - returns from customer. Also the movement type 655 moves the goods into QI stock.  In this case, the Quality personnel needs to change the inspection stock type using transaction code QA32. They will change the usage decision on the customer returns.
    Once the change the inspection type is changed, you can do the post goods receipt.
    Regards

  • No Quality Inspection for Stock Transfer

    Hi,
    There is a scenario now in which a material is activated for quality inspection. This same material is also used for Stock transfer from other plant with same company.
    So if material if received using STO, how can I deactivate Quality Inspection and just transfer to unrestricted use.
    Thank You,
    Raymond

    Hi
    check user exit.
    QAAT0001 Inspection type determination different from variant 01
    You can install enhancement QAAT0001 ,the function modules contained in this enhancement are called up in the
    programs in which you can access the master inspection type if necessary.
    The inspection lot is then created with the inspection type that was
    determined using the enhancement.
    logic will be for STO it will consider Z mvt type of origin 08 ,for STO material activate a Z mvt type & do not tick on Post to inspection.
    For normal stock trnsfer system will create 08.
    I hope this will add some value
    Regards'
    Sujit

  • Change screen field network and upload additional wbs network activity

    Dear All,
    1st. How can i change the screen field company code in network header (assignment tab) to input or required. I tried OPUA but it doesnt show company code. In default  it shows that network header (company code) in display mode.
    2nd. How can i add additional WBS,network and activity using additional enhancement for easy use method. Or in other word, is there any enhancement program..not cj20n / cj20?
    really appreciate.
    nies

    Hi
    2nd. is there any other solutions? users donot convinience to use cj20n / or copy from template? is there badi /program upload to be used? in other words, users can maintain it in excel then upload it..
    Use this BAPI to create WBS elements
    BAPI_BUS2054_CREATE_MULTI
    Sorry for the my last post on the point 1
    The company code for network order is coming from thw WBS element, that you cannot change in network order. This is standard setting.
    Thanks
    S.Murali

  • Quality Inspection for the 1st time Receive of Batch

    Hi all.
    My requirement is just to do the quality inspection when the Batch(MCHA-CHARG) is received in the first time in MIGO.
    No quality inspection is required for next & consequtive goods receive for the same batch.
    for the 1st time receive, the stock will go to quality inspection stock for any batch of a material. From the next time , the stock will go directly to unrestricted stock without quality inspection. is it possible? plz advice.
    Thanks
    pabi

    Hi Pabi,
    I am not sure if this will help you, but here are the three options that you might want to consider:
    - Source inspection. The idea here is that an IL is created for a purchase order prior to GR. All subsequent receipts for this PO can be configured to skip inspection.
    - Control if insp. lot in material master (insp. set-up). In this case, the system will not create new insp. lot, if there's already one open for the same batch - it will merely add the qty of the new GR to the same open insp. lot.
    - With dynamic modification you can let the following receipts of the same material from the same vendor to go without QI, but you can't fine-tune it by batch.
    I know this is not the same what you want, but I can't recall at the moment a function that will satisfy your requirement exactly.
    BR
    Raf
    Edited by: Rafael Zaragatzky on Aug 7, 2011 4:32 PM

  • Separate PR no. for each time we create PR through WBS Network Activity

    Dear Experts,
                         I want to create seperate PR number for each time I attach material through activity.Kindly give some valuable suggestion.What are important configurations required.
    Regards

    Hi,
    on OPUV, dont switch on CollectiveRequstn, what it does as per F1 help
    "If you do not set this indicator then a seperate purchase requisition is created for every externally processed operation or non-stock component."
    Hope this would help.
    regards,
    Sam L

  • Quality inspection for the items issued for Sales order

    Hi, How to map the qc for the items issued for sales order?

    Dear Yadav,
    -Activate insp type 10 in the Material Master-QM view insp setup (MM01)
    -Create Inspection plan (QP01) with usage as Goods issue & assign Insp characteristics
    -Create Sales order (VA01)
    -Delivery against the Sales order (VL01N) or through sales order menu. Delivery Insp lot gets created after Delivery is made.
    -Do results recording and take usage decision (QA32)
    Note:
    -This inspection is non stock relevant inspection. There will be no stock posting through Quality Management.
    -Post Goods issue in the delivery can be made only after taking the usage decision.
    Regards,
    Keerthi.

  • Quality inspection for the Operation

    Hi Gurus,
    I have multiple operation routing here which is having operation 010, 020,030 ,040 ,050 .
    client requirement is that they want to have the quality check at each operation .
    usage decision at each operation but result recording at the specific operation like 040
    How can i achieve it .

    Hi
    1. You have to use the inspection type 03 ( In-process inspection)
    2. It is possible for results recording at a specific operation. You have to assign the MIC in the particular operation for which you want to do results recording.
    3. Giving usage decision for each operation is not possible in Standard SAP. Because only one inspection lot will be generated for an order, in the same lot  you have to do the results recording by selecting the required operation. But usage decision is possible for the whole inspection lot only not for each operation.
    Regards
    Bala

  • Quality inspection for stock transfer inspection type 8

    Dear Friends ,
    For inspection type 8 , when there is a stock transfer from plant to plant a inspection lot is created automatically
    and then the stock goes to QI and we do RR and UD and stock posting to Unrestricted stock if pass
    Is my understanding is correct
    Thanks & Regards
    Raj

    Hi raju
    ur understanding is correct after giving inspection type 8 in material master and ur transfering material from plant to plant then lot get genrated and after RR and UD it goes to unrestricted stock
    regards
    sachin

Maybe you are looking for

  • DHCP question on VPN to ASA 5520

    Our VPN uses the Microsoft VPN client to connect to an ASA 5520 running 8.0(3). Clients get address from our internal DHCP server. How do I get the ASA to send the client computer name in the DHCP request, rather the the group name and some number it

  • ABAP mapping split messages and dynamic filename

    Hello, i have set up a IDOC to file scenario where the IDOC is split into several files, which works fine. In addition to this it is required to set a dynamic filename out of the ABAP mapping for each file. If only one file is created this works alre

  • Loading local PDF, iOS, iPad2

    Hi I'm trying to make my application view local PDF on iPad. This pdf was downloaded from internet into app-storage dir.  Here is some code: var f:File = new File(obj.url); var webView = new StageWebView(); webView.stage=parent.stage; webView.viewPor

  • EXPORT XML with XMLCONCAT

    Good Morning, I have a package that I use to export an XML file created by taking data from 2 tables and I was thinking of splitting used in two procedures, one procedure for each table. But the select that goes to compose the XML file is FROM dual.

  • Is a one server with two system IDs configuration valid when using MSCS

    As the last step in my upgrade from BW30b to BI70 I need to introduce Java. My newly upgraded ABAP BI70 system is running on a Microsoft Cluster and it was my intention to add Java as a separate system(SID).  When doing this it appeared I would be ab