Quality inspection scenario

Hi experts
Can u please help me in mapping the following scenario
There is process called tube cutting. It means there is a long pipe and it is cut into pieces of specified fixed length.
Now for QM my requirement is .. the process should be checked that the length that is cut is right or wrong. (may be the blade is moved becoz of cutting force).
This checking is done at the start of shift and then after every 2 hours.
i have to consider the cost for testing activity also and hit the cost in the cost center. plz tell how to do it.
Please tell me how to do this?
will it be having inspection points?
will it be having inprocess inspection?
will it be having after production information.
please tell me the whole procedure for doing the process including config if any.
thanxs a lot in advance

Dear friend
How are you handling the cutting process always inhouse or subcontacting also is involved? if In_house the cycle you should be undergoing will be via Production order only. How many cutting stages you are covering this process from good issue till confirmation?
base uponm that you can decide how to have and where to have inspection processes.
Baiscally
1. You can have the incoming inspection when you purchase the material(pipe)
2. You can have inprocess Inspection tocheck the length of the pipes cut(different material code). You need to decide how mant inprocess inspection proces to have based upon diferent stages of output.
3. Inspection points are not required in your case unless you have the evaluation process in place
4. After production informaiton -what kind of information you wish to have since once confirmed you will have the complete information and history in the order itself ( can use COOIS).
If you are maintaining prices in masters properly then during confirmation, itemisation and costing takes place automatically and you need not take any special care for that. All along I expect that your production settign are in place.
Best Regards
SAM
Edited by: samuel mendis on Apr 4, 2009 7:22 AM

Similar Messages

  • Reg., Quality Inspection at the time of Goods Receipt against the P.O.

    Hi
    Pls provide the procedure for the "Quality Inspection at the time of Goods Receipt against the P.O."
    Thanks in advance.
    Regards
    Ravi

    Answers:
    1.Our client wants that he want to send back to Vendor, In which way we have to do in SAP?
    In QM,Raise notification for rejected qty in special stock, this will carry task of return delivery.
    2. Without Quality inspection User shouldn't do the MIRO?
    User discipline only it will be solved or
    Prepare user exit with help of ABAP'r
    while goods receipt(MIGO) for all scenarios(under delivery/over delivery/rejected) in development,
    Check MIRO for QC passed qty is allowed for bill booking, give meaningful messages for all scenarios.
    3. Quantity was certified by 13 only, so the user should do the MIRO for 13 only, Kindly suggest iIn which way we have to configure in SAP?
    Do return delivery for rejected quantity(2),if there excise,reverse it thru J1IS.
    After finishing above steps,Wheu u do IV only Quantity 13 will flow.
    Invoice verification will be done only for the accepted quantity.
    Above solution will solve problem.
    Edited by: Jeyakanthan A on Jan 11, 2010 12:01 PM
    Edited by: Jeyakanthan A on Jan 11, 2010 12:02 PM

  • Inspection setup maintained while stock in quality inspection

    Dear Consultants,
    While having stock in quality inspection we were still able to maintain the inspection setup in QM view of that material in that plant.
    Actually the system should have thrown error "To activate QM, the inspection stock for the material must be empty". But some how this is not happening.
    Kindly provide solution.
    Regards,
    Ninad.

    Hello Ninad,
    You can activate an
    inspection type under the following conditions:
    If it is not stock-relevant
    If it is stock-relevant and at least one active stock-relevant inspection type exists
    If it is the first stock-relevant inspection type and no inspection stock exists, or if you set the indicator Activate despite insp. stock
    above lines are copied from
    https://help.sap.com/saphelp_46c/helpdata/en/2d/350ef6448c11d189420000e829fbbd/content.htm
    Your scenario falls in 2nd condition. You can activate inspection type if it is stock-relevant and at least one active stock-relevant inspection type exists.
    Amol.

  • How to Clear Stock From Quality Inspection

    Dear Sir,
    We have following problem scenario :
    In the Quality View the wrong type of Inspection Type was given and subsequently during MIGO as  the "Quality Inspection" option was selected under Stock Type , so after MIGO stock got posted under Quality Inspection  and no Inspection Lot was created .
    Now we want to clear the Stock from QI to either Un-restricted or any other type , so that material can be cleared and brought to Un-restricted Stock  ultimately .
    We tried to use MB1b with movement type 321 , but it given error as "Change the inspection stock of material CJMC1A0477 in QM only" .
    I request you to kindly guide me as how can the Stock be cleared from QI .
    With Thanks and Regards
    B Mittal

    Hi ALL,
    I'm also facing the same issue. In material master QM view : Q M Procurement activity deactivated and Inspection setup also deactivated.  This is not a proper way to solve the issue anyway i have deactivated, but still i am facing same issue.
    Please anybody can help on this...
    Regards
    Chandru.

  • In-Process Quality Inspection in Rep Mfg

    Hi..
    We have Rep Mfg scenario , and we want to chk the material while in-process.
    In the Mtl Mastr we have maintained Insptn type as 13 .
    In Rate Routing we have maintained a operation with  control key which requires Insptn characteristics n MIC is assigned in routing.
    We have created a Planned order .
    Now , requirement is dat system should not allow backflush activity until in-process inspetion rresult is recorded.
    Whether Inspetion Lot gets created in Rep Mfg as soon as Planned Order is created..? 
    How to make the system to accomodate in - process inspection before backflush..?
    Please guide me with soln
    With Regards,
    LN

    Hi
    Try by selecting reporting point in the rem profile.
    suppose u have 10 operations ok
    first 3 operations are production operation then 4th u want to go for inprocess inspection then for the 3rd operation select the control key as milestone key and 4th is quality control key with milestone confirmation.
    Then when ever u go for backflush(MFBF)  first u have to confirm the up to 3rd operation then 4th operation confirmation.
    by this u can do the inprocess inspection scenario for REM

  • In process quality inspection in operation of a process order

    Hi,
    PP-PI inprocess quality inspection at operation level
    I am creating a process order having two operation. the first is quality inspection (inprocess inspection) & last is related to consumption of some materials.
    The control key in operations are pi02,pi03(miles stone confirmation). i am using insp type 03 in material master 
    user needs  insp. happen first then consumption of material.
    my question is
    1.when operation first get triggered  quality lot generated i enter RR & do UD.but here i can not see the insp lot stock as subscreen. why? then how can i block defect qty in block stock?
    2.how can i consume material in the same quality operation? 
    With Regards,
    Kareena

    Hi Kareena,
    I think the thread is going in other direction. You were asking for some solution to mentioned the consumption.............
    That can be taken care..........
    For 03 - "In process inspection" lot as yield confirmation by activating the STD function of SAP as I have mentioned in my last post.
    For 04 - "Inspection against GR form Production" lot, by stock posting.
    For any lot you can do customization in "EXIT_SAPLQEEM_011", to post the material consumption at each MIC/Operation valuation.
    But now the entire scenario what you are asking is bit confusing.
    You wrote
    I think for process order,
    quality activity confirmation we are talking
    & for this i have not maintained inspection
    point or inspection point identification.
    i am doing RR from qe11.
    It seems you we are talking about 03 type inspection lot. that you can relate with the option I have mentioned in the beginning of this reply.
    in my inspection plan for the material
    i have maintained 5 different characterstics
    in that row i can not see the sampling
    procedure,base unit of measure,
    base quantity all these field are gray in color
    i have defined sampling procedure also
    i have not maintained inspection point identification.
    Where you have mentioned these 5MICs?
    If it is inspection plan, then it will go with 04 Type.
    If it is Master Recipe/Routing, then it will go with 03 Type.
    Now the other point you wrote the MIC Line item have the fields GREY for Sampling Procedure,&...........&.......So to activate them,
    Select the line item for MIC, click on the Control Indicator (Sampling Procedure) and then you will be able to assign the Sampling Procedure to MIC.
    The fields "Inspect" & "Inspected" are related with the "Insp. Scope" with the MIC. The scope is define at the Control indicators for the MICs (On Page2 for the Indicators). There are four Radio Buttons to define the Inspection Scope.
    Scope not Fixed
    If you set this indicator, the number of inspected units is defined by the user for results recording.
    This number does not have to agree with the precalculated number of inspected units.
    E.g. If the the sample size for that particular MIC is not fixed ever and you will supposed to enter it at the time of RR you should define this indicator and the field will open for entry in QE11.
    Fixed Scope
    If you set this indicator, the number of inspected units must correspond
    to the precalculated number of units to be inspected for results
    recording.
    The system can perform a valuation for the inspection characteristic based on the number of nonconforming units or the number of defects in the sample.
    And the field will be GREY, non - modifiable.
    Similarly the larger and smaller scopes work.
    Best Regards,
    Shyamal

  • Vendor wise Quality inspection parameter for same material

    Hi,
    I am working in Quality Management for Material procurement quality check according to vendor, The Quality Inspection parameter same material procure deferent vendors have different parameter.
    Please help me for SAP configuration for above scenario.
    Thanks
    Rajesh Tiwari

    No Answer received yet

  • Quality inspection at different location

    Hello Masters,
    I’m new to SAP QM Please help..
    My client wants to do GR for process order at storage location 001 in plant ABCD then do STO (possibly partial qty) to another location 002 in plant ABCD with quality inspection then do dispatch after UD completion.
    Please guide me how to get this requirement done in SAP. If possible
    please help me on step by step process and movement types involved & quality
    inspection types used in this scenario.
    Thanks in advance.
    Arun.

    Hi Arun,
    Activate inspection type 08 in material master in QM view. using 311 movement type you can transfer stock from storage location 001 to 002. during this transfer system automatically create inspection lot and stock will be posted to quality inspection..
    Thanks
    Kumar

  • Quality inspection in repetitive mfg

    Hi
    I have some queries in quality inspection setup for REP MFG.
    1. Setting up inprocess inspection
    2. GR Inspection from production
    3. At what stage the QM lot is generated .
    The inspection types used for PP-P1 03 and 04 hold good for above or should I take other inspection type.
    Best wishes
    Murali

    Hi Bhramankar,
    I have not got chance to work on the REM Live environment. But I am very anxious to work over it if I will have chance.
    I have posted the thread regarding the same about the Order when I read the process scenario form the Library material on [Repetitive Manufacturing|http://help.sap.com/saphelp_46c/helpdata/en/8a/1a1eff4e4211d182be0000e829fbfe/frameset.htm].
    Where the last line have link to capture the Quality inspection for REM.
    The [Link|http://help.sap.com/saphelp_46c/helpdata/en/8a/1a1d794e4211d182be0000e829fbfe/content.htm] may have leaded me to write such.
    If have misguided him, I sincerely APOLOGIES for that. And deeply regretted for the same.
    I truly request you to posture some focus over in process inspection in REM and cultivate our information.
    I again thank you for your inputs.
    Dear Dharam,
    The SAP standard inspection type is 13 for REM.
    How to capture it? I have a [Document|http://help.sap.com/saphelp_46c/helpdata/en/8a/a5aadd4adc11d189740000e8322d00/frameset.htm] it may help you.
    Regards,
    Shyamal

  • Quality Inspection before Production

    Hi All,
    We are using Production resource tools(PRT) in Production Order. We want to do the quality inspection of the PRT before one day of Production.
    How can we map the following scenario so that Quality check can be done for PRT before Production??
    Thanks,
    Sanjay

    Dear
    1) Create Equipment under the category Test Equipment (Q)
    2) Go to inspection plan and assign the PRT in the opertion overview. When you click on PRT normaly it will ask for material, you can choose equipment and then add the Equipment there. You can assign multiple PRTs
    3) In inspection characteristic - make sure that Test Equip is ticked in the control indicator of the mic
    4) In inspection charactertistic overview for each mic you can select and the PRTs maintained in the operation view is visible here and you select the one which is require
    Refer : Re:PRT Inspection
    Regards
    JH

  • How we may by pass quality inspection during PO creation

    Hi Guru,
    How we may by pass quality inspection via selecting document type in the PO. User create dummy PO in multi level marketing indsutry in order to achieve points & awards during month end. Since all the materials subject to quality inspection, material in dummy PO also falls under quality inspection. For your kind information there is no physical movement or GR for this dummy PO. It's just created in the system as I mentioned the purpose the above. I already created seperate document type to diffrentiate this scenario but looking forward how we may by pass quality inspection for this document type. Or is that any t/code which can by pass quality inspection during PO creation. Please advice. Thank you.
    rgds,
    nantha

    Dear Netto,
    As I said before user need to create dummy PO & must do GR in order to get the rewards & bonuses. User do GR in the system but it doesn't involve material movement. My question is how we may by pass the quality inspection for said GR since physically no goods involved.
    Dear JS,
    For your kind information this material subject to quality inspection & it has been set in material master. I tried one more as per your advice. System post this GR to quality inspection eventhough I change to unrestricted use in PO & GR as well before posting maid. Quality Inspection is auto defaulted for said material. Quality inspection is requirement to most of the goods so I can't change that. I'm wondering how we may by pass this just for dummy PO & GR.
    I believe this clarifies your queries. Thank you.
    rgds,
    nantha

  • Quality inspection lot creation during GR for STO

    Dear Friends,
    I have a Scenario for Quality inspection lot creation during GR with respect to STO
    can use inspection type 01
    or is there any other inspection type to create inspection lot during GR for STO
    Thanks & Regards
    Raj

    Dear Friends,
    when i maintain inspection type 08
    Inspection lot is created in GR  Plant
    Thanks for that
    but when i am moving the stock from  Plant  Sloc A to same plant Sloc B one more inspection lot is cretaed (movment type 311)
    if i go to SPRO i can deactivate 311 movement type to avoid creating inspection lot
    but it is client level , i need to restrict only for one plant
    is there any other way to control  just one inspection lot for one GR
    if you are not clear with my writing pls do not hesitate to ask for more information
    Thanks & Regards
    Raj

  • Exclude Quality Inspection from Batch Determination

    Hi Guys
    I have am stuck with  a very strange scenario and need your help to sort this out please
    In the process orders I have set auto-batch determination on release and in the checking rule I have excluded the quality inspection lot.
    Now when I am release the process order on batch determination it picks up the quality inspection batch!
    Can you please let me know where and how this can be resolved
    Thanks in advance
    Rahul

    "Also when I do the material availability check the QI stock is not considered."
    Presumably, this availability check is run when order is status CRTD. Please check if the same checking rule has been applied to "Creation" & "Release" in OPJK. If not, check the differences between these checking rules in OVZ9.
    "However I am not sure if the checking rule decides the batch determination, please correct me if I am wrong. And let me know where do we maintain the relationship between the cheking rule and batch determination procedure!"
    Yes, they are related. Batches go through 3 stages to be determined.
    Stage 1: Check against Stock
    Stage 2: Check against Classification
    Stage 3: Availability Check.
    It may be possible that stage 3 is not a dynamic availability check, in which case the checking rule is irrelevant. However, if it is a dynamic availability check, the checking rule is relevant.
    The quickest way to determine if a dynamic ATP check is executed is to set a breakpoint at Function Module AVAILABILITY_CHECK_CONTROLLER in se37. This breakpoint should be reached when you release the order. The first line of code in the function module is:
    CHECK NOT P_ATPCSX[] IS INITIAL.
    Double click on P_ATPCSX[] to see if it contains entries. If this table contains entries, a dynamic ATP check is executed.
    Also, When you enter CO09 for the material, plant and checking rule, is the QI stock displayed?

  • No Quality Inspection for Stock Transfer

    Hi,
    There is a scenario now in which a material is activated for quality inspection. This same material is also used for Stock transfer from other plant with same company.
    So if material if received using STO, how can I deactivate Quality Inspection and just transfer to unrestricted use.
    Thank You,
    Raymond

    Hi
    check user exit.
    QAAT0001 Inspection type determination different from variant 01
    You can install enhancement QAAT0001 ,the function modules contained in this enhancement are called up in the
    programs in which you can access the master inspection type if necessary.
    The inspection lot is then created with the inspection type that was
    determined using the enhancement.
    logic will be for STO it will consider Z mvt type of origin 08 ,for STO material activate a Z mvt type & do not tick on Post to inspection.
    For normal stock trnsfer system will create 08.
    I hope this will add some value
    Regards'
    Sujit

  • Quality inspection for external opearatio

    Experts
    One of my product having one operation in externel
    Once it coming back after the externel operation confirmation is happening(here material number is not changing)
    In this point i want to create a inspection lot on confirmation
    how we can achieve this what is the inspection type we want to give
    Give me a details step
    Faisal

    Hi Friend ,
    Procedure for Quality inspection for external operation is :
    1) Assign the operation in routing which is done external processing
    control Key : PP02 ( External processing )
    Click on indicator : Insp char. required.
    Hence when production order is released for above scenario , double click on the operation and click on create PR.
    Than PO from PR.
    material is relaesed for external processing agianst PO .
    when material is get external processing and come in through GR . Material goes to quality stock.
    after quality ok , its come in unrestricted stock.
    Regards
    Vinod