Quality Lot creation against

Hi,
I need to create an inspection lot against GR w.r.t Reservation.
Is that possible and what would be the appropriate inspection type in that case.
Regards,
Amlan C

I am trying to feasibility of the below process:
Goods issue needs to happen against Reservation 261. MB21
While Goods issue the Shop floor person needs to return the defective part to store.
Store will update the receipt using MIGO against reservation.
Since the part that is returned to the stores is damaged, the GR needs to be under quality inspection.
Maintenance will take the necessary corrective measures and move the qty to unrestricted.
My only CONCERN is will G.R against reservation create a quality lot. What kind of inspection type needs to be used for GR against Reservation?
Regards
Amlan C

Similar Messages

  • Quality lot creation

    Hi
    In production order.. 3 operation are there...generally when production order has done GR ... Inspection lot has created..
    but here i want inspection lot created..at the time of  2nd opearation conformed/released...(inspection lot creation automatically at operation level)...is it possible.. any one could  guide me .. about this  issue..
    regards
    sesidhar

    Hi,
    If you are talking about 03 type inspection then it is not generated at the time of GR (3rd operation) but it is generated at the time of Order Release.
    Now if you are talking about 04 (Receipt against production order) then in general this type of inspection lot is generated at the time of GR, but if you want to create this inspection lot earlier before Goods Receipt then you have option of early Lot creation.For this go to QM view of Material Master and in Inspcetion type view select Inspection type 04.
    And select option Y Early Lot creation at Control Inspection Lot.
    This will generates the inspection lot at the time of order release (not at specific Operation) along with 03 inspection lot.
    Regards,
    Dhaval

  • Quality lot creation for operation description

    Dear All
    My client requirement is like this
    we are creating the production order in that operations are external operations for which automatic purchase requisition is created with respect to the operation description(i.e. without material) using account assignment catagory F. now my requirement is after doing GR quality lot has to be created with respect to Purchase order and we can able to give the usage decision for that lot and post
    Regards
    Shafi

    HI
    If you are not using any material then for which one you want to make inspection lot? and for which you will make RR and UD?
    i think only at material level QM can be activated thru QM view.
    Plz check at your end
    Regards
    Anupam Sharma

  • Quality Lot Creation during various stock movements

    I am unable to trigger a quality inspection when moving the material from unrestricted use to project-unrestricted [412Q] or from project-unrestricted to different project-unrestricted [415Q]. Can anybody help me in this regard? Also how do i trigger a quality inspection before and after a service order to check the material quality? note: [] contains movement type.

    543 Consumption from stock of material provided to vendor
    This movement cannot be entered manually.
    The consumption of components for a subcontract order is posted using goods receipt for purchase order (101). It can be corrected by means of a subsequent adjustment.
    Possible special stock indicators: E, Q.
    For the special stock indicators E and Q, you must ensure that the quantity is not removed from the stock of material provided to vendor, but from the unrestricted-use sales order or project stock.
    545 Goods receipt from by-product from subcontracting
    If a component is entered with a negative quantity for the subcontract order, the receipt of the by-product is posted during goods receipt for purchase order or during the subsequent adjustment.
    Possible special stock indicators: E, Q
    For special stock indicators E and Q, you must ensure that the quantity is not posted to the stock of material provided to vendor, but to the unrestricted-use sales order or project stock.
    551 Scrapping from unrestricted-use stock
    553 Scrapping from stock in quality inspection
    555 Scrapping from blocked stock
    Possible special stock indicators: E, K, Q
    561 Initial entry of stock - unrestricted-use stock
    563 Initial entry of stock - quality inspection
    564 Initial entry of stock - blocked stock
    During initial entry of stock balances, you enter the physical warehouse stock frigures or the book inventory from your old system into the SAP System for productive operation. This data entry usually takes place by means of batch input.
    Possible special stock indicators: E, K, M, O, Q, V, W (565: only E, K, Q)

  • Quality inspection lot creation at  GIR

    Dear MM/QM guru's........
    Can you explain me in bref wat are the customizing setting in Quality managemnt and MM for creation of inspection lot the moment you go GIR and how to release the inspection lot..
    Reagrds
    SARFRAZ

    hi sarfrazny,
    first you have to activate the QM view in material and activate the inspection type in the material master .
    inspection plan to be prepared
    as soon as you process the the GIR a inpection lot will be created for which you have to record the result .
    kindly look into this
    <b>Inspection for a Goods Issue</b>
    Purpose
    The system can automatically create an inspection lot when a goods issue is posted in the system. A goods issue can be posted internally (for example, a material withdrawal from the warehouse) or to an external destination (for example, a goods issue to a customer). In a goods issue, the materials are usually withdrawn from unrestricted-use stock and posted to a cost center, project, customer, or other account assignment object. When the system creates an inspection lot for a goods issue, the inspection lot is not stock relevant.
    Prerequisites
    The system creates an inspection lot automatically for a goods issue if the following conditions have been met:
    In Customizing for Inspection Lot Creation (Inspection for a Goods Movement) QM is active for the movement type.
    QM is active for the material. This means that in the inspection settings of the material master:
    In Customizing for Inspection Lot Creation (Inspection for a Goods Movement) QM is active for the movement type.
    An inspection type is active for inspection lot origin 02 (goods issue)
    The other indicators for the inspection type are set appropriately to meet your requirements for inspection processing (for more information, see Processing Inspection Settings)
    Process Flow
    The system creates an inspection lot automatically when the goods issue is posted in Materials Management (MM).
    If the inspector will record results for inspection characteristics (controlled by the inspection settings in the material master), the system assigns an inspection specification (for example, a task list or material specification) to the inspection lot. If the system cannot find a specification or if more than one inspection specification is assigned to the material, you must assign a specification to the inspection lot manually.
    If dynamic modification criteria are defined for the inspection lot origin or task list usage, the system checks the existing quality level for the material (and the other criteria, if applicable):
    If a quality level is not available, the system creates one.
    If the dynamic modification rule specifies that the quality level must be updated when the usage decision is made, the system does not update the quality level now.
    If the dynamic modification rule specifies that the quality level must be updated when an inspection lot is created, the system updates the quality level now.
    The system calculates the sample size.
    If the sample calculation must be triggered manually (controlled by the inspection settings in the material master), you must call up the inspection lot in the change mode and choose the function to trigger the sample calculation manually.
    If you are going to inspect the goods in the inspection lot using an inspection specification:
    The system can print out the inspection instruction and/or sample-drawing instruction automatically when the inspection lot is created
    You can print out the inspection instruction and/or sample-drawing instruction manually when you call up the inspection lot in the change mode
    Result
    You can use the information in the sample-drawing instruction and inspection instruction as a guide to:
    Draw and prepare the samples at the work centers specified for each operation
    Inspect the goods in the inspection lot
    Record characteristic results and/or defects
    When you have finished recording inspection results and/or defects, you can complete the inspection.
    Result
    When you have finished recording inspection results and/or defects, you can complete the inspection.
    regards
    thyagarajan

  • Quality inspection lot creation during GR for STO

    Dear Friends,
    I have a Scenario for Quality inspection lot creation during GR with respect to STO
    can use inspection type 01
    or is there any other inspection type to create inspection lot during GR for STO
    Thanks & Regards
    Raj

    Dear Friends,
    when i maintain inspection type 08
    Inspection lot is created in GR  Plant
    Thanks for that
    but when i am moving the stock from  Plant  Sloc A to same plant Sloc B one more inspection lot is cretaed (movment type 311)
    if i go to SPRO i can deactivate 311 movement type to avoid creating inspection lot
    but it is client level , i need to restrict only for one plant
    is there any other way to control  just one inspection lot for one GR
    if you are not clear with my writing pls do not hesitate to ask for more information
    Thanks & Regards
    Raj

  • Stock Transfer to quality without Inspection lot creation

    Hi,
    I want to do stock transfer from unrestricted stock of Plant A to quality stock of Plant B. However I don't want inspection lot to be created.
    Is this possible?
    I am using Movement type 301 and Inspection Lot of type 08 is active in Material Master.
    If I deactivate QM for movement type, can I post to quality without inspection lot creation.
    Thanks

    Do you have any inspection type setup for material in plant B? If yes then you would be not able to transfer stock in QI without creating an inspection lot. If inspection type is active in material master of plant B(destination) then system would through you error message saying - "transfer stock in QM only". The reason is you would not have an option to move stock from QI using 321 (QI to UNR) in plant B if QM is active. 321 managed by an insp lot.
    If inspection type is not setup in material master at plant B then you would be able to post stock in QI without creating an inspection lot. Then move stock from QI to UNR using 321 (MB1B).
    Hope this clarify you.

  • Inspection lot creation

    Dear Experts,
    Reqiurement as follow :
    We have four plant like 1000,1001,1002,1003,1004
    System creates inspection lot when we do GRN against in stock transfer PO when STO from
    1000 to 1004, 1001 to 1004, 1002 to 1004, 1003 to 1004, as we have activated inspection type 08,01 in MMR.
    My requirement is system should not create inspection lot when STO from 1003 to 1004 only.
    We can not deactivate inspection type as we need inspection lot when STO from other plant.
    Please help in this scenario.

    In QM, we can deactivate the quality for certain movement type.That means though QM is active in material master, if we are using any movement type for which QM is not active, it will not generate the inspection lot. For STO from plant 1003 to 1004, use the movement other 101 i.e copy of 101.
    Copy 101 movement say as 901.Using following path deactivate QM for this new movement type 901.
    SPRO - QM - Q. Insp - Insp lot creation - Insp for goods movement - Deactivate insp for movement type. Select the indicator "QM not active".
    Now use movement type 901 for STO from plant 1003 to 1004.
    Vishal Jonnalwar

  • Inspection lot creation while partial comformation in 03 inspection type

    Hi
    I want inspection to be created while partial confirmation of operation in CO11N in 03 inspection.
    It is happening with release of production order.
    PLz let me know -if anybody can help.
    Regards
    Pooja

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Inspection lot creation for inspection type 05

    Hi Gurus,
    We have finished material FERT & semifinished material HALB.We have assigned insp. type 02 & 05 in material master of matl. HALB.When we create production order for FERT & confirm the order , inspection lot is generated for matl.HALB of inspection type 02.
    Now we are reversing the goods issue by movement type mb1a, movement 262.In customizing for movement 262 inspection lot origin 05 is assigned.
    My problem is that when i reverse the goods issue with mvmt.262, inspection lot is not created for insp. type 05. What should be the reason behind this? or are any changes to be done to above setting?
    Regards
    Ram

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Updating of QM info structures on the basis of inspection lot creation date

    Dear Gurus,
    Our business requirement is as follow:
    Suppose MM has received 10 consignment of a material (Goods receipt) against a material in month of Feb-2008 from a particular vendor.
    Inspection lot statistics in MCXA is updated on the basis of inspection lot generation, which is as per our requirement.
    Suppose this inspection take 2 days for analysis at laboratory.
    Now FI has to make payments for the month of Feb-2008 against this inspection results. They need the value of average quality parameter for the month of Feb-2008. (Average value of all quality parameter for the material of all the inspection lot which are generated in Feb-2008)
    I want that QMIS should update on the basis of Inspection Lot creation date not on the basis of result recording system date.
    I think there should be some configuration settings available for this purpose.
    Please help me out.
    Regards
    Honyal

    Any valuable input are welcome
    regards
    Honyal

  • Inspection Lot creation for the 103 movement type

    <<Don't ask for or offer points>>
    Dear Experts,
    we have the requirement of Creating the Inspection lot for the 103 movement type. we have done all the necessary settings for 103 movement type (in OMJJ and under the node   Quality Management --> Quality Inspection -->Inspection Lot Creation -->Inspection for Goods Movements) but still I am unable to achieve the results. Same is happening for 105 movements.
    Kindly let us know what settings need to be done in order to achieve the same.
    Full points will be awarded for the reply
    Regards.
    Edited by: Matt on Sep 18, 2011 4:44 PM

    Hi,
    If you have activated two inspection types (eg 01, 0101) of same inspection lot origin (01), in material master you should  have a preferred indicator set for the inspection type for which you want to be selected when you perform goods receipt.
    This check box is available in the inspection type set up in the Material master.
    Also check whether the post to inspection stock indicator is set for the material (in the inspection type), then only material will be posted to inspection stock.
    Please confirm, what happens to the stock after making MIGO. check in MMBE and confirm
    Go through the link and maintain the necessary settings. I think default settings for 01 type should work.
    http://help.sap.com/saphelp_470/helpdata/en/2d/350e4d448c11d189420000e829fbbd/content.htm
    Regards
    Hari

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

  • Inspection type 01 - inspection lot creation based on vendor batch number

    Hi Guys,
    this topic has been discussed several times here, but I was not able to find a suitable answer for my question.
    I am facing the folowing requirement:
    I have activated inspection type 01 for a raw material.
    I am receiving a firs goods receipt from vendor A with vendor batch number 0001.
    The system creates its own goods receipt batch number 0546 based on internal numbering.
    A new inspection lot is created.
    I am posting a second goods receipt from vendor a with vendor batch 0001.
    The system creates a new batch number 0547 based on internal numbering.
    A new inspection lot is created.
    I do not want to get the second inspection lot, because I received vendor batch 0001 before and I am assuming it has been inspected or is in inspection.
    Option 1: Post the second goods receipt against the first internal batch number created.
    I am aware of this need at the moment, but a user is not always checking if there is an internal batch with the same vendor received before.
    Can I customize the system to create inspection lots based on the fact that the vendor batch number was received before?
    Or do I have to use an exit and some ABAP code to get the wanted result?
    Thanks for your advice in advance.

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Early Inspection Lot Creation on Goods Receipt

    I work for a company that melts steel into batches referred to as Heats.  Each of these Heats are processed through various steps to create tubing.  In the tubing operations multiple Heats are applied to production orders but the integrity of each Heat is always maintained.  If we do a Goods Issue for 6 Heats into a production order, we expect to do a Goods Receipt of 6 Heats from that production order and inherit all of the Heat related characteristics for each Heat processed.  At certain points we do laboratory tests for chemisties and properties of each Heat.  These tests are run while the order is being processed through other operations but need to be recorded against the batch.  We are thinking that we need to do Goods Receipt Inspection with Early Inspection Lot Creation.  It looks like this method will create a single Inspection Lot upon release of the Production order.  Is there a way to create multiple Inspection Lots that will correspond to Heat batches prior to the actual Goods Receipt?

    6 partial GR (Heats) are done against 1 production order? Then, you will have one inspection lot and one usage decision for the entire lot (03 / 04: Goods Receipt Inspection with Early Inspection Lot Creation.).
    Think this: Each heat can be one sample/ inspection point each, in case of early goods receipt. So, if you have 6 samples: 3 pass and 3 fails, then do the Usage decision on 3/6th of the quantity at the end of the test: this needs to done manual stock psting while doing the UD.
    So, you do the inspection at the sample levels, but not at multiple inspection lot level.
    There is a way to create mutiple inspection lots on partial GR for the same process order.
    The logic lies like this, if your previous inspection lot is reset on usage decision, then you will get a new inspection lot when doing a partial GR.
    If the UD is not reset case:
    (a) Usage decision open: It will increase the QI stock in the same inspection lot. This means no new inspection lot creation.
    (b) Usage decision done: It will post to unrestricted, thinking that the rest of the sample is OK!! So, again no new inspection lot creation.
    This I tried on 04 inspection type. I am not sure on 03. Hope this helps!!

Maybe you are looking for

  • Table for getting open PR quantity

    Hi I have one requirement........ I have created a PR for 100 nos. Then I created a PO with ref. to this PR for 25 nos. Now i want to capture how much open PR quantity (75 nos) is present in the system. In which table I can get this information? Rgds

  • Solaris Express 11 and Mac compatibility

    Hi all, I would want to use Solaris with my Mac so I tried to boot on the DVD and install the Developer version, the Mac boot on it correctly and started to install Solaris. But I have a problem with the screen (APPLE 23' with a NVidia 7300GT) when i

  • Creating connection using NAT address

    Can we use ServerSockets to create a connection to a server using the NAT address ? If yes, then does it require something different ?

  • Random 'touch glitches" on x220 with Windows 8 Pro

    Performed a clean install of Win8 on x220 Tablet with brand new SSD (not an upgrade). The Start Menu GUI displays 'random touch glitches' (those highlights that appear when you actually touch the screen), which are invoking random apps. This is not h

  • Right-click modification of cal events in Outlook that were added in iPad

    Calendar events that I add using iPad Calendar sync properly to the Outlook 2003 Calendar on my desktop PC, but I am unable to bring up the right-click context menu for those events (for example to change their category). I can double click and modif