Quality lot generation through PI sheet

Hi,
I have the following requirement:
In the PI sheet I need to confirm an operation and which in turn would generate a inprocess inspection lot. In that lot I need to do a result recording. Every step is to be carried out through PI sheet. Can anybody give me any idea on how should I approach? Is there any standard process instruction category (I could not find one that would work in this situation.. may be I am missing something).
Thanks in advance!!
Snigdho

Hi,
There are some SAP standard process instruction categories, which you can use if it meets your requiements. These are like characteristics based instructions where you give the values. If not you can create the Process Instructions Categories of your own with your own required characteristics.
Otherwise the Process instructions can be of Text type also.
The other way is to define your PI by Xsteps.

Similar Messages

  • Goods issue through PI sheet

    Gurus,
    I am facing a strange problem. I am trying to issue components through PI sheet. I have used almost all the standard characteristics (such as cons_1, cons_2, cons, cons2 etc.). But everytime I try to issue the material I find that the header material is being issued not the components (I find this in CO54). The problem I guess lies in the characteristics PPPI_MATERIAL (whose function module is COC1_PPPI_CHAR_VALUES). Has anybody else faced this problem? Please let me know if you people have any solution or feel that I am making some mistakes...
    thanks is advance!
    Snigdho

    Hi,
    Problem solved!! generation scope was 0 instead of 1.

  • BAPI for AFS BOM Creation through Cost Sheet

    Hello Experts,
    Is there any way to create the AFS BOM through BAPI.
    Client requirement is to create the automatic AFS BOM through Cost Sheet (KKE1), I already developed custom Cost Sheet as per the requirement .
    When we create the Cost Sheet Using KKE1 / ZKKE1, automatically AFS BOM should be create in the system with all grid values of component.
    I'm not getting how should I create the AFS BOM using all the components in the Cost Sheet with Grid values.
    There is no issue in creation of simple BOM using Bapi but for AFS BOM I'm facing problem.
    Please suggest and also tell the possibility.
    Thanks & Regards
    Prajyot.D

    Hi!  Thanks for your help.  I used CS_BI_BOM_CREATE_BATCH_INPUT1 and was able to create the BOMs successfully.  My problem now is on the change.  I tried using CS_BI_BOM_CHANGE_BATCH_INPUT but I kept running into various errors.  I think it has something to do with the fields that I am populating in the structures and tables that are being passed to the BAPI.  I tried researching for CS_BI_BOM_CHANGE_BATCH_INPUT but could not find any match.  The function module documentation is not available as well.  If you have used this FM in the past, will appreciate if you could share some inputs on how you were able to make this work.  Thanks a lot!

  • Process order confirmation through PI sheet -reg

    Hi,
    Please tell how to confirm the operation/order through PI sheet.
    I have created the process order with PH_CON as process instruction catagory. after I sent the message thr. CO53 and in CO58 entered the actvity timining and then saved.
    But i am not getting any status in the order,
    Please tell me is there any mistake inthe process.
    Regards
    Karthik

    Hi,
    Process Massage will generate only after Completing the PI sheet.So after maintaining the PI sheet you have to press Complete button then only system will generate Process Massage regarding completion of PI sheet.
    But if you leave the PI sheet only with Save then it means still there are some entries are left or may be change.So in this case system will not generate process massage.
    Now first complete the PI sheet then check in CO54 with correct date , time and plant selection.Send it from here and then check in process order.
    Regards,
    Dhaval

  • Process order confirmation through PI sheet without Batch no.

    Hi Experts,
    Can any body tell me how can we confirm the process order through PI sheet without batch no.? I know though COEBR we can confirm the order through PI sheet but it requires batch no. & We don't have batch managenent implemented.
    Youe suggestions are valuable for me.
    Regards,
    Shivkumar Dachawar

    To make GR for the order for materials without PI sheet.
    1. Process instruction category PROD_2 - which does not require batch number. Tcode O12C
    2. Assign this Process instruction category to your Control recipe destination for your plant - SPRO- > PPPI -> Process management  -> Control recipe / PI sheets -> Contrl. rec. destination -> Define and setup
    If you need more information let me know.

  • Inspection Char without Inspection lot generation

    Hi
    We are trying to model a customer requirement in PP for which a few production steps have a few characteristics to be monitored (status checked); for example - in a process of "spraying fertilizer", qty of 4 fertilizers have to be noted in the operation. Now these cannot be included in the BOM for some costing issues. We are apportioning the cost using an internal order in FI.
    Can these be modelled in PP as inspection char. for which values (readings) have to be noted without generation of inspection lot?
    Any ideas?
    Deepak

    Hi Deepak,
    One thing you need to clear is that without inspection lot generation you cannot record the values. Instead, you can create the inprocess inspection lot which does`nt effect the actual production, you can record results such as quantity etc.. for each operation for ur reference.
    The secong thing you can do is select any field or the text box that you are not usingit currently in the confirmation and enter the characteristics in that field.
    Final option is to create a document and save it with reference to ur order no. , bom etc..
    Reward if cleared and close the thread.

  • Quality lot not getiing generated

    Hi
    If  QUALITY PLAN  is assigned to any material then it should appear in QA32 that is quality lot must be created.The problem is such that during starting of new period i.e. every month starting Inspection lot is not getting genrated for already asssigned Quality Plan materials.The problem gets normal after 4 -5 days after the month start.
    Please suggest any solution
    Regards
    Pallab
    +91 9960331816,Pune

    Hi Anup,
    The thing is like that we generally maintain qulaity plan to any inprocess/incomming material.Now for the entire month the in process material after productuion order confirmation will get appear in QA32 then results recording is done then UD.
    Now in the starting of every mionth when new periods opens for couple of days the in process material give errors that inspection plan is not maintained.Where as these are those materials which responded Ok in the last month with inspection
    plan maintained.Also after couple days of starting of the month things become normal
    Regards
    Pallab
    +91 9960331816(Pune)

  • How to creat Process messages automatically through PI sheet saved?

    How to creat Process messages automatically through PI sheet to the Process message destinations.

    Hi Jessie,
    When you process instruction category PROD_3 in master recipe, the process message PI_PROD is created.
    After releasing process order, you have to create control recipe. Upon successful creation of control recipe, process instructions will get generated. Check the error log for control recipe creation for error if any. 
    Note that control recipe will be generated only with order status "Released".
    You have to sent this control recipe to process control (CO53).
    Hope it is helpful.
    Regards,
    Sachin

  • Setup awr generation through script

    how can i setup awr report generation through product UI pag?
    using oracle 11g enterprise edition.. please help.
    if steps provided appreaciated.

    Hi,
    I think you can use this
    Generating the AWR Report
    Regards

  • Quality management - can I change description of quality lot after UD ?

    Quality management - can I change description of quality lot after Usage Decision ?

    Hi,
    Try in transaction QA12 to change the usage decision & then try to change to description of the lot.
    Regards,
    Prashant

  • Quality lot creation for operation description

    Dear All
    My client requirement is like this
    we are creating the production order in that operations are external operations for which automatic purchase requisition is created with respect to the operation description(i.e. without material) using account assignment catagory F. now my requirement is after doing GR quality lot has to be created with respect to Purchase order and we can able to give the usage decision for that lot and post
    Regards
    Shafi

    HI
    If you are not using any material then for which one you want to make inspection lot? and for which you will make RR and UD?
    i think only at material level QM can be activated thru QM view.
    Plz check at your end
    Regards
    Anupam Sharma

  • HT3215 Can I charge my apple Ipod touch 4th generation through the headphone jack

    Can I charge my apple Ipod touch 4th generation through the headphone jack

    Stedman1 is right, can not be done. What made you think you could? Just curious.

  • Quality Lot creation against

    Hi,
    I need to create an inspection lot against GR w.r.t Reservation.
    Is that possible and what would be the appropriate inspection type in that case.
    Regards,
    Amlan C

    I am trying to feasibility of the below process:
    Goods issue needs to happen against Reservation 261. MB21
    While Goods issue the Shop floor person needs to return the defective part to store.
    Store will update the receipt using MIGO against reservation.
    Since the part that is returned to the stores is damaged, the GR needs to be under quality inspection.
    Maintenance will take the necessary corrective measures and move the qty to unrestricted.
    My only CONCERN is will G.R against reservation create a quality lot. What kind of inspection type needs to be used for GR against Reservation?
    Regards
    Amlan C

  • Estimating complexity of template generation through Adobe LiveCycle...

    Hi,
    I need to estimate the effort based on low, medium and high complexity of templates generation through Adobe Livecycle. Suggest if there is any benchmark figures available for the same.
    Please help to provide the same.
    Thanks and regards,
    Mayank

    Shawn,
    This may be a couple of known things; one is related to your specific installation (may have become corrupted if you did an upgrade from a previous version, especially if you upgraded from Beta?) Or, it may be related to a known SQL Server compatibility bug for which a hotfix will shortly be posted. (Problem with some Microsoft DLLs that get updated if you install SQL server).
    If you have SQL Server installed, try looking on these forums for a patch that should be posted within the next 2 days. If not - please contact me directly, as I'd like to get someone on my development team to help look through your installation and see what the problem is, so we can fix this properly.
    Mike

  • Excel sheet generation through RFC call from a BSP application

    Hi,
      I am calling a RFC FM ( in R3)  in Event handler 'OnInputProcessing' of a BSP application in a SRM server.
    That function submits a report program which geneates a excel sheet using download FM . Excel sheet is not getting generated.
    But when i am calling this RFC FM  (in R3) from a report program ( in srm server)
    this is generating an ecel sheet.
    I want to have call RFC from BSP application.
    I tried the way of submit a program ( which contains RFC call) from BSP application ,but it is also not generating excel sheet.
    My ultimate AIM is to generate excel sheet by trigerring CALL or submit from BSP
    application.
    can any one propose solution for it.
    Useful answers will be rewarded.

    Hi,
    Which FM is it. I guess that the download generated is a SAP gui oriented solution, which will never work in a web environment
    Eddy
    PS. Reward useful answers and earn points yourself

Maybe you are looking for

  • Unable to start Photoshop CS 6 Beta - could not open a scratch file because the file is locked (win)

    The Program does nor start. I the the following error message: Gould not open a scratch file because the file is locked, you do not have necessary access perimssens, or another program is using the file. Use the "Properities" command In the WIndows E

  • Flash Builder 4.7 won't debug air app on Android devices  anymore

    Hi there, A strange thing happened today to my Flash Builer 4.7 installation on OS 10.8.5 : it suddenly refused installing and debugging AIR apps. At -the famous- 57% of compilation completion I can see the "installing app on device" message, but not

  • How to handle classification multi value characterstic

    Hi, I searched SDN for multi value characteristic addition in to classificatin data source and found that we need to implement notes: 535370, 350296 sin sequence. But I'm wondering if there is any update on creating the class data source with multple

  • Web server logging

    In Labview 8.6 real-time projects, when i go to "Web server: configuration" page of target properties, the "Use log file" checkbox is grayed and unselectable. But it wasn't with Labview 8.2 on same target. Why can't i enable logging? Everything else

  • How to calcullate this scenerio in sap sd pricing

    Hi all sap gurus Please help I am in a crunch condition. My client is in warehouse business so he charges as per the pallet(sqft wise) with the days of renting.suppose a customer comes and asks for 500 pallet position for 5 days then system has to ca