Quality notification for test equipment

Dear expert,
In calibration plan if my result of calibration is rejected. then I want a notification to repair the same equipment.
But system do not allow me to assign maintenance notification to inspection type (14 )  in IMG. it has to be   Q type notification .
Now my question is how we map maintenance activity in Q type notification. ?
Regards,
Prasad

Dear ,
I am facing a big problem with QM-IDI interfaces,
Requirement: Whenever MIGO done inspection lot will create and we need to send this inspection lot to external system i.e. MES.
And SAP receives Results Recording and User deceision or Defect recording in SAP. I Reffered QM-IDI interfaces but i am not able to use which function module for what. Here i have to give structure to MES team, once i wil provides the will do mappings.
If do you have any mapping specs. Any test scenarios related to QM interfaces. Which function module i have to use to send inspection lot or which function module i have to use to receive data from external system how i have to give structures to them
Here my main intesion is mapping to external system

Similar Messages

  • Error during usage decision for Test Equipment

    Hi,
    I have completed results recording  for Test Equipment using QE51N (results closed and confirmation completed). When I tried to make usage decision (QA11) for the lot the pop-up message shows as "Not all equipment is valuated! Do you want to force inspection completion. I also noticed that in equipment tab of qa11 code valuation column shows as Not  Valuated.
    I request you to help me to solve this problem.
    Thanks & Regards
    V.Devaraj

    HI,
    You may try changing the valuation mode in IA06. In the inspection characteristic overivew, click on details -> operation, scroll down, you will find Quality management inspection points  -> maintain automatic valuation based on inspection points.
    The changes if made will be effective only for the next inspeciton lots.
    Regards,
    M.M

  • Error while result recording for test equipment

    Dear Gurus
    My scenario is to do unplanned maintenance for test equipment and recording the result.
    For that I have done the following steps
    1)     Created Notification for the test equipment (customized notification type TE).
    2)     For that notification I created order.  (customized order type TE01).
    3)     Attached General maintenance task list for that order. Task list has inspection point 300.
    4)     Released the order and saved.  Inspection Lot is created.
    5)     In QE51N / QA32 when I tried to do results recording, it shows the following error.
    "Equipment VERN01 do not exist in the object list for order 4001214"
    Please help me to correct this error.
    Regards
    Babu R

    Hi
    I applied oss and today I got reply. When 1278254 notes is implemented it is solved. 
    I have one more question, now in QE51N, I did result recording and when saved it is asking for order confirmation, I have given all data and came back to the same screen.  There is one more option for Valuate Inspection Point.  In that I have selected Can be used option and saved. Now if I goto maintenance order and TECO the order, it is saying that A usage decision has stll to be made. 
    Whether I want to take UD once again in QA32 ?
    Also is there any settings to TECO the notification automatically when the maintenance order is TECO'ed. Now the notification is not TECO'ed when order is TECO'ed.
    Babu R

  • Customer Quality notification for multiple batches

    Hi All,
    Is there any way I can reference multiple Batches to single quality notification?
    Present solution Proposed -  Using user exit insert New Zfields to notification to enter Batch nos manually.
    is there any other standard enhasment where multiple batch entry can be done!
    Thanks in advance!
    Jay

    Dear Sadan,
    There is a chance of happening this due to that field is marked as mandatory.
    I hope this would happen, when Pm guy was making settings for the notification fields.
    He might have made this filed mandatory w/o any reference of Notification type (Influencing in spro filed selection), If he doesnt select Influencing and Notification type, that field Mandatory will effect all the Notification types.
    So please check with ur PM guy and change the field setting for Notifications and ask him to use Influencing - Notification type and desired notification type.
    Regards,
    Praveen

  • Multiple 'F3' Quality Notifications for defects from single Service Order

    Those of you working w/ the QM module no doubt know that if a failure is recorded against an inspection characteristic linked to a Production Order (Order category 10), that SAP standard functionality creates a Defect document (Quality Notification type 'F3'). Any subsequent failures recorded that are linked to that same Production Order (as well as the material & serial number) are recorded, as additional line item defectes, on that same 'F3' Quality Notification.
    HOWEVER, I have found when failures are recorded against inspection characteristics for a Maintenance Order (Order Category 30), a new Defect document (Quality Notification type 'F3') is created for each failure that is recorded. Why is this?
    My client wants only a single 'F3' Quality Notification to be created for any and all failures that are recorded against a single Maintenance Order. I do not see any way to accomplish this w/o a core mod. Understanding WHY SAP treats these two order categories differently will go a long way to assisting me in designing an adequate solution.
    Thanks for your help.

    A couple more pieces of information....
    1. We are currently running SAP Enterprise (4.7).
    2. If I go to SPRO -> 'Quality Management' -> 'Inspection Lot Creation' -> 'Maintain Inspection Types', and display the details for Inspection Type 14 (which we use for Service Orders) the check box for 'One Q-notification per insp. lot' is active. Clearly the system is not processing a single Quality Notification per inspection lot on service orders.
    Your assistance is greatly appreciated. Happy New Year

  • Quality notification for deviation

    Dear Experts,
    Can anyone brief the steps for allowing deviation for a product in inspection type:01?
    how to get approval in SAP using QM01?
    VRMP

    Hi,
    Enter trasaction QM01 and select the notification type A3
    then enter the material document or p.o number;if both are not available still go inside the notification.
    enter the material code for which you want deviation ; after that in subject tab enter the description for the approval, in Item tab enter defect and cause if any
    then on next subject screen enter Department resp ,coordinator ,priority and Quantity and save the notification; after that from change mode send it to the respective authority from which u want approval.
    it will go to his Inbox for approval,
    then he will go to the change mode of that notification select Decision tab and then go to action box of that notification and click on special approval link and approve your deviation; for writing any other instruction long text is there; if any inspection lot is pending for this approval the approver can directly give usage decision from that action box screen and then send back notification to the co ordinator
    I think all your doubts are cleared now if any left please revert back
    Thanks
    Vinay

  • MB56 for quality notifications?

    Hi all,
    is there a possibility to see quality notifications for substream materials which were consumed for production of a finished good? I mean a kind of MB56 for quality notifications.You enter the finished goods material and batch and see if there were notifications for a material which was used to produce the finished good?
    Does this exist somewhere in the R3 - system?
    Thank you for your help!
    Alex

    Hi Isabelle,
    Thanks for your patience in understanding my question.
    My primary worry is if i use this exit to have electronic signatures in 4.0b and i know this functionality (Electronic  signatures) is standard in latest versions, what will happen to the electronic signature data that i create until i upgrade.
    The electronic signature data is the user id , date and time associated with a notification. I plan to store this in a custom table.
    I will appreciate , if you can share with me your analysis.
    Thanks
    Manoj Jain

  • Crane Aerospace and electronics is looking for Test Engineers with LabVIEW experience - please disregard previous post.

    Here is the correct post:
    Are you detail-oriented, creative, and technically skilled at Engineering design and development?  Come to Crane Aerospace & Electronics and use your excellent Engineering skills to design, improve, and deliver the next generation of products in the aerospace and electronics Industry!
    We have a unique and exciting career opportunity for Engineer II, Test.
    You will be responsible for maximizing new product development and manufacturing performance through the creation and deployment of test strategies, tools, and plans.  Design and implement high performance hardware and software for test equipment.  Authoring test procedures and performing Qualification test activities.  Ensure high product quality.
    Responsibilities:
    Collaborate with customers and multi-disciplined engineers to establish/clarify test, qualification, verification and validation requirements.
    Write test plans, procedures, requirements and reports in a highly structured environment.
    Analyze, develop and deploy complex and high performance test hardware and software solutions for automated test equipment. 
    Design, develop, debug, validate & verify the fabrication of manual and automated test equipment at the circuit board and system level, and specify and procure COTS test equipment.
    Develop/maintain hardware documentation including block diagrams, schematics, BOMs, wiring diagrams and wiring lists, software documentation, and configuration control of initial release and updates. 
    Perform detailed calculations to establish test equipment specifications and design margins.
    Maintain existing test systems through bug fixes, improvements and modifications.
    Support the estimation of costs and schedules to develop or upgrade test platforms.
    To perform a number of the above responsibilities with limited supervision.
    Minimum Requirements:
    Experience: 2-5 years.  Previous work experience in aerospace, space or medical electronics industry preferred.
    Knowledge: Microprocessor / Microcontroller hardware and firmware design; Analog Circuit and power supply design; Digital Circuit Design including high-speed serial communication design; Firmware programming in c; Schematic Capture, PADS Logic preferred; Circuit Simulation; Fundamentals of magnetic proximity, temperature, and pressure sensing electronics; ESD; Familiarity with testing standards (MIL-810, MIL-704, and DO-160 preferred).  Basic laboratory test equipment; LabVIEW experience, certification preferred; Developing hardware per DO-254 and software per DO-178 preferred; Experience with Adobe FrameMaker, IBM Rational tools, TestStand, Microsoft Project preferred.
    Skills: Good interpersonal and communication skills (verbal and written)- effectively lead and/or participate in multifunctional teams in a dynamic work environment. Ability to manage multiple tasks, flexibility to switch between tasks and prioritize tasks. 
    Education/Certification: Bachelors Degree in electrical engineering, computer science, physics or related technical discipline.
    Eligibility Requirement: Must be a US Person (under ITAR rules) to be eligible.
    Working Conditions:
    Working conditions are normal for an office/manufacturing environment. Machinery operation requires the use of safety equipment to include but not limited to safety glasses, heel straps, and shop coats.
    Requires lifting 25 lbs
    Apply online today: http://ch.tbe.taleo.net/CH06/ats/careers/requisition.jsp?org=CRANEAE&cws=5&rid=3170
    Crane Aerospace & Electronics offers competitive salaries and outstanding opportunities for career growth and development.  Visit our website at CraneAE.com for more information on our company, benefits and great opportunities.
    In our efforts to maintain a safe and drug-free workplace, Crane Aerospace & Electronics requires that candidates complete a satisfactory background check and pass a drug screen prior to employment.  FAA sensitive positions require employees to participate in a random drug test pool.

    How can you say you are hiring test engineers with LabVIEW, yet the job description doesn't even mention LabVIEW.  All I see in there is CAD design.
    There are only two ways to tell somebody thanks: Kudos and Marked Solutions
    Unofficial Forum Rules and Guidelines

  • Create Quality Notification

    Hi,
    I want to create quality notification  and print the same in a report.
    there is a BAPI , which is not useful in my case, as i have to give batch, order,matnr, long text etc fields.
    can anybody give some FM to create a QNotification.
    and I want to print the notification from the program.
    How to print the notification from the program.
    Regards,
    K.K

    Hi,
    BAPIs for quality notifications
    BAPI_QNOTIFICAT_CREATE Create Quality Notification
    BAPI_QNOTIFICAT_GETCATALPROFIL Determine Catalog Profile for Quality Notification
    BAPI_QNOTIFICAT_GETKEYFIGURES Determines Existing Quality Notifications
    BAPI_QNOTIFICAT_GETLISTFORCUST Select Quality Notifications for a Customer
    BAPI_QNOTIFICAT_GETMATLISTFCUS Select a Customer Material List for Quality Notifications
    Use the one that matches ur requirement.
    Regards,
    Ramya

  • Material Type for Test Equipments

    Hi,
    What is the standard material type used for Test Equipment.This material type is not used for consumtion.This is used only for testing purposes.
    Regards,
    Nitin Amritkar

    Hi
    You should be using material type FHMI - Production resources/Tools
    Regards
    Prasad

  • Function module to update Quality notification

    Dear All,
    I have two questions.
    1) Is there any function / BAPI to change quality notification?
    2) Can i use call transaction in function module which is called as Background task?
    Regards,,,
    Sunil Joyous

    Hi,
    Following are the BAPIs for quality notification:
    BAPI_QNOTIFICAT_CREATE Create Quality Notification
    BAPI_QNOTIFICAT_GETCATALPROFIL Determine Catalog Profile for Quality Notification
    BAPI_QNOTIFICAT_GETKEYFIGURES Determines Existing Quality Notifications
    BAPI_QNOTIFICAT_GETLISTFORCUST Select Quality Notifications for a Customer
    BAPI_QNOTIFICAT_GETMATLISTFCUS Select a Customer Material List for Quality Notifications
    Regards,
    Sharath

  • Quality Notification Customization

    Dear Sir,
    I am New to QM and have been assigned a task to configure QN for Customer Complaints with reference to the SD Billing document Or Delivery Document. Kindly tell me what i should do to configure the business requirements. I need customizing steps which i should take in sequence.
    Regards,
    Shahzad

    hi
    I would suggest use notification type Q1( Customer complaint)  which is std notiifcation type.
    Quality Notification for the Customer complaint.
    FM for customer returns from Q1 notification.
    Just go through one cycle of Q1 type.this will help you a lots.
    Regards'
    Sujit

  • Cfalibration of test equipment.

    Hi,
    My clinet is working on calibration scenario.Here calibration of some equipment is done by maintenance department . So I would like to know what are the different setting i have to do before creating calibration order(PM06). I konw for that i have to create master data for testing equipment (Q).
    I am facing problem in QM point of view.So it is integration of PM-QM so i would know how
    Expecting for reply.
    Regards,
    Pravin

    hi
    check the link
    http://help.sap.com/saphelp_46c/helpdata/en/f4/e0e869af9911d29a250000e8a529f3/content.htm
    http://help.sap.com/saphelp_46c/helpdata/en/bf/b9b3341a933f50e10000009b38f83b/frameset.htm
    IE01:Equipment
    IP11: Maintainence Strategy
    IA05: Task List
    IP42: Maintainence Plan
    IP10: Scheduling Of plan
    IP30: Job Planning
    Create Measuring inspection characteristics....QS21
    Create Task list by assiging ispection point as 300 /310...IA05
    Assign MIC & Strategy to the task list....IA05
    Create PM order for calibration order which should have ...IW31 (inspection type assigned as 14 as std)
    Assign Task list to PM Order...IW32
    Release PM order....IW32
    You will get inspection lot
    Provide readings against the inspection lot...QE17/QE51
    Provide Usage decieon for the FL/ EQ...QA11
    If you aregoing for Maint plan then crete maint item...IP41
    Assign this to maint plan & scheduling paramertes
    Schedule maint plan...IP10/IP30
    Get PM Orders Release it Get Inspection lots..IW38
    -ashok

  • Email setup for Test Workbench

    Hi
    I am looking to setup Email notifications for Test Workbench.
    Such as, automatically emailing testers when Test packages are assigned
    Emailing Developers when a Test Problem Report is created.
    How do i do this? Does anyone have any documentation they can share?
    Really need some help.
    Many thanks

    Yes Ramesh,
    By setting up ChaRM the following actions can be triggered automatically,
    1) When a requestor creates support message based on an error, service desk employee will be notified automatically
    2) A developer will be notified when a change manager in the service desk assigns a developement task assigns.
    3) When the developer completes the task, change manager will be notified again.
    4) Then, a tester will be notified when change manager assigns a tester.
    and many other things also there in the sequence.
    Regards,
    Satish.

  • Test Equipment Management in BPR

    Hi,
    I am current setting up BPS for our company, and I am having some difficulties finding Scenarios, Processes, and Process Steps for Test Equipment Management in the BPR.
    Any suggestions?
    BR
    Bendt Bendtsen

    Dear friend
    If you goto Organizational area wise
    Coorporate Support & Services
    Business Processes->Test Equipment Management
    Hope it solves ur query.
    Regards
    Prakhar

Maybe you are looking for

  • Audio files are bad, no they're good, no they're bad, no they're ....

    I downloaded some classical music (yes I paid for it) in the form of an mp3 file (Rachmaninoff: 24 Variations on a Theme of Paganini) - I am giving a lecture on this music and wanted to segment it into the theme and the 24 variations, 25 sections in

  • Configuring Static Routing

    Hi, I have some issues configuring my WRT54G in my business, I've already got 2 networks and i want to create a new one with my router.. The main network where all our servers are is the 192.168.1.0/24 (gateway 192.168.1.1), second network is 192.168

  • Urgent - Global Objects

    Hi All, Actually I am in a big trouble , I began my first project in java and I need an answer for the following q. 1) - I need a global object to be seen from other objects for the same user in the runtime for specific object??. 2)- I need a global

  • Doesn't dowload messages

    Suddenly Thunderbird has stopped downloading messages. It seems to be looking either for servers or messages but never completes the task. The little circle just keeps going around. However, I can access my mail using Outlook and other programs.

  • How do I cancel a monthly subscription to a magazine

    I am trying to cancel a subscription to a magazine and I don't know how to do this