Quantity not post in auto confirmation in process order (PPPI)
Hi Expert ,
We are doing process order (PPPI-Route) stage wise...Now we have ACTIVATED auto confirmation in contorl key PI01...Now system allow us to confirm only PI03 Control key...Upto that, it is ok....
But when we check in COR3 , Activity Consumption (standard) - which we maintain in PI01 not calculated as actual Qty and Cost.....(Actual qty comes zero)
Can you give your input on this...
Rajesh Mehta
+91 9924141561
Hi Expert,
Yes, we can get Target and Planned Qty and Cost in COR3...but we can not get Actual Qty and Actual Cost...
Second,
Our Price Indicator in Activity type is 1 and Actual Price Indicator is 5.
Is this settings needs to be change ?
Waiting for reply
Rajesh Mehta
+91 9924141561
Similar Messages
-
Auto GR not happend while doing confirmation of process order
Hi
while confirming proccess order as per control key settings , the finished good GR should happen automatically. But it was not happend as per the user comments. He done it manually. and also not reflected in COGI.
I have seen the display process order confirmations in CORT transaction, there i didn't find the ginished good. I am predicting user might have deleted the finished good (101 movement) in good movement tab while doidng confirmation. If so where can we find the deleted data ? can u tell me the table or info structure ?
best regards
sapHi SAP,
Go to t-code COOISPI, in the List filed select "Documented Goods Movement" select stand profile and then give process order number, this will list all the components which are consumed and confirmed material. Compare with Standard BOM and componets consumed, this will give you info of what exactly has happened.
Trust this should be fine... -
Total confirmation quantity not equal to planned confirmation quantity
HI
In co11. if i entered more than operation quantity
its showing warning message
Total confirmation quantity not equal to planned confirmation quantity
Message no. RU117
how can i change into error msg???
thanks in advanceDear,
Go to OPJB then select
00000000 RU 117 Total confirmation quantity not equal to planned confirmation quantity E- Error.
It will work for you.
Regards,
R.Brahmankar -
Confirmation of process order create : goods movement
Dear Sir/Madam ,
I am using the Transaction Code - CORK for confirmation of process order , but promblem is that when i am saving the goods for confirmation then material pi101 has some error i.e the material pi101 is locked by another user or something , then that is not confirmed but rest of the material which are having 531 movement are confirmed ,
so i want that if the first material i.e pi101 which has 101 movement that should be confirmed first then after that rest of the goods having 531 movent confirm,
i have already searched the userexit for transaction cork i.e CONFPI05 when saving the data and another one is CONFPI06 for Actual data transfer plz tell me what will be the logic and which structure to call in this userexit because in this userexit the structure which is present is not of use .
thanks and regards ,
arunHi,
I believe you would need to append the below line for your code for goods movement.
wa_timetickets-order_itno = p_itno. " Order item nos.
Check & revert if it resolves the issue.
Regards,
Vivek -
Time ticket confirmation in Process Order
Hi All,
I am working on 6.0
While confirming a process order with COR6N, I have set error in case operation sequence not adhered in OPK4. but while confirming if i do not adhere the sequence still it is not giving error.
What may be the problem ?Hi,
Please also check with ur control key assined to operation , if it milestone confirmation system will give error message .
Regards
Pradeep -
Progress confirmation for process order
Hello to all,
I want to use the progress confirmation functionality for process order. I know that it is possible for production orders, but I couldn't find respective transaction for process order. Do you know if it is possible to use progress confirmation for process orders.
BR,
NikolayThanks for your inputs, but they are not useful!
COR6 - it cannot be used once the order is confirmed at phase level;
COOISPI - it's a report
COR6N -it is the standard transaction for process order confirmation
I want to do so-called "unplanned milestone" for process orders, something similar to CO1F for production orders.
BR,
Nikolay -
Collective confirmation of process orders
COR6N - Confirmation of Process Orders phase wise
But i need the tcode to confirm all the phases of process orders at one stretch.
Also tell me tcode to do collective confirmation of process orderHi,
Pls Try CORR for Process order,
CO12 for Production Order
Regards,
Pavan -
Milestone Confirmation for Process Orders
Hi,
We are using PPPI and I am trying to perform a milestone confirmation for phase (COR6). Although it is working without errors, it prompts you for which phase to confirm.
In discrete PP, you set up milestones, and when you go to CO11 - confirm operation, the system automatically goes to the details for the first milestone operation.
Is there any way you can do this with proces orders for COR6, ie automatically go to the detail screen for the milstone phase?
Regards,
Fotini DelgadoHi
u can use t; code COR6 : confirmation of process order
we can enter operation number (same as final one )
so we can directly confirm last Phase
or
We can use
CORR : for collective confirmation of process order
or
CORZ : confirmation : for time event
please tell me if u have any more question
Thanks
Sunil Singh -
Why settlement is needed after confirming production/Process orders?
Hi,
PP Gurus.
After cnfming any Prod.order what is the convention of giving TECO status to complete the order. why it needs to settle errors in COGI, why we have to do settlement of prod. Order.?
Pls guide me.......
yogesh thorat......Dear,
If TECO is done..we can not post any planned goos issue to order, practically we are annoucing that it can be settled. Hence if TECO partically it is finished from Production side, hence to be proceed on overhead calculation, variance calculation, settlement.
In COGI, we have error goods movements for that order, hence production people are expcted to finish all the component issue and GR, so that we can announce finance that we are completed.
Why settlement required?
Let us say the std cost of product is 10 USD. But after the production the actual cost of production is say 12 USD. It will remain in the production order. Now this has to be booked again either the product or against a variuance cost centre, so that from the variance cost centre we can book it to different cost centres.
Hence during the settlement if the material price control is V, then the difference cost i.e. in our example 2USD will be chared to material GL a/c during settlement.
If the price control is S, then the difference cost of 2/USD will be charged to variance GL a/c which is assigned to a variance cost center. This variance cost centre is zeroed out depending on the business rule.
Hence at the end of settlement, the production order net value is ZERO.
please come back if you need help. -
The confirmed quantity not posting in COOISPI
Hi Gurus,
Currently, there is an issue in COOISPI wherein the process order has been confirmed and delivered however, confirmed quantity in the report is 0 but the delivered quantity is correct. The finished goods are auto-GR. The transaction code used is COR6.
Need help on this!
Thanks,
MaeHi Tao,
The control keys are:
The control keys used in the recipe are PI01, PI03 and NATP
Thanks,
Mae -
Quantity not posted to object error in while activity confirmation
Hello All,
i am getting below error while activity confirmation , please help me on this below.
Note : Activity and cost center and KP26 no changes are made compare to preview year and current year , for the fiscal year 2014 i didn't get any error , only for the fiscal year 2015 i getting below error.Dear Hari,
If the activity type of the confirmation has set the flags as
mentioned (indicator MANIST in table COKL is set) the system will simply
NOT post any quantity on the sender cost center/activity type during
the confirmation.
So all quantities which are currently missing (as these were not
updated by the confirmation) must be posted with transaction KB51N.
If you implement the coding corrections of #760437 you have the
possibility to change the message BK263 from "I" to "A" in transaction -
which is however not recommended.
So the advised procedure is:
-post all mising quantities with transaction KB51N first
-then run the report ZRKMANIST_RESET to remove the flag MANIST (which is
the reason why the confirmations did not post quantities on the
sender cost centers)
After this procedure, the quantities will again be updated when you
post confirmations.
Best regards,
Jason -
Auto Confirmation for combined order with quantity distribution
Dear All,
we need your help that we have using the auto-confirmation for normal production order , but got the problem in combined order confirmation for final operation , in final operation we are not getting quantity distribution with respect to child order.
please suggest any BAPI is there?Not possible in standard system.
-
Activity can not post when do confirmation
Dear Gurus!
I have an issue now, when I do confirmation for production order. But some order can post actvity(in CO03 -> Cost analisys -> Activity actual) but some can not.
Do I miss any steps? I use BAPI to create comfirmation.
Regards,
TonyIt is hard to guess some reason, you should carry out some comparative study between the production orders that are displaying this different behaviour. There are many factors to be considered....
1) The production orders are for the same material or different materials? If different, then check routings....
2) Use the same work centers or activity types....
3) Belongs to the same cost center ?
4) the operation is really confirmed but no values for activities ( chack if the problem is quantity , i.e. hours, or currency, based on the price od each activity type)
5) Check prices for activities in KP27....
and so on... -
Auto GR while confirmation of Process order
Hi Gurus ,
I have one senario , I am doing confirmaiton of the process order but still it is not posting the GR 101 movement for the finished good .
I have maintain the setting in the mateiral maste always back flush -1 and in the operaion control key auto GR and as well as
in order type I have maintained the auto GR but stil system is not posting the goods receiptHi,
Plz Refer the below link
[Auto GR is not happening.;
Regards
kumar -
GR Cost not updating as Target Cost for process orders
Dear SAPians,
We are facing an issue in Target Vs Actual cost reporting for process orders. We are creating a process order after cost estimate of that material and doing the confirmations for activity cost. After that, GR has been done for the finished goods of that process order. That GR entry is updating the Actuals values but not updating the Target cost. When I am checking the standard report KKBC_ORD, I am getting the following figures.
Cost Elemnt Text | Target Cost | Actual Cost | Target Vs Act
Inventory Chnge FG | 0 | 1,472,205.60- | 1,472,205.60-
Packing Matrl Cons. | 1,148,142.37 | 1,252,752.68 | 104,610.31
Raw Material Cons. | 60,463.91 | 50,688.29 | 224.38
Semi-Fin Matrl Cns. | 181,934.68 | 367,959.56 | 186,024.88
Labour Cost Activity | 39,735.36 | 39,862.80 | 127.44
Machine Cst Activty | 41,611.75 | 43,153.01 | 1,541.26
That 'Inventory Change FG' entry is showing the GR posting updating actuals and not target cost. This is causing huge difference in target vs actual cost that will affect the profit and loss figures ultimately.
What am I missing here? What should I do to update the GR amount in Target cost as well.
ShiraziDear,
Target Cost on Production Order or Process Order is shown only when Variance is Calculated.
So please calculate the Variance, system will show the Total Target Cost.
Br,Vivek
Maybe you are looking for
-
I have Firefox set so that when I start up, I have it set so that it automatically goes to my home page. However when it freezes, which it does on a daily basis, and I have to shut it down and re-start, it automatically goes to the site which caused
-
hii... I've a student project to read and write data from a continous signal with labVIEW.. I'm going to read the system for 24/7, The reading program already finished. The problem is in the writing procces.. I have no idea how to write data to file
-
Converting using stramclip for apple tv help.
Can someone help, im using windows and am unable to convert anymore that 4 vob files 1gig each, is there a way to convert a movie which is fairly long without using another program to convert it to something like avi which streamclip can convert, you
-
Parallax scrolling for different screens
Hi there... Does anybody know how to deal with different screen sizes and parallax scrolling? It know the 100% width option so that is not the issue.....the issue is the height!! Laptop versus desktop etc.. So what is the best height to use so it wil
-
IOS 8.0.2: My iPhone 5 became very slow/freezes while running apps
When I open any app, it takes ~1 min to open and apps are running extremely slow. Basically, the phone bacame unusable after I updated to iOS 8.0.2. After iOS 8 update, battery drains faster and shuts down the phone if battery below 20% mark. Lots