Query on eRec integration with ECC (HCM)

Hello All,
We are using standalone eRec server on ehp4. Now my scenario is
1) While raising the requisition request i need the Org unit to be pulled from the HR system. Currently i maintained the following switched with RFC's
in HCM system i mainateined a witch
1)RECFA DTCBA     ED1_200     (RFC Connection in E-Recruiting System) - RFC is created in the HR System
(RFC type 3)
Switches mainteined in Erec system
2)RECFA HRRFC     CSD_130     Logical System of Connected HR System - Here i maintained RFC which is created in erec system
Now when i create a requition in erec when i choose the Org Unit drop down I am unable to see the org units which are mainained in the HR system
AM i missing any config or any functionality or any troubleshooting required.
Pls guide me with you inputs
2) Also i would like to know the data transfer of the applicant data from erec system to hr system while i do the data transfer.
What all i need to configure for this and any prerequsitive is needed from my end.
Plss help me on this
Thanks & Regards
Vijay Mohan G

Hello Deepak,
Thanks for sharing the Note
When i am looking into the Note for I2 A scenario it is saying that i should maintain switches in T77SO table i.,e
In which system should i maintain the folwwing switches i.,e in eRec system or HCM System. Pls let me know
HRALX HRAC X Activates HR integration
HRALX OBPON ON Activates O-BP integration
HRALX PBPHR ON Distributes employees from
connected HR system
HRALX USRAC X Creates relationship to user
RECFA HRRCF Logical system, not
required when using XI
technology for the data
transfer but definitely
required for integration in
Organizational
Management
Logical system of the coupled
HR system
RECFA RECCE Specifies whether
Concurrent Employment
(CE) is active in the SAP ERecruiting
system.
Concurrent Employment is
active in the SAP E-Recruiting
system (parameter is relevant
as of Release 604)
RECFA DTCBA Logical system (required on
the HR system side) , not
required when using XI
technology for the data
transfer
RFC connection to the SAP ERecruiting
system

Similar Messages

  • How is the integration with ECC in SRM 7.0??

    Hi,
    Working with SRM 5.0 or 5.5  the use of XI for integration with ECC is not mandatory because when we send any document from ECC to SRM like requisitions (to convert them in shopping cards) or when we send any document from SRM to ECC like shopping cards, PO´s, contracts,  we only use the RFC´s and the abap programs.
    Is the same behavior with SRM 7.0?????
    Could the integration from SRM 7 with ECC 6 work with RFC´S without XI or for this vertions is XI mandatory?????
    Thanks

    SRM70 is closely integrated with XI for transferring docs between ECC and SRM.  SAP introduces eSOA tech nology with SRM70 and hence all documents like PR from ECC to SRM, Central Contract from SRM to ECC, PO creation (Classic), etc uses this techn ology.
    Thanks,
    Jagadish

  • CRM 3.0 integration with ECC 6.0

    Hi all, I wanted to confirm if CRM 3.0 can be integrated with ECC 6.0
    If yes, then which support pack,etc. will be applicable and what all issues could be encountered in integration?
    Thanks in advance.

    Hi Animesh,
    just to be clear.
    the CRM and the backend ECC60 are communicating via  Plug -ins
    you can read more information here
    http://service.sap.com/r3-plug-in
    http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000601131&
    The other  SP level of the systems (BASIS etc.) are independent.
    Once you could conect the systems at basis level. You can begin your work at
    Application level.
    Whether you can have problems here please ask the CRM Gurus in a separate therad in other forum.
    I Hope I have answered all of your questions.
    Kind regards
    Imre Takácsi-Nagy
    Senior Support Consultant II.
    SAP Global Support Center Austria
    Netweaver WEB Application Server ABAP / JAVA

  • SAP XI 2 BI Integration with ECC 6.0

    Dear all,
    we are planning to do XI integration between ECC 6.0 to BI
    1) How to Get the BI Standard data from ECC 6.0?
    2)We are planning to integrate Standard BI reports with ECC 6 0 through XI.
    Please sugget the scenario for integration between ECC 6.0 to BI through SAP XI.
    Thanks In Advance.
    Mahesh

    Hi Mahesh,
    Please go thru these links
    To push data from BW to XI, please check
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20push%20data%20into%20bw%20from%20xi.pdf
    To send data from XI to BW please check
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/integrate%20bw%20via%20xi.pdf
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40574601-ec97-2910-3cba-a0fdc10f4dce
    XI-BI Integration unsing RFC
    Pushing data from BI to XI using RFC Adapter
    https://forums.sdn.sap.com/click.jspa?searchID=17734474&messageID=5878682
    Thanks,
    Shweta

  • Steps: SNC (Supplier Network Collaboration) Integration with ECC through XI

    Hi,
    Has anyone worked on the SNC(Supplier Network Collaboration) integration with SAP ECC via SAP XI.
    Could you pls share any documentation related to this. And also could anybody tell me the setup required to go ahead with the integration.
    Thanks,
    S

    Hi Xavier,
    SNC integration with XI has predefined mappings. So ask your basis guys to download the XI content for SNC using with PI. Once they deployed you will have a builtin predefined content in XI. Within the predefined content mostly they all are xsl mappings.
    If your requirement is with the standard idocs then you can use them directly. Else if their is customization they you may need to change the mappings according to your requirements.
    Also check this help:
    http://help.sap.com/esoa_scm_snc2007/helpdata/en/index.htm
    Regards,
    ---Satish

  • Sourcing integration with ECC using PI (percentage rebate scenario)

    Hi Experts,
    Sourcing - OP 7
    ECC - configurations done for rebate conditions as mentioned in standard configuratin guide
    PI - SP02 patch 0
    We are publishing percentage rebates in Master agreement from sourcing to ECC to create Online Agreement using standard predelivered content for PI from SAP, however ECC returns error in RFC response mentioning
    No currency code found for ISO code P1 in field HEADER_CONDITION/CURRENCY_ISO
    I checked PI content & I see for % rebates, field HEADER_CONDITION/CURRENCY_ISO is always populated in PI with P1.
    What are the next steps to be done in ECC or in PI to overcome the mentioned error.
    Any pointers will be appreciated, Thanks.

    Hello Jeet,
    I would suggest to check first that in both your SAP ERP and SAP Sourcing an ISO Code P1 for percentage exists. Further I would check if a rebate with an absolute amount works fine (also create multiple amounts and check if a scale is created in ERP, just to ensure that it works in general). E.g. check if the price condition/condition type exists and is configured correctly in ERP.
    If that all looks good you might want to check the ERP transaction BBP_ES_ANALYZE. I recently created a SDN blog about some tips and tricks, it also explains this transaction, please see ERP integration with SAP Sourcing – tips and tricks Maybe the error message(s) in this transaction will help you to better understand what is going on.
    Hopes that will help you
    Markus

  • Pro/E integration with ECC 6.0

    I want to integrate Pro/E with ECC 6.0 in order to transfer/exchange engineering data such as materials, BOMs, engineering changes, documents, etc.
    Does anyone know of Pro/E functionality or a 3rd party product that does this sort of thing?
    Kind regards,
    Rex L. Farris

    A direct interface is developed by .riess GmbH and SAP.  It is SAP certified and supported by SAP.
    For more information,
    Go to <a href="http://service.sap.com/plm">http://service.sap.com/plm</a>
    Life-Cycle Process Support -> Product Development -> Integration -> MCAD Integration -> Pro/ENGINEER

  • C4C integration with ECC 5.0

    Guru,
    My company is looking for implementing cloud for customer, but our backend system is running on ECC 5.0.
    SAP had strongly recommended us to upgrade our ECC before implementing C4C project.
    Through some reading, it seems that integration prerequisite is ECC has to be version 5.0
    Or there is any workaround to integrate (standard integration) C4C to ECC 5.0 through HCI? Like by applying or enhancing standard iflow that released for ECC 6.0?
    Thanks.
    Cheers,
    Jim

    Not sure where you have read that ECC 5.0 would be supported. The official SAP position is summarised in the table below. You can clearly see that some functionalities even depends on what EHP level you are at with ECC 6.0.
    SAP PI and HCI leverage the same iFlow content.

  • CRM2007 integration with ECC 5.0

    Hi All,
    Will appreciate if someone can send a document or link that can help me with ECC5.0 and CRM 2007
    Regards,
    Suren

    this is copied from the installation guide
    Prepare an OLTP Backend System:
    n SAP R/3 or R/3 Enterprise systems as well as ECC 5.0
    systems require the R/3 Plug-In 2004.1 with at least
    SP10.
    See SAP Note 704564 (R/3 plug-in:PI 2004.1
    installation/delta upgrade) and SAP Service Marketplace at
    http://service.sap.com/r3-plug-in
    n As of SAP ECC 6.0, the R/3 Plug-In is no longer
    required. New and extended interfaces for integrating
    SAP ECC 6.0 are directly contained in SAP ECC 6.0.
    [SAP ERP 6.0 <Technology> on <Operating System>: Database
    then it should be done as with any OLTP system.
    I've done a connection to a R/3 Enterprise 4.7 system and that worked fine.
    Follow the Best Practices documenation and you will be fine!
    http://help.sap.com/bp_crmv12007/CRM_DE/HTML/index.htm

  • Integration with ECC 6 and Xcelsius

    Hi,
    I would like to know if its possible to integrate Xcelsius directly with an ECC report.
    For example, take the ALV data and 'send' it to Xcelsius in order to have an Xcelsius report.
    I know that Xcelsius has (now), built in integration with BW queries, but wonder if that is proprietary with BW, or can the concept of integrating a report from BW work in ECC?
    Please advise.
    Thanks.
    JP

    Hi,
    in case you would like to build an Xcelsius dashboard on top of ERP data you can use Crystal REports to connect to the ERP system  (see here: /people/ingo.hilgefort/blog/2008/03/23/businessobjects-and-sap-part-4) and then you can use Live Office to connect Xcelsius to a Crystal REports objects. see here:
    XC, CR and LO Part 1 of 4
    /people/ingo.hilgefort/blog/2008/10/03/businessobjects-and-sap-part-1-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 2 of 4
    /people/ingo.hilgefort/blog/2008/10/07/businessobjects-and-sap-part-2-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 3 of 4
    /people/ingo.hilgefort/blog/2008/10/07/businessobjects-and-sap-part-3-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 4 of 4
    /people/ingo.hilgefort/blog/2008/10/10/businessobjects-and-sap-part-4-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    In regards to an ALV - there will be an integration with Crystal Reports but not for Xcelsius and keep in mind that an ALV is a push model and is only available when the transaction is been executed.
    Ingo

  • Supplier Registration in ESourcing  ( Vendor integration with ECC or MDM )

    Hi All,
      SAP ESourcing has the functionality of Supplier Registration.  As per the functionality, Supplier will provide all the required information in the registration form. The Supplier form will go for approval to the Buyer / Purchaser. Once approved, the supplier will considered for RFx event. My questions are :
    1 :Is there OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system  with ECC so that system will automatically create new vendor in ECC.
    2 : Is there OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system with MDM (Master Data Management system ) .
    Please through some pointer on this ?
    Regards,
    Kalandi

    Hi Kalandi
    For your first question, if you deploy standard integration package provided by SAP  for e sourcing-ECC integration, you can replicate approved e sourcing vendor to ECC using  standard script (I think script name is  "Publish to ECC" ).
    In case you prefer a custom option,you can write a customized script to get a flat file (.CSV) download of  e sourcing vendor whcih can be used to update ECC
    As far as OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system with MDM (Master Data Management system ) is concerned, there is no standard solution provided by SAP but again since it is possible to get a CSV export of vendor field, it can be used to update MDM as well
    Hope this helps!
    Regards
    Mudit Saini
    Edited by: Mudit_UCB on Jun 28, 2011 1:20 PM

  • ITS Integration with ECC 6.0

    Hi
    we are doing upgrade from 4.6c to ECC 6.0. It is technical upgrade. In SAP HR, we are using ESS timesheet entry (CATW). Now during upgrade we are facing problem in using ESS timesheet as we are using ITS server and SAP ECC 6.0 does not support ITS anymore. As the result the system doesn't allow to enter time data and save it through ESS, the error message it gives is "No Posted Data for 5_CPR_EXTID 5( Include LCATS_ITSF10)" but if we enter time in SAP directly then it is working fine.

    Replying to this old post hoping for some answers.
    We had researched this and converted to Integrated ITS using our ZCATW over a year ago. The notes read that while integrated ITS is a suppoted platform, ESS scenarios for which newer technology exists are no longer supported. We tested ZCATW under ECC5 and decided to move forward because of a pending technical upgrade. We are now in the middle of the technical upgrade and wishing to keep it technical we are trying to keep ZCATW going and then look at the newer components as a seperate project. Has anyone found a way to overcome the above issue in CATW/ECC6?
    Thanks,
    Doug

  • Error Connecting to SLD, while CC integration with ECC 6.0

    Dear All,
    I am using the CC v and from ECC IDES. I cannot connect to the SLD. It is giving an Error.
    When I try to register the Server Programs in Vis Admin and click the SET button I am getting an error "Error Adding Bundles". In the ABAP part I am getting the same error of RFC connection.
    Now from ECC when I do a SM59, and then goto TCP/IP connections, on creating this connections I cannot make them UNICODE as the R3 system is Non-Unicode. So these dont work.
    What am I supposed to do.
    Please let me know. This is very urgent and useful replies will be awarded full points.
    Thanks and Best Regards
    Chakra and Somnath

    Replying to this old post hoping for some answers.
    We had researched this and converted to Integrated ITS using our ZCATW over a year ago. The notes read that while integrated ITS is a suppoted platform, ESS scenarios for which newer technology exists are no longer supported. We tested ZCATW under ECC5 and decided to move forward because of a pending technical upgrade. We are now in the middle of the technical upgrade and wishing to keep it technical we are trying to keep ZCATW going and then look at the newer components as a seperate project. Has anyone found a way to overcome the above issue in CATW/ECC6?
    Thanks,
    Doug

  • CRM 2007 integration with ECC 6.0

    Hi Friends,
    I am currently working on the CRM 2007 Web UI
    I have created the copy of existing standalone CRM client which is already having products, organization, BP created in it.
    Now I am planning to connect the CRM client with the ECC client.
    Is there any special care i need to take while connecting both the systems?
    Also while doing replication any extra care do I need to take?
    Help will be definately rewarded?
    Cheers,
    Raj

    Hi!
    Check the SAP Best Practices documents
    http://help.sap.com/bp_crmv12007/CRM_DE/HTML/index.htm
    There have a look at
    C71: CRM Connectivity
    B09: CRM Customizing Replication
    regarding the connection and replication
    rollo

  • PI 7.1 installation & integration with ECC 6.0

    Experts,
    We'd like to know if it is possible to integrate PI 7.1 with SAP Netweaver 7.0 ECC 6.0 without involving PI 7.0 into the picture. Someone from SAP told us that we need to have PI 7.0 if we have to upgrade it to PI 7.1. Is it really required? Can we not install PI 7.1 directly?

    Hi,
    SAP NetWeaver PI 7.1 contains all of the technology of SAP NetWeaver 7.0 (PI) so you can use the newer release without having to also use a 7.0 system.
    SAP NetWeaver PI 7.1 must be installed as a seperate system to the SAP ERP 6.0 system.
    I think the confusion might be related to the fact that you cannot upgrade the SAP NetWeaver 7.0 runtime WITHIN the SAP ERP 6.0 system to SAP NetWeaver 7.1.
    Cheers,
    Mike.

Maybe you are looking for

  • Query View name not saved in "Analysis Grid Properties" under Data Provider

    Hi BW World;) We are on BI 7.0 I have created a BI workbook which contains a query view. However when we go into design mode and then "analysis grid properties" for this query view then "change data provider" it does not show the query view name but

  • Customer service issues, no complaint department!

    Not sure I'm really asking a question here, just looking for a place to be heard!  Up to now my experience with Verizon has been good, however I've always been on the buying end, Verizon on the selling.  Recently though, I needed to cancel a line on

  • Frustrating syntax error:cfqueryparam

    I must be brain dead. I have been looking at this code for about 45 minutes trying to figure out where the syntax error is. I think it is in one of the "," but I have rearranged them so many times I am going bonkers. Can someone find where my error i

  • RAID Management Software for TS130 (Windows Server 2008 R2)

    Hello, I'm needing assistance locating RAID management software for the TS130 in Windows Server 2008 R2 Standard. In Device Manager, the drive has the following hardware ID: "IDE\DiskRAID11.0.00__".  Does anyone know of a utility to check and monitor

  • Deploy a image by Task Sequence - then can't see it in software centre after a rebuild.

    i've made a task sequence for installing an OS, that works fine, i've created a collection, added my machine in there gone to the software library --> task sequence --> created a deployment and targeted the collection.  Log onto the machine in that c