Query on Repetitive Manufacturing

Hi PP GUrus,
I have few queries on REM in PP.
As in case of REM we dont have Production Orders we only have Planned Orders..Correct me if I am wrong..
1) Can we calculate WIP in case of Repetitive Manufacturing. If yes then how and will it be calculated on Planned Orders.
2) I need to do settltmernt in CO. For that the order to be used will be Planned Order or what is the process.
3) Also if some one can give me a step by step process for REM then it will be really helpful.
Regards
Ashish

>As in case of REM we dont have Production Orders we only have Planned Orders..Correct me if I am wrong..
Its correct
1) Can we calculate WIP in case of Repetitive Manufacturing. If yes then how and will it be calculated on Planned Orders.
While doing settlement in KK87, WIP has posted to financial posting
2) I need to do settltmernt in CO. For that the order to be used will be Planned Order or what is the process.
YOu need to give Material and plant to run settlement
3) Also if some one can give me a step by step process for REM then it will be really helpful.
1)create plan MD61
2) run MRP: MD02
3) create product cost collector- KKf6N
4) preliminary costing for PCC & costing is carried out In KKF6n
5) Material staging: MF60
6) Rem Backflush: MFBF
7) Run Overhead- Co42
8) Run variance- KKs6
9) Run settlement- KK87
display report of PCC0 -KKBC_PKO

Similar Messages

  • Triggering Repetitive manufacturing inspection lot - insp type 13

    Dear Expert,
    I have activated 13 insp type for my semi-finish material,
    in the routing also for the last operation control key has maintained.
    Finally in the production version also we have selected the the same routing.
    I am not able to create Inspection lot for repetitive manufacturing.
    Please tell me what settings need to be done.
    Thanks
    DON

    Dear DON,
                   Before posting thread please refer to earlier created theards you may find some thing which you were looking for related to your query.
    you will definatly find the solution,If the threads are not there then post the new thread with your query.Our great Gurus will help the needy.
    please refer to
    [In Process Inspection of Repetitive Manufacturing;
    for your repetitive manufacturing
    if this is not enough,follow this as given below.
    MM01/MM02
    Activate inspection type 09 at the time of material creation. AND enter the number of days in the field "Inspection interval" in QM view.
    This field indicates at what frequency in days you need to trigger the recurring inspection lot.
    QA05
    Define a variant for recurring inspection lot generation. Refer the below pasted link for the same.
    Related Thread
    It will trigger the inspection lots according to the date of next inspection date in he Batch.
    QP01
    You need to keep a inspection plan ready to record results for this lot.
    QA32
    Record Results for the inspection lot.
    Perform UD for the lot.
    To create variant through QA05 will not enough. You need to schedule the job, and release them also.
    To check whether you have successfully scheduled the job or not.
    Run QA05, here you will be able to see a line item for the variant you have created. correct?
    1}
    So select that line and click on the button "DISPLAY SCHEDULING", if the scheduling is not carried out, it will through the "Message no. 38001 - No jobs found in the display client" else will show the it will show "Recurring insp: job planning: list of scheduled requests."
    2}
    To schedule the job, select the variant line, and click on the button Schedule, it will lead you to the screen Recurring insp: job planning scheduling; start time.
    here you need to define "Job start date" and "Batch job start time", then click on "Schedule Periodically" and enter the at what frequency you want to replete the job run.
    At the this frequency (e.g. if you select day 1) then it will run the job daily at the time you have entered at "Batch job start time".
    3}
    Then replete the 1} to view your scheduling details. And the job is not released then release them else it will again not run and you will not have the lot.
    Edited by: vijaysap123 on Jan 25, 2010 11:33 AM

  • Can we use batch management in repetitive manufacturing?

    Can we use batch management in repetitive manufacturing?
    If not, can we use classification or something else?
    or what else options we have.
    Thnx!

    why not?
    http://help.sap.com/saphelp_47x200/helpdata/en/25/283c594f7811d18a150000e816ae6e/frameset.htm

  • Cost  of finished product repetitive manufacturing

    Hi,
    My clients produces 5 different finshed products always. I want to map the scenario in Repetitive manufacturing.
    Is it possible in REM to get the actual cost of production of 5 products separately?? fir example can i get cost of finished product 1 as Rs200, in the month of Jan2009 for 10 quantity, cost of finished product 2 in the month of Jan2009 for 5 quantity etc etc .
    Regards.

    Thanks to all for their valuable inputs.
    Dear Mangalraj: Its really a challenge for me to decide whether to go for REM or not. The reason why I am not going for discrete is :
    1. Client doesnt know how much of ( for example) fertilizers it issues for finished 1 or finished 2 . client says he  knows that in a month how much he has used  for example 100 kg of fertilizers in total, not on basis of finished goods. So, i think i will have problem during BOM creation and goods issue in particular.
    2. Since finished products are rose plants, jasmine plants etc, client says i dont how much to do Goods reciept. few plants may still be not ready to be able to do goods reciept.Client says its very difficult for me to count flower plants everyday and then say out of 1000, 10 are ready to be done Goods reciept and 15 are dead so these should be scrapped etc.
    These are the resons why i thought it to map to REM. But client also wants to know price of each plant , means whats the price of rose plant(per plant), price of jasmine plant( per plant).
    Request you all to throw some light on this..
    Regards.

  • Production Order in Repetitive Manufacturing

    Hi All,
    We are using REM scenarios. But we need to use the Production order for some material in the same plant where we are already using REM.
    Is it possible to use both Discrete and REM for the same material but at different periods? Using Discrete for some period and switching over to REM. Is there is anyway to use the above mentioned scenario.
    Kindly suggest.
    Regards,
    Sureshbabu G.

    Hi,
             As we know that In Repetitive Manufacturing, components are often staged at the production line without reference to a particular order.
    To create the demand program again for your production order, you must define the planning strategy for a product. Planning strategies represent the methods of production for planning and manufacturing or procuring a product. and run the scenario accordingly.
    Regards
    Chandra

  • WIP FOR REPETITIVE MANUFACTURING WITH VALUATED SALES ORDER

    Dear All,
    We are in the process of implementing Repetitive manufacturing with valuated sales order(MTO). I want to clarify whether in this scenario WIP will be generated.
    Since, at the time of final backflushing, what ever GR done for finished goods, the GI for its components will be done automatically. The components will be issued based on the BOM. I think in this scenario WIP will not be there.
    Please tell me whether i am correct.
    regards
    ranga

    Thanks. I have another scenario. My client wants to transfer all cost of HR,Admin, finance etc and other indirect production cost center cost to production cost center. I mean they want to charge on the product. I have to production cost center. Client will give me the basis for allocating the cost. I have to do assessment and distribution for cost allocation
    But, I want to clarify how do i include the admin, hr or finance and indirect production cost center cost in cost component structure if i do the above process.
    How to do the cost splitting.
    regards
    ranga

  • In Process Inspection for Repetitive Manufacturing

    Hi All,
    I'm trying to perform in-process inspection for repetitive manufacturing. I have a semi finished material which has the inspection type 13 activated in the material master. Rate routing for it has also been created. Characteristics have been assigned to its operation and the routing is attached to a production version. When I o to MFPR to create a lot, I specify the material, plant and production version with QM active (tried the other 2 options as well) but when I execute, nothing shows up in the list. When I click on create inspection lot, it says, "either select versions or place cursor on versions now" but there's nothing in the list?
    Regards,
    Bilal

    Hi,
    Please check whether the repetitive manufacturing check box and REM profile is defined in the MRP4 of material master.
    Please define that and try to run the transaction MFPR.
    It should solve your problem
    Regards,
    Sumit Gupta

  • Repetitive Manufacturing Scenario

    Dear All,
    I would appreciate it if you can provide me with a FLOW of REM, a walkthrough guide with transactions to test the REM scenario and pre-requisites of each transaction.
    Thank you

    Dear,
    Reporting Point Rem
    Steps are as,
    1)You must assign a suitable repetitive manufacturing profile in the material master record to be able to backflush a material using either the mandatory or the optional reporting point backflush function.
    2)You must set the optional or the mandatory reporting point backflush in the repetitive manufacturing profile.
    3)This type of backflushing corresponds to the milestone confirmation in make-to-order production. Therefore, in the routing, you must select a control key which has indicator 1 (= milestone confirmation) in the confirmation field.
    4)You must enter the routing in the production version of the material. The system first looks for the routing entered in the detailed planning section. If no entry exists here, the system then uses the routing from the rate-based planning section.
    5)You must carry out a version-specific or a standard cost estimate.
    6.You are recommended to use the version-specific cost estimate which can be carried out in shorter intervals than the standard cost estimate.
    Reporting point is a concept for REM. This is to be set up just like Milestone operation.
    Select the Control key which is relevent for Milestone confirmation like PP01
    or select a control key which is having the confirmtion selected as *1 - Milestone confirmation
    You need to select REM profile 003 or 004 from sttd REM profiles to have Reporting Point and in OP67 (Control key for Operations) you need to set confirmation to 1 - milestone confirmation .
    Please try and come back.
    Regards,
    R.Brahmankar

  • Repetitive manufacturing:backflush

    Dear experts,
                      At my client place , repetitive manufacturing scenario is there.
    While doing back flush, I am facing an error "Argument 1061 not contained in table T437D"
                                     "Message no. RM001"
    Please guide me where I am going wrong in customisation.
    Regards,
    Sameer

    Dear Sameer,
    check for this 2 settings,
    SPRO-Production-Repetitive Manufacturing-Planning-Define scheduling parameters for Planned orders (OPU5),Check
    *whether for order type * or for order type PE - Run Schedule*Quantity for Plant RA01 whether you have maintained the
    relevant required parameters.
    Then also in SPRO-Production-Repetitive Manufacturing-Planning - Planning Table-Maintain distribution for Planning
    table whether you maintained the setting for the plantRA01.
    Once after doing this setting,it gets updated in table T437D.
    Regards
    Mangalraj.S

  • Repetitive Manufacturing - Backflushing

    Hi Gurus,
    I am new to Repetitive manufacturing Scenario, I have created a planned order and then done the required steps of Backflushing and GR and completed that.
    After which I found that the components are not correctly consumed during backflushing. One of the component was consumed in less. Now I want to charge this remaining qty to that order.
    But when I try to do this using the same tcodes like MB1A, MIGO with 261 movement against that order, Error message "Internal Order..................."
    is displayed,
    Please let me know on how this problem can be solved, this may look silly, but being new to this scenario Can any one please help me.

    Hi,
    If you want to correct then you have only option to reverse the backflush from MF41 and perform the fresh confirmation (backflush) like same in production order confirmation cancellation and then re-confirmation.
    While reversing syetem updates the stock for components and for finished part its create planned order for reverse quantity (depends on rem profile settings).
    If any question then please inform.
    Regards
    TAJUDDIN

  • Repetitive manufacturing:subcontracting

    Dear experts
                  In repetitive manufacturing scenario, I have subcontracted my 4 of operations.
               Now the requirement is I want to create Automatic PR for those operations.
              So please guide me what are the necessary settings to be done.
    Regards,
    Sameer

    Dear Sameer,
    I doubt whether operation sub-contratcing is possible in REM scenario,i have not tried this,but in my understanding if you are
    using a reporting point backflush this may be achieved.
    In one of my project in REM scenario we used direct sub-contracting where this is possible.
    Also refer this thread to explore more,
    Re: Subcontracting in REM
    Correct me if I'm wrong.
    Regards
    Mangalraj.S

  • Repetitive manufacturing

    I have a  knowledge question regarding collective entry of confirmations using  repetitive manufacturing u2013 transaction MF42N.
    Is there an option to get data from planning table (MF50) pre-selected  to simplify final backflushing such as:
    Preselect all planned orders (PE) of a defined plant for a pre-selected planned production date  or all materials with planned orders for a defined planned production date shall be pre-selected.
    I donu2019t see an option to preselect open planned orders  for backflushing .
    I only see the option to manually enter either material or planned order for each single planned quantity from planning table. 
    It is vital  for the central kitchen food production process to be as simple as possible. 
    Whatever can be pre-selected improves usability of this process for Retailers significantly.
    rgds
    sandeep

    Hi,
    Your thought of having pre-select data like Planned Orders (PE) for a particular period in MF42N is really a good one... but I don't see any user exit/anything available for this.
    But this could be achieved by developing a custom report, in which you can first fetch data like Planned Orders for a particular period and then provide those details to MF42N through a BAPI.
    Again not sure how feasible it would be...
    Regards,
    Anup

  • Repetitive Manufacturing Profiles

    Hi Experts,
    i have a question about REM profile:
    in the repetitive manufacturing profile (REM profile) that  we want to post activities,
    what was the difference beetwen standard cost estimate for material and preliminary cost estimate for the product cost collector in sales order related production,
    what is the result of each selection in  sales order related production  and which setting is recommended for this case,
    I would be highly appriciated if you can respond in detail.
    Your help would be appreciated.
    Thanks.
    Azam

    Dear Azam,
    1. If in the REM profile if the radio button is selected against standard cost estimate,then while doing
    backflushing the system picks up the standard cost estimate of the material from the material master and
    confirmations are made & variances are calculated.That's CK40N is to be carried out periodically.
    If there's no standard cost estimate for a material means then you cant do the confirmation in MFBF.
    2. If in the REM profile if the radio button is selected against preliminary cost estimate means while creating
    the product cost collector for a material and saving means then based on this cost itself confirmations can
    be made in MFBF,no need to carryout the costing run in CK40N.You can see any standard cost of the
    material in the material master in costing 2 view.
    3. In the case of Make to Order scenario as per to my knowledge based on preliminary cost estimate it self
    we can do the confirmation.
    4. Please check these links [Standard Price with Valuated Sales Order Stocks |http://help.sap.com/saphelp_erp60_sp/helpdata/en/90/ba63e7446711d189420000e829fbbd/frameset.htm]
    [Example for Valuated Sales Order Stock Without Product Cost by Sales Order: Quantity and Value Flow |http://help.sap.com/saphelp_erp60_sp/helpdata/en/90/ba63e7446711d189420000e829fbbd/frameset.htm]
    [Product Cost Collectors in Sales-Order-Related Production |http://help.sap.com/saphelp_erp60_sp/helpdata/en/90/ba63e7446711d189420000e829fbbd/frameset.htm]
    Regards
    Mangalraj.S

  • Repetitive manufacturing - CM01 Capacity Requirement

    Hi All,
    I configured repetitive manufacturing process with lead time scheduling.
    Conf. at OPU5 is set as below
    Rate.plng horzn  - 999
    SelID:rate plng -  02
    Scheduling u2013 X (selected)
    Generate Capacity reqs. u2013 X (selected)
    Scheduling level  - Via Rate based scheduling
    Adjust dates u2013 Do not adjust basic dates, dep reqmt to operation dates 
    For capacity scheduling u2013 Always basic dates, dep. Reqmt to operation dates 
    I run MRP (MD02) with option - Lead Time Scheduling and Capacity Planning
    I could see required capacity is calculated at tab u201CProduction Ratesu201D & also in menu Planned order >> Goto >>Capacity leveling.
    we are unable to view Capacity requirement in CM01 transaction & in planning table MF50.
    Regards

    Hi,
    Select the correct profile in CM01.  Menu->Planning->Profiles
    Thanks

  • Repetitive Manufacturing and Planning Strategy 52

    Can I run Repetitive Manufacturing on a material with the planning strategy of 52 (Plnng w/o final assem. w/o make-to.stock) ?
    When i try to perform backflush on the planned orders, i am faced with the following error :
    <b>Plnd ord. <i>XXXXX</i> is a plnd order for planning w/o final assembly
    Message no. RM131</b>
    Please advise.
    Thanks

    for planning strategy you can execute production(ie backflush in REM) only after u receive a sales order. please ensure that a sales order is in place.

Maybe you are looking for

  • Implementing I2C on Siemens TC65

    Hi, I need an assistance with I2c protocol, just some basic questions. Do you need connector object, and connection to start and control I2C, or all control is done by AT commands ? If You need connector and connection, what type of connection should

  • Purchase Order Reconciliation Workbench

    We are running into performance issues while closing POs in the Purchase Order Reconciliation Workbench. If 5+ users kick off the PO_RECON process online, it times out. Anybody out there experience similar issues? Any pointers would be appreciated. -

  • MIRO - hitting to purchase varience account

    Hi, i am trying to post Invoice, when i am giving PO in invoice screen entries are coming correct. but when i simulate the invoice lot of variance accounts are coming with different values. please advice why purchase variance is coming while simulate

  • Debugger output text is centered

    In Coldfusion 9, when I enable "Enable Request Debugging Output" in the administrator settings, the debugging text on my site pages is centered from  "Scope Variables" to the end of the output. One of the fields is so wide that I have to scroll right

  • Desktop app doesn't load the app links.

    Hi, When i start up the desktop app, the little blue "loading wheel" keeps on spinning forever. The text, file and Behance buttons sometimes work, but it all takes very long time and slows down my whole system. I work with 10.8.4, have 8 Gb ram and t