Questions about Cynett Windsor iPad2 case

Hi, I am looking to buy iPad2 case. I saw this beautiful Cynett Windsor leather case. In their website and other websites, they only show the front view of the case. My questions are; 1. whether they have hole for back camera? and 2. Can front cover be folded backwards to hold the ipad in one hand during reading books?
If any one have Cynett Windsor case, please clarify my doubts.
Thanks in advance!
Jay

Hi, I am looking to buy iPad2 case. I saw this beautiful Cynett Windsor leather case. In their website and other websites, they only show the front view of the case. My questions are; 1. whether they have hole for back camera? and 2. Can front cover be folded backwards to hold the ipad in one hand during reading books?
If any one have Cynett Windsor case, please clarify my doubts.
Thanks in advance!
Jay

Similar Messages

  • Some questions about buying an Ipad2

    I want to buy an Ipad2 but if I order it online I need to wait for 2 or 3 weeks.
    I am in Manchester(UK), by any chance the Apple store will stock some Ipad everyday??
    Cuz if there are I would rather queuing outside the shop than wait for the order.
    Can anyone answer my question?!?
    Thx xxx

    You can pre-order.
    1. At 9pm go to to apple website for the machester store: http://www.apple.com/uk/retail/manchesterarndale/
    2. Then click Reserve Now and follow the instructions.
    This worked for me. However, there is limited supply so you have to be online and ready to go at 9pm or you will miss the boat. Also, you have to collect next day.

  • Question about screen protector (ipad2)

    Hi,
    I just applied a screen protector on my iPad 2 and I've noticed that it isn't 100% straight:
    The front camera doesn't sit exactly in the protector's hole.
    Actually, the hole in the protector kind of sits in the center of the camera.
    It doesn't disturb the images, but is it can do harm to the camera in some way?
    Thanks :)

    No it won't harm your iPad, but it might cause picture distortion on the edges of the photos. If your pictures look fine then you are OK.

  • Question about autodiscover in case of multiple bound namespace

    Hi Experts,
    I have a question about the autodiscover behaviour. Let's assume we have the below infrastructure:
    SiteA :
    MBX-Server-SiteA : Member of a DAG
    CAS-Server-SiteA : outlook anywhere url = siteA.domain.com
    SiteB :
    MBX-Server-SiteB : Member of a DAG
    CAS-Server-SiteB-1 : outlook anywhere url = siteB-1.domain.com
    CAS-Server-SiteB-2: outlook anywhere url = siteB-2.domain.com
    We have DB-1 and DB-2 that have copies in both MBX servers.
    My question is how does exchange select the access URLs to return in the autodiscover process? I know that it depends on where the mailbox is hosted but can't find details about the process in the technet articles.
    Thanks.

    There's quite a few details that are involved in the Autodiscover process. First of all - probably the most important thing is that there are 2 stages to the whole process.
    In the first stage, the client is simply concerned with getting the address of a CAS server that will help it further. We'll keep things simple and assume your scenario where the client is located inside the network and is domain-joined. The details of the
    LDAP query are detailed in
    this link. (At the time I was investigating this I've actually went ahead and ran the queries using the ldp.exe client against the Configuration partition of the respective AD domain - it's worth seeing the actual responses.) An interesting trick here is
    the 'keywords' attribute that's stamped on those SCP entries. The reason behind it is that you don't want a client located in a site to go half across the globe in order to connect to a CAS server, when there's one available in its own site. One simple way
    to get the 'keywords' attribute stamped is through the Set-ClientAccessServer cmdlet, using the -AutodiscoverSiteScope parameter. In your example, you'd probably want to run it against the CAS server in Site A and specify the name of the corresponding AD site
    ('SiteA') and correspondingly against the 2 CAS servers in Site B (using 'SiteB'). Once the client has got the response to his query, it will attempt to select one server that's handling the site he's in (essentially it will filter the results based on 'keywords'
    -contains <client-site>). Now that we got our endpoint we can go to stage 2.
    In stage 2, the client will actually use EWS in order to query the Autodiscover service itself running on our target server. There are 2 possible interfaces of accessing the Autodiscover service: POX (Plain Old XML) and SOAP. POX will be targeting the ../Autodiscover.xml
    URLS, while the SOAP one will be using ../Autodiscover.svc URLs. Details about this including some hardcoded parts are
    here. What happens next is detailed in point 3, section 2.1 The Autodiscover Process
    here. This last link is the key to the whole process:
    "It provides a list of CAS that has AutodiscoverSiteScope information set for the
    Associated AD site of the Database where the client Mailbox is located."
    In other words, the CAS is smart enough to return the URLs belonging to a CAS server in the AD site where the client's mailbox' database is active.
    My advice is to test this on your scenario. Tests can be done here first-hand: the Outlook's tray icon Test E-Mail AutoConfiguration can be used or alternatively - if you want to see the details in the communication - SoapUI
    for the SOAP access method, for POX there's an extension called 'Postman for Chrome' that can be used. I've used all these in my tests back when I was fighting conflicting results from the articles around the web about Autodiscover.
    That's a long way of saying we get the AutoD URL of a CAS server closest to the workstation, which then provides the configuration to use which are the the URLs closest to the mailbox  :)
    By all means look at the SOAP response, but Outlook will only use POX.  Lync does SOAP along with other 3rd party apps.
    Cheers,
    Rhoderick
    Microsoft Senior Exchange PFE
    Blog:
    http://blogs.technet.com/rmilne 
    Twitter:   LinkedIn:
      Facebook:
      XING:
    Note: Posts are provided “AS IS” without warranty of any kind, either expressed or implied, including but not limited to the implied warranties of merchantability and/or fitness for a particular purpose.

  • Hi , i'm new here and i would like to ask a question about iPad 2 . Well , actually when i hold my finger on any icon , its not jiggling , i need to fix the icons . May i know what can i do in this case ? thank you in advance ,

    Hi , i'm new here and i would like to ask a question about iPad 2 . Well , actually when i hold my finger on any icon , its not jiggling , i need to fix the icons . May i know what can i do in this case ? thank you in advance ,

    Try a reset. Hold the Sleep and Home button down for about 10 seconds until you see the Apple logo. Ignore the red slider.

  • Possible newbe to Appleworld has 11 questions  about Ipad2

    Hello everybody,
    As a Windows user I am very interested in the Ipad 2 as so to become a member of the AppleWorld. But still I have some questions about the Ipad2 and hopefully somebody can help me with my questions:
    1) Is the only way to install the applications by using the Itunes Store? Or can it also be dragged and dropped and than installed like in Windows.
    2) If the anwser on the first question is "YES", what happens than if you install programs using Itunes and for some reason you have to format the Ipad? Do you have to download them again? Pay for them again? or is it something like the Wii, that you can download the payed ones so many times you want on the same Ipad?
    3) Can you play normal DIVX movies on the Ipad or do you have to convert them to Mp4 always?
    4) Can you see normal PDF files or do they neede to be converted also?
    5) I have read that it doesnñ´t support flash for example, so how cna you see Youtube movies or CNN reports on teh Ipad?
    6) The battery life is somewhat 10 hours, but as we know in life, all the batteries die after x years. Can you cange them by yourself? Or do you need to go to a Applestore and they change it? And if so, is it expensive?
    7) Can you just drag and drop your own MP3 collection on it?
    8) I have a PDA which I use with a GPS device (using Bluetooth), and using the program TomTom. Does the Ipad has a program similar as TomTom? Does anybody has had experience with it?
    9) I have in my home a private network using Wifi and cable. Can I connect an Ipad and then searching for excample my PC harddrive for a movie? Is that possible to link the world of Apple with the World of MS?
    10) Where can I take a look of all the Apps for the Ipad2? Do I first have to install Itunes, even if I do not have an Ipad2?
    11) My primary use for the Ipad will be: reading mail, surf the web, read PDf files and maybe see some videos. I suppose the Ipad2 can do all that (and more). I thought of the 32GB, should it be enough? I mean of the 32GB, what finally have you for using/storing?
    Many thx for helping me and I hope to be very soon a part of this "new" world for me.
    David
    Message was edited by: DavidL_70

    DavidL_70 wrote:
    Hello everybody,
    As a Windows user I am very interested in the Ipad 2 as so to become a member of the AppleWorld. But still I have some questions about the Ipad2 and hopefully somebody can help me with my questions:
    1) Is the only way to install the applications by using the Itunes Store? Or can it also be dragged and dropped and than installed like in Windows.
    You download apps directly to the iPad from the App Store app which is preinstalled on the iPad. You can also download the apps in iTunes on your computer and then sync them to the iPad.
    2) If the anwser on the first question is "YES", what happens than if you install programs using Itunes and for some reason you have to format the Ipad? Do you have to download them again? Pay for them again? or is it something like the Wii, that you can download the payed ones so many times you want on the same Ipad?
    You do not have to "format" apps for the iPad if you download them in iTunes on your computer. If you purchase an app, if you need to download it again, there is no charge.
    3) Can you play normal DIVX movies on the Ipad or do you have to convert them to Mp4 always?
    Read the requirements on this link.
    http://www.apple.com/ipad/specs/
    4) Can you see normal PDF files or do they neede to be converted also?
    You can download iBooks in the App Store as a free download to view and save PDF files. If someone emails you a PDF, you will be able to open and read it in the Mail App once you set up your email.
    5) I have read that it doesnñ´t support flash for example, so how cna you see Youtube movies or CNN reports on teh Ipad?
    It does not support Flash. There is a preinstalled YouTube App on every iPad. Many websites are using html5 which makes a lot of video content available while surfing the web on an iPad.
    6) The battery life is somewhat 10 hours, but as we know in life, all the batteries die after x years. Can you
    cange them by yourself? Or do you need to go to a Applestore and they change it? And if so, is it expensive?
    You must have the battery replaced by Apple. I easily get 10-12 hours a day from a full charge. Read about the iPad battery care here.
    http://www.apple.com/batteries/ipad.html
    7) Can you just drag and drop your own MP3 collection on it?
    You sync music and other content from your iTunes library on your computer, so you will need to install iTunes on your computer. Your computer must meet minimum requirements which are detailed in the iPad specs website referred to above. This site will give you more information on iOS 4.2, the newest software on the iPad.
    http://www.apple.com/ipad/ios4/
    8) I have a PDA which I use with a GPS device (using Bluetooth), and using the program TomTom. Does the Ipad has a program similar as TomTom? Does anybody has had experience with it?
    All iPads have a preinstalled Maps App for directions. Navigation Apps are available in the App Store.
    9) I have in my home a private network using Wifi and cable. Can I connect an Ipad and then searching for excample my PC harddrive for a movie? Is that possible to link the world of Apple with the World of MS?
    Yes you can "link" the two worlds. Peace and harmony have come to the land of the iPad.
    The newest software on the iPad has a feature called Home Sharing that allows you to view content on your computer, in your iTunes library on your iPad without having to sync the movie to the iPad. This allows you to free up storage space on you iPad but still be able to enjoy all of the movies and TV shows that you have purchased.
    10) Where can I take a look of all the Apps for the Ipad2? Do I first have to install Itunes, even if I do not have an Ipad2
    You do not have to install iTunes to see some of the apps that are available for the iPad. You can Google IPad apps and there any number of websites that talk about and review apps. You can go to Apple's iPad and/or iTunes websites and navigate through them to see some of available apps.
    11) My primary use for the Ipad will be: reading mail, surf the web, read PDf files and maybe see some videos. I suppose the Ipad2 can do all that (and more). I thought of the 32GB, should it be enough? I mean of the 32GB, what finally have you for using/storing?
    Because of the new Home Sharing feature you can download loads of video content and not have to keep it on your iPad if you want to view it. Only you can be the judge of how much storage capacity you will need. From your brief description, the middle of the road 32GB model should be fine. If your are a gamer at all, some of the bigger name games can take up 700 or MB and videos and movies can be 3-4GB as well, but you can keep those in your iTunes library as mentioned previously. And remember, a very extensive music or photo collection can take up a good bit of storage as well.
    Message was edited by: Demo

  • Some questions about Muse

    First of all, I would like to say that I am very impressed with how well Muse works and how easy it was to create a website that satisfies me. Before I started a daily updated website I thought I would encounter many problems I will not be able to solve. I have only had a few minor issues which I would like to share with you.
    The most problems I have with a horizontal layouts (http://www.leftlane.pl/sty14/dig-t-r-3-cylindrowy-silnik-nissana-o-wadze-40-kg-i-mocy-400- km.html). Marking and copying of a text is possible only on the last (top) layer of a document. The same situation is with widgets or anything connected with rollover state - it does not work. In the above example it would be perfect to use a composition/tooltip widget on the first page. Unfortunately, you cannot even move the cursor into it.
    It would be helpful to have an option of rolling a mouse to an anchor (like in here http://www.play.pl/super-smartfony/lg-nexus-5.html and here http://www.thepetedesign.com/demos/onepage_scroll_demo.html).  I mean any action of a mouse wheel would make a move to another anchor/screen. It would make navigation of my site very easy.
    Is it possible to create a widget with a function next anchor/previous anchor? Currently, in the menu every button must be connected to a different anchor for the menu to be functional.
    A question about Adobe Muse. Is it possible to create panels in different columns? It would make it easier to go through all the sophisticated program functions.
    The hits from Facebook have sometimes very long links, eg.
    (http://www.leftlane.pl/sty14/mclaren-p1-nowy-krol-nurburgring.html?fb_action_ids=143235557 3667782&fb_action_types=og.likes&fb_source=aggregation&fb_aggregation_id=288381481237582). If such a link is activated, the anchors in the menu do not work on any page. I mean the backlight of an active state, which helps the user to find out where on page they currently are. The problem also occurs when in the name of a html file polish fonts exist. And sometimes the dots does not work without any reason, mostly in the main page, sometimes in the cooperation page either (http://www.leftlane.pl/wspolpraca/). In the first case (on main page), I do not know why. I have checked if they did not drop into a state button by accident,  moved them among the layers, numbered them from scratch and it did not help. In the cooperation page, the first anchor does not work if it is in Y axle set at 0. If I move it right direction- everything is ok.
    The text frame with background fill does not change text color in overlay state (http://www.leftlane.pl/sty14/nowe-mini-krolestwo-silnikow-3-cylindrowych.html). I mean a source button at the beginning of every text. I would like a dark text and a light layer in a rollover, but  the text after export and moving cursor into it does not change color for some reason.
    I was not sure whether to keep everything (whole website) in one Muse file (but I may be mistaken?). I have decided to divide it into months. Everyone is in a different Muse file. If something goes wrong, I will not have any trouble with an upload of a whole site, which is going to get bigger and bigger.
    The problem is that every file has two master pages. Everything works well up to the moment when I realize how many times I have to make changes in upper menu when I need to add something there. I have already 5 files, every with 2 masters. Is there any way to solve this problem? Maybe something to do with Business Catalyst, where I could connect a menu to every subpage independently, deleting it from Muse file? Doing so I would be able to edit it everywhere from one place. It would make my work much easier, but I have no idea jendak how to do it.
    The comments Disqus do not load, especially at horizontal layouts  (http://www.leftlane.pl/sty14/2014-infiniti-q50-eau-rouge-concept.html). I have exchanged some mails and screenshots with Disqus help. I have sent them a screenshot where the comments are not loaded, because they almost never load. They have replied that it works at their place even with attached screenshot. I have a hard time to discuss it, because it does not work with me and with my friends either. Maybe you could fix it? I would not like to end up with awful facebook comments ;). The problem is with Firefox on PC and Mac. Chrome, Safari and Opera work ok.
    YouTube movie level layouts do not work well with IE11 and Safari 7 (http://www.leftlane.pl/sty14/wypadki-drogowe--004.html). The background should roll left, but in the above mentioned browsers it jumps up. Moreover the scrolling with menu dots is not fluent on Firefox, but I guess it is due to Firefox issues? The same layout but in vertical version rolls fluently in Firefox (http://www.leftlane.pl/sty14/polskie-wypadki--005.html).
    Now, viewing the website on new smartphones and tablets. I know it is not a mobile/tablet layout, but I tried to make it possible to be used on mobile hardware with HD (1280) display. I mean most of all horizontal layouts (http://www.leftlane.pl/sty14/2015-hyundai-genesis.html), where If we want to roll left, we need to roll down. Is there a way to make it possible to move the finger the direction in which the layout goes?
    On Android phones (Nexus 4, Android 4.4.2, Chrome 32) the fade away background effect does not work, although I have spent a lot of time over it (http://www.leftlane.pl/lut14/koniec-produkcji-elektrycznego-renault-fluence-ze!.html). It is ok on PC, but on the phone it does not look good. A whole picture moves from a lower layer instead of an edge which spoils everything.
    This layout does not look good on Android (http://www.leftlane.pl/sty14/nowe-mini-krolestwo-silnikow-3-cylindrowych.html#a07). The background does not fill the whole width of a page. There are also problems with a photo gallery, where full screen pictures should fill more of a screen.
    Is it possible to make an option of  scroll effects/motions for a fullscreen slideshow widget thumbnails (http://www.leftlane.pl/sty14/2014-chevrolet-ss%2c-rodzinny-sedan-z-415-konnym-v8.html#a06)? It would help me with designing layouts. Currently, it can go from a bottom of a page at x1 speed or emerge (like in this layout) by changing opacity. Something more will be needed, I suppose.
    Sometimes the pictures from gallery (http://www.leftlane.pl/sty14/2014-chevrolet-ss%2c-rodzinny-sedan-z-415-konnym-v8.html#a06 download very slowly. The website is hosted at Business Catalyst. I cannot state when exactly it happens, most of the time it works ok.
    I really like layouts like this (http://www.leftlane.pl/sty14/2014-chevrolet-ss%2c-rodzinny-sedan-z-415-konnym-v8.html#a03). On the top is a description and a main text, and the picture is a filled object with a hold set at the bottom edge. That is why there is a nice effect of a filling a whole screen- nevertheless the resolution that is set. It works perfect on PC, but on Android the picture goes beyond the screen. You can do something about it?
    In horizontal layouts (http://www.leftlane.pl/sty14/dig-t-r-3-cylindrowy-silnik-nissana-o-wadze-40-kg-i-mocy-400- km.html) holding of a filling object does not work. Everything is always held to upper edge of a screen regardless the settings. Possibility of holding the picture to the bottom edge or center would make my work much easier.
    According to UE regulations we have to inform about the cookies. I do not know how to do it in Muse. I mean, when the message shows up one time and is accepted, there would be no need to show it again and again during another visit on the website. Is there any way to do it? Is there any widget for it maybe?
    The YouTube widget sometimes changes size just like that. It is so when the miniature of the movie does not load, and the widget is set to stroke (in our case 4 pixels, rounded to 1 pixel). As I remember ( in case of a load error) it extends for 8 pixels wide.
    Last but not least - we use the cheapest hosting plan in Business Catalyst. The monthly bandwidth is enough, although we have a lot of pictures and we worried about it at first. Yet we are running out of the disk storage very quickly. We have used more than a half of a 1 GB after a month. We do not want to change BC for a different one, because we like the way it is connected with Muse. But we do not want to buy the most expensive package - but only this one has more disk space. We do not need any other of these functions and it would devastate our budget. Do we have any other option?
    I’m using Adobe Muse 7.2 on OS X 10.9.1.
    and I'm sending Muse file to <[email protected]>

    Unfortunatley, there is no way to get a code view in Muse. I know quite a few people requested it in the previous forum, but not really sure where that ended up. Also, you may not want to bring the html into DW unless you only have 1 or 2 small changes 2 make. Two reasons. First, it isnt backwards compatible, so if you are planning on updating that site in Muse, you will need to make those changes in DW everytime you update. Second, by all accounts the HTML that Muse puts out is not pretty or easy to work with. Unlike you, I am code averse, but there was a lenghty discussion on the previous forum on this topic. I know they were striving to make it better with every release, just not sure where it is at this point.
    Dont think I am reading that second question right, but there was a ton of info on that old site. You may want to take a look there, people posted a ton of great unique solutions, so it worth a look.
    Here is the link to the old forums- http://support.muse.adobe.com/muse

  • A question about the impact of SQL*PLUS SERVEROUTPUT option on v$sql

    Hello everybody,
    SQL> SELECT * FROM v$version;
    BANNER
    Oracle Database 11g Enterprise Edition Release 11.2.0.1.0 - 64bit Production
    PL/SQL Release 11.2.0.1.0 - Production
    CORE    11.2.0.1.0  Production
    TNS for Linux: Version 11.2.0.1.0 - Production
    NLSRTL Version 11.2.0.1.0 - Production
    SQL>
    OS : Fedora Core 17 (X86_64) Kernel 3.6.6-1.fc17.x86_64I would like to ask a question about the SQL*Plus SET SERVEROUTPUT ON/OFF option and its impact on queries on views such as v$sql and v$session. Here is the problem
    Actually I define three variables in SQL*Plus in order to store sid, serial# and prev_sql_id columns from v$session in order to be able to use them later, several times in different other queries, while I'm still working in the current session.
    So, here is how I proceed
    SET SERVEROUTPUT ON;  -- I often activate this option as the first line of almost all of my SQL-PL/SQL script files
    SET SQLBLANKLINES ON;
    VARIABLE mysid NUMBER
    VARIABLE myserial# NUMBER;
    VARIABLE saved_sql_id VARCHAR2(13);
    -- So first I store sid and serial# for the current session
    BEGIN
        SELECT sid, serial# INTO :mysid, :myserial#
        FROM v$session
        WHERE audsid = SYS_CONTEXT('UserEnv', 'SessionId');
    END;
    PL/SQL procedure successfully completed.
    -- Just check to see the result
    SQL> SELECT :mysid, :myserial# FROM DUAL;
        :MYSID :MYSERIAL#
           129   1067
    SQL> Now, let's say that I want to run the following query as the last SQL statement run within my current session
    SELECT * FROM employees WHERE salary >= 2800 AND ROWNUM <= 10;According to Oracle® Database Reference 11g Release 2 (11.2) description for v$session
    http://docs.oracle.com/cd/E11882_01/server.112/e25513/dynviews_3016.htm#REFRN30223]
    the column prev_sql_id includes the sql_id of the last sql statement executed for the given sid and serial# which in the case of my example, it will be the above mentioned SELECT query on the employees table. As a result, right after the SELECT statement on the employees table I run the following
    BEGIN
        SELECT prev_sql_id INTO :saved_sql_id
        FROM v$session
        WHERE sid = :mysid AND serial# = :myserial#;
    END;
    PL/SQL procedure successfully completed.
    SQL> SELECT :saved_sql_id FROM DUAL;
    :SAVED_SQL_ID
    9babjv8yq8ru3
    SQL> Having the value of sql_id, I'm supposed to find all information about cursor(s) for my SELECT statement and also its sql_text value in v$sql. Yet here is what I get when I query v$sql upon the stored sql_id
    SELECT child_number, sql_id, sql_text
    FROM v$sql
    WHERE sql_id = :saved_sql_id;
    CHILD_NUMBER   SQL_ID          SQL_TEXT
    0              9babjv8yq8ru3    BEGIN DBMS_OUTPUT.GET_LINES(:LINES, :NUMLINES); END;Therefore instead of
    SELECT * FROM employees WHERE salary >= 2800 AND ROWNUM <= 10;for the value of sql_text I get the following value
    BEGIN DBMS_OUTPUT.GET_LINES(:LINES, :NUMLINES);Which is not of course what I was expecting to find in v$sql for the given sql_id.
    After a bit googling I found the following thread on the OTN forum where it had been suggested (well I think maybe not exactly for the same problem) to turn off SERVEROUTPUT.
    Problem with dbms_xplan.display_cursor
    This was precisely what I did
    SET SERVEROUTPUT OFFafter that I repeated the whole procedure and this time everything worked pretty well as expected. I checked SQL*Plus documentation for SERVEROUTPUT
    and also v$session page, yet I didn't find anything indicating that SERVEROUTPUT should be switched off whenever views such as v$sql, v$session
    are queired. I don't really understand the link in terms of impact that one can have on the other or better to say rather, why there is an impact
    Could anyone kindly make some clarification?
    thanks in advance,
    Regards,
    Dariyoosh

    >
    and also v$session page, yet I didn't find anything indicating that SERVEROUTPUT should be switched off whenever views such as v$sql, v$session
    are queired. I don't really understand the link in terms of impact that one can have on the other or better to say rather, why there is an impact
    Hi Dariyoosh,
    SET SERVEROUTPUT ON has the effect of executing dbms_output.get_lines after each and every statement. Not only related to system view.
    Here below what Tom Kyte is explaining in this page:
    Now, sqlplus sees this functionality and says "hey, would not it be nice for me to dump this buffer to screen for the user?". So, they added the SQLPlus command "set serveroutput on" which does two things
    1) it tells SQLPLUS you would like it <b>to execute dbms_output.get_lines after each and every statement</b>. You would like it to do this network rounding after each call. You would like this extra overhead to take place (think of an install script with hundreds/thousands of statements to be executed -- perhaps, just perhaps you don't want this extra call after every call)
    2) SQLPLUS automatically calls the dbms_output API "enable" to turn on the buffering that happens in the package.Regards.
    Al

  • Re: Questions about Plan structure

    Reply-To: "Duncan Kinnear" <[email protected]>
    Q. if you have an Employee class with related EmployeeSubordinate and
    EmployeeSalaryHistory classes, should these all be in the same plan?
    A It is better to have them in the same plan.It depends on the design
    you have
    Q Why should the Managers be separated from their business classes?
    A Managers are usually service objects which might require different
    resources.
    These managers when deployed might be required by several other
    applications.
    Seperating them as a different plan will help in just using one
    installed partition to be
    Used by different applications (refer about Reference Partition)
    Q If you have the Database managers separate, what scope does each DB
    manager cover?
    A It is better to have the DB managers in user scope.
    It depends on the numbers of users, u have for the system.
    Since u are talking about 100 tables. It's a huge system.
    It also depends on the user licenses u have for the backend.
    Take care that u use proper load balancing of DB Managers for the
    system.
    Krishna CVSR
    GoldStone Softech Inc
    >
    Hi there,
    We are in the middle of designing the structure of a new system.
    I have read/heard that it is best to break down the plans into the
    following categories:
    Business Classes
    Managers/Services
    Clients
    I have a few questions about this structure:
    Should related business classes be grouped together in Plans? E.g. if
    you have an Employee class with related EmployeeSubordinate and
    EmployeeSalaryHistory classes, should these all be in the same plan?
    Why should the Managers be separated from their business classes?
    E.g. if there is an EmployeeMgr service which deals with anything to do
    with the Employee business class, why separate them in different
    plans? If you need the manager to access the class, you will always
    need both.
    Some of the Forte documentation talks about "Policy" managers and
    "Database" managers. How do the functions of these managers differ
    for a simple CRUD (Create Read Update Delete) class?
    If you have the Database managers separate, what scope does each
    DB manager cover? I.e. do you have one for the entire database (over
    100 tables in our case), or do you break it down by sub-system?
    Thanks in advance for any answers.
    Cheers,
    Duncan Kinnear,
    McCarthy and Associates, Email: [email protected]
    PO Box 764, McLean Towers, Phone: +64 6 834 3360
    Shakespeare Road, Napier, New Zealand. Fax: +64 6 834 3369
    Providing Integrated Software to the Meat Processing Industry for over 10 years
    To unsubscribe, email '[email protected]' with
    'unsubscribe forte-users' as the body of the message.
    Searchable thread archive <URL:http://pinehurst.sageit.com/listarchive/>
    Get Your Private, Free Email at http://www.hotmail.com
    To unsubscribe, email '[email protected]' with
    'unsubscribe forte-users' as the body of the message.
    Searchable thread archive <URL:http://pinehurst.sageit.com/listarchive/>

    Reply-To: "Duncan Kinnear" <[email protected]>
    Q. if you have an Employee class with related EmployeeSubordinate and
    EmployeeSalaryHistory classes, should these all be in the same plan?
    A It is better to have them in the same plan.It depends on the design
    you have
    Q Why should the Managers be separated from their business classes?
    A Managers are usually service objects which might require different
    resources.
    These managers when deployed might be required by several other
    applications.
    Seperating them as a different plan will help in just using one
    installed partition to be
    Used by different applications (refer about Reference Partition)
    Q If you have the Database managers separate, what scope does each DB
    manager cover?
    A It is better to have the DB managers in user scope.
    It depends on the numbers of users, u have for the system.
    Since u are talking about 100 tables. It's a huge system.
    It also depends on the user licenses u have for the backend.
    Take care that u use proper load balancing of DB Managers for the
    system.
    Krishna CVSR
    GoldStone Softech Inc
    >
    Hi there,
    We are in the middle of designing the structure of a new system.
    I have read/heard that it is best to break down the plans into the
    following categories:
    Business Classes
    Managers/Services
    Clients
    I have a few questions about this structure:
    Should related business classes be grouped together in Plans? E.g. if
    you have an Employee class with related EmployeeSubordinate and
    EmployeeSalaryHistory classes, should these all be in the same plan?
    Why should the Managers be separated from their business classes?
    E.g. if there is an EmployeeMgr service which deals with anything to do
    with the Employee business class, why separate them in different
    plans? If you need the manager to access the class, you will always
    need both.
    Some of the Forte documentation talks about "Policy" managers and
    "Database" managers. How do the functions of these managers differ
    for a simple CRUD (Create Read Update Delete) class?
    If you have the Database managers separate, what scope does each
    DB manager cover? I.e. do you have one for the entire database (over
    100 tables in our case), or do you break it down by sub-system?
    Thanks in advance for any answers.
    Cheers,
    Duncan Kinnear,
    McCarthy and Associates, Email: [email protected]
    PO Box 764, McLean Towers, Phone: +64 6 834 3360
    Shakespeare Road, Napier, New Zealand. Fax: +64 6 834 3369
    Providing Integrated Software to the Meat Processing Industry for over 10 years
    To unsubscribe, email '[email protected]' with
    'unsubscribe forte-users' as the body of the message.
    Searchable thread archive <URL:http://pinehurst.sageit.com/listarchive/>
    Get Your Private, Free Email at http://www.hotmail.com
    To unsubscribe, email '[email protected]' with
    'unsubscribe forte-users' as the body of the message.
    Searchable thread archive <URL:http://pinehurst.sageit.com/listarchive/>

  • Questions about Contracts and New Phones

    I've had some questions about how upgrading and adding new lines to a contract works and I haven't been able to find the answers through Google. First some background information: We started this most recent contract in September of 2011 and as such the current contract will end September of 2013. According to the phone information portal, all three of the devices on my account will be eligible for an upgrade this Saturday (May 4th, 2013). My daughters birthday just so happens to coincide with that date and as such we were planning on surprising her by taking her to buy a new phone and we are going to allow our son to upgrade his phone as he has been asking to for a while.
    Is there any way of locking/limiting the amount of data allowed for each phone on a shared plan? I'm worried that my daughter will go way over our limit and not pay attention to the point where she will end up costing us a very large amount of money
    Does adding a new line require the start of a new contract?
    My son was interested in purchasing the "Samsung Galaxy S4" and has noticed that pre-orders for that phone are currently available. Is it possible to pre-order the phone on that date using the upgrade so that the price will be reduced?
    If the answer to number 2 is a no, does adding the new line take away the upgrades from other phones or would he be able to go to the store past the release date and upgrade then?
    Thanks for taking the time to read through all of this. Any help that I receive will be extremely appreciated.

    1. Yes. There is an additional fee per line you wish to do this for. When you add the line you can choose this option and set the data amount it is allowed to use.
    2. Yes. Each line is a separate contract with its own expiration date.
    3. The contract starts when you sign up for the contract. The amount will be pro-rated on the plan if it is not started until part-way through your billing cycle that is what you are asking. Doing the pre-order just guarantees you the phone in case they sell out.
    4. No it will not take any upgrades away as each line has its own termination date. You can move upgrades around between lines though.

  • Some question about International Travel

    Ok so i know alot of people have question about international travel weather is USA to Canada, Canada to USA or where ever.
    So i just got off the phone with someone from AT&T these are my questions for them. i hope it can help, im confuse myself.
    *1. I travel recently travel to canada a few weeks ago, when i cross the boarder i switch the data roaming ON and it picks up Rogers Wireless, a few days ago i try i again it said NO SERVICE is something wrong with my iPad?*
    NO, consider yourself lucky u didnt get charge for that roaming, your ipad well not work out of the US unless u buy one of our International plans that AT&T has provided. The reason for this is so you wont have any unwanted charge or high charge on your bill.
    *2. If i was to buy a sim card from Canada and pop it in to my US ipad well it work?*
    Honestly that's something you can try at your own risk, it's design for AT&T so by switching sim cards it may affect your ipad such as running slow, virus, crash. You can try it, i dont work for Rogers so i know nothing about them, i work for AT&T so i can only tell you about our plans and i wont lie to you.(I THINK U JUST DID) This ipad is not unlock just like the iphone so it well only work with AT&T.
    *3. If i pop my sim card out and put in an international sim card well it affect my plan at all or in any way?*
    Yes it can, right now your on the unlimited plan if you put in a different sim card and then re-put in ur AT&T one chances are you're going to loose your unlimited plan and have to settle for the newer plan. That's why AT&T has reduce it's international plans so people are more likely to use it. It's a contract we sign with Apple, if u want to use in canada you can always buy an Ipad in canada and use their plan. (***)
    At the end of this conversion i was just more angry with them. All in all she told bottom line is dont do anything stick with AT&T and pay for international plans. So i have to pay over price data plan if i want to use it intertanional? or i have to buy an ipad for each international places i go to?
    Has anyone try or done any of the 3 ive mention and did it affect ur plan or ipad in anyway?
    Thanks
    Andy

    Ok so here's a little more info
    I called AT&T again today asking them the same question the guy was more helpful then the one yesterday. Even though he kinda told me the same saying that the ipad need to be unlock. , Afterward he transfer me someone from Apple. The lady told me
    1. The ipad is UNLOCK so dont bother trying to get it unlock.
    2. she doesnt see why sticking in another sim card from one of the apple ipad carrier is a problem. U would just have to sign up activated it like u would when u first got it.
    3. Contact phone company (my case Rogers) to see if they carry the mico sim cards.
    4. She doesnt see why it would affect the current plan u have now.
    So at the end of all that she told me, seem like AT&T is just telling you, you cant do this or u shouldnt do that is simple THEY WANT YOU TO USE THEIR PLANS.
    so with that i said i just want to let everyone know. I'm gonna go pick my Micro sim cards from Canada in a bit and sign up for thier plan we'll keep everyone updated if anything change or how it work

  • Question about Rescheduling Start Date of a Task

    Question about Rescheduling Start Date of a Task
    I'm trying to determine whether the 'Reschedule' action is appropriate to my situation...
    I have a service that consists of 4 tasks.  The first 3 tasks will be completed immediately and then the request's 4th task will sit in a queue for about a month so that all of these requests can be grouped together and fulfilled during a few overnight work sessions.
    While the 4th task is waiting to be fulfilled, the technician will be contacting the requestor to schedule the work to be done sometime during a 3 day window.  The technician needs to specify which of the 3 days each request will be worked on.  I'm not sure if I should store the date in a service form field or have the technician reschedule the task so that the start date of the task is set to one of the 3 days.  If I use the reschedule feature, are there any downsides?
    The advantage of using the reschedule feature is that the scheduled start date can be displayed in ServiceManager's task list and can therefore be sorted on and queried.  This wouldn't be possible if I stored the date in a dictionary field on the service form.  In that case, I'd have to use custom reports to group the tasks by start date.
    Please let me know your thoughts...
    Thanks,
    Scott

    This strikes me as a very good use of this feature, since your need to to have the date for this task rescheduled/reflected in ServiceManager. This is the specific effect of using this feature.
    For the benefit of others reading this post, remember: this rescheduled date will not change the due date for the service.

  • Question about Scheduled Task

    Question about Scheduled Task
    RequestCenter 2008.3
    Oracle 10g
    Websphere 6.1.27
    IE 7
    Hi:
    I have tried to get a scheduled task to work without any luck.  I am referencing a date/time field on the form and the task goes to "Scheduled", but never moves to "Ongoing".
    I've opened a case with support, but was wondering if anyone has gotten this to work.
    Thank you
    Daniel
    Safeway Inc.

    We just went through this too. If the plan is fairly complex, and has allot of conditional tasks you will have difficulty.
    The explanation I got from Shweta is that the calculation that determines the OLAs before my scheduled task was to start looks at ALL the potential tasks and combines them, essentially saying the duration is much longer than what you think it should be, ie the sum of all potential task OLAs, not just the tasks that became active.
    Bottom line if your scheduled date is with

  • PL/SQL web service: question about stub

    hello,
    I'm currently learning how to work with PL/SQL Web Services.
    I have a question about stubs. The point is, I can deploy a web service to the OC4J server and it works. It also works when I create a stub following the WSDL I made with creating the PL/SQL web service. If I go to the endpoint in my webbrowser, the functionality is the same, with or without using a stub.
    My question is: what is the function of the stub?

    A stub is leveraged by a client application to communicate with a corresponding server side object (in this case, the web service implementation). If you think back to CORBA or RMI applications they follow a similar pattern.
    In the case of a web service you would use the stub to write a client application that could invoke the methods of the remote service and return the responses as java data types. The methods the stub class offers are the same as the methods of the web service interface. It's a common way for providing RPC like functionality.

  • Questions about CIN tax procedure choice and pricing schemas

    Hi all,
    I have to implement SAP on a Indian company and I'm verifying all particularity about this country (in particular tax procedures and the great number of differents tax conditions used).
    I have two questions about tax procedures and pricing schemas. Every feedback about thse points will be appreciated.
    a) To choose tax procedure TAXINN or TAXINJ which are the elements that I have to consider?
         I have read lot of documentation about CIN implementation and Iu2019m oriented to choose TAXINN schema, but If possible I  would  to understand better which are on behalf of one choice or another.
    b) To define pricing schemas for India, after check with local users and using examples of documents (in particular tax invoice) actually produced, I have understood that taxes have to be applied on amount defined starting from price list, minus discounts recognized to customer plus surcharges eventually to bill (packing, transport,  etc.).
    Itu2019s correct for any type of taxes that tax amount is calculated on u201Cnet valueu201D defined at item level or there are exceptions to this rule?
    Thanks in advance
    Gianpaolo

    hi,
    this is to inform you that,
    a) About point 1 I know the difference between the 2 tax procedures (conditions or formulas). I also have read in others post in the FORUM that TAXINN is preferable. So I would to understand which are the advantages to choose instead TAXINJ. There are particular reasons or it'a only an alternative customizing setting?
    a.a. for give for posting the link : plese give me the advantages of TAXINJ and TAXINN
    CIN - TAXINN and TAXINJ
    b) About point 2, to define which value has to be used as base amount to calculate taxes isn't a choice, but is defined depending by fiscal requirement of the country, in this case India fiscal requirement. I know that, as Lakshmipathi
    write as answer on my question, exception could be, but it was important for me to understand if I have understood correctly the sequence of the pricing condition in the schema in "normal" situation.
    b.b. you can create your own pricing procedure for this and go ahead.
    hope this clears your issue.
    balajia

Maybe you are looking for

  • NB100 3G Ericsson F3507g not working with Windows 7

    I've done everything and I can't make it work in Windows 7, although it works on Windows XP. I've already upgraded the modem firmware to the latest R1D06 (I had to downgrade to XP to do it, because in windows 7 the upgrade program notices "No module

  • GX660 (i5) System Control Manager on XP 64 Bit

    Hi all, I bought a GX660 last week but I don't want to use it with Windows 7 64 bit so I installed Windows xp 64 Bit. After having struggled to find any drivers for this operating system (especially graphics drivers) everything works fine except the

  • New 2012 Macbook pro 15" Retina low FPS

    HI, I bought a top of the range Macbook pro 15" Retina(like 2 weeks ago), 2.6 i7, 512 SSD, 8GB 1600 RAM, nVidia GT 650M 1GB. I am tying to run battlefield 3 on bootcamp (windows 7 Utl x64) and i struggle to get above 12 FPS even on low graphic settin

  • A question about Accordion in Muse on positioning

    A question about Accordion in Muse - e.g. I put an Accordion a web page with an anchor position and use a menu button to point to the location. However, when I resize the browser such that it is narrower than before, the Accordion actually moves towa

  • Workers not working in AIR

    HI, I'm trying to get a worker working in an adobe air application, the problem is: the code seems to work in a flash projector, the calls come and go between workersm but when that same code is used in the air app, the call is made to the secondary