Queue to ERP stopped Status SYSFAIL

Hallo all,
yesterday evening we got the Problem that our Queue to ERP-System stopped. Status is SYSFAIL and and error CALL_FUNCTION_LZ_EXPAND_ERROR occured. Unfortunately theres no text available for this dump. The dump is produced in Program SAPLSMOUTIL in BAPI_CRM_SAVE.
Does anyone have an idea, what's the reason for this failure, or how to resolve it?
Thanks a lot for your help.
Best regards,
Daniel

Hi Frederic and Fredric,
thanks for your further ideas. The dump info didn't contain much info...
We had opened an OSS-message on friday, because it was important to solve this problem fast. SAP meant to delete the entries in the cue, because it seemed that the data got corrupted because of hardware or network errors. The missing data is logged, so we can reload it. Following the queue worked until now.
Thanks for your help!
Best regards,
Daniel

Similar Messages

  • [Urgent] Queues are blocked in status SYSFAIL

    Hi experts,
    I have the following problem that arose unexpectedly in an XI 3.0 installation:
    Queues are blocked in SYSFAIL status and when I click on one entry, I get message: XI Error CLIENT_RECEIVE_FAILED.INTERNAL: Queue stopped
    It seems to me that J2EE stack cannot connect to ABAP stack.
    When I test INTEGRATION_DIRECTORY_HMI connection in sm59, I get no reply..
    I cannot logon to Visual Administrator. It stops at 99%.
    Hardly can I connect to Integration Builder.
    Any ideas.
    I need your help ASAP.
    Evaggelos

    Hi Evaggelos,
    >I cannot logon to Visual Administrator. It stops at 99%.
    Is your XI installation over? 
    We had a similar problem in one of my earlier projects. We restarted the server and everything started working fine.
    If it is possible you can try the same.
    Regards,
    Sumit

  • SMQ2 - Found a queue with name "*" and all other queues stuck in STOP state

    Hi all,
    We have a problem on the ECC side, on outbound asynchronous proxies. Sometimes a new queue appears on SMQ2 there with name "", and with status "STOP". At this time, all other queues stuck with STOP status... the only way of resetting all those queues to RUNNING state again is to delete the queue named as ""...
    Some of you has any idea how this queue "*" appears there and stop all other queues?
    thanks
    roberti

    Hi Ravi,
    Is not only about one queue stopped... the problem is this queue named ""... with status STOP, all other queues stops too with it. The only way to make things work again is to delete the queue named as ""... the problem is to discover what or who is creating this stupid "*" queue. I think that this is a procedural error on datacenter, but they are saying is not the case... I'm investigating, but if someone else has any idea about I would appreciate
    thanks!
    roberti

  • Where to search for  R3A* queues in status SYSFAIL in my system.

    Hi Experts,
    Can anyone tell me in which Tcode or table I can search for the below entries. I am trying to find out these entries  as one of  CRM team member had mentioned the below one.
    R3A* queues in status SYSFAIL were detected in your system. As a result, changes in the R/3 system have not been updated in the CRM system.
    Regards
    Srujan K

    Hi Muthu,
    Can you please tell me what are these Queues belong to, meaning which is repsonsible for what in SRM?
    R3AD_ATTRIBUTE
    R3AD_CLASS
    R3AD_CUSTOME0000000043
    Do we as an SRM consultant have to monitor the SMQR queues also?
    please clarify me on the above 2 points.
    Thanks in Advance!!!
    Regards,
    Srujank

  • Inbound Queue R3AD_SAL_ERR in Status SYSFAIL

    Hi
    In  CRM 2007 i get this inbound queue R3AD_SAL_ERR in status SYSFAIL.
    Could you please let me know why this error occurs and  the steps to solve this error.
    Regards
    Masthan

    Hi Masthan,
    I hope the below mentioned notes will help you to some extent :
    1372859
    608332
    Thanks and Regards,
    Vignesh Ravikumar

  • BPM: Prevent queue from being stopped in case of errors

    Dear experts,
    in one of our BPM scenario, we recently experienced problems when mapping errors occur. In SMQ2 the queue is on status "SYSFAIL" and no further messages get processed. Only when these entries are deleted manually and the queue is unlocked, the other messages get processed.
    Is it possible to configure the queues to process the next message, if the first message is faulty? Currently ALL messages are stopped because of one error. We need an automated solution here.
    Best regards,
    David

    Always make sure that there is proper exception handling in the BPM.
    For your transformation step, handle the exception and in the control step, either
    1. Cancel the BPM or
    2. Raise an alert
    This will ensure that no queue issues or hanging integration processes will be there.
    http://help.sap.com/saphelp_nw04/helpdata/EN/33/4a773f12f14a18e10000000a114084/frameset.htm

  • Status SYSFAIL in SMQ1

    Hi All,
    We are getting an error message with status "SYSFAIL" in SMQ1 while replicating the BP from CRM to ECC and the message goes like "The current application triggered a termination wi th a short dump."
    The BDoc status is in YELLOW status.
    Please help us to fix the issue.

    Hi,
    1. Read this note  Note 430980 - CRM Server: Analysis in delta data exchange R/3->CRM
    They have error status 'SYSFAIL'. This is only the case if there is a technical problem with the receiving system (for example, a database problem on queue tables QRFC, ARFC). The problem must be corrected on the CRM server, and then you can restart the queue. Generally, a short dump is then displayed on the target system, which provides more detailed information on the cause of error.
    2. Check entries in tr. smw01.
    Denis.

  • Reenvio do GRC para o ERP do Status de NFe 225

    Pessoal,
    Enviamos uma Nfe que foi rejeitada pela SEFAZ, com o validador GRC desativado.
    Devido a uma falha de comunicação logada na /XNFE/BACKSTATUS o ERP não teve o update do status da nota, sendo que o GRC estava atualizado com o Status 225 para o lote, com o Error Status 46 para nota.
    Em análise do programa de reenvio /XNFE/UPDATE_ERP_STATUS percebemos que o status enviado ao ERP é o status do cabeçalho da Nfe (tabela /XNFE/NFEHD, campo STATCOD).
    Para o DOCNUM 138746, o campo STATCOD está em branco na tabela /XNFE/NFEHD, porém está preenchido na tabela /XNFE/BACKSTATUS, campo CSTAT como pode ser visto nos screenshots anexos.
    No ERP, então, temos o erro u201CNo status code was received for NF-e 0000138746u201D
    Existe alguma forma de reprocessar NF-e com status SEFAZ setado somente para o lote?
    Segue os prints das telas:
    http://img5.imageshack.us/img5/1936/screen1le5.jpg
    http://img232.imageshack.us/img232/1678/screen2zs7.jpg
    http://img232.imageshack.us/img232/4084/screen3ns1.jpg
    http://img232.imageshack.us/img232/5003/screen4nt6.jpg
    http://img232.imageshack.us/img232/1944/screen5hc2.jpg
    Obrigado,
    Dorval Neto.

    Bom dia Alexandre,
      O report /XNFE/UPDATE_ERP_STATUS foi lançado no SP05 através da nota 1251349, nela é comentado sobre a criação do job e a execução individual. Após esta nota o report foi modificado algumas vezes sendo a mais recente 1273616 ou SP06. Acredito que mais modificações são necessárias ao programa, como a descrita que não retorna individualmente para NFe que ocorreu rejeição 225 por lote.
      Quanto a como identificar o erro:
    a) NORMAL - Se foi uma rejeição de processamento "normal" do R/3, ou seja, por algum motivo conhecido ele rejeitou a resposta enviada pelo GRC, então a resposta será encontrada na tabela J_1BNFE_INVALID no R/3, procure pelo docnum (obter na /xnfe/nfehd-docnum). Existe algumas situações especiais que o R/3 usa como docnum o valor de 9999999999, invalidando a pesquisa anterior. Então procura pela data e hora (ACTION_DATE e ACTION_TIME) da transmissão do GRC para o R/3.
    b) ST22 - Se o não processamento no R/3 foi devido a algum dump no momento da execução da função ou alguma EXIT/BADI, então este não será logado corretamento no R/3. Verifique na ST22 do ERP se existe alguma informação no momento da execução do report update_erp_status.
    c) RFC - Se não encontrar nesta tabela no R/3 então o problema pode ser de comunicação ou impressão, neste caso verifique no GRC NFE os logs de RFC via transação AL11, é um pouco mais complicado, pois você terá pegar o exato work process que fez a comunicação (se seu sistema tiver poucos erros de RFC, então fica mais simples). Exemplo:
      . Transação AL11, Name of Directory Parameter = DIR_HOME
      . Para facilitar, coloque em ordem por data e hora decrescente
      . Procure um arquivo chamado dev_rfcN, onde N foi o Work Process que executou o call function remote (este é o ponto onde talvez não saiba), então procure pelo último data/hora logo após a execução do report /XNFE/UPDATE_ERP_STATUS
    d) SEM OPÇÃO - Em último caso pode-se executar diretamente a função chamada no R/3 (J_1BNFE_XML_IN_TAB) através da SE37 e acompanhar passo-a-passo com os valores que o GRC  tentou enviar sem sucesso (atenção para preencher exatamente os mesmo valores)
    Dorval,
      Poderia abrir um chamado na SAP sobre esta situação, desta forma poderemos submeter à equipe de desenvolvimento para providenciar a correção.
      Atenciosamente,
    Fernando Da Rós
    Edited by: Fernando Ros on Mar 4, 2009 9:53 PM

  • Tomcat is hanging as a stopping status when we try to stop it.

    Hi,
    We are using BOE 3.1 SP6 Patch 1. We believe that our Tomcat ( version 7.0.40 ) has a problem because we could not view BO Infoview Screen one or
    two times in every months.So we have to restart the Tomcat. If Tomcat start successfully, our BO Infoview screen can be viewed and working in success.But for most of times, when we restart Tomcat, it stays as a stopping status and not getting stopped status.
    We wonder that why Tomcat's status is stopping?
    Do you have any idea about this case?
    I have attached some of log files of Tomcat belonging to when we face this problem.
    Best Regards,
    Cihangir

    Hi Hrishikesh,
    Our Maximum memory pool has not been entered any value so far, now we set it to 2048 MB.
    Our MaxPermSize is 320 MB as before. We have not changed it.
    Our Server has 8 Cores, 32 GB RAM,
    Thanks for your helps,
    My Best Regards,
    Cihangir

  • SIA in stopped status after installation of SAP BO BI 4.0 SP02 Full Build

    SIA in stopped status after installation of SAP BO BI 4.0 SP02 Full Build Version
    Regards
    Kapil

    Hi Kapil,
    Please post your question in the SAP Business Objects Administration.
    Here you can only post questions to Integration Kit.
    I think the installation of the default CMS database provided with BI 4.0 i.e SQL Server 2008 Express Edition was not proper.
    Go to CCM.
    Go to SIA Properties and select the Configuration tab.
    Click on the option Specify for CMS database.
    Repoint the CMS to any other available 64 bit Database.
    Start SIA.
    If the SIA starts then that was the issue.
    Please post in the proper category for further assistance.

  • Workflow Notification Mailer stays on Stopping Status

    Hi all,
    I configured all the settings for Workflow Notification Mailer all the steps were successful. After completing the configuration I tried restarting Workflow notification mailer but it stays in "Stopping" status for a long time. In Workflow Mailer Service Container all the services are already activated. My Apps Version is 11.5.9. If any body faced same kind of a issue please help me out to sort out the issue.
    Thanks,

    Hi,
    Can you find any errors in Workflow log file?
    Please go through the following documents, it should be helpful in troubleshooting the issue.
    Note: 564394.1 - How to Troubleshoot when the Workflow Services Go Down
    Note: 753845.1 - How to Perform a Meaningful SMTP Telnet Test to Troubleshoot Java Mailer Issues
    Regards,
    Hussein

  • Application hangs in STOPPING status - NW04s

    Occassionally, when manually stopping an application from the deploy service inside of Visual Administrator, the application stays in a STOPPING status.  The only way that we have been able to get it out of this STOPPING status is to restart the entire server node.  Has anyone else experienced this?  The application is a web dynpro component with runtime/deploy references to another web dynpro applicaion and an EJB application.
    Is there another way to "force" a shutdown of an application without having to restart the entire server node?  After the initial stop_app call, no other operations are allowed on the application.  I don't see anything in the logs after the initial stop attempt of the application....only the messages after trying to stop it or start it again.
    thanks
    Eric

    When this happens next time...try looking at the locking service to see if there are locks the server may be waiting for...

  • SDM instance is shown stopped status

    Hi,
    I am appling a note 905856 after that SDM instance is shown stopped status.
    I already started je22 engine and restarted SDM 3 to 4 times but no status is changed.
    I need some expert comments .
    Help will be rewarded.
    Regards,
    Gurprit Bhatia

    Hi,
    Kindly check what trace file says..check if SDM is in integrated mode and not on standalone.Because sometimes deploying components through SDM command prompt, we take SDM to standalone mode  and then once deployment is over, we take it to integrated mode. So kindly check its mode
    Regards,
    Ameya.

  • Can I cancel mail job from SOST queue and make its status to be error or red

    Do you have any idea to cancel mail job from SOST queue and make its status to be error or red (msgno = 806) by using coding ??

    veekwall wrote:
    Hi,
    I recently (over this past summer) updated my phone and plan with Verizon.  I'm from Pittsburgh, Pennsylvania, and I got the phone in Pittsburgh.  It is a Droid Eris and very nice.  I got it and a month later I moved to Olympia, Washington for school.  Since moving there, I have hardly been able to use it.  The service is terrible and its been impossible to keep in touch with my family, I wasn't even able to call them over Thanksgiving.  I'm also having to pay extra money so I can use the internet on my phone, but I can't even access the internet let alone make phone calls.  It's really frustrating.  I can't use my phone to keep in touch with everyone in Pittsburgh-and if I am ever in trouble I wouldn't be able to call for help, which makes me really nervous.  Is there a way I can cancel my 2yr contract?  Yes.  Just visit a Verizon store, or dial *611 from your phone and let them know you would like to cancel your account.  Would I have to pay a fee-and how much would that cost? Yes, Verizon no longer waives ETFs due to moving to an area without service, so you will probably have to pay an Early Termination Fee.  Since you have a smartphone, it will probably be $350 less $10 for each month of service you have completed.  The Customer Service rep you contact about cancelling will be able to tell you the exact amount.  Would I have to go to the Verizon store I bought the phone from to do this or would I have to do this in Washington-where I am now living and having the problems? You can do it over the phone, or at a corporate Verizon store.  Help!
    -Victoria

  • Unprocessed Outbound Queues on SMQ1 with Status NOSEND...

    Dear Experts,
    We have following 4 Queues which have NOSEND status:
    BW0110BPARTNER_ATTR
    BW0110BPARTNER_TEXT
    BW0110BP_DEF_ADDRESS__A1
    BW0110CRM_SALES_ACT_1
    I cannot unlock this and activate these as the system displays message: LUWs in status NOSEND must be picked up by the application.
    I need your help to know how to process these queues.
    Best Regards, Murugesh

    Hi Murugesh,
        The four queues that you have mentioned are BW specific queues. These cannot be unlocked or activated from the CRM system. For BW queues in CRM, it has to be processed or called from the BW system. BW queues will always be in status 'No Send' in the crm system unless and until it is called by the BW system.
    Regards,
    Ratish

Maybe you are looking for

  • I transfer my ADF application then don't work any thing !!!?????

    Hi everybody, I have an ADF application. it was OK But when I copy my application to another system and run via it's JDeveloper, nothing work correctly, without any error messages !?. I mean navigation button in form don't work , tree is not shown, s

  • When i open pdf files, they keep opening in new windows, i want it to open in a new tab, not a new widow.

    when i open any pdf document in firefox it opens in a new window, i want any open pdf documents to open in a new a tab, not a new window.

  • Regardin bdc

    i have legasy data  in flat file        in that flat file there is  "company ID" (HP ID) field, but in my transaction scree there is no filed of COMPANY ID (HP ID) so in need to up load this HP ID data into the database . what is the approach can i f

  • Fetch from Table Type

    Hi All I am modifying standard smartform. I am facing problem in fetching data from "Form Interface". For Eg. Status           type         output_status but here "output_status" is Table Type of some Structure(from where I want to fetch the field).

  • Free Trial Setup Error

    I am currently trying to download the free trial of Photoshop Cs4 but I am having difficulties. I am able to download and extract the necessary files but I am unable to actually setup the program. When I click on the "setup" icon, a window opens that