Qulaity stock included in the Plant stock -MD04

Dear All ,
                  I am having  following stock for the Material A ,
Unrestricted Stock  =  0
Quality Stock           =  10
When i check in the T-code :MD04 , System shows the Plant Stock as 10 , and this stock is included in MRP also ..
I have checked the Checking Rule assignment in the configuration  plant parameters under MRP .
How the Quality stock is included in the plant stock and the same considered for MRP .
Is this logic is correct one ...
I am expecting some replies from you all

hi,
What you notice is standard SAP behavior. QC stock is considered in plant stock & same is available during MRP run. However for Av. Check you can exclude QC stock in the checking rule.
If your business need is not to include QC stock in MRP run, then create a SLoc which is not MRP relevant & maintain the stock in this location. In MRP - 4 view you need to maintain the value 1 for Sloc MRP indicator. You can get this value defaulted for all newly created materials in OMIR. For mass changes of existing materials you can use MM17.
Regards,
Vivek

Similar Messages

  • STO. How to create the stock in transit if the plant has been block.

    Problem with STO. How to clear the stock in transit if the plant has been block.

    The command builder takes a Select SQL and automatically creates a Insert, Update, and Delete SQL commands.  The database could have Insert priviledge and not Updates and Delete priviledges. But I don't think this is causing the problem.  I suspect
    the Orcacle Client handled an exception that wasn't returned to you code and the client is in an invalid state.  You may need call a new constructor for the client.  I would check the Control Panel : Adminsitrative Tools : Event Viewer to see if
    there were any error messages created when you ran the application.
    jdweng

  • Transaction to see the Open stock transfer order for the plant

    HI ,
    i need to develop one report in that client to make the report for the all open stock transfer order & the cost of the open stock transfer order for the plant .
    I need how to cretae the stock transfer order for the material , whci material master is required for this process.
    please give me step by step details for this .
    regards
    satish
    Edited by: satish kapartiwar on Jul 16, 2009 9:33 AM

    Hi Satish,
    You can see open stock transfer quantity in MB5T and stock value in MB5L. If you want to make stock transfer, there is two types intra company transfer(with in same company code) and inter company transfer (different company codes).
    Steps for Intra company stock transfer:
    This is only within the comp.code(w/o SD)
    (w/o SD) 351101 MvT. and (with SD) 641101
    1. Mat.(1434)should be maintained in both the plants.(@1000&1100).
    2. Should have enough stock in supplying plant(1000).
    3. Make its supplying plant as a vendor in vendor master record in receiving plant(1100).
    4. Make it receiving plant as a customer in customization.
    Create customer (xd01) & and define the shipping data for plants in both the plants.
    Path: spro u2013 img u2013 material mgmt u2013 purchasing u2013 po u2013 set up STO u2013 define shipping data
    (1 by1 )
    In Receiving plant (1100)
    Customer num. 123345 (for ex.)
    Sales org. yyy
    Dist. Channel yy
    Sales div. y
    In Supplying plant (1000)
    Customer num. -
    (don't fill)
    Sales org. yyy
    Dist. Channel yy
    Sales div. y
    5. Assign doc. Type is "NL" for intra company STO. If STO is inter company, Assign doc. Type is "NLCC".
    Position doc type is "UB"
    Enter supplying plant(1000) & doc type (NL)&checking rule (ex:01)
    6.Assign doc. Type is "UB" to u'r plants.(PO)
    Go for new entries
    Enter supplying plant(1000) & Receiving plant (1100)&doc type (UB).
    7. Create a PO, choose the doc type is 'UB' & item cat.'U', Enter supplying plant as a vendor in PO of the receiving plant(1100).
    8. Provide this num (PO) to SD people, they will do the delivery by using transactional code is VL10B.
    9. Sales people they will provide "out bound delivery num".
    10. Do the GR. In GR the second tab 05 outbound delivery instead of PO mov.type 101.
    11. See the stock overview in the receiving & supplying plants.
    Steps for Inter company Transfer:
    1) Create one Customer Master in XD01 with respect to Supplying Plant Sales Area and assign this Customer no with Receiving Plant in OLME->PO-> set up STO->Define shipping data for plant and for the supplying Plant assign the above sales area.( Make sure, In Customer Master, sales Area Tab: you are maintaining shipping condition)
    2) For Receiving Plant Pur. Org and Co.Code Combination create Vendor master in XK01 and in this vendor master assign the Supplying plant in Pur.Org.Data screen->Extras--> Add.Pur.data
    3) OLME->PO-> Set up STO------>For your supplying plant assign document type NB, Delivery type NLCC and Checking Rule RP
    4)then For your supplying Plant and receiving Plant assign Document type NB
    5)Make sure you are maintaining Sales View for the material at supplying Plant and in Sales /Gen plant Data view maintain Availability check, Loading group and Transportation group.
    6) In SPRo-->Logistics execution> Shipping->Basic shipping functions->Shipping point Determination>assign shipping points-> For your Loading group, Shipping Condition and Supplying plant combination, Assign shipping point
    these are the configuration settings you have to do in background.
    Then Create STO from Receiving Plant in ME21N with document type NB.
    Based on that STO, Create Delivery in VL10B from supplying Plant
    Do PGI in VL02N from Supplying plant
    Do GR in MIGO at Receiving Plant keeping Outbound delivery as a ref. document.
    Now your STO bet. two plants belongs to diff. Co.Codes will be completed.
    Regards,
    Prasath

  • Regarding to stock in the plant.

    I maintained stock in the plant i.e. Unrestricted stock Having batch number . while doing the delivary the system showing "only 0 kg of the material is avilable.( i maintained the batch number in the delivary note also)".
    may i know what are the settings needed?

    have u posted the stock using using mb1c with batch number?
    if not post the material using mb1c with batch numbers

  • Stock Transfer between the Plants Abroad

    Dear Experts,
    I need any one of your guidence in step by step configuration of stock transfer order between the plants situated in two different countries under one company code in EOU.This STO requires billing document to be posted to A/C with Zero Value for INTRASTAT purpose.Any guidence will be appreciated.
    Thanks in advance.
    Regards
    kumar

    Dear Kumar
    Please check the links
    [Plants Abroad|http://help.sap.com/saphelp_46c/helpdata/en/e5/077f984acd11d182b90000e829fbfe/frameset.htm]
    [Plants abroad: Sales-specific settings |http://help.sap.com/saphelp_46c/helpdata/en/34/60b19dae724effe10000009b38f91f/frameset.htm]
    thanks
    G. Lakshmipathi

  • SC stock back to the plant

    Hi Foks,
    Have  a scenario
    - PO created with 'SC vend' checked.
    - The GR and Invoicing too was done.
    - Later the user unchecked the 'SC vend'.
    Now as expected the stock got updated at 'Stock provided to Vendor'.
    The user wants the stock back to the plant.
    What is the expected way to 'get back'.
    Note this is not a component.
    Regards

    In my opinion you have two options, basically:
    - cancel the GR (MBST / MIGO) and after change settings in PO and do a new GR to your SLoc.
    - move the goods by MB1B + 542 from subcontractor's special stock segment to your SLoc/Plant.
    Regards,
    Csaba
    Edited by: Csaba Szommer on May 19, 2009 4:13 PM

  • Project stock belongs to different plant than the plant in project definition

    Dear all,
    I have a case:
    Project belongs to plant A (which is entered in the project definition), but there's a material in project stock which is belongs to plant B (checked in MMBE, the material under this project, but under plant stock B).
    Is this the normal case of SAP standard? As I never seen this case before (always project stock belongs to the same plant as entered in the project definition).
    Awaiting for your answer& clarification.
    Thanks and best regards,
    Andy

    Thanks for your helpful answer.
    I'd like to explain more about this case:
    I found a PO and a good receipt document to the project stock, and the plant in these documents is plant B.
    Then the material appear in MMBE under project stock and plant B.
    But when I check the project in CJ20N, the plant in project definition is plant A.
    As the requirement is to reverse the goods receipt document, but when doing so, system issues a message as "inconsistency data", so I confuse is it because of the different in plant stock in goods receipt document and plant in project.
    That's why I ask is this the standard case if material in project stock belongs to different plant than the plant in project definition.
    Hope you understand clearly my situation.
    Do you have any more suggest in this case?
    Thanks and best regards,
    Nghia

  • Available Stock - MD04 - Movement  Types

    Hi All,
    I find it difficult how system calculates the stock quantity in MD04 transaction.
    Can this Available stock quantity be interpreted in terms of movement types ?
    for example like a difference between receipts and issues in MB51
    (Movement type 101 + Movement type 102)  - (Movement 601 + Movement type 602)
    Please advise.
    Meghna

    Dear,
    I have not understood your question, As I understood my answer is as below
    the stock what you have is the stock available as on that date in the plant(what you see in MMBE, unless otherwise any of the storage loc is not covered under MRP)
    To see exactly how this figure is achieved, got MMBE and place the curser on the plant stock and follow the menu path
    environment -->material movements....
    you will get all the movement type which contributed for this stock.

  • Reg : Enhacement for the transaction code MD04

    Hi experts,
    I have implemented an user exit for the transaction code MD04 where in the stock/requirement list I am supposed to add a new column for the exception number which displays the exception description for the corresponding exception number.
      The coding part for fetching the exception description for the corresponding exception number is done in the include 'ZXM61U03'.
      The problem is in the importing parameter IMDEZEXIT in which all the screen data will be present basing on which the data fetching is done .The AUSKT(Exception number) value is not getting populated . All the other data in the row is getting populated.
    Please suggest e a solution for this.
    Regards,
    Ramkishore.

    Hi
    Hope it will help you.
    reward if help.
    Please use FM MD_STOCK_REQUIREMENTS_LIST_API to get all information for transaction MD04/MD05.
    You might also want to check out the function module API.
    MD_MRP_LIST_API
    and also
    check this link for extracting data from MRP tables:
    http://www.sap-img.com/pp001.htm

  • STO from storgae location to storgae location with in the plant

    Is it possible to create stock transport order to move stock from one storage location to other storage loctaion with in the plant? what are configuration settings required?
    how to define sending storgae location.
    Thank you

    hi
    In 4.7 version you will not get the Storage location to storage location Stock transfer option.
    This is applicable to the ECC version only.
    In 4.7 version you can adapt the Transfer posting from Storage loc to Storage loc using the Movement type 311,
    but if you need the delivery type, Shipping data for Stock transfer b/w Storage loc to Storage location it is not possible in 4.7 version. It is only avalible in ECC versions.
    Stock Transfer Between Storage Locations
    u2022 Function of stock transport orders between storage locations is available from ECC 6.0 onwards.
    u2022 As a result of which user can input issuing storage location with supplying plant.
    u2022 Facility of using different delivery types for different issuing storage locations is available.
    u2022 Shipping Point data can also be determined based on the issuing storage location.
    if u want u can try following in ECC version
    STO in Storage loc
    http://sapfunctional.com/MM/StockTransfer/Configure.htm
    hope it clears
    regards
    kunal

  • Machine part (From the Plant sending )outside for  job work

    Hi
    i want to send a machine part present in working location (but not a stock item) outside the plant for job work and that part is excisable material.
    How can i send this to vendor or
    is there any procedure for this ,inform me.
    Regords
    manju

    I  want to send a machine part present in working location (but not a stock item) outside the plant for job work and that part is excisable material.
    How can i send this to vendor
    Hai,
    1.Do the MB1A with 202 mvt type to get back the material from the Work location Cost center to Storage location.
    2.Create the Subcontracting PO without payment of excise duty ie., with subcontracting challan. Here the components provided to the vendor & material at item overview should be the same.
    3.Do the MB1B - 541 Mvt type transfer posting.
    4.Create the subcontracting challan w r t material doc by J1IF01
    5.Do the MIGO for SC PO.
    6.Reconcile the SC Challan.
    7.If the qty is fully reconciled then you can complete the challan.
    8.Do the LIV for SC PO.
    9.Do the MB1A with 201 MVT type to issue the material to the Work location.

  • Common delivery instructions for both the plants

    hi,
    sap gurus,
    in sap system order and delivery instructions are genarated seperately for plants individually. 1000 and 2000.
    but in our practice one delivery instruction will be created for two plants and basing on the truck availability and feasibility of practice and where ever stock is available they will supply from that plant.
    for eg:
    1000 kgs ordered --- 1000 kgs might be delivered by plant 1000 --- every time.
    1000 kgs ordered ---  500 kgs might be delivered by plant 1000 and the remaining will be delivered by plant 2000.
    i know that in SAP this functionality is not there, but provide me a way how to solve this issue.
    requesting to provide solution for this.
    regards,

    Hi;
    One way of doing it is splitting the order itself. Instead of 1000 units make it as 2 line items of 5 units each and change the plant at the item level. If you want to automate this process then i am afraid that we may need to make changes to the User exit and incorporate the change.
    Regards,
    Mani

  • Reg storage location for all the materials in the plant.

    Dear Gurus,
                       In my plant I would like to know the storage location for all the materials in the plant.can u guys suggest me the solution?

    If Stock is there in Each Storage Location then You can Run MMBE Report by Inputting Material & Plant. Then it will Show All the Storage Location Stocks for a Plant.
    Or you can Run MM60 Report Which will give you Detail Report.
    Else you Can Check in MMSC List of Extendable Storage Locations.
    Regards,
    Ashok

  • ATP CHECK in all storage Location of the Plant

    Dear gurus,
    we have the stock for the component in the storage location :
    Storage Location A 10 PZ
    Storage Location B 30 pz
    Storage location C 40 pz
    In the planned order for this component there is the storage location A.
    The ATP check ( in the transaction MDVP) confirm the quantity only in the storage location A, but i would like confim the quantity stock of all the storage location, also having to maintain the storage location A in the position of the component in the planned order.
    For example for the planned order the requirement for this component is 30 pz , when i run the atp check the system confirm only 10 pz in the storage location A present in the position of the component, but i need confirm all quantity because present in others storage location, also having to maintain the storage location A in the position of the component in the planned order.
    I need see in the avalaible ATP check all the storage location of the plant, there are the customizing setting or material master setting.
    Thanks a lot
    Daniele Pistilli

    Daniele,
    First determine which ATP check is being used for your planned orders in OPPJ under plant or MRP group.  Then, also in OPPJ, under 'Determine Check', modify that availability check by ticking the 'no stor locn inspectn' box.
    Perhaps you can advise your 'friend' [Luca Malavasi|http://forums.sdn.sap.com/profile.jspa?userID=841888], of this response as well.  He has asked the same question. 
    Atp Check see all storage location of the plant
    I won't blindly assume that a single person is using more than one userid on these forums.  Many of the moderators do not permit this practice..
    Rgds,
    DB49

  • Atp Check see all storage location of the plant

    Dear gurus,
    we have the stock for the component  in the storage location :
    Storage Location A     10 PZ
    Storage Location B      30 pz
    Storage location  C       40 pz
    In the planned order for this component there are the storage location A.
    The ATP check ( in the transaction MDVP) confirm the quantity only in the storage location A, but i would like confim the quantity stock of all the storage location .
    For example for the planned order the requirement for this component is 30 pz , when i run the atp check the system confirm only 10 pz in the storage location A present in the position of the component, but i need confirm all quantity because present in others storage location, also having to maintain  the storage location A in the position of the component in the planned order.
    I need see in the avalaible ATP check all the storage location of the plant, there are the customizing setting or material master setting.
    Thanks a lot
    Daniele Pistilli

    Hi,
    In OPJJ "Scope of Check" Under "storage location Inspection" check the box against " No storage loc Inspection"
    This indicator is used to set the scope of the availability check. It is used to switch off the check at storage location level.
    Test this and revert back
    pavan

Maybe you are looking for

  • How to use a gif to replace the original background in the tab on portal ?

    Hi All: I want to change the background by using a gif as the background in the tab of the index.html. The Area is like the red area in the url below. Link:[pic example|http://uploads.bizhat.com/view/103254] All I know is to change a CSS in a par fil

  • Error while trying to replicate current environment

    Hello all, Bi server throws these errors after uploading and restarting RPDs. I am trying to replicate the current environment, not able to understand whats causing the error. Could anybody help me with this. <Aug 19, 2011 10:39:58 PM PDT> <Error> <o

  • Dynamic variable failing

    <p>I have some code with a connect by clause.  When I use atext string in the 'start with' part of the statement the codecompiles and runs.  When I use the dynamic variable [$folder]I get a compilation error:  Error and then code is includedbelow.  <

  • How to get the Negative Form value in the B1

    Dear All, Any one Help me how to get the UDf value in the System form . Please Reply me ASAp Thanks Dhiraj

  • I have a common switch on two panels.

    When a panel is brought to foreward, it should be in control of the switch. When the switch is closed on one panel, it should be closed on the other panel also, so that when that panel is brought foreward, the switch will be in the correct state. Not