Quota Arrengement in Scheduling agrement -MRP

Dear Support,
    We are going to implement Quota arrengenet in scheduling agrement through MRP. So please provide some usefull document so that based on that we can able to implement our requirement.
Please provide some usefull document and concept for quota arrengement.
Thanks

Hi Kumar...
take a look on these threads...
Quota Arrangement
Re: Quota in Quota Arrangement
Hope this helps
Regards
Eduardo

Similar Messages

  • Schedule Agrement

    Hi
    In Schedule agrement Schedules are are eneterd as follows
    Target Qty 10000
    Schedules
    01-08-2008 - 200nos
    05-08-2008 - 200nos
    But the items are ready and we want the despatch the material today(17-07-08), in the initila Outbound delivery creation screen
    the system dispalys message as "No schedule lines due for delivery up to the selected date"     
    If we change the date to 01-08-2008 in the initial selection screen we can enter into Delivery doc screen and can create PGI
    is there any other metod/ or report is available in SAP to over come above problem.
    (ie. if we eneter schedules Date wise and wants to despatch the material before the schedule dates)
    Regards
    Naga/Raavi

    scheduling is for supplying according to a schedule. You ahve every right to override the system. But how can you expect the system to understand that it should despatch on the 1st when it should actually despatch on the 8th.
    When you save the order with schedule lines it will save the order with the schedule lines confirming the qty for those dates. If you want to deliver it earlier you need to reset the dates in the order as well.
    Another way of the getting around is change the MRP type from CP to CN for that line item. This will allow you to confirm qty for 1st. But remember there is not planning in such a case. IN other words scheduling does not apply.
    regards
    Jude

  • Pricing procedure for scheduling agrement as per PO

    Hi,
    As per the std. procedure in case of Purchase order , the Pricing procedure get detrmined as per schema determination  but in case of Scheduling agrement it not works in the that way, the pricing procedure comes as per the pricing procedure atttach to the condition type in M/06 to the condition PB00,  so it it possible how attach the pricign procedure as per PO  for different vendor.
    regards,
    zafar

    Hi Zafar,
    One step back.
    In SPRO U can assign the calculation Schema to GROUP of P.Org. and GROUP of Vendor.
    Check this link.
    Material manamegemnt > Purchasing > Conditios > Define pricing determination process > define schema determiantion.
    Once U have defined a group for vednor U should assign it to yours.
    Does it satisfy your request?
    Regards,
    Mik

  • Scheduling in MRP Run MD02

    dear all,
    i still confuse for using scheduling in MRP run MD02,
    what is the use of using both scheduling type "1" and type "2"?
    because if i run the MRP using scheduling type 2,  after i generate the planned order, then i can see the capacity planning evaluation,
    but not if i run scheduling type 1
    if i run the scheduling type 1, how can i analyze the capacity planning?
    until now, i always run the scheduling type 2, because i think it is more useful to run scheduling type 2,
    so what is the plus and the minus using scheduling type 1 or type 2?
    best regards,
    MARUFAT

    Hi,
    In simple words:
    The main difference between scheduling type 1 (Basic date scheduling) & Scheduling type 2 (Lead time scheduling & Capacity requirements) is from which records MRP reads the values.
    Basic dates is more like a rough scheduling where the values are read from the material master & the exact operation times are not considered or capacity requirements generated.
    Lead time scheduling is more precise meaning for each in-house produced material it reads the routing & checks the time maintained for each operation, it then calculates the exact times for each operation based on the working days, shift timings, breaks & also generates capacity requirements.
    Now what is the criteria to select... it depends on the business requirement. But the data maintenance for Scheduling type 2 is higher as compared to Scheduling type 1.
    What is the benefit for going for Scheduling type 2.... well it gives you a clear picture on your production planning process & how much capacity is required, whether you have the requisite capacity etc etc.
    Basic date scheduling is preferred when you do not want such fine control on your production planning process.
    For more info refer to SAP help, it should make it more clear.
    Regards,
    Vivek

  • Planned order scheduling in mrp

    hi
    iam trying to run MRP at my client place
    facing problem in planned order dates
    i choosen  tequirement type BSF and strategy group as 11
      in md 61 pir was given in a month of june2008(monthly)
    after mrp run at modo4 iam getting planned order with
    execption message 64 called order date in past
    means iam getting planned order START DATE AND END DATE IN THE MONTH OF JUNE
    where as i need to  my planned order satar date in MAY MONTH and
    end date must be 1st of june
    means i given PIR which is my start of my june month
    checked scheduling parameters which  says backword scheduling, and i choosed planning mode 3 and leddtime scheduling
    plz suggest which setting effects the planned order start and end dates??
    regards
    sasikanth

    hi
    i selected schedule margine key with 0 flots (key000)
    and chossed *LEED TIME SCHEDULING (in mrp controll parameters :-scheduling 2 at MD02 )
    how the reduction strategy helps in this case ,casue i am doing lead time scheduling system has to consider only routing time ??? right ??
    plz suggest how to  arrest message 64
    regards
    sasikanth 
    message 64 diagnosis enclosed
    64: Production finish after order finish                                                                  (P4)
    Message no. MD427
    Diagnosis
    The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.
    As the system uses the order finish date in the planning run, this situation may lead to material shortages if production is not finished until the production finish date calculated by the system.
    System Response
    This exception is displayed in the MRP list and in the current stock/requirements list.
    Procedure
    Check the times in the material master record and in the routing.
    Check whether the order has to be rescheduled in.

  • BADI or User Exit for scheduling in MRP

    Hello,
    I am searching a possibility to influence the scheduling of planned orders, when they are created in the MRP run. There exists a BADI which is called when creating planned orders manually, but not in MRP. Its name is MD_PLDORD_SCHEDULING
    Does anybody know about such an alternative for scheduling in MRP?
    Thanks in advance
    Roland Böhm

    Hi,
    Check these Enhancements
    LMDR2001 User exits restr. profiles of opt. pur.ord.-based load bldg
    LMDZU001 User exits in additional planning
    Regards,
    Satish

  • Influence on lead time scheduling in MRP

    Hello,
    I am searching a possibility to influence the scheduling of planned orders, when they are created in the MRP run. There exists a BADI which is called when creating planned orders manually, but not in MRP. Its name is MD_PLDORD_SCHEDULING
    Does anybody know about such an alternative for scheduling in MRP?
    Thanks in advance
    Roland Böhm

    Hi,
    During MRP run for single material by MD02 or on plant level by MDBT,
    For MRP control parameters-
    Scheduling take value as 2 - Lead time Scheduling and Capacity Planning.
    and run the MRP.
    With this you will get planned orders, and production rates are calculated as per time mentioned in routing.
    But if you take scheduling value as 1 - Basic dates will be determined for planned order, then you system not consider lead time. Dates are picked from material master.
    Srini

  • Quota arrangement with schedule agreements

    Dear guru's,
    I maintained source list with 3 Schedule agreements with 3 different vendors, MRP indicator as 2, in Material master Quota as 4, and maintained Quota.
    now after planning run i am getting two PR's for two vendors and for third vendor schedule lines are generated against that schedule agreement.
    can u any one help me in this
    vinay

    Hi,
    In the source list have you put a 2 as MRP indicator for all the scheduling agreements in the source list.
    Also please make sure that the fixing indicator is not set in the source list.
    Can you also check the if the validity period for all scheduling agreements and source list entries are correct.

  • MRP - Problem in scheduling of MRP created schedule lines

    Hi,
    I am working with single level BOM of FG and trying to generate Schedule lines for RM as per requirement coming from FG - BOM explosion during MRP run - 
    Material master setting of RM is  as below -
    MRP type - PD,
    Lot Size - Ex,
    Procurement type - F,
    Planned dlv time - 14 days
    i am getting dependent requirement as below -
    06.07.2009 - 2000 EA
    13.07.2009 - 1500 EA
    01.08.2008 - 1000 EA
    And schedule lines are generated as below -
    06.07.2009 - 2000 EA
    13.07.2009 - 1500 EA
    01.08.2008 - 1000 EA
    The date of schedule line should be after taking calculation of planned del time of the RM, which is not happening. I can't understand why?
    The planned dlv time is same in all 1) Material Master 2) Scheduling agreement and 3) Pur info record
    Please help.
    Regards,
    Amol

    Dear Amol,
    the date shown is the ultimate reciet date and not start date.
    Since you have already converted PR into schedule lines you will not be able to see the actual start date.
    If it was still a PR you can see the release date as planed delivery time days early.
    If the requirements date was say 31/05/2009 and you were taking planning run today then the recieved date would come as 05/06/2009.that is 14 days from today.
    if requirement well beyond planned delivery time then the planned delivery time will not reflect in recipt date.

  • Scheduling agreement MRP run

    Hi All,
    We use Scheduling agreements for purchasing spare parts. The nightly MRP run checks the warehouse requirements and creates delivery schedule line to scheduling agreement.
    Now the MRP run creates unnecessary delivery schedule lines to scheduling agreement if the earlier created delivery schedule line's delivery date has been changed manually.
    Today the MRP run finds requirement for article XYZ and creates the delivery schedule line, where delivery date is 2.9.2008 (determined from articles basic data).
    The Vendor confirms the delivery date as 3.10.2008 and the purchaser changes manually  (transaction ME38) the delivery date to delivery schedule line accordingly and prints the created message.
    The next MRP run creates new delivery schedule line, where delivery date is again 2.9.2008.
    After that there are two open delivery schedule lines for article XYZ with delivery dates 3.10.2008 and 2.9.2008.
    Why the MRP run does not notice the existing delivery schedule line with the new delivery date 3.10.2008?

    issue resolved

  • Dates for Backwards scheduling when MRP Run

    Hello experts,
    When MRP run, which calendar does SAP take to schedule planned orders? where could I indicate it?
    Thanks in advance.
    Laura

    Thank you all,
    I have checked the calendar that is assigned to my plant, and, as you have said, is the one that is taking into consideration to determine the dates.
    In my case, Saturdays and Sundays are not workdays. As a result, every purchase requisition has its release date assigned to a workday.  What I have noticed is that although Saturdays and Sundays are not work days, planned delivery time and In-house production time is taking them into consideration to calculate the release date. What I mean is that those two fields are defined as calendar days. Is that correct??
    Thanks again.

  • Scheduling after MRP

    Hi All,
    I've below case:
    A Finished product A has a raw material R1 as a component.
    Raw material R1 has planned delivery time as 2 days.
    I enter the demand for A and run the MRP.
    MRP gives scheduled planned orders for material A with some order dates and creates PRs for R1.
    I've situation wherein planned delivery time for R1 is changed from 2 to 10 days.
    (Or consider R1 not procured as scheduled)
    Now, I re-run the MRP for A and expect that the order dates for planned orders are changed.
    They are pushed further as planned delivery time for R1 is increased.
    But dates remain same for planned orders of A. If we check PRs for R1, the dates are changed.
    Strategy group for A is : 10
    MRP run parameter for Scheduling : 1 and also 2 (both are used)
    How the dates for planned orders for A are changed or even production order if not planned order?
    Objective is that we should not get missing parts message in production order when it is taken
    at order start date.
    Thanks in advance.

    Hi,
    The dates in planned order will be captured from the inhouse production time in the material mater and in the routing time (if it is lead time scheduling).
    After creation of planned order you can run the report MDVP to check the availability of raw materials for each planned orders. Once it is available you can firm it, then you can convert it to production orders where you will not get the missing parts.
    You can also do availability check in each planned order (change view / MD12). The scheduling option is to generate the scheduling dates based on the routing times.
    Thanks,
    JK

  • Scheduling the MRP run

    I have configured in the system for a Re-order point planning MRP run. But I have to execute the MRP run manually through MD03 transaction. Is it possible to schedule it ,eans system will execute MRP run automatically at a scheduled day of a month?
    Please advice.
    Thanks
    Satya
    Edited by: Csaba Szommer on Aug 18, 2011 12:51 PM

    hi,
    I don't see any direct solution for it...
    but indirectly,
    Try to remove the line item ie. source from the source ...and try again...
    its not possible to do via changing the dates...nor any source doc...system still create the procurment...
    also try via changing the MRP indicator in the source list to NO MRP...
    let me know updates..
    Regards
    Priyanka.P

  • Scheduling in MRP

    Hi, one fert req one roh to maufacture. we have mentioned 2 days for fert mat as in-house prod days, 2 days as pland delivery days for roh. after mrp run, how system will schedule the dates? pls explain. we know delivery date in sales order.

    Dear Yadav,
    As per the scheduling parameters given to OPU5 (for plan orders) scheduling takes place in MRP
    There are two types of Schedulings
    1) basic date scheduling
    2) lead time scheduling
    basic date scheduling -  in initial parameters of MRP if u give scheduling as basic scheduling then system takes the data from material master i.e in-house production time. in this scheduling capacity requirments are not generated
    lead time scheduling -  in initial parameters of MRP if u give scheduling as lead time scheduling then system takes data from Routing to calculate dates. here cacity requirments are generated.
    Coming to dates
    if ur maiantaing in-house production time as 2 days for FERT & 2 days as plan delevery time  (without GR processing Time)
    Then system does backward scheduling as (if u maintain backward scheduling in OPU5)
    so total days for FERT to be availble will be 18.07.2009 (starting from today)
    Regards
    kumar

  • Schedule agrement: Delivery schedule

    Hi,
    For a sub contracting schedule agreement,when i try to maintain delivery schedule(me38) and try to explode BOM.the system is taking first alternative BOM but i wnt to explode second or third alternative BOM,
    How it can be done
    Regards,
    SAGAR

    Hi,
    This is generally controlled by the field 'Altern. selection' = 1 in the MRP view 2 of the material master.
    When this value is 1, alternatives are selected according to the BOM explosion date.
    Please check the Date of the alternative BOM's created and check for the desired BOM explosion.
    Regards,