R/3 4.6C and APO 5.1 integration problems

Hi Frends,
   I have a problem in integrating R/3 4.6C with APO 5.1. Systems are connected with required standard settings and RFcall is happening beween systems. Publication settings are done for immediate transfer of external procurements in APO. The plants, vendors, materials, stocks, PR+PO, are integrated successfully.  Problem is;  APO generated purchse requisitions are not getting published  into R/3 and getting stuckup in R/3 inbound queue with a reason " Integration model is not active for PR". Integration models are active and PO from R/3 is getting integrated with APO. I tried with CIF re-conciliation. Here too, I am unable to select the transaction data integration models in CIF Deltareport3 screen. Re-conciliation without any reference to model is returning the same above error. CIF logs are not of any additional help other than the above error entry details.
   Any experience share and help in this regard is highly appreceated.
Regards,
Raghav

Raghav,
The most common reason for this error is exactly what it says, you have somehow overlooked including a material/plant in a PR IM.
Go into the failed queue, find all material/plants that exist in the failed LUW.  Enter these one by one into CFM5 in R/3.  You should have one and only one active model for each of these materials.  Inactivate all but one IM if there are multiple PR models active.
If this PR is for a STO, then you must have open active IMs for both the source and destination plant materials.
Now, you say that in SCM you cannot select the models, this means that they are not active and valid.  If you can find the model in R/3, but Delta3 can't find it, it implies that there is some type of error with connectivity, perhaps in your system destination definitions.  Wrong RFC connection name, wrong server id, wrong client, etc in SM59.   Or, wrong logical system name.  Check these on both sides.
More unlikely, but also possible, check is for inconsistencies in the IMs.  In R/3, run RAPOKZFX.  Regenerate your IM runtimes with RCIFIMAX.
Finally, it is possible that you have userexits that are impacting the CIF.  Talk to your developers to see if any have been activated.
Best Regards,
DB49

Similar Messages

  • Zend studio 8.0 and flex 4 plugin integration problem(please help!)

    hello every body, actually i have installed Zend Studio 8.0 is built on Helios( which is  currently the latest one) and trying to integrate flash builder 4(flex  4) plugin, but when i point to (C:\Program Files\Zend\Zend Studio -  8.0.0) folder the flex installer warns me since there is no folder named  "dropins" in Zend Studio - 8.0.0 directory . even if i ignore the  warning from flex plugin installation and continue to finish and at the  end when i start zend studio no flex plugin is detected.please can any  one help me in this regard. i will grately appreciate a help from the adobe team and community.

    this is the same problem disscused in thread (Flash Builder 4 plugin with eclipse 3.6)  http://forums.adobe.com/thread/747394?tstart=0.please follow that thread if any one do not understand this thread problem.

  • Crystal Reports 10 and MX 7.0 Integration Problem

    We have Windows 2003, MX 7.03, SQL 2000 and Crystal Reports
    10 installed. When we run the Crystal report first time, it's okay.
    The problem is when we try the second time, we will get the message
    "Server Error The server encountered an internal error and was
    unable to complete your request. Run closed connection." The only
    way to get around this problem is to click on X to kill the browser
    and try to run the report. Does anyone have the same problem and
    know what caused this?

    I found what caused this. After turning off the debugging in
    CF Admin, the problem went away.

  • BASE UOM different in R/3 and APO

    Hi Experts
    I am working in a scenario where we have 2 R/3 boxes connected to 1 APO. The products are common across the boxes but locations are different. We are implementing GATP with Rules based substitutions for locations across the R/3 boxes. Since the confrmations in sales order in 1 R/3 box will have supplying locations lying in other R/3 box, we have set up all 3 systems (2 R/3 and 1 APO) under the asme BSG.
    1. Now there is a situation where there is a material defined with the same material number in both R/3 boxes but the base UOM is different (eg. In one box it is Kg and the other it is gram). All relevant conversions (Kg to gram and gram to KG) are already defined in respective R/3 material masters. It is evident that in APO I will be working with only one base UOM. I have transferred the material from one of the box and the base UOM transferred is KG. If I CIF the same material from the other box (for different location and different base UOM gram) I get an error as the there is a base UOM conflict in APO. Have you come across such a situation in any of your projects? If yes then how did you reslove it?
    2. Assuming that I am able to overcome the above problem by using user exits around CIF, I will have a situation where there is a material defined with base UOM as GRAM in one of the R/3 boxes and KG in APO (I manually simulated such a scenario by changing the base UOM in APO). In both R/3 and APO the appropriate UOM conversions have been defined. When I CIF stock of 10 gram, it comes in APO and appears as 10 KG. Is there a workaround for this situation.
    Your response will be greatly appreciated.
    Thank You
    vijeyeeta

    Hi Bharath,
    EDI can be extensively used in Vendor managed inventory process(VMI) in APO.
    I have attached the link for this
    http://help.sap.com/saphelp_scm70/helpdata/EN/48/03f69d67b34aa7e10000000a421937/frameset.htm
    Regards
    R. Senthil Mareeswaran.

  • What are the table names for CRM and APO?

    hi friends,
    what are the table names for CRM and APO?
    Regards
    suneel.

    hi Suneel,
    check in crm forum
    Re: SAP-CRM Tables
    BUT051 BP Relationship: Contact Person Relationship
    Similar to BUT050 , additionally contains Contact Person’s Address data
    BUT0BK Business Partner: Bank Data & Details
    BP Number, Bank Key, Bank Country Key, Bank Account Number
    BNKA Bank Master Data
    BUT100 BP: Roles
    ADR2 Telephone Numbers (Business Address Services)
    ADR6 SMTP Numbers (Business Address Services)
    Contains Email – Id of the BP.
    ADRC Addresses (Business Address Services)
    BP’s Complete Address Details- City, Country, Post Code, District, Street, Title No Etc
    TSAD3T Table containing the Title text against a Title No.
    COMM_PRODUCT Master Table for Product
    CRMM_BUAG Master table for Business Agreement
    CRMM_BUAG_H Header Data for Business Agreement such as Tax Category, Tax Characteristic, Form key, Business Agreement Class. Data in this table correspond to ISU CRMD_ORDERADM_H Contains the Header Information for a Business Transaction.
    Note:
    1. It doesn’t store the Business Partner
    responsible for the transaction. To
    get the Partner No, link it with
    CRM_ORDER_INDEX.
    2. This table can be used for search
    based on the Object Id(Business
    Transaction No).
    CRMD_CUSTOMER_H Additional Site Details at the Header Level of a Business Transaction
    CRMC_PROC_TYPE Master table Business Transaction Type
    CRMC_PARTNER_FCT Definition of Partner Functions
    SCPRIOT Priorities for Activities with priority text.
    CRMC_PROC_TYPE_T Text for a transaction type
    CRMC_ACT_OBJ_T Objective Number and Text for Activities
    TJ30T All the status code and text
    CRMC_PR_ASSIGN : Transaction Type and its Transaction Type Object.
    IBIB : Installed Base/Ibase
    IBIN : Installed Base Components
    COMM_PRODUCT : Products
    CRMC_T077D : customer account groups
    CRMD_ORDERADM_H (for header) CRMD_ORDERADM_I (Item data)
    CRMD_ORDERADM_H Business Transactions CRM
    CRMD_ACTIVITY_H Activity
    CRMD_OPPORT_H Opportunity
    BUTOO : Customer details
    BUT001 BP: General data II
    BUT100 BP: Roles
    BUT150 BP relationship: Attribute table (test
    different
    BUT_HIER_TREE Business Partner Group Hierarchy
    CDBC_T_PRODUCTID Mapping: Product Id
    CDBD_ORGMAN Business transaction - organizational unit -
    set
    COMC_PRODUCT General Product Settings
    COMC_R3_FIELDS Assignment of R/3 material master fields to
    CFOP
    COMM_CATEGORY Category
    COMM_CFGMAT Basic Data for Materials
    COMM_HIERARCHY Category Hierarchy
    COMP_TYPES Hierarchy Tool: Comparison Type Check
    Table
    CRMC_CPRICPROC Customer Pricing Procedures
    SMOKVBEZ15 Assignment employees to positions
    CRMMLSGUID: GUID entry (should match GUID in CRMPRLS)
    CRMM_BUT_CUSTNO : Also GUID table (GUID here should match GUID in R/3 table CRMKUNNR)
    SMOFSUBTAB : Mapping & Parameters
    SMOFDSTAT : Download Monitor (R4AM1)
    SMOFFILTAB : Filters (Should match filters in R3AC1 & R/3 Table CRMFILTAB)
    SMOFOBJECT Definition of Objects for Download
    SMOFOBJPAR Parent Objects of an Object in Table
    SMOFPARSFA Middleware Parameter
    SMOFQFIND Queue Finder Table for MW-Queue finder
    SMOFTABLES Definition of Tables for Download

  • CIF - Integration model name and APO application

    Hi Experts,
    In the CFM1 Transaction, there are 3 mandatory inputs are Model name, Logical system and APO application.
    Logical systems are customized in CFC1 transaction. I couldn't trace the model name and application creation.
    What is the transaction to customize/Create the new Model name and APO application.
    Hope this is very simple question to you and expect your soon.
    Thanks,
    Saravanan V

    Hi Somnath,
    Thanks for ur reply.
    First I saved the selection as variant. But it was not updated in the IM table.
    Then I tried to generate the model and now I can see the details when I use the F4 help.
    So, to create a integration model need to generate the variant once.
    Thanks for the confirmation.
    Thanks,
    Saravanan V

  • Landscape planning with BI and APO

    Hello all,
    This is more of planning question rather than issue.
    If you have upgraded your R/3 system first to Unicode before the BI and APO/SCM - how did you manage the interface testing within BI and APO, especially on how to avoid impact on existing work on BI/APO.
    - DId you have to create a separate new landscape?
    - Did you simply copy infocubes in the existing BI side?
    - Did you also apply 'freeze' development work on both BI and APO?
    Thanks,
    Terry

    Hi,
    can you look at this
    [http://help.sap.com/saphelp_crm60/helpdata/en/cc/441b6aa3e2484fadb08cc474272789/content.htm]
    Regards,
    Muralidhar

  • Data flow between R/3 AND APO

    How the chars and Navigational attributes are flowing in-between the R/3 AND APO ?
    Why we need to maintain the chars and nav attrr in APO? . Any input will be highly appreciated
    Thanks

    Hello Nick,
    Navigational Attributes : Characteristic attributes can be converted into navigation attributes. They can be selected in the query in exactly the same way as the characteristics for an InfoCube. In simple words an attribute is a characteristic that is logically assigned and subordinated to another characteristic. Navigational attributes offer a way to plan multiple objects while achieving optimum system performance in Demand Planning.
    e.g. Costs of the cost center drilled down by person responsible: You use the attribute u2018Cost Center Manageru2019 for the characteristic u2018Cost Centeru2019. If you want to navigate in the query using the cost center manager, you have to create the attribute u2018Cost Center Manageru2019 as a navigation attribute, and flag it as a navigation characteristic in the InfoCube.
    Characteristics : A planning object such as a product, location, brand or region.
    The master data of Demand Planning or Supply Network Planning encompasses the permitted values of the characteristics, the characteristic values. Characteristic values are discrete names or numbers . For example, the characteristic 'location' could have the values London, Delhi and New York.
    Regards
    Rahul Chitte
    Edited by: Rahul Chitte on Aug 30, 2010 5:07 PM

  • Integration between R/3 and APO

    Hi Friends
    I had created integration model betwee R/3 , APO and activated 
    My R/3 material is in X (Ex 1000) plant.
    Iam not able see my product in Locations Y & Z  (ex 3000 & 4000).
    Iam able to see the product in Location  X(EX 1000 only)
    what settings i have to be made in R/3 and APO.
    Please advise me..
    Regards,
    Srihari.

    Hi Srihari,
    You said that,
    "My R/3 material is in X (Ex 1000) plant.
    Iam not able see my product in Locations Y & Z (ex 3000 & 4000).",
    does this mean that your material is not created at locations Y and Z in R/3.
    If not it should be done.If your material is not created at locations Y and Z, obviously they are
    not available in APO system at those locations( Y and Z).
    Regards,
    Rajendra.

  • PP and APO

    Hi Guru's
    can you give an insight on what is APO and how it is interfaced with PP module in SAP. Also give a detail example of how APO enhances the PP module in R/3 .  I will be thankful if u can explain me with a specific scenario, say for example discrete manufacturing in a normal R/3 system and a system interfaced with APO
    thank u

    Hi Nithiyaseelan,
    APO stands for Advanced Planner and Optimizer. The transferring of datas from R/3 to APO by using the interface CIF (Core Interface). This CIF is BW components.
    The transaction data relevant for planning, such as warehouse stock and sales or production orders is also transferred from the R/3 into APO via the CIF interface.
    Aggregated actual data can be transferred to APO from OLTP, BW (Business Information Warehouse), Excel, and Legacy systems, and saved in InfoCubes.
    The data transfer between R/3 and APO Systems is defined and controlled using the APO Core Interface (CIF). The CIF is the central interface for connecting APO to the existing R/3 System environment.
    The forecasting data of demand plan is created as a result of the forecast.
    You release the demand plan to Production Planning, which creates planned independent requirements for Supply Network Planning (SNP), and PP/DS. You can also transfer the demand plan to the operating system (OLTP - Online Transferring Process) as planned independent requirements.
    The seamless integration with Supply Network Planning (SNP), and PP/DS supports an efficient S&OP process.
    please let me know any clarification. if helpful, pls reward the points.
    Thanks in advance,
    Mohan R

  • New to SNC and APO

    Hi Experts,
    Could any one highlight on the SAP technical aspects/ABAP of SNC and APO Modules.
    What is required to be known.?
    Any reference material and links?

    Please check below threads;
    https://forums.sdn.sap.com/click.jspa?searchID=18251859&messageID=3084114
    https://forums.sdn.sap.com/click.jspa?searchID=18251859&messageID=5241676
    https://forums.sdn.sap.com/click.jspa?searchID=18251859&messageID=5071581
    Also visit Wiki page https://www.sdn.sap.com/irj/sdn/wiki?path=/display/scm/apo-technical
    Manish

  • BW and APO Administration Guides

    HI Guys
    Require BW and APO Administration Guides. Please forward me the link.
    Thanks
    Madhav

    Hello Madhav ,
    Please download from URL :
    Monitoring and Administration for SCM / APO :
    https://websmp204.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700007382642002E
    BW :
    https://websmp204.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700002631452002E
    Regards ,
    Santosh Karadkar

  • We are upgrading EHP4,What are the scenarios we will check in ECC and APO

    Hi gurus,
    We are upgrading (ECC )EHP4
    What are the scenarios we will check in ECC and APO, kindly tell me gurus.
    Regards
    babu

    Babu,
    We live within a dream. The आत्मन् is real, all else is Illusion. Names are illusion.  If DB49 does not suit you, then call me nameless.
    Before you even release the software into the test environment, you must perform unit testing.  Can every transaction that is used by your company be executed?  Does every userexit/enhancement still perform the same task?  Does every custom report work the same? All interfaces passing the proper data?
    Merely testing the software itself will not give your company any assurance that it will support your business after you go live with it, so after unit testing comes integration testing and user acceptance testing.  You must interview Key business users, and from their input you must develop and execute tests for 'business processes'.  For example, one common business scenario (which contains many business processes), Order to Cash:  Check whether your upgraded systems supports your ability to receive and enter an order, plan the parts, obtain the RM, build the parts ship the order, and book the cash.  Or, another Scenario, Procure to Pay:  Check if you can plan RM parts, create/release PR, create PO, send PO to Vendor, receive PO in stock, pay invoice, close month for accounting purposes.
    These are two major business scenarios in most companies that use ERP.  There are hundreds more that can be tested, If you work for a company that cannot afford to have any disruption in their business, then all activities that are normally done by any business user should be tested.
    On the SCM side, during an ERP update, you have a smaller task (SAP usually does a good job with backward compatibility with their own modules).  BW extractors must be tested.  All integration models must be tested.  All userexits must be tested.  Publishing results/releasing results to ERP must be tested. The list goes on and on depending upon which SCM modules you have implemented.
    Regards,
    DB49

  • APO/BW: Verifying/Establishing a connection between BW and APO

    Hi
    1. Is there a way to see that my BW system is connected to an APO system, other than finding a name with “APO” in it under the Source System tree in BW?
    2. Also, if the connection does NOT exist between BW and APO, can you provide me with the steps on how do I establish such a connection?
    3. Does a successful  in “Generate Export DataSource” in BW indicate that my BW system is connected to APO DP?
    Thanks

    . Is there a way to see that my BW system is connected to an APO system, other than finding a name with “APO” in it under the Source System tree in BW?
    In source system tree, you will find all the systems that are connected to your BW system. The system name need not have to start with APO.
    2. Also, if the connection does NOT exist between BW and APO, can you provide me with the steps on how do I establish such a connection?
    Transaction Sm59. you need to know the source and destination IP adresses. Usually, the baais will take care of connections.
    3. Does a successful in “Generate Export DataSource” in BW indicate that my BW system is connected to APO DP?
    NO. Export generaion is within BW system; nothing to do with the APO system that is connected.
    Ravi Thothadri

  • Inspection lot status not matching R/3 and APO

    Hi,
    I am getting an error in CCR report saying that "The inspection lot is in "released" status in R/3 but not in APO". Here I am giving the steps that I have followed to get this error.Please let me know why this error is coming. Can some give idea about this.
    1.Planned order converted and released (not an early lot create material). 
    2.Good receipt done, inspection lot created.  Rescheduled “in” released process order prior to the original start date, in the planning board.  Dates update in the order in APO successfully,  
    The inspection lot shows in APO as the product is not forward processed.  (The stock will not appear until the usage decision is made.)  There is a CCR report discrepancy, error code 405.  The inspection lot is in "released" status in R/3 but not in APO.
    Thanks in Advance,
    Ramesh M

    Hi Sajeev,
    Sorry for late response.
    Yes,I have made changes to process order dates after GR.
    And I am populating these date changes to Insp. lot in user exit in R/3 and sending that Insp Lot to APO using the function module CIF_ADD_INSPLOT_OUT.
    I can see the date changes in R/3 as well sa APO.But the release status in R/3 is intact and APO is removed.
    This is causeing CCR error 405.
    Let me know if you need further information.
    Thanks,
    Ramesh